Canal fall- necessity andlocation- types of
falls- Cross regulator anddistributory head
regulator- their functions, Silt controldevices,
Canal escapes-types of escapes.
Introduction
canal obtains its share of water from the
pool behind a barrage through a structure
called the canal head regulator
also a regulation structure for controlling
the amount of water passing into the canal
In this lesson, attention focussed on
structures that regulate the discharge and
maintain the water levels within a canal
network
These structures may be described as follows:
1. Drops and falls, to lower the water level of the
canal
2. Cross regulators, to head up water in the parent
channel to divert some of it through an off take
channel, like a distributary.
3. Distributary head regulator, to control the
amount of water flowing in to off take channel.
4. Escapes, to allow release of excess water from
the canal system.
Canal drops and falls
canal has a designed longitudinal slope
but has to pass through an undulating
terrain.
When a canal crosses an area that has a
larger natural surface slope, a canal drop,
also called fall in India, has to be provided
suitably at certain intervals.
location of fall judiciously worked out
such that there should be a balance
between the quantities of excavation and
filling.
height of the fall has to be decided, since it
is possible to provide larger falls at longer
intervals or smaller falls at shorter
intervals.
Necessity of canal falls
When slope of ground suddenly changes to
steeper slope, permissible bed slope cannot
be maintained.
Slope of ground is more or less uniform and
slope is greater than permissible bed slope of
canal.
In cross drainage work, when difference
between level of canal and that of drainage is
small or when F.S.L of canal is above bed
level.
Types of canal fall
1. Ogee fall
 an ogee curve (combination of convex
and concave curve) provided for carrying
canal water from higher level to lower
level.
 Fall is recommended when natural
ground surface suddenly changes to a
steeper slope along the alignment of the
canal.
Fall consists of a concrete vertical wall and
concrete bed.
Over the concrete bed the rubble masonry
is provided in the shape of ogee curve.
Upstream and downstream of the fall is
protected by stone pitching.
2. Rapid fall
When slope of the natural ground surface
is even and long.
Consists of long glacis with longitudinal
slope.
Curtain walls are provided on the
upstream and downstream side of the
sloping glacis.
3. Trapezoidal notch fall
Body wall is constructed across the canal.
Body wall consists of several trapezoidal
notches between side piers and
intermediate piers.
Notches are kept at the upstream bed level
of canal.
Body wall is constructed with masonry or
concrete.
4. Vertical drop fall
Consists of vertical drop wallconstructed
with masonry work.
Water flows over the crest of wall.
Concrete floor provided on downstream
side to control scouring effect.
Curtain wall provided on upstream and
downstream side.
This type falls provided at Sardar canal,
UP. Hence known as sardar fall.
Canal regulators
include the cross regulator and the
distributary headregulator structures for
controlling the flow through a parent
canal and its off-taking distributary .
help to maintain the water level in the
canal on the upstream of the regulator.
 angle at which a distributary canal off-takes
from the parent canal has to be decided
carefully.
 The best angle is when the distributary takes off
smoothly.
 Another alternative is to provide both channels
(off-taking and parent) at an angle to the original
direction of the parent canal.
 When it becomes necessary for the parent canal
to follow a straight alignment, the edge of the
canal rather than the centre line should be
considered in deciding the angle of off-take.
To prevent excessive entry of silt
deposition at the mouth of the off-take, the
entry angle should be kept to between 600
and 800.
For the hydraulic designs of cross
regulators, one may refer to the Bureau of
Indian Standard code IS: 7114-1973
“Criteria for hydraulic design of cross
regulators for canals”.
The distributary should preferably be
designed to draw sediment proportional
to its flow, for maintaining non-siltation of
either the parent canal or itself.
three types of structures have been
suggested as discussed below along with
the relevant Bureau of Indian standard
codes.
Silt vanes
are thin, vertical, curved parallel walled
structures constructed of plain or
reinforced concrete on the floor of the
parent canal, just upstream of the off-
taking canal.
height of the vanes may be about one-
fourth to one-third of the depth of flow in
the parent canal.
thickness of the vanes should be as small
as possible and the spacing of the vanes
may be kept about 1.5 times the vane
height.
To minimize silting tendency, the pitched
floor on which the vanes are built should
be about 0.15 m above the normal bed of
the parent channel.
Groyne walls or curved wings
project out in to the parent canal from the
downstream abutment of the off-taking
canal.
it divides the discharge of the parent canal
in proportion of the discharge
requirement of the off-taking canal with
respect to the flow in the downstream
parent canal.
The groyne wall extends upstream in to
the parent canal to cover ¾ to full width of
the off-take.
proportional distribution of flow in to the
off-taking canal is expected to divert
proportional amount ofsediment.
The height of the groyne wall should be at
least 0.3m above the full supply level of
the parent canal.
Skimming platforms
A skimming platform is an RCC slab
resting on low height piers on the bed of
the parent canal, and in front of the off-
taking canal.
creates a kind of low tunnel at the bed of
the parent canal, which allows the
sediment moving along its bed to pass
through downstream.
floor of the off-taking canal being above
the level of the platform thus only takes
suspended sediment load coming along
with the main flow in the parent canal.
suitable where the parent channel is deep
(about 2m or more) and the off-take is
comparatively small.
The tunnels should be at-least 0.6m deep.
The upstream and downstream edges of
the platform should be inclined at about
300 to the parent canal cross section.
Canal escapes
structures meant to release excess water
from a canal, which could be main canal,
branch canal, distributary, minorsetc.
usually an irrigation system suffers from
deficit supply in later years of its life
situations that might suddenly lead to
accumulation of excess water in a certain
reach of a canal network may occur due to
the following reasons:
1.Wrong operation of head works in trying
to regulate flow in a long channel
resulting in release of excess water than
the total demand in the canal system
downstream.
2. Excessive rainfall in the command area
leading to reduced demand and
consequent closure of downstream gates.
3. Sudden closure of control gates due to a
canal bank breach.
The excess water in a canal results in the
water level rising above the full supply
level which, if allowed to overtop the
canal banks, may cause erosion and
subsequent breaches.
Hence, canal escapes help in releasing the
excess water from a canal at times of
emergency.
Escapes as also built at the tail end of
minors at the far ends of a canal network.
These are required to maintain the
required full supply level at the tail end of
the canal branch.
Weir or surface escapes
are constructed in the form of weirs,
without any gate or shutter and spills over
when the water level of the canal goes
above its crest level.
Sluice or surplus escapes
gated escapes with a very low crest height.
these sluices can empty the canal much
below its full supply level and at a very
fast rate.
In some cases, these escapes act as
scouring sluices to facilitate removalof
sediment.
The locations for providing escapes are
often determined on the availability of
suitable drains, depressions or rivers with
their bed level at or below the canal bed
level.
Escapes may be necessary upstream of
points where canals takeoff from a main
canal branch.
Escape upstream of major aqueducts is
usually provided.
Canal escapes may be provided at
intervals of 15 to 20km for main canal and
at 10 to 15km intervals for other canals.
Canal Regulation Works

