How HR and Recruitment Tech is changing the workforce across the globe.
1. Insights into how multi billion recruitment and HR industry is investing and adopting tech to deliver value to it’s customer and candidates
2. Emerging trends like AI/ML/NLP real time use
3. How Bots and Block chain technology making inroads in this space
4. How world of jobs will change in coming years
This presentation identifies the growing demand for cloud based HR services and the challenge of managing and maintaining this. We provide an understanding of the longer-term impact of maintaining cloud applications and the why application maintenance is so critical for business success.
This presentation is for you if:
-Your organization is moving from traditional on-premise to cloud-based HR systems
-You are responsible for the performance of HR/business applications
-Your apps are not ‘happy’: out of sync with release cycle, facing integration and compliance challenges
-You need to maximize returns on HR tech investments
-You are overwhelmed by the concept of application management services and /or the options available to you
Extending the HR Cloud with Cloud Technologies, Machine Learning and BotsNGA Human Resources
This presentation delves into real-life examples of how automation and machine learning are freeing HR managers from administrative tasks, allowing them to concentrate on the strategic and human side of the HR business.
Learn how businesses can empower employees and create a culture of active engagement, collaboration, and always on access, enabling a smarter user experience.
This webinar is for you if you would like to;
-Eliminate human errors from HR processes
-Maximize HR response and resolution times
-Remove functional user frustrations of HR processes
-Make HR tech conversational and human
Working Towards Digital Global HR Practices With The Human TouchNew To HR
HR Tech Conference Asia, Malaysia - September 2015 - New To HR presents:
Technology has transformed the power of HR, shifting concentration from long days filled with admin duties to speedy online processing. Although new technology has allowed us to achieve more in a shorter time period, has it led us to neglect the “human” in HR?
This slideshare is from the webinar on Setting up the Centre of Excellence for RPA featuring David Thurkle, Executive Program Director at National Australia Bank.
NGA Africa Payroll is one end-to-end, no risk payroll solution for up to 49 countries in 2 languages, all serviced from our delivery centers in Pretoria, Cape Town and Umhlanga (Durban) and a network of local partners.
NGA Africa Payroll makes your payroll processing quick, easy and compliant:
* Manages end-to-end payroll for up to 49 countries
* Reduces complexity, legal and compliance risks
* Simplifies your business expansion in Africa
* Increases your visibility into the payroll process for analytics and regional reporting
* Integrates with your existing HRIS
* Gives you a clear view on total payroll cost across region
* Serviced from our proven delivery centers in Pretoria, Cape Town and Umhlanga (Durban) and a network of local partners
The 10 most admired outsourcing companiesMerry D'souza
In the issue of “The 10 Most Admired Outsourcing Companies”, We have listed; Ascent Consulting Services employs a matrix of technology, domain expertise, streamlined business workflow, and highly skilled people to create tangible, measurable, performance improvements throughout the client’s organization
HRO Today Europe Forum, Nov 2013. Key lessons from nearly 25 HR buyer engagements seeking a solution to HR Technology, HR Services, or both (HRO) in the most recent 18 months (2012-2013).
This presentation identifies the growing demand for cloud based HR services and the challenge of managing and maintaining this. We provide an understanding of the longer-term impact of maintaining cloud applications and the why application maintenance is so critical for business success.
This presentation is for you if:
-Your organization is moving from traditional on-premise to cloud-based HR systems
-You are responsible for the performance of HR/business applications
-Your apps are not ‘happy’: out of sync with release cycle, facing integration and compliance challenges
-You need to maximize returns on HR tech investments
-You are overwhelmed by the concept of application management services and /or the options available to you
Extending the HR Cloud with Cloud Technologies, Machine Learning and BotsNGA Human Resources
This presentation delves into real-life examples of how automation and machine learning are freeing HR managers from administrative tasks, allowing them to concentrate on the strategic and human side of the HR business.
Learn how businesses can empower employees and create a culture of active engagement, collaboration, and always on access, enabling a smarter user experience.
This webinar is for you if you would like to;
-Eliminate human errors from HR processes
-Maximize HR response and resolution times
-Remove functional user frustrations of HR processes
-Make HR tech conversational and human
Working Towards Digital Global HR Practices With The Human TouchNew To HR
HR Tech Conference Asia, Malaysia - September 2015 - New To HR presents:
Technology has transformed the power of HR, shifting concentration from long days filled with admin duties to speedy online processing. Although new technology has allowed us to achieve more in a shorter time period, has it led us to neglect the “human” in HR?
This slideshare is from the webinar on Setting up the Centre of Excellence for RPA featuring David Thurkle, Executive Program Director at National Australia Bank.
NGA Africa Payroll is one end-to-end, no risk payroll solution for up to 49 countries in 2 languages, all serviced from our delivery centers in Pretoria, Cape Town and Umhlanga (Durban) and a network of local partners.
