HS-05 Solvent Free One Component Polyurethane (PU) Waterproofing Coating
1. The Waterproofing System Specialist
HESHENG®
HS-05
Single Part Solvent Free Water Curing Polyurethane PU Waterproofing Coating
DESCRIPTION
Hesheng devoted himself to research new high-quality waterproofing materials, the Hesheng HS-05 is a
new generation environment-friendly waterproofing materials.
PRODUCT FEATURES
1.Environment Friendly. HS-05 is a white liquid of single component that can add water directly to
make it solidify, non-toxic and pollution-free. It can solidify by putting 10% water directly and mix with
electric mixer or direct application.
2.Excellent Quality. HS-05 adopts advanced technology and uses modern production equipment, and it
can make into cured cross linking agent by putting water directly, the active gene of coating reacts to
water molecule, and then become waterproofing with rubbery properties. Waterproofing coating has
good tensile strength, high elongation at break, good weather resistance, adaptability deformation
characteristics.
3.Simple construction. HS-05 is single component that can work by adding water directly, construction
has no special requirements of basic level, no clear water to construction. Construction safety and
environmental protection, product is in a standard environment, surface drying time≤6h, fully drying
time≤12h, great to meet the requirements of the construction period.on-site no fire, no organic solvent.
4.Cost-effective.The solid content is small, the proportion of small, per square meter coating thickness
of 1mm using about 1.2kg,unit area with less, physical performance is good,cost-effective.
WHERE TO USE
1.Upscale community, roof of non-exposed high standard buildings.Waterproofing of kitchen & bath,
swimming pool, fountain,drinking water project
2.Railway, tunnel and underground engineering
TECHNICAL DATA SHEET
Executive Standard: GB/T 19250-2003
Item
Index
Ⅰ Ⅱ
Tensile strength Mpa
Non-treatment ≥1.90 ≥2.45
Alkali treatment 60~150% 60~150%
Acid treatment 80~150% 80~150%
Artificial weathering retention
rates
80~150% 80~150%
Elongation at break
Non-treatment ≥500 ≥450
Alkali treatment
500 400
Acid treatment
2. Artificial weathering retention
rates
Tear strength (N/mm) ≥12 ≥14
Heat shrinkage -4.0~1.0 -4.0~1.0
Foldability at low
temperature
Non-treatment ≤-40°C No gash ≤-40°C No gash
Alkali treatment
≤-35°C No
Gash
≤-35°C No Gash
Acid treatment
Artificial weathering retention
rates
Impermeability( 0.3Mpa, 30min) Impermeable Impermeable
Bonding strength with moist surface (Mpa) ≥0.6 ≥0.6
Solids content % ≥80 ≥80
Drying time
Surface drying Time ≤6 ≤6
Fully srying Time ≤12 ≤12
CONSTRUCTION PROCEDURE
Construction preparation→ base treatment → Detail, node, and processing →scraping the bottom layer
of the coating processing →Surface coating layer→ organization acceptance→ protective cover
MAIN POINT OF CONSTRUCTION
1. Clean, solid base level requirements, defects should be repaired;
2. Details: in the first Angle, a layer of paint coated pipe root of inside and outside, the shop is stuck
again strengthen layer (glass fiber cloth or nonwoven, etc.), and makes the coating completely soaked
with strengthening layer;
3. The base surface: "at the grass-roots level to strengthen treatment agent is added in the coating
increase with the seal of the grassroots and permeability;
4 layer surface: the coating evenly coated with rubber scraper scrape on the base of a coated before
blowing direction and a vertical surface direction. Coating table dry room temperature about 12 hours,
before each coating intervals, coating is not glue the hand, generally need to surface 2-3 times (or
according to the design requirements);
5. Every time the thickness in 0.5 0.8 mm advisable;
DOSAGE OF REFERENCE
1 mm thick coating, reference usage is about 1.2~1.4 Kg /㎡
1.5 mm thick coating, reference usage is about 1.6~2 Kg /㎡
2 mm thick coating, reference usage is about 2~2.5 Kg /㎡
MATTERS ATTENTION
1. Open after an exhausted, use time for half an hour. When the product storage period is longer, might
form a layer of thin film coating surface, when used. Does not affect the use effect;
2. The coating construction before curing it is forbidden to walk on the waterproof layer, weights and
sharp objects are strictly prohibited to damage the waterproof layer;
3. Keep ventilated, construction site construction personnel equipped with the protection object such as
safety helmet, gloves, work shoes, in order to avoid from irritation of the skin and eyes, the construction
site shall not contact with fire;
4. Upon the acceptance of coating to do protective layer construction;
3. 5. In the low temperature environment construction, in order to ensure the dry solid velocity can add
special matching curing additive;
6. Restrictions on the use of rain and snow, wind and cold weather;
7. Do not conform to the requirements on the basic of unfavorable use.
STORAGE/TRANSPORTATION/PACKAGING
1. Stored in dry room, away from fire and heat source, storage temperature should not be higher than
40 ℃;
2. Shelf life: 12 months from the date of production;
3. In the process of transportation to prevent collision and weathered;
4. Packaging specifications: 25 kg/barrel.
Foshan Shunde Hesheng Chemical Industry Co., Ltd.
Web: www.he-sheng.com.cn/en/ E-mail:kevin@he-sheng.com.cn
Sales Manager: Kevin Cell/WhatsApp: +86 13794633232 Tel.:+86 757 22904888 Fax.:+86 757 22904999
Headquarter Addr.:No.11-1-2, Fu An Industrial Area, Leliu, Shunde, Foshan City, Guangdong Province, China
Sub-factory Addr.:NO.10 Fuyuan Rd.,Rongbian, Rongui, Shunde, Foshan City, Guangdong Province, China