More Related Content

What's hot

Canal & canal types with design of channels by dj sir covered kennedy lacey t...
Canal & canal types with design of channels by dj sir covered kennedy lacey t...Canal & canal types with design of channels by dj sir covered kennedy lacey t...
Canal & canal types with design of channels by dj sir covered kennedy lacey t...
Denish Jangid
 
Cve471 lecture notes 4 spillways
Cve471 lecture notes 4   spillwaysCve471 lecture notes 4   spillways
Cve471 lecture notes 4 spillways
saibabu48
 
Embankment lecture 3
Embankment lecture 3Embankment lecture 3
Embankment lecture 3
Vidhi Khokhani
 

What's hot (20)

Hydraulic structures
Hydraulic structuresHydraulic structures
Hydraulic structures
 
guide banks.pptx
guide banks.pptxguide banks.pptx
guide banks.pptx
 
River training method
River training methodRiver training method
River training method
 
seminar presentation report on spillway
 seminar presentation report on spillway seminar presentation report on spillway
seminar presentation report on spillway
 
Canal & canal types with design of channels by dj sir covered kennedy lacey t...
Canal & canal types with design of channels by dj sir covered kennedy lacey t...Canal & canal types with design of channels by dj sir covered kennedy lacey t...
Canal & canal types with design of channels by dj sir covered kennedy lacey t...
 