NGA Africa Payroll makes your payroll processing quick, easy and compliant:
* Manages end-to-end payroll for up to 49 countries
* Reduces complexity, legal and compliance risks
* Simplifies your business expansion in Africa
* Increases your visibility into the payroll process for analytics and regional reporting
* Integrates with your existing HRIS
* Gives you a clear view on total payroll cost across region
* Serviced from our proven delivery centers in Pretoria, Cape Town and Umhlanga (Durban) and a network of local partners
The 10 most admired outsourcing companiesMerry D'souza
In the issue of “The 10 Most Admired Outsourcing Companies”, We have listed; Ascent Consulting Services employs a matrix of technology, domain expertise, streamlined business workflow, and highly skilled people to create tangible, measurable, performance improvements throughout the client’s organization
HRO Today Europe Forum, Nov 2013. Key lessons from nearly 25 HR buyer engagements seeking a solution to HR Technology, HR Services, or both (HRO) in the most recent 18 months (2012-2013).
Watch the webinar replay: https://www.hfsresearch.com/webinars/webinar-getting-rpa-to-scale
Access all HfS webinars: www.hfsresearch.com/webinars/
Understanding the key elements of a transformational enterprise-wide RPA implementation
Despite all its promise, the majority of RPA projects today never progress beyond pilot programs. Fortunately, there are enough successful enterprise-scale RPA implementations available today to learn about well-planned RPA initiatives that go beyond the hype.
In this webinar, experts from HfS, Automation Anywhere, EY and Societe Generale will discuss the evolution of Intelligent Automation and RPA, and discuss the challenges (and solutions) are faced and overcome during a transformational enterprise-wide RPA implementation. What are the must-have functional capabilities that make an RPA platform rapidly deployable, highly scalable, granularly secure and, therefore, truly transformational for an enterprise?
What you'll learn:
- What are the key lessons learned from early RPA deployments?
- What are the main levers to scale those deployments?
- How are the RPA technologies and approaches evolving?
Speakers:
- Sumeet Pathak, Senior Vice President, Global Solution Center, Societe Generale
- Sharda Cherwoo, Senior Advisory Partner, Intelligent Automation, EY
- Kashif Mahbub, Vice President, Product Marketing, Automation Anywhere
- Phil Fersht, CEO and Chief Analyst, HfS
- Tom Reuner, Senior Vice President, Intelligent Automation and IT Services, HfS
- John O'Brien, Research Director, RPA Customer Experiences, HfS
How Deloitte Uses AI to Simplify Reporting and Increase ValueAmazon Web Services
In this webinar, you’ll learn how Deloitte, a multinational consultancy, solves client pain points around employee efficiency, scale, regulatory compliance, and customer engagement using Quill, a NLG solution created by Narrative Science and deployed on AWS. You’ll learn how you can easily get started with artificial intelligence on AWS to derive deeper insights, improve operational efficiency, enhance customer experiences, and meet compliance requirements.
Join our webinar to learn:
- How NLG can solve problems around internal reporting, operational efficiency, and regulatory compliance
- How Deloitte delivered transformative solutions both internally and to clients on AWS while saving over $600K
- How to get started with NLG in your organization
Transforming HR into a Strategic Asset enabled by Oracle HCM CloudCognizant
Today’s Human Capital Management (HCM) market is undergoing a unique shift from the traditional transactional process areas to strategic process areas with increasing focus on:
1. Integrated Talent Management: Employee skill management and development has taken the center stage. What are the emerging trends in this space and how is this important for business growth?
2. Enhanced Usability: More than ever, employees need and demand user friendly, contemporary self-service. How does a good self-service strategy unlock $ value for you.
3. Accessibility: Integrated functionality for Analytics, Mobility, and Enterprise Social is a requirement. What can your organization do to get the best value out of these feature rich frameworks?
In this new environment, what are the target options available for HR working on legacy systems? How can CxOs and HR evaluate their current HCM systems and ensure that the technology led HR transformations are not only aligned to the latest HR trends but also provide maximum ROI through increased productivity and automation with lower total cost of ownership?
This presentation by Praveen Gupta (Senior Director, HCM Solution Advisor) throws light on the latest trends in HCM marketplace, target options for customers on legacy systems or manual processes and show how HR in leading companies are leveraging the Oracle HCM & Talent Cloud to move from being a transactional unit to a strategic asset in business growth.
HfS Webinar Slides: Standard Bank Case Discussion - Improving Customer Experi...HfS Research
This webinar replay shares how Standard Bank transformed its onboarding process by deploying Smart Process Automation. Standard Bank’s insights will enable organizations to clearly make the case for Automation as part of their service delivery strategies.
Learn from practitioners and experts on Smart Process Automation from HfS Research, WorkFusion and Standard Bank as they share their experiences about improving business outcomes through more integrated automation technologies.
Watch this replay and learn:
How did Standard Bank approach the automation of key processes—how did the deployment work and what were the results?
What can you learn from a leading service buyer about the future of Smart Automation?
How do Cognitive Computing and Machine Learning enhance the quality and agility of service delivery?
What is the impact of Smart Automation? What are the main use cases and insights?
Watch the webinar replay: http://www.hfsresearch.com/pointsofview/hfs-webinar-standard-bank-case-discussion-improving-customer-experience-through-rpa-ai-powered
The 10 best performing HR technology solution providers 2018 Merry D'souza
In this issue of “The 10 Best Performing HR Technology Solution Providers 2018”, we have brought those organizations that have made a thumping impression all across the globe with their cutting-edge HR technology solutions. On the cover we have highlighted “Infomart” which is a global identity and background screening company with almost three decades of experience in providing companies the information that they need to make informed business decisions.
