Holcim Cement
Pre-Engineered Office Building

                Presented by:
       Wes Villhard – Kozeny-Wagner
            VP Commercial Construction


             Tom Way – WGA
            Senior Engineering Manager
Success Thru Best Practices
 Front End Planning
 Materials Management
 Team Building
 Partnering
Front End Planning
 Pre-Engineered Building
 Architecture & Engineering
 Mechanical / Electrical
 Interior Finish
 Project Team
Pre-Engineered Building
 Pre-Ordered American Metal Building
 Released without Door & Window Trim
 “In-Stock” Center Support Building
 Early Delivery in order to Build Frames During Slab Pour
Architecture & Engineering
 Completed Foundation Design from Pre-Engineered
  Building Loads
 Ordered Rebar for Foundations before Slab Design was
  Complete
 Pre-Approved Concrete Mix Design
 Allowed Two Weeks for Architectural Design
Mechanical / Electrical
 Ordered “In-Stock” Ground Mounted Split Systems
 Saved Engineering Time for Roof Frames
 Electrical Rough-in of Slab vs. Overhead
 Saved Two Weeks on Schedule
Mechanical / Electrical
 HighBay Lighting for Open Office Areas
    Reusable for Future Warehouse
 Duct Socks Reduced Field Labor
 Prefabed All Ductwork
 Installed Ductwork Prior to Roofing
Interior Finish
 Panelized Office Walls During Floor Slab Pours
 Install Studs Prior to Roofing
 Ordered only “In-Stock” Material
    Windows, Doors, Hardware, Toilet Partitions, Accessories, etc.
 Allowed Sealed Concrete Floors Rather than VCT or Other
  Flooring
 Coordinated all Interior Work with Roof Installation
    One Side then the Other
Project Team
 Selected Only Subs with Available Manpower
 Past Performance “Can-do” Attitude
    Subcontractors- Foreman & Project Manager
    Kozeny-Wagner - Foreman & Project Manager
 Teamwork, Find Solutions
 Overcome Obstacles
 Go the Extra Mile
Week 1 – Prefab Foundation Rebar
During Building Layout
Week 1 – Bad Soils & Rock
Encountered
Week 1 – Rock Encountered
Week 1 – Foundations Started
Week 1 – PreFabed Rebar in Perimeter
Foundations
Week 2 – Foundation Complete and
Backfilled
Week 2 – Slab Rough-in, Electrical &
Plumbing
Week 2 – Rebar For Heavy Duty Slab,
Delivered & Installed
Week 3 – Slab Pour, Steel Material Deck
Delivered in the Background
Week 3 – Rain Pushed First Slab Pour
Late Into the Night
Week 3 – Second Slab Pour
Week 4 – Plumbing Rough-in Started
Immediately with Wall Layout
Week 4 – Steel Erection in Progress
Using Pre-Assembled Frames
Week 4 – Center Support vs Clear-Span
Steel Used for Early Delivery
Week 4 – Building Frame Complete
Week 5 – Roof Perlins Complete and
Duct Hangers In Progress
Week 5 – Ductwork Delivered
Week 5 – Plumbing Rough-In
In Progress
Week 5 – Ductwork & West End &   Side
Wall
Week 5 – Exterior HVAC Units Set, Roof
Insulation & Roof Panels In Progress
Week 5 – Roof Insulation, Roof Panels,
Widows & Exterior Framing In Progress
Week 5 – Exterior View of Roof Insulation,
Window Framing & Ductwork / AC Units
Week 6 – Close-up of Roof Panels
In Progress
Week 6 – Ceiling Grid-Continuous,
Prior to Perimeter Offices
Week 6 – First Panelized Office
Week 6 – Exterior Office Framing,
Acoustical Grid, Prior to Roof Panels
Week 6 – Roof Insulation & Roof Panels
Continue to the Far End of the Building
Week 6 – One Side of Roof Complete,
Framing / MEP Rough-in In Progress
Week 7 – High Bay Lights Above Open
Office Areas
Week 7 – Roof Deck Delayed by High
Winds 1- 2 Weeks, Nearly Complete
Week 7 – Exterior Panes / Windows
Nearly Complete
Week 7 – Exterior Wall Panels Complete
Week 7 – Exterior Duct Work Complete,
Power On! Test & Balanced Started.
Week 7 – Duct Socks Installed to
Reduce Field Labor
Week 7 – Sheetrock and Restrooms
In Progress
Week 7 – Drywall / Doors / Hardware In
Progress, Preparing for Work Stations
Week 8 – Work Stations In Progress, Flex
Duct / Diffusers Installed, Lights / HVAC On
Week 8 – Painting Nearly Complete
Week 9 – Project Complete
COMPLETED IN
  9 WEEKS!
Project Summary
 Design-Build Delivery
 Half the Time of a Typical Schedule
 32 Private Offices, 5 Conference Rooms and
  90 Workstations
 Critical Path – “Fast-Track” Mode
    10-12 Hour Days
    7 Days / Week
Project Summary
 $240,000 in Change Orders
 $79 / Square Foot Total
 45 Normal Working Days (9 Weeks M-F)
 Less 16 Weather Days
Safety Award
 “On the Spot” WGA Safety
  Award Given to Dan Fox of
  Kozeny-Wagner.
 MSHA Award – Recognized by
  the South Central Region of the
  Federal Mine Safety & Health
  Administration for Outstanding
  Safety Compliance &
  Accomplishment.
Success Thru Best Practices
 Front End Planning
 Materials Management
 Team Building
 Partnering
Thank You Project Team!
 Aschinger Electric              Zumwalt Corporation
 Bieg Plumbing Company           Wedemeyer/Cernik/Corrubia, Inc.
 Fenix Construction Company      Zahner Surveying
 Frontenac Painting, Inc.        A.F. Becker
 Grau Contracting, Inc.          CKC Woodworks, Inc.
 Jarrell Contracting             H&G Sales
 Paul Abt Flooring               St. Louis Steel Buildings
 Rednour Steel Erectors, Inc.
A Special Thanks to