Diversion head works
Diversion head worksDiversion head works
Diversion head works
 
Cve471 lecture notes 4 spillways
Cve471 lecture notes 4   spillwaysCve471 lecture notes 4   spillways
Cve471 lecture notes 4 spillways
 
Canal
CanalCanal
Canal
 
Design of Lined Canal and Canal Lining
Design of Lined Canal and Canal LiningDesign of Lined Canal and Canal Lining
Design of Lined Canal and Canal Lining
 
Chapter two
Chapter twoChapter two
Chapter two
 
Weir and barrage lecture
Weir and barrage lectureWeir and barrage lecture
Weir and barrage lecture
 
Design of Hydraulic Structures
Design of Hydraulic StructuresDesign of Hydraulic Structures
Design of Hydraulic Structures
 
TYPES OF SPILLWAYS & PROMINENT FEATURES
TYPES OF SPILLWAYS & PROMINENT FEATURESTYPES OF SPILLWAYS & PROMINENT FEATURES
TYPES OF SPILLWAYS & PROMINENT FEATURES
 
Canal of design
Canal of designCanal of design
Canal of design
 
Embankment lecture 3
Embankment lecture 3Embankment lecture 3
Embankment lecture 3
 
Canal headworks
Canal headworksCanal headworks
Canal headworks
 
Diversion head works
Diversion head worksDiversion head works
Diversion head works
 
050218 chapter 7 spillways and energy dissipators
050218 chapter 7 spillways and energy dissipators050218 chapter 7 spillways and energy dissipators
050218 chapter 7 spillways and energy dissipators
 
Canal design
Canal designCanal design
Canal design
 
Canal Regulation & Canal Types
Canal Regulation & Canal TypesCanal Regulation & Canal Types
Canal Regulation & Canal Types
 

Similar to Canal Regulation Works

Similar to Canal Regulation Works (20)

Canal regulation works. m4pptx
Canal regulation works. m4pptxCanal regulation works. m4pptx
Canal regulation works. m4pptx
 
Barrage Gate Operation Rules and Silt Control Devices Report
Barrage Gate Operation Rules and Silt Control Devices Report Barrage Gate Operation Rules and Silt Control Devices Report
Barrage Gate Operation Rules and Silt Control Devices Report
 
Canal irrigation
Canal irrigationCanal irrigation
Canal irrigation
 
Cross drainage work.pptx
Cross drainage work.pptxCross drainage work.pptx
Cross drainage work.pptx
 
DIVERSION HEAD WORKS
DIVERSION HEAD WORKSDIVERSION HEAD WORKS
DIVERSION HEAD WORKS
 
Design of hydraulic structures ce 413
Design of hydraulic structures ce 413Design of hydraulic structures ce 413
Design of hydraulic structures ce 413
 
Diversion headwork
Diversion headwork Diversion headwork
Diversion headwork
 
Canal structures
Canal structuresCanal structures
Canal structures
 
Canal structures
Canal structuresCanal structures
Canal structures
 
Diversion head work
Diversion head workDiversion head work
Diversion head work
 
unit-3.pdf
unit-3.pdfunit-3.pdf
unit-3.pdf
 
SPILLWAYS.pdf
SPILLWAYS.pdfSPILLWAYS.pdf
SPILLWAYS.pdf
 
Drainage Engineering (cross drainage structures)
Drainage Engineering (cross drainage structures)Drainage Engineering (cross drainage structures)
Drainage Engineering (cross drainage structures)
 
UNIT 5 Distribution Works.pptx
UNIT 5 Distribution Works.pptxUNIT 5 Distribution Works.pptx
UNIT 5 Distribution Works.pptx
 
Design Principles that are involved in the Design of Flow over an Ogee Crest ...
Design Principles that are involved in the Design of Flow over an Ogee Crest ...Design Principles that are involved in the Design of Flow over an Ogee Crest ...
Design Principles that are involved in the Design of Flow over an Ogee Crest ...
 