XtendHR: NGA HR's SAP Hana Cloud Platform extensions for HRNGA Human Resources
Presentation delivered by Katy Powell from NGA Human Resources at SAP D-Kom in Karlsruhe, Germany, on January 12, 2017. XtendHR, the future-proofed HR apps - powered by NGA HR - deliver digital HR transformation results quickly.
The apps – built on the HR HANA Cloud Platform - help organizations deploy, roll out, configure and manage SuccessFactors Employee Central faster, safer, better and cheaper.
18+ years of overall experience in IT field. Director of the Engineering. Key skills: - Build highly effective development process (agile delivery model) - Coordinate and enable successful project execution by working with offshore & onsite teams - Team productivity - Scope and risk management - Knowledge sharing framework - Quality process improvement
Report
Хочу поделиться success story, в которой инновационный подход к технологиям победил сильных конкурентов и рассказать, как можно обьединить людей вокруг сложной задачи. A также на этом примере рассказать о взаимодействии групп Sales<->Pre-Sales<->R&D<->Engineering и на выходе получить Customer Success
Six HR Technology Trends: Improve Your Business Performance with TechnologyVing
HR departments must stay on top of today's technology trends and implement them in the workplace to improve employee engagement, and, ultimately, increase the company's bottom line.
Digitization of hr slideshare kenny company 2018 pdf versionWill Yen
In 2016, HR technology funding reached record levels with 402 deals worth approximately $2.2B, more than 5 times the funding in 2012. This innovation in the market place has created a new wave of adoption and digitization by HR organizations.
HR in IT services- the strategic shifts over yearsKrish Shankar
Looks at the changing focus of HR in IT services industry, and outlines a framework for arriving at a HR strategy given the environmental changes and business strategy.
Lessons learnt on setting up and scaling an automation CoEMindfields Global
This webinar presentation featuring Mindfields’ Sukalp Sharma and our guest speaker from ANZ Bank, Yann-Walter Dunlop, covers the lessons learnt and best practices for setting up and scaling an Automation Centre of Excellence at an enterprise level.
EVEREST GROUP: Making RPA Enterprise-Grade at ScaleUiPath
A survey-based research on Robotic Process Automation RPA. Everest Group SOT research focuses on a range of technologies for Service Delivery Automation (SDA).
HfS Webinar Slides: Unveiling the Digital OneOffice Premier LeagueHfS Research
View the webinar replay here: http://www.hfsresearch.com/webinars/digital-oneoffice-premier-league
A digital organization has the ability to take all the cool social, mobile and interactive tech we use in our personal lives and create that experience for all the people in its environment: its employees, customers, and partners.
The Digital OneOffice™ Framework is all about creating the digital customer experience and an intelligent, single office to enable and support it. In a few months, we won’t be talking nearly as much about intelligent automation and digital technology as the critical “value levers” for operations, as they become an embedded part of the fabric of the future operations platform for new generation organizations. Instead, we will be talking about an integrated support operation having the digital prowess to enable its organization to meet customer demand - as and when that demand happens.
Everything about the digital organization is about engaging people by responding to their needs instantaneously, giving people their choice of medium to interact with it, be it voice, chat box, text, Facebook messenger, email, virtual agent, etc.
The OneOffice™ Framework is wrapped around the needs of the people in its environment, where automation is completely native and decisions can be made on predicting events, not merely reacting to historical data archives.
Speakers:
- Phil Fersht, CEO and Chief Analyst
- Melissa O'Brien, Research Director for Contact Center and Omnichannel Operations and BPO
We’ll discuss the following:
- Why the Digital OneOffice™ Framework is the Future of Outsourcing
- How the new generation of enterprises are leveraging digital technologies to link the customer experience with the supporting operations
- New dynamics we’re seeing in the market that point to a Digital OneOffice™ future, based on 450 enterprise interviews
It’s not a secret that the need to modernize traditional finance operations and evolve into a “Digital Finance” organization has become a key priority for finance leaders.
In this video recap of the webinar held on 12/11/ 2019; Raul Vega, Auxis CEO, discussed the key risks and challenges organizations typically face as part of their transformation journey, and how to develop and execute a strategy that provides the business case and outcomes you expect based on your specific company size and needs.
What was covered:
- What does Modern Finance really mean?
- Digitization as a Key Element of the Modern Finance Organization
- Most Common Tools you should be implementing as part of your Digital Finance journey
- What’s driving RPA’s growth?
- Implementation Strategies & Alternatives
- How Outsourcing can help finance executives self-fund their Digital Finance Strategy and drive faster outcomes
How Ideapreneurs take Relationships Beyond the ContractHCL Technologies
HCL’s 100,000 Ideapreneurs are changing the world one relationship at a time. And they’re doing it by taking their relationships with their customers beyond the contract. Our approach to engagements is best described by the word ‘relationship’. Because every relationship – be it between family members, friends, colleagues, or clients and vendors – operates based on a contract, whether written or unwritten. But beautiful relationships that benefit both parties are sustained by emotions, behaviour, and actions that go beyond that explicit or implied contract.