  Holcim Cement
        &
       WGA
We Build A Better Quality of Life

More Related Content

What's hot

Allen Robert CV
Allen Robert  CVAllen Robert  CV
Allen Robert CVRob Allen
 
Avenue & Chaplin CLC - Construction Update: November 3, 2021
Avenue & Chaplin CLC - Construction Update: November 3, 2021Avenue & Chaplin CLC - Construction Update: November 3, 2021
Avenue & Chaplin CLC - Construction Update: November 3, 2021Crosstown TO
 
Brentcliffe - Victoria Park Construction Liaison Committee (CLC) Meeting
Brentcliffe - Victoria Park Construction Liaison Committee (CLC) MeetingBrentcliffe - Victoria Park Construction Liaison Committee (CLC) Meeting
Brentcliffe - Victoria Park Construction Liaison Committee (CLC) MeetingCrosstown TO
 
Fairbank-Oakwood Construction Update - January 2021
Fairbank-Oakwood Construction Update - January 2021Fairbank-Oakwood Construction Update - January 2021
Fairbank-Oakwood Construction Update - January 2021Crosstown TO
 
Cedarvale & Forest Hill Construction Update (November 24, 2021)
Cedarvale & Forest Hill Construction Update (November 24, 2021)Cedarvale & Forest Hill Construction Update (November 24, 2021)
Cedarvale & Forest Hill Construction Update (November 24, 2021)Crosstown TO
 
Fairbank-Oakwood Construction Update - January 2022
Fairbank-Oakwood Construction Update - January 2022Fairbank-Oakwood Construction Update - January 2022
Fairbank-Oakwood Construction Update - January 2022Crosstown TO
 
Fairbank-Oakwood Construction Update - November 2021
Fairbank-Oakwood Construction Update - November 2021Fairbank-Oakwood Construction Update - November 2021
Fairbank-Oakwood Construction Update - November 2021Crosstown TO
 
Eglinton & Mount Pleasant Construction Liaison Committee Meeting - Oct 2018
Eglinton & Mount Pleasant Construction Liaison Committee Meeting - Oct 2018Eglinton & Mount Pleasant Construction Liaison Committee Meeting - Oct 2018
Eglinton & Mount Pleasant Construction Liaison Committee Meeting - Oct 2018Crosstown TO
 
Brentcliffe - Victoria Park Construction Liaison Committee Meeting
Brentcliffe - Victoria Park Construction Liaison Committee MeetingBrentcliffe - Victoria Park Construction Liaison Committee Meeting
Brentcliffe - Victoria Park Construction Liaison Committee MeetingCrosstown TO
 
PROJECT-Details_Attach_B_Jim Benge 6-14
PROJECT-Details_Attach_B_Jim Benge 6-14PROJECT-Details_Attach_B_Jim Benge 6-14
PROJECT-Details_Attach_B_Jim Benge 6-14Jim Benge
 