hydraulic structures in civil engineering
hydraulic structures in civil engineeringhydraulic structures in civil engineering
hydraulic structures in civil engineering
 
Diversion headworks
Diversion headworksDiversion headworks
Diversion headworks
 
Spillways & energy dissipator
Spillways & energy dissipatorSpillways & energy dissipator
Spillways & energy dissipator
 
Elements of Water Conductor System
Elements of Water Conductor SystemElements of Water Conductor System
Elements of Water Conductor System
 
Hydroelectric power plants (chapter 5)
Hydroelectric power plants   (chapter 5)Hydroelectric power plants   (chapter 5)
Hydroelectric power plants (chapter 5)
 

Recently uploaded

Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ankushspencer015
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 

Recently uploaded (20)

Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
 

Canal Regulation Works

  • 1. CANAL REGULATION WORK MODULE- 4 PREPARED BY – ABDUL SAHID DEPARTMENT OF CIVIL ENGINEERING B.N. COLLEGE OF ENGG. & TECHNOLOGY , LUCKNOW
  • 2. Content… Canal fall- necessity andlocation- types of falls- Cross regulator anddistributory head regulator- their functions, Silt controldevices, Canal escapes-types of escapes.
  • 3. Introduction canal obtains its share of water from the pool behind a barrage through a structure called the canal head regulator also a regulation structure for controlling the amount of water passing into the canal In this lesson, attention focussed on structures that regulate the discharge and maintain the water levels within a canal network
  • 4.
  • 5. These structures may be described as follows: 1. Drops and falls, to lower the water level of the canal 2. Cross regulators, to head up water in the parent channel to divert some of it through an off take channel, like a distributary. 3. Distributary head regulator, to control the amount of water flowing in to off take channel. 4. Escapes, to allow release of excess water from the canal system.
  • 6. Canal drops and falls canal has a designed longitudinal slope but has to pass through an undulating terrain. When a canal crosses an area that has a larger natural surface slope, a canal drop, also called fall in India, has to be provided suitably at certain intervals.
  • 7.
  • 8. location of fall judiciously worked out such that there should be a balance between the quantities of excavation and filling. height of the fall has to be decided, since it is possible to provide larger falls at longer intervals or smaller falls at shorter intervals.
  • 9. Necessity of canal falls When slope of ground suddenly changes to steeper slope, permissible bed slope cannot be maintained. Slope of ground is more or less uniform and slope is greater than permissible bed slope of canal. In cross drainage work, when difference between level of canal and that of drainage is small or when F.S.L of canal is above bed level.
  • 10. Types of canal fall 1. Ogee fall  an ogee curve (combination of convex and concave curve) provided for carrying canal water from higher level to lower level.  Fall is recommended when natural ground surface suddenly changes to a steeper slope along the alignment of the canal.
  • 11. Fall consists of a concrete vertical wall and concrete bed. Over the concrete bed the rubble masonry is provided in the shape of ogee curve. Upstream and downstream of the fall is protected by stone pitching.
  • 12.
  • 13. 2. Rapid fall When slope of the natural ground surface is even and long. Consists of long glacis with longitudinal slope. Curtain walls are provided on the upstream and downstream side of the sloping glacis.
  • 14.
  • 15. 3. Trapezoidal notch fall Body wall is constructed across the canal. Body wall consists of several trapezoidal notches between side piers and intermediate piers. Notches are kept at the upstream bed level of canal. Body wall is constructed with masonry or concrete.
  • 16.
  • 17. 4. Vertical drop fall Consists of vertical drop wallconstructed with masonry work. Water flows over the crest of wall. Concrete floor provided on downstream side to control scouring effect. Curtain wall provided on upstream and downstream side. This type falls provided at Sardar canal, UP. Hence known as sardar fall.
  • 18.
  • 19. Canal regulators include the cross regulator and the distributary headregulator structures for controlling the flow through a parent canal and its off-taking distributary . help to maintain the water level in the canal on the upstream of the regulator.
  • 20.
  • 21.  angle at which a distributary canal off-takes from the parent canal has to be decided carefully.  The best angle is when the distributary takes off smoothly.  Another alternative is to provide both channels (off-taking and parent) at an angle to the original direction of the parent canal.  When it becomes necessary for the parent canal to follow a straight alignment, the edge of the canal rather than the centre line should be considered in deciding the angle of off-take.