In business, a contract can safeguard all that is in within the “span of control”. But in today’s uncertain world where business and macro environment are seeing new challenges and undergoing changes every day, what makes an engagement truly worthwhile is that which cannot be scripted in any contract. It’s a simple thing called values. Read on to understand the HOWS and WHATS of HCL Technologies Ltd. that believes in leading with its Relationships - with its customers, clients, partners and employees - that go Beyond the contract.
HR and IT managers that want to achieve a successful digital transformation must make fundamental changes. Whether businesses are looking to increase agility, improve customer service, streamline processes or drive innovation, change needs to start in the workplace. This is because the performance of individual employees is decisive in a world increasingly characterized by knowledge work. However, employee performance can only improve when the work environment is adapted and optimized to their respective roles and requirements. Equipping workers with new mobile devices or collaboration tools is not a solution in and of itself.
Based on PACs view of Digital Workplace as a holistic design and service concept, this presentation offers a 360° view on critical issues related to workplace modernization. It gives insight into current trends, investment plans and challenges relating to digital workplace initiatives.
Watch the webinar replay: https://www.hfsresearch.com/webinars/webinar-getting-rpa-to-scale
Access all HfS webinars: www.hfsresearch.com/webinars/
Understanding the key elements of a transformational enterprise-wide RPA implementation
Despite all its promise, the majority of RPA projects today never progress beyond pilot programs. Fortunately, there are enough successful enterprise-scale RPA implementations available today to learn about well-planned RPA initiatives that go beyond the hype.
In this webinar, experts from HfS, Automation Anywhere, EY and Societe Generale will discuss the evolution of Intelligent Automation and RPA, and discuss the challenges (and solutions) are faced and overcome during a transformational enterprise-wide RPA implementation. What are the must-have functional capabilities that make an RPA platform rapidly deployable, highly scalable, granularly secure and, therefore, truly transformational for an enterprise?
What you'll learn:
- What are the key lessons learned from early RPA deployments?
- What are the main levers to scale those deployments?
- How are the RPA technologies and approaches evolving?
Speakers:
- Sumeet Pathak, Senior Vice President, Global Solution Center, Societe Generale
- Sharda Cherwoo, Senior Advisory Partner, Intelligent Automation, EY
- Kashif Mahbub, Vice President, Product Marketing, Automation Anywhere
- Phil Fersht, CEO and Chief Analyst, HfS
- Tom Reuner, Senior Vice President, Intelligent Automation and IT Services, HfS
- John O'Brien, Research Director, RPA Customer Experiences, HfS
How Deloitte Uses AI to Simplify Reporting and Increase ValueAmazon Web Services
In this webinar, you’ll learn how Deloitte, a multinational consultancy, solves client pain points around employee efficiency, scale, regulatory compliance, and customer engagement using Quill, a NLG solution created by Narrative Science and deployed on AWS. You’ll learn how you can easily get started with artificial intelligence on AWS to derive deeper insights, improve operational efficiency, enhance customer experiences, and meet compliance requirements.
Join our webinar to learn:
- How NLG can solve problems around internal reporting, operational efficiency, and regulatory compliance
- How Deloitte delivered transformative solutions both internally and to clients on AWS while saving over $600K
- How to get started with NLG in your organization
Transforming HR into a Strategic Asset enabled by Oracle HCM CloudCognizant
Today’s Human Capital Management (HCM) market is undergoing a unique shift from the traditional transactional process areas to strategic process areas with increasing focus on:
1. Integrated Talent Management: Employee skill management and development has taken the center stage. What are the emerging trends in this space and how is this important for business growth?
2. Enhanced Usability: More than ever, employees need and demand user friendly, contemporary self-service. How does a good self-service strategy unlock $ value for you.
3. Accessibility: Integrated functionality for Analytics, Mobility, and Enterprise Social is a requirement. What can your organization do to get the best value out of these feature rich frameworks?
In this new environment, what are the target options available for HR working on legacy systems? How can CxOs and HR evaluate their current HCM systems and ensure that the technology led HR transformations are not only aligned to the latest HR trends but also provide maximum ROI through increased productivity and automation with lower total cost of ownership?
This presentation by Praveen Gupta (Senior Director, HCM Solution Advisor) throws light on the latest trends in HCM marketplace, target options for customers on legacy systems or manual processes and show how HR in leading companies are leveraging the Oracle HCM & Talent Cloud to move from being a transactional unit to a strategic asset in business growth.
HfS Webinar Slides: Standard Bank Case Discussion - Improving Customer Experi...HfS Research
This webinar replay shares how Standard Bank transformed its onboarding process by deploying Smart Process Automation. Standard Bank’s insights will enable organizations to clearly make the case for Automation as part of their service delivery strategies.
Learn from practitioners and experts on Smart Process Automation from HfS Research, WorkFusion and Standard Bank as they share their experiences about improving business outcomes through more integrated automation technologies.
Watch this replay and learn:
How did Standard Bank approach the automation of key processes—how did the deployment work and what were the results?
What can you learn from a leading service buyer about the future of Smart Automation?
How do Cognitive Computing and Machine Learning enhance the quality and agility of service delivery?
What is the impact of Smart Automation? What are the main use cases and insights?