Cedarvale & Forest Hill Construction Liaison Committee Meeting - June 2018
Cedarvale & Forest Hill Construction Liaison Committee Meeting - June 2018Cedarvale & Forest Hill Construction Liaison Committee Meeting - June 2018
Cedarvale & Forest Hill Construction Liaison Committee Meeting - June 2018Crosstown TO
 
Brentcliffe-Victoria Park CLC Meeting
Brentcliffe-Victoria Park CLC MeetingBrentcliffe-Victoria Park CLC Meeting
Brentcliffe-Victoria Park CLC MeetingCrosstown TO
 
Pharmacy to Kennedy CLC meeting
Pharmacy to Kennedy  CLC meetingPharmacy to Kennedy  CLC meeting
Pharmacy to Kennedy CLC meetingCrosstown TO
 
Chaplin & Avenue Construction Liaison Committee Meeting
Chaplin & Avenue Construction Liaison Committee MeetingChaplin & Avenue Construction Liaison Committee Meeting
Chaplin & Avenue Construction Liaison Committee MeetingCrosstown TO
 
Brentcliffe to Victoria Park CLC Meeting - Presentation - November 4, 2021
Brentcliffe to Victoria Park CLC Meeting -  Presentation - November 4, 2021 Brentcliffe to Victoria Park CLC Meeting -  Presentation - November 4, 2021
Brentcliffe to Victoria Park CLC Meeting - Presentation - November 4, 2021 Crosstown TO
 
Balinese residences at adora de goa
Balinese residences at adora de goaBalinese residences at adora de goa
Balinese residences at adora de goaprovidenthousing4
 
Plots for sale in electronic city
Plots for sale in electronic cityPlots for sale in electronic city
Plots for sale in electronic cityprovidenthousing4
 

What's hot (20)

Allen Robert CV
Allen Robert  CVAllen Robert  CV
Allen Robert CV
 
Avenue & Chaplin CLC - Construction Update: November 3, 2021
Avenue & Chaplin CLC - Construction Update: November 3, 2021Avenue & Chaplin CLC - Construction Update: November 3, 2021
Avenue & Chaplin CLC - Construction Update: November 3, 2021
 
Brentcliffe - Victoria Park Construction Liaison Committee (CLC) Meeting
Brentcliffe - Victoria Park Construction Liaison Committee (CLC) MeetingBrentcliffe - Victoria Park Construction Liaison Committee (CLC) Meeting
Brentcliffe - Victoria Park Construction Liaison Committee (CLC) Meeting
 
Fairbank-Oakwood Construction Update - January 2021
Fairbank-Oakwood Construction Update - January 2021Fairbank-Oakwood Construction Update - January 2021
Fairbank-Oakwood Construction Update - January 2021
 
Cedarvale & Forest Hill Construction Update (November 24, 2021)
Cedarvale & Forest Hill Construction Update (November 24, 2021)Cedarvale & Forest Hill Construction Update (November 24, 2021)
Cedarvale & Forest Hill Construction Update (November 24, 2021)
 
ITS Building Project - progress update 6
ITS Building Project - progress update 6ITS Building Project - progress update 6
ITS Building Project - progress update 6
 
Fairbank-Oakwood Construction Update - January 2022
Fairbank-Oakwood Construction Update - January 2022Fairbank-Oakwood Construction Update - January 2022
Fairbank-Oakwood Construction Update - January 2022
 
Fairbank-Oakwood Construction Update - November 2021
Fairbank-Oakwood Construction Update - November 2021Fairbank-Oakwood Construction Update - November 2021
Fairbank-Oakwood Construction Update - November 2021
 
Eglinton & Mount Pleasant Construction Liaison Committee Meeting - Oct 2018
Eglinton & Mount Pleasant Construction Liaison Committee Meeting - Oct 2018Eglinton & Mount Pleasant Construction Liaison Committee Meeting - Oct 2018
Eglinton & Mount Pleasant Construction Liaison Committee Meeting - Oct 2018
 
Brentcliffe - Victoria Park Construction Liaison Committee Meeting
Brentcliffe - Victoria Park Construction Liaison Committee MeetingBrentcliffe - Victoria Park Construction Liaison Committee Meeting
Brentcliffe - Victoria Park Construction Liaison Committee Meeting
 
PROJECT-Details_Attach_B_Jim Benge 6-14
PROJECT-Details_Attach_B_Jim Benge 6-14PROJECT-Details_Attach_B_Jim Benge 6-14
PROJECT-Details_Attach_B_Jim Benge 6-14
 