  • 22.
  • 23. To prevent excessive entry of silt deposition at the mouth of the off-take, the entry angle should be kept to between 600 and 800. For the hydraulic designs of cross regulators, one may refer to the Bureau of Indian Standard code IS: 7114-1973 “Criteria for hydraulic design of cross regulators for canals”.
  • 24. The distributary should preferably be designed to draw sediment proportional to its flow, for maintaining non-siltation of either the parent canal or itself. three types of structures have been suggested as discussed below along with the relevant Bureau of Indian standard codes.
  • 25. Silt vanes are thin, vertical, curved parallel walled structures constructed of plain or reinforced concrete on the floor of the parent canal, just upstream of the off- taking canal. height of the vanes may be about one- fourth to one-third of the depth of flow in the parent canal.
  • 26. thickness of the vanes should be as small as possible and the spacing of the vanes may be kept about 1.5 times the vane height. To minimize silting tendency, the pitched floor on which the vanes are built should be about 0.15 m above the normal bed of the parent channel.
  • 27.
  • 28. Groyne walls or curved wings project out in to the parent canal from the downstream abutment of the off-taking canal. it divides the discharge of the parent canal in proportion of the discharge requirement of the off-taking canal with respect to the flow in the downstream parent canal.
  • 29. The groyne wall extends upstream in to the parent canal to cover ¾ to full width of the off-take. proportional distribution of flow in to the off-taking canal is expected to divert proportional amount ofsediment. The height of the groyne wall should be at least 0.3m above the full supply level of the parent canal.
  • 30.
  • 31. Skimming platforms A skimming platform is an RCC slab resting on low height piers on the bed of the parent canal, and in front of the off- taking canal. creates a kind of low tunnel at the bed of the parent canal, which allows the sediment moving along its bed to pass through downstream.
  • 32. floor of the off-taking canal being above the level of the platform thus only takes suspended sediment load coming along with the main flow in the parent canal. suitable where the parent channel is deep (about 2m or more) and the off-take is comparatively small.
  • 33. The tunnels should be at-least 0.6m deep. The upstream and downstream edges of the platform should be inclined at about 300 to the parent canal cross section.
  • 34.
  • 35. Canal escapes structures meant to release excess water from a canal, which could be main canal, branch canal, distributary, minorsetc. usually an irrigation system suffers from deficit supply in later years of its life situations that might suddenly lead to accumulation of excess water in a certain reach of a canal network may occur due to the following reasons:
  • 36. 1.Wrong operation of head works in trying to regulate flow in a long channel resulting in release of excess water than the total demand in the canal system downstream. 2. Excessive rainfall in the command area leading to reduced demand and consequent closure of downstream gates. 3. Sudden closure of control gates due to a canal bank breach.
  • 37. The excess water in a canal results in the water level rising above the full supply level which, if allowed to overtop the canal banks, may cause erosion and subsequent breaches. Hence, canal escapes help in releasing the excess water from a canal at times of emergency.
  • 38. Escapes as also built at the tail end of minors at the far ends of a canal network. These are required to maintain the required full supply level at the tail end of the canal branch.
  • 39. Weir or surface escapes are constructed in the form of weirs, without any gate or shutter and spills over when the water level of the canal goes above its crest level.
  • 40.
  • 41. Sluice or surplus escapes gated escapes with a very low crest height. these sluices can empty the canal much below its full supply level and at a very fast rate. In some cases, these escapes act as scouring sluices to facilitate removalof sediment.
  • 42.
  • 43. The locations for providing escapes are often determined on the availability of suitable drains, depressions or rivers with their bed level at or below the canal bed level. Escapes may be necessary upstream of points where canals takeoff from a main canal branch.
  • 44. Escape upstream of major aqueducts is usually provided. Canal escapes may be provided at intervals of 15 to 20km for main canal and at 10 to 15km intervals for other canals.