Watch the webinar replay: http://www.hfsresearch.com/pointsofview/hfs-webinar-standard-bank-case-discussion-improving-customer-experience-through-rpa-ai-powered
The 10 best performing HR technology solution providers 2018 Merry D'souza
In this issue of “The 10 Best Performing HR Technology Solution Providers 2018”, we have brought those organizations that have made a thumping impression all across the globe with their cutting-edge HR technology solutions. On the cover we have highlighted “Infomart” which is a global identity and background screening company with almost three decades of experience in providing companies the information that they need to make informed business decisions.
XtendHR: NGA HR's SAP Hana Cloud Platform extensions for HRNGA Human Resources
Presentation delivered by Katy Powell from NGA Human Resources at SAP D-Kom in Karlsruhe, Germany, on January 12, 2017. XtendHR, the future-proofed HR apps - powered by NGA HR - deliver digital HR transformation results quickly.
The apps – built on the HR HANA Cloud Platform - help organizations deploy, roll out, configure and manage SuccessFactors Employee Central faster, safer, better and cheaper.
18+ years of overall experience in IT field. Director of the Engineering. Key skills: - Build highly effective development process (agile delivery model) - Coordinate and enable successful project execution by working with offshore & onsite teams - Team productivity - Scope and risk management - Knowledge sharing framework - Quality process improvement
Report
Хочу поделиться success story, в которой инновационный подход к технологиям победил сильных конкурентов и рассказать, как можно обьединить людей вокруг сложной задачи. A также на этом примере рассказать о взаимодействии групп Sales<->Pre-Sales<->R&D<->Engineering и на выходе получить Customer Success
Six HR Technology Trends: Improve Your Business Performance with TechnologyVing
HR departments must stay on top of today's technology trends and implement them in the workplace to improve employee engagement, and, ultimately, increase the company's bottom line.
Digitization of hr slideshare kenny company 2018 pdf versionWill Yen
In 2016, HR technology funding reached record levels with 402 deals worth approximately $2.2B, more than 5 times the funding in 2012. This innovation in the market place has created a new wave of adoption and digitization by HR organizations.
HR in IT services- the strategic shifts over yearsKrish Shankar
Looks at the changing focus of HR in IT services industry, and outlines a framework for arriving at a HR strategy given the environmental changes and business strategy.
Lessons learnt on setting up and scaling an automation CoEMindfields Global
This webinar presentation featuring Mindfields’ Sukalp Sharma and our guest speaker from ANZ Bank, Yann-Walter Dunlop, covers the lessons learnt and best practices for setting up and scaling an Automation Centre of Excellence at an enterprise level.
EVEREST GROUP: Making RPA Enterprise-Grade at ScaleUiPath
A survey-based research on Robotic Process Automation RPA. Everest Group SOT research focuses on a range of technologies for Service Delivery Automation (SDA).
HfS Webinar Slides: Unveiling the Digital OneOffice Premier LeagueHfS Research
View the webinar replay here: http://www.hfsresearch.com/webinars/digital-oneoffice-premier-league
A digital organization has the ability to take all the cool social, mobile and interactive tech we use in our personal lives and create that experience for all the people in its environment: its employees, customers, and partners.
The Digital OneOffice™ Framework is all about creating the digital customer experience and an intelligent, single office to enable and support it. In a few months, we won’t be talking nearly as much about intelligent automation and digital technology as the critical “value levers” for operations, as they become an embedded part of the fabric of the future operations platform for new generation organizations. Instead, we will be talking about an integrated support operation having the digital prowess to enable its organization to meet customer demand - as and when that demand happens.
Everything about the digital organization is about engaging people by responding to their needs instantaneously, giving people their choice of medium to interact with it, be it voice, chat box, text, Facebook messenger, email, virtual agent, etc.
The OneOffice™ Framework is wrapped around the needs of the people in its environment, where automation is completely native and decisions can be made on predicting events, not merely reacting to historical data archives.
Speakers:
- Phil Fersht, CEO and Chief Analyst
- Melissa O'Brien, Research Director for Contact Center and Omnichannel Operations and BPO
We’ll discuss the following:
- Why the Digital OneOffice™ Framework is the Future of Outsourcing
- How the new generation of enterprises are leveraging digital technologies to link the customer experience with the supporting operations
- New dynamics we’re seeing in the market that point to a Digital OneOffice™ future, based on 450 enterprise interviews
It’s not a secret that the need to modernize traditional finance operations and evolve into a “Digital Finance” organization has become a key priority for finance leaders.
In this video recap of the webinar held on 12/11/ 2019; Raul Vega, Auxis CEO, discussed the key risks and challenges organizations typically face as part of their transformation journey, and how to develop and execute a strategy that provides the business case and outcomes you expect based on your specific company size and needs.
What was covered:
- What does Modern Finance really mean?
- Digitization as a Key Element of the Modern Finance Organization
- Most Common Tools you should be implementing as part of your Digital Finance journey
- What’s driving RPA’s growth?