Cedarvale & Forest Hill Construction Liaison Committee Meeting - June 2018
Cedarvale & Forest Hill Construction Liaison Committee Meeting - June 2018Cedarvale & Forest Hill Construction Liaison Committee Meeting - June 2018
Cedarvale & Forest Hill Construction Liaison Committee Meeting - June 2018
 
Brentcliffe-Victoria Park CLC Meeting
Brentcliffe-Victoria Park CLC MeetingBrentcliffe-Victoria Park CLC Meeting
Brentcliffe-Victoria Park CLC Meeting
 
Pharmacy to Kennedy CLC meeting
Pharmacy to Kennedy  CLC meetingPharmacy to Kennedy  CLC meeting
Pharmacy to Kennedy CLC meeting
 
progress of work till date
progress of work till dateprogress of work till date
progress of work till date
 
BGCAPP Year in Review Dec. 11, 2012
BGCAPP Year in Review Dec. 11, 2012BGCAPP Year in Review Dec. 11, 2012
BGCAPP Year in Review Dec. 11, 2012
 
Chaplin & Avenue Construction Liaison Committee Meeting
Chaplin & Avenue Construction Liaison Committee MeetingChaplin & Avenue Construction Liaison Committee Meeting
Chaplin & Avenue Construction Liaison Committee Meeting
 
Brentcliffe to Victoria Park CLC Meeting - Presentation - November 4, 2021
Brentcliffe to Victoria Park CLC Meeting -  Presentation - November 4, 2021 Brentcliffe to Victoria Park CLC Meeting -  Presentation - November 4, 2021
Brentcliffe to Victoria Park CLC Meeting - Presentation - November 4, 2021
 
Balinese residences at adora de goa
Balinese residences at adora de goaBalinese residences at adora de goa
Balinese residences at adora de goa
 
Plots for sale in electronic city
Plots for sale in electronic cityPlots for sale in electronic city
Plots for sale in electronic city
 

Viewers also liked

Richa industries is the main Pre Engineered building and Construction firm in...
Richa industries is the main Pre Engineered building and Construction firm in...Richa industries is the main Pre Engineered building and Construction firm in...
Richa industries is the main Pre Engineered building and Construction firm in...Richa Industries Ltd
 
Ace Builders and Engineers
Ace Builders and EngineersAce Builders and Engineers
Ace Builders and Engineersacebuilders
 
Civil pre engennerd structure
Civil pre engennerd structureCivil pre engennerd structure
Civil pre engennerd structureArpan Dixit
 
101804898 project-report-of-pre-engineered-steel-building
101804898 project-report-of-pre-engineered-steel-building101804898 project-report-of-pre-engineered-steel-building
101804898 project-report-of-pre-engineered-steel-buildinghlksd
 
Pre engg buildings
Pre engg buildingsPre engg buildings
Pre engg buildingshlksd
 
88254718 pre-–engineered-steel-buildings
88254718 pre-–engineered-steel-buildings88254718 pre-–engineered-steel-buildings
88254718 pre-–engineered-steel-buildingshlksd
 
Peb structures
Peb structuresPeb structures
Peb structureshlksd
 
Commercial Office Building Acquisition
Commercial Office Building AcquisitionCommercial Office Building Acquisition
Commercial Office Building AcquisitionSteve Berkman
 
P.e.b. mini project report
P.e.b. mini project reportP.e.b. mini project report
P.e.b. mini project reportShubham Parab
 
Portal Frame Construction & Pre Engineered Building System
Portal Frame Construction & Pre Engineered Building SystemPortal Frame Construction & Pre Engineered Building System
Portal Frame Construction & Pre Engineered Building SystemIan Toisa
 
Office building design
Office building designOffice building design
Office building designsalsa moyara
 
Bajaj corporate Office Architect and interiors India
Bajaj corporate Office Architect and interiors India Bajaj corporate Office Architect and interiors India
Bajaj corporate Office Architect and interiors India COLLABORATIVE ARCHITECTURE
 
Pre engineering building design sample
Pre engineering building design samplePre engineering building design sample
Pre engineering building design samplesurya0588
 
Project Punjab Energy Development Agency, Office Building, Chandigarh
Project Punjab Energy Development Agency, Office Building, ChandigarhProject Punjab Energy Development Agency, Office Building, Chandigarh
Project Punjab Energy Development Agency, Office Building, Chandigarharvindkrishan
 
Design with Sun, for an office building in Aurangabad, India
Design with Sun, for an office building in Aurangabad, IndiaDesign with Sun, for an office building in Aurangabad, India
Design with Sun, for an office building in Aurangabad, Indiasuvidhasagave
 
PEB construction-Mukesh Bhavsar
PEB construction-Mukesh BhavsarPEB construction-Mukesh Bhavsar
PEB construction-Mukesh BhavsarMukesh Bhavsar
 
Portfolio office design
Portfolio office designPortfolio office design
Portfolio office designguest516d293
 
115659118 pre-engineered-buildings
115659118 pre-engineered-buildings115659118 pre-engineered-buildings
115659118 pre-engineered-buildingshlksd
 
Office Building in Järnbrott
Office Building in JärnbrottOffice Building in Järnbrott
Office Building in JärnbrottRaul Espasandin
 

Viewers also liked (20)

Richa industries is the main Pre Engineered building and Construction firm in...
Richa industries is the main Pre Engineered building and Construction firm in...Richa industries is the main Pre Engineered building and Construction firm in...
Richa industries is the main Pre Engineered building and Construction firm in...
 
Ace Builders and Engineers
Ace Builders and EngineersAce Builders and Engineers
Ace Builders and Engineers
 
Civil pre engennerd structure
Civil pre engennerd structureCivil pre engennerd structure
Civil pre engennerd structure
 
101804898 project-report-of-pre-engineered-steel-building
101804898 project-report-of-pre-engineered-steel-building101804898 project-report-of-pre-engineered-steel-building
101804898 project-report-of-pre-engineered-steel-building
 
Pre engg buildings
Pre engg buildingsPre engg buildings
Pre engg buildings
 
88254718 pre-–engineered-steel-buildings
88254718 pre-–engineered-steel-buildings88254718 pre-–engineered-steel-buildings
88254718 pre-–engineered-steel-buildings
 
Peb structures
Peb structuresPeb structures
Peb structures
 
Commercial Office Building Acquisition
Commercial Office Building AcquisitionCommercial Office Building Acquisition
Commercial Office Building Acquisition
 
P.e.b. mini project report
P.e.b. mini project reportP.e.b. mini project report
P.e.b. mini project report
 
Portal Frame Construction & Pre Engineered Building System
Portal Frame Construction & Pre Engineered Building SystemPortal Frame Construction & Pre Engineered Building System
Portal Frame Construction & Pre Engineered Building System
 
Office building design
Office building designOffice building design
Office building design
 
Bajaj corporate Office Architect and interiors India
Bajaj corporate Office Architect and interiors India Bajaj corporate Office Architect and interiors India
Bajaj corporate Office Architect and interiors India
 
Pre engineering building design sample
Pre engineering building design samplePre engineering building design sample
Pre engineering building design sample
 
Project Punjab Energy Development Agency, Office Building, Chandigarh
Project Punjab Energy Development Agency, Office Building, ChandigarhProject Punjab Energy Development Agency, Office Building, Chandigarh
Project Punjab Energy Development Agency, Office Building, Chandigarh
 
Design with Sun, for an office building in Aurangabad, India
Design with Sun, for an office building in Aurangabad, IndiaDesign with Sun, for an office building in Aurangabad, India
Design with Sun, for an office building in Aurangabad, India
 
PEB construction-Mukesh Bhavsar
PEB construction-Mukesh BhavsarPEB construction-Mukesh Bhavsar
PEB construction-Mukesh Bhavsar
 
Portfolio office design
Portfolio office designPortfolio office design
Portfolio office design
 
115659118 pre-engineered-buildings
115659118 pre-engineered-buildings115659118 pre-engineered-buildings
115659118 pre-engineered-buildings
 
Office Building in Järnbrott
Office Building in JärnbrottOffice Building in Järnbrott
Office Building in Järnbrott
 
IT parks in india
IT parks in indiaIT parks in india
IT parks in india
 

Similar to Office Building Constructed in Nine Weeks !