- Implementation Strategies & Alternatives
- How Outsourcing can help finance executives self-fund their Digital Finance Strategy and drive faster outcomes
How Ideapreneurs take Relationships Beyond the ContractHCL Technologies
HCL’s 100,000 Ideapreneurs are changing the world one relationship at a time. And they’re doing it by taking their relationships with their customers beyond the contract. Our approach to engagements is best described by the word ‘relationship’. Because every relationship – be it between family members, friends, colleagues, or clients and vendors – operates based on a contract, whether written or unwritten. But beautiful relationships that benefit both parties are sustained by emotions, behaviour, and actions that go beyond that explicit or implied contract.
In business, a contract can safeguard all that is in within the “span of control”. But in today’s uncertain world where business and macro environment are seeing new challenges and undergoing changes every day, what makes an engagement truly worthwhile is that which cannot be scripted in any contract. It’s a simple thing called values. Read on to understand the HOWS and WHATS of HCL Technologies Ltd. that believes in leading with its Relationships - with its customers, clients, partners and employees - that go Beyond the contract.
HR and IT managers that want to achieve a successful digital transformation must make fundamental changes. Whether businesses are looking to increase agility, improve customer service, streamline processes or drive innovation, change needs to start in the workplace. This is because the performance of individual employees is decisive in a world increasingly characterized by knowledge work. However, employee performance can only improve when the work environment is adapted and optimized to their respective roles and requirements. Equipping workers with new mobile devices or collaboration tools is not a solution in and of itself.
Based on PACs view of Digital Workplace as a holistic design and service concept, this presentation offers a 360° view on critical issues related to workplace modernization. It gives insight into current trends, investment plans and challenges relating to digital workplace initiatives.
The world of work is in the midst of accelerated disruption due to new business models, emerging technology and evolving definitions of the workforce. Talent professionals must not only adapt but also innovate in order to future-proof both their organizations and their employees.
• The talent professionals imperative to anticipate, embrace and proactively drive change
• How to gather and evaluate both internal and external data (i.e. PEST) to inform strategic actions within the organization
• How to effectively forecast, plan and measure the impact of talent activities across the organization
SmartERP Webinar
Did you know that approximately 55% of work activities can be automated using Robotic Process Automation (RPA) technology? Automating business processes in Finance is now considered a business imperative. RPA enables organizations to power people and automates business operations by leveraging this game-changing technology.
RPA has become one of the most popular choices for improving operational efficiency with tactical automation. 59% of Finance & Accounting leaders believe RPA will make their business more competitive over the next two years.
In this webinar, you will learn how to:
How to utilize RPA to transform your organization
Fix broken manual processes
Integrate RPA with your Finance applications
Easily scale large and often changing logic systems
Perform a vast array of key essential tasks; quickly and precisely
Use RPA with AI, to augment tasks that need human intelligence
Benefits:
Increase productivity across your organization
Enables cost reduction for your organization
Improve your accuracy and increase efficiency
Enhances your customer’s experience
HCM Workforce Compensation Trends and DemoEmtec Inc.
How is Cloud going to help solve today's HR Challenges? How are you going to retain your key employees? With a fully functional Core HR, Workforce Management, Workforce Rewards, and Talent Management. But how do you get there?
Artificial Intelligence is the ability of machines to seemingly think and learn just like Human brain. It enables Machine to learn by themselves using the provided data and make accurate prediction.
AI & Machine Learning - How Will They Impact HR Now & In The FutureCMP
HR tech will revolutionize the world of work for all HR professionals and how a new class of new collar employees (deep skills but without a four-year college degree) will create a whole new talent acquisition opportunity for HR leaders.
Leveraging Applied AI to Accelerate Digital Transformation and Maximize Busin...Apttus
Enterprise business is taking a significant leap forward in its ability to maximize business outcomes using Applied AI – conversational and cognitive technologies. Leading organizations are accelerating digital transformation through machine learning, artificial intelligence and virtual assistants designed to streamline and accelerate revenue generation processes.
In this presentation for executives and decision makers, we’ll share insights from the soon-to-be-published Harvard Business Review study on using Applied AI to accelerate B2B Quote-to-Cash processes and commerce. We’ll examine Applied AI emerging trends, best practices, and barriers to adoption.
A point of view on Indian IT - Its extraordinary growth & factors that led to it, its current state & future challenges. Specifically, the case of captives in India & 3rd party technology providers (IPPs) are discussed.
Big Data Analytics offers a nearly endless source of business and informational insight, that can lead to operational improvement and new opportunities for companies to provide unrealized revenue across almost every industry.
As the need for skilled IT professionals grows, organizations face a growing talent crunch that poses significant challenges to their operations. IT staff augmentation services have emerged as a powerful solution to address these workforce challenges.
Analytics Recruitment Consultants India | PeopleLogicpeoplelogic669
Elevate your team with top analytics talent. PeopleLogic, your trusted recruitment consultants in India, specializes in analytics recruitment. Connect with us today.
In this edition of Insights Success, we present India's Best Payroll Service Providers that continue to serve the companies with the latest technology has to offer to maintain the financial matters of their employees.
Similar to How technology is transforming the workforce! (20)
1. HOW TECHNOLOGY
IS TRANSFORMING
THE WORKFORCE!