Intern operations project
Intern operations projectIntern operations project
Intern operations projectKidd Khazini
 
Oldcastle Precast Spokane - Urban Modular Construction - The Grand Hotel
Oldcastle Precast Spokane - Urban Modular Construction - The Grand HotelOldcastle Precast Spokane - Urban Modular Construction - The Grand Hotel
Oldcastle Precast Spokane - Urban Modular Construction - The Grand HotelBlake Johnson
 
Building act 2006 presentation english version
Building act 2006 presentation english versionBuilding act 2006 presentation english version
Building act 2006 presentation english versionsitomise
 
North Dakota Precast Concrete
North Dakota Precast ConcreteNorth Dakota Precast Concrete
North Dakota Precast ConcreteJenny Frost
 
Leaside and Laird CLC - 10 May 2021
Leaside and Laird CLC - 10 May 2021 Leaside and Laird CLC - 10 May 2021
Leaside and Laird CLC - 10 May 2021 Crosstown TO
 
Case Study: Challenges of Insulating Existing Masonry Buildings in the Common...
Case Study: Challenges of Insulating Existing Masonry Buildings in the Common...Case Study: Challenges of Insulating Existing Masonry Buildings in the Common...
Case Study: Challenges of Insulating Existing Masonry Buildings in the Common...Sustainable Performance Institute
 
Leaside and Laird CLC 8Mar2021
Leaside and Laird CLC 8Mar2021Leaside and Laird CLC 8Mar2021
Leaside and Laird CLC 8Mar2021Crosstown TO
 
A Net-Zero World and The Greening of Aiken
A Net-Zero World and The Greening of AikenA Net-Zero World and The Greening of Aiken
A Net-Zero World and The Greening of AikenMaclay Architects
 
ARCIS Ultra-Thin, Lightweight Prestressed Architectural Precast Panels – Prop...
ARCIS Ultra-Thin, Lightweight Prestressed Architectural Precast Panels – Prop...ARCIS Ultra-Thin, Lightweight Prestressed Architectural Precast Panels – Prop...
ARCIS Ultra-Thin, Lightweight Prestressed Architectural Precast Panels – Prop...Communications Branding
 
Scs – A World Of Possibilities R New
Scs – A World Of Possibilities R NewScs – A World Of Possibilities R New
Scs – A World Of Possibilities R Newneerajtri
 
Thermo Bond Pre-Cast Concrete Brochure
Thermo Bond Pre-Cast Concrete BrochureThermo Bond Pre-Cast Concrete Brochure
Thermo Bond Pre-Cast Concrete BrochureDoug Olson
 
Guidetosolarprojectimplementation 140323073210-phpapp01
Guidetosolarprojectimplementation 140323073210-phpapp01Guidetosolarprojectimplementation 140323073210-phpapp01
Guidetosolarprojectimplementation 140323073210-phpapp01Kiran Singh
 
advanced constructiion technologies
advanced constructiion technologiesadvanced constructiion technologies
advanced constructiion technologiesMOHANAHARIHARAN R
 

Similar to Office Building Constructed in Nine Weeks ! (20)

Intern operations project
Intern operations projectIntern operations project
Intern operations project
 
Factory built substation case study
Factory built substation case studyFactory built substation case study
Factory built substation case study
 
Oldcastle Precast Spokane - Urban Modular Construction - The Grand Hotel
Oldcastle Precast Spokane - Urban Modular Construction - The Grand HotelOldcastle Precast Spokane - Urban Modular Construction - The Grand Hotel
Oldcastle Precast Spokane - Urban Modular Construction - The Grand Hotel
 
Building act 2006 presentation english version
Building act 2006 presentation english versionBuilding act 2006 presentation english version
Building act 2006 presentation english version
 
Assume the Worst: Dealing with Contingency Items Before and After Renovation...
Assume the Worst: Dealing with Contingency Items Before and After Renovation...Assume the Worst: Dealing with Contingency Items Before and After Renovation...
Assume the Worst: Dealing with Contingency Items Before and After Renovation...
 
North Dakota Precast Concrete
North Dakota Precast ConcreteNorth Dakota Precast Concrete
North Dakota Precast Concrete
 
Leaside and Laird CLC - 10 May 2021
Leaside and Laird CLC - 10 May 2021 Leaside and Laird CLC - 10 May 2021
Leaside and Laird CLC - 10 May 2021
 
Case Study: Challenges of Insulating Existing Masonry Buildings in the Common...
Case Study: Challenges of Insulating Existing Masonry Buildings in the Common...Case Study: Challenges of Insulating Existing Masonry Buildings in the Common...
Case Study: Challenges of Insulating Existing Masonry Buildings in the Common...
 