By
Raghav Poojary
Head of HR Technology and Process Automation
FirstMeridian Business Services
2. Presenter Profile – Raghav Poojary
Head of HR Technology and Process Automation
FirstMeridian Business Services
Specializations
HR Technology & Process Automation | Tech Transformation Consulting | Tech Enabled RPO &
Managed Service Programs
2
Summary
Subject matter expert with more than 17 years of experience in setting up and
operating HR Tech CoE within the people business covering RPO, HR Consulting
and Staffing Business Operations.
Had worked with companies like Merit Trac, Skill Assure, CareerNet, Adecco,
PeopleStrong and Quess Corp in the past.
Linked-in Profile
https://www.linkedin.com/in/raghavpoojary/
Website
http://www.raghavpoojary.com/
5 MAY 2020How Technology is Transforming the Workforce
3. 5 Trends Shaping the Future of Work!
35 MAY 2020How Technology is Transforming the Workforce
4. Global Mobile Workforce by 2022
42.5%
By 2022, 1.87 billion people will be
mobile employees, comprising 42.5%
of the total global workforce
[Source: Strategy Analytics]
Work from anywhere
Stay connected with people and information anytime,
anywhere, on any device
Hire the best talent regardless of location
Onboard top candidates who aren't willing to relocate
Business hours are when you are most productive
Open-ended schedule offering flexibility in work timings
Mobility – Key Impact Areas
4
Impact!
The way we manage people and projects will change –
project management methods will emerge as must
have skills and also increase in demand for
collaboration tools.
5 MAY 2020How Technology is Transforming the Workforce
5. Key Technologies Changing the Way We Work
Big Data Blockchain AI/ML/NLP
Robotic Process
Automation
Collaboration
Platforms
Cloud Computing Edge Computing Internet of Things
VR/AR Cybersecurity
55 MAY 2020How Technology is Transforming the Workforce
6. “In the future of
work, Technology is
the Central
Nervous System of
the organization
that enables
everything to
function.”
65 MAY 2020How Technology is Transforming the Workforce
7. A QUICK DIVE INTO
THE RECRUITMENT &
HR INDUSTRY
75 MAY 2020How Technology is Transforming the Workforce
9. Recruitment Industry
TYPES OF SERVICES
• Temp Staffing
• Permanent Recruitment
• Recruitment Process Outsourcing
(RPO)
• Professional Staffing
• SOW-Based or Project Hiring
• Managed Services
• Master Services Provider
• HR Tech
Recruitment Industry
TOP TECH TRENDS
• An Applicant Tracking System
(ATS) to Automate End-to-End
Recruitment
• Mobile-Friendly Career Sites and
Digital Onboarding Apps to Attract
Millennials & Gen Z
• AI & Machine Learning to
Automate Sourcing
• Analytics and Algorithms to
Digitize Recruitment Practices
• Chatbots with Natural Language
Processing (for Improved
Candidate Experience)
Recruitment Industry
KEY FOCUS AREAS
• Candidate Supply Chain
• Candidate Experience
• Speed & Quality of Hire
• Service Automation
• Recruitment Team Productivity
• Employee Engagement
• Employee Benefits
• Client Servicing
• Compliance
• Vendor Management
95 MAY 2020How Technology is Transforming the Workforce
11. Process Mapping of Staffing Operations
Process Sales &
Marketing
Contracts Demand
Mgmt.
Sourcing/
Processing
Offer/
Onboarding
Operations/
Resource
Mgmt.
Payroll &
Billing
Compliance
People
Sales Team Legal Team
Account
Management
Team
Sourcing
Team
&
Operations
Team
Onboarding
Team
Client
Servicing
Team
Payroll Team
&
Account
Team
Compliance
& Legal
Team
System
Sales CRM ERP ATS
Job Portals,
Social
Media,
Reference,
Market
Place
Mobile App
Based
Technologies
Bot Based
Attendance
Collection
Client Portal,
Payrolling
tools
EPFO
Portal,
eKYC,
115 MAY 2020How Technology is Transforming the Workforce
12. Setting Up of PMO Team for Tech Deployment and Adoption at Staffing Companies
12
PHASE 1
CURRENT STATE
ANALYSIS
PHASE 2
PMO DESIGN
PHASE 3
PMO
DEPLOYMENT
PHASE 4
PMO
MAINTENANCE
• Processes & tools
• Methodologies
• Org structures
• Roles & responsibilities
• Stakeholder analysis
• PMO functions
• Key Competencies
• Areas of responsibilities
• Training plan
• Resource plan
• IT infra
• Implement processes &
methodologies
• Communications
• Change management
• Performance monitoring
• Steady state operations
• Handover to operations
• Post-go live support
Communications&OrganisationalChangeManagement
5 MAY 2020How Technology is Transforming the Workforce
13. Pool Question
Do you see increase in Project Management practices being implemented post
COVID to handle work from home teams?
If Yes then to what percentage?
a) Increase by 10%
b) Increase by 20%
c) Increase by 30%
d) Increase by 40% +
135 MAY 2020How Technology is Transforming the Workforce
14. 4 Building Blocks of Staffing Business
Colleagues
The internal workforce, consisting of all
the departments and teams across the
organization
Partners & Government Bodies
Freelance recruiters, vendor agencies,
suppliers of software, L&D service
providers, government regulatory bodies
like EPFO, Income Tax Department, etc.
Customers
Small, Medium and large-sized
businesses looking to scale their
workforce up through Staffing,
Recruitment, HR Tech & Managed
Services
Candidates
Freshers, experienced, mid-management
and leadership level professionals
seeking job/career opportunities
5 MAY 2020 14How Technology is Transforming the Workforce
15. Candidate/Associate Experience
– Bot-Enabled Job Search & Application
Management
– Digital KYC & Onboarding
– Mobile Attendance
– Career Services Platform
– Employee Self-Service
Candidate Supply Chain
– Job Portal (Web & Mobile)
– Campus Placement Portal
– Freelancer/Sub Vendor
Network Portal/App
– Market Place – Talent Stock Exchange
Digitization of Staffing Process – For Candidates
155 MAY 2020How Technology is Transforming the Workforce
16. The Power of Candidate Experience
165 MAY 2020How Technology is Transforming the Workforce
17. Digitization of Staffing Process – For Customers
Customer Experience
To Manage Demand, Candidate
Shortlisting, Video Interviews,
Assessments, Leaves and
Attendance, Invoice Approvals,
Helpdesk etc.
HR Tech Integrated
Services
– Demographic-Focused
Candidate Sourcing Platform
– L&D Platform
– Employee Benefits Platform
– Master Services Program
Tech-Enabled Services
– Payroll Management
– Statutory & Regulatory
Compliance
– Geo-Tagged Attendance
Tracking
– Analytics/Reporting Platform with
BI & Dashboards
– Managed Services Program
175 MAY 2020How Technology is Transforming the Workforce
18. Digitization of Staffing Process – For Colleagues
Service Automation
End to ERP to manage
Demand, Sourcing, Offers,
Candidate onboarding, attendance
management, payroll, invoicing,
collections and Candidate exit
management.
Productivity Tools
– Sales CRM
– ATS
– Performance Apps
– Recruiter App
– Freelance Recruiter App
Internal Employee
Engagement
– HRIS
– Rewards & Benefits
– L&D Tool
– Health & Wellness
– Tax & Money Mgmt. Tools
185 MAY 2020How Technology is Transforming the Workforce
19. ADOPTION OF NEW-
AGE TECH IN HR
195 MAY 2020How Technology is Transforming the Workforce
20. “79% agree that
chatbots will be an
important interface
to deliver quick,
real-time answers
to candidate or
employee queries”
20
Chatbots in Recruitment
5 MAY 2020How Technology is Transforming the Workforce
21. 21
Pool Question
Do you prefer BOT handling your personal hiring for next job you apply?
a) Yes
b) No
c) May be
5 MAY 2020How Technology is Transforming the Workforce
23. Applications of Blockchain in HR
Employee Data Security and Access
• Decentralized data storage
• Restricted access through tokenized permission
Background Checks
• Access and verify work and academic history, etc.
• Eliminate chances of fraudulent applications
Smart Contracts for Gig Workforce
• Auto-release payments upon task completion
• Protect businesses from fraudulent invoicing
235 MAY 2020How Technology is Transforming the Workforce
24. THE WORLD OF JOBS
WILL CHANGE IN THE
COMING YEARS
245 MAY 2020How Technology is Transforming the Workforce
25. What Makes Gig Economy the Hottest Trend in India?
255 MAY 2020How Technology is Transforming the Workforce
26. Gig Workforce is Trending
• Unconventional Approach to Work by
Millennials
• The Rise of Start-Up Culture
• Growing Demand for Contractual
Workforce by MNCs
• Introduction of Blockchain Payment
System
• Rise of Freelancing Platforms
265 MAY 2020How Technology is Transforming the Workforce
27. Uberized Recruitment – Rating-Based Hiring of Workforce
275 MAY 2020How Technology is Transforming the Workforce
28. Uberized Recruitment is in Demand
28
• Immediate deployment of flexi staff
• Review and select candidate
profiles (using client ratings and
experience summary)
• Last-minute hiring requests
• Payroll and administration of flexi
staff taken care by vendor
• Rate the staff and add their profiles
to favourites
5 MAY 2020How Technology is Transforming the Workforce
29. Post-COVID Era in Employment and Workforce Building (1 of 2)
29
Borderless Workspaces
• Remote working will be the new
normal
• Lesser members at office
• Digital workspaces to become a
hot trend globally
• Programs managed remotely
with Project Management
Standards
Latest News
75% of 4.5 lakh TCS employees to
permanently work from home by
2025
5 MAY 2020How Technology is Transforming the Workforce
30. Post-COVID Era in Employment and Workforce Building (2 of 2)
30
Changes in Work Culture
• New ways to measure employee productivity;
which will be outcome-driven not time spent
• Redefinition of project management standards
• Adoption of Enterprise Learning to pick up
pace
• Leadership skills will evolve to manage a New
Breed of workers
• Newer strategies to instill a sense of belonging
within remote workers
• Elements of TEAM, TRUST and
TRANSPARENCY will take the centerstage
• Need for leaner operational models
5 MAY 2020How Technology is Transforming the Workforce
31. 31
Pool Question
What Percentage of your team/company will be allowed to work from anywhere post
COVID come back?
a) 20%
b) 30%
c) 40%
d) 50% +
5 MAY 2020How Technology is Transforming the Workforce