Leaside and Laird CLC 8Mar2021
Leaside and Laird CLC 8Mar2021Leaside and Laird CLC 8Mar2021
Leaside and Laird CLC 8Mar2021
 
ITS Building Project - progress update 5
ITS Building Project - progress update 5ITS Building Project - progress update 5
ITS Building Project - progress update 5
 
A Net-Zero World and The Greening of Aiken
A Net-Zero World and The Greening of AikenA Net-Zero World and The Greening of Aiken
A Net-Zero World and The Greening of Aiken
 
ARCIS Ultra-Thin, Lightweight Prestressed Architectural Precast Panels – Prop...
ARCIS Ultra-Thin, Lightweight Prestressed Architectural Precast Panels – Prop...ARCIS Ultra-Thin, Lightweight Prestressed Architectural Precast Panels – Prop...
ARCIS Ultra-Thin, Lightweight Prestressed Architectural Precast Panels – Prop...
 
Scs – A World Of Possibilities R New
Scs – A World Of Possibilities R NewScs – A World Of Possibilities R New
Scs – A World Of Possibilities R New
 
We have your piece of heaven
We have your piece of heavenWe have your piece of heaven
We have your piece of heaven
 
We Have Your Piece of Heaven
We Have Your Piece of HeavenWe Have Your Piece of Heaven
We Have Your Piece of Heaven
 
Thermo Bond Pre-Cast Concrete Brochure
Thermo Bond Pre-Cast Concrete BrochureThermo Bond Pre-Cast Concrete Brochure
Thermo Bond Pre-Cast Concrete Brochure
 
Guidetosolarprojectimplementation 140323073210-phpapp01
Guidetosolarprojectimplementation 140323073210-phpapp01Guidetosolarprojectimplementation 140323073210-phpapp01
Guidetosolarprojectimplementation 140323073210-phpapp01
 
Guide to Solar Project Implementation
Guide to Solar Project ImplementationGuide to Solar Project Implementation
Guide to Solar Project Implementation
 
ITS Building Project - progress update 1
ITS Building Project - progress update 1ITS Building Project - progress update 1
ITS Building Project - progress update 1
 
advanced constructiion technologies
advanced constructiion technologiesadvanced constructiion technologies
advanced constructiion technologies
 

Recently uploaded

VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurSuhani Kapoor
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...noida100girls
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetDenis Gagné
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Tina Ji
 
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service PuneVIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service PuneCall girls in Ahmedabad High profile
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 

Recently uploaded (20)

VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.
 
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
 
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service PuneVIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 

Office Building Constructed in Nine Weeks !

  • 1. Holcim Cement Pre-Engineered Office Building Presented by: Wes Villhard – Kozeny-Wagner VP Commercial Construction Tom Way – WGA Senior Engineering Manager
  • 2. Success Thru Best Practices  Front End Planning  Materials Management  Team Building  Partnering
  • 3. Front End Planning  Pre-Engineered Building  Architecture & Engineering  Mechanical / Electrical  Interior Finish  Project Team
  • 4. Pre-Engineered Building  Pre-Ordered American Metal Building  Released without Door & Window Trim  “In-Stock” Center Support Building  Early Delivery in order to Build Frames During Slab Pour
  • 5. Architecture & Engineering  Completed Foundation Design from Pre-Engineered Building Loads  Ordered Rebar for Foundations before Slab Design was Complete  Pre-Approved Concrete Mix Design  Allowed Two Weeks for Architectural Design
  • 6. Mechanical / Electrical  Ordered “In-Stock” Ground Mounted Split Systems  Saved Engineering Time for Roof Frames  Electrical Rough-in of Slab vs. Overhead  Saved Two Weeks on Schedule
  • 7. Mechanical / Electrical  HighBay Lighting for Open Office Areas  Reusable for Future Warehouse  Duct Socks Reduced Field Labor  Prefabed All Ductwork  Installed Ductwork Prior to Roofing
  • 8. Interior Finish  Panelized Office Walls During Floor Slab Pours  Install Studs Prior to Roofing  Ordered only “In-Stock” Material  Windows, Doors, Hardware, Toilet Partitions, Accessories, etc.  Allowed Sealed Concrete Floors Rather than VCT or Other Flooring  Coordinated all Interior Work with Roof Installation  One Side then the Other
  • 9. Project Team  Selected Only Subs with Available Manpower  Past Performance “Can-do” Attitude  Subcontractors- Foreman & Project Manager  Kozeny-Wagner - Foreman & Project Manager  Teamwork, Find Solutions  Overcome Obstacles  Go the Extra Mile
  • 10. Week 1 – Prefab Foundation Rebar During Building Layout
  • 11. Week 1 – Bad Soils & Rock Encountered
  • 12. Week 1 – Rock Encountered
  • 13. Week 1 – Foundations Started
  • 14. Week 1 – PreFabed Rebar in Perimeter Foundations
  • 15. Week 2 – Foundation Complete and Backfilled
  • 16. Week 2 – Slab Rough-in, Electrical & Plumbing
  • 17. Week 2 – Rebar For Heavy Duty Slab, Delivered & Installed
  • 18. Week 3 – Slab Pour, Steel Material Deck Delivered in the Background
  • 19. Week 3 – Rain Pushed First Slab Pour Late Into the Night
  • 20. Week 3 – Second Slab Pour
  • 21. Week 4 – Plumbing Rough-in Started Immediately with Wall Layout
  • 22. Week 4 – Steel Erection in Progress Using Pre-Assembled Frames
  • 23. Week 4 – Center Support vs Clear-Span Steel Used for Early Delivery
  • 24. Week 4 – Building Frame Complete
  • 25. Week 5 – Roof Perlins Complete and Duct Hangers In Progress
  • 26. Week 5 – Ductwork Delivered
  • 27. Week 5 – Plumbing Rough-In In Progress
  • 28. Week 5 – Ductwork & West End & Side Wall
  • 29. Week 5 – Exterior HVAC Units Set, Roof Insulation & Roof Panels In Progress
  • 30. Week 5 – Roof Insulation, Roof Panels, Widows & Exterior Framing In Progress
  • 31. Week 5 – Exterior View of Roof Insulation, Window Framing & Ductwork / AC Units
  • 32. Week 6 – Close-up of Roof Panels In Progress
  • 33. Week 6 – Ceiling Grid-Continuous, Prior to Perimeter Offices
  • 34. Week 6 – First Panelized Office
  • 35. Week 6 – Exterior Office Framing, Acoustical Grid, Prior to Roof Panels
  • 36. Week 6 – Roof Insulation & Roof Panels Continue to the Far End of the Building
  • 37. Week 6 – One Side of Roof Complete, Framing / MEP Rough-in In Progress
  • 38. Week 7 – High Bay Lights Above Open Office Areas
  • 39. Week 7 – Roof Deck Delayed by High Winds 1- 2 Weeks, Nearly Complete
  • 40. Week 7 – Exterior Panes / Windows Nearly Complete
  • 41. Week 7 – Exterior Wall Panels Complete
  • 42. Week 7 – Exterior Duct Work Complete, Power On! Test & Balanced Started.
  • 43. Week 7 – Duct Socks Installed to Reduce Field Labor
  • 44. Week 7 – Sheetrock and Restrooms In Progress
  • 45. Week 7 – Drywall / Doors / Hardware In Progress, Preparing for Work Stations
  • 46. Week 8 – Work Stations In Progress, Flex Duct / Diffusers Installed, Lights / HVAC On
  • 47. Week 8 – Painting Nearly Complete
  • 48. Week 9 – Project Complete
  • 49. COMPLETED IN 9 WEEKS!
  • 50. Project Summary  Design-Build Delivery  Half the Time of a Typical Schedule  32 Private Offices, 5 Conference Rooms and 90 Workstations  Critical Path – “Fast-Track” Mode  10-12 Hour Days  7 Days / Week
  • 51. Project Summary  $240,000 in Change Orders  $79 / Square Foot Total  45 Normal Working Days (9 Weeks M-F)  Less 16 Weather Days
  • 52. Safety Award  “On the Spot” WGA Safety Award Given to Dan Fox of Kozeny-Wagner.  MSHA Award – Recognized by the South Central Region of the Federal Mine Safety & Health Administration for Outstanding Safety Compliance & Accomplishment.
  • 53. Success Thru Best Practices  Front End Planning  Materials Management  Team Building  Partnering
  • 54. Thank You Project Team!  Aschinger Electric  Zumwalt Corporation  Bieg Plumbing Company  Wedemeyer/Cernik/Corrubia, Inc.  Fenix Construction Company  Zahner Surveying  Frontenac Painting, Inc.  A.F. Becker  Grau Contracting, Inc.  CKC Woodworks, Inc.  Jarrell Contracting  H&G Sales  Paul Abt Flooring  St. Louis Steel Buildings  Rednour Steel Erectors, Inc.
  • 55. A Special Thanks to Holcim Cement & WGA
  • 56. We Build A Better Quality of Life