Life after upgrading to R12 at Origin Presentation to: InSync Date: August 2010
Origin in 2008 Page 2
Origin in 2008 Oracle eBusiness version 11.5.10 Relatively low number of production issues Stable Production environment. Well known and understood processes No Performance issues Page 3
Why did Origin go to R12 ? Origin had multiple requirements for an Asset Management system Decided to go for an enterprise-wide solution rather than multiple business unit specific solutions Oracle Asset Management Solution (eAMS) selected as the enterprise solution The functionality Origin required in their eAMS solution had R12 as a pre-requisite Project set up to Upgrade to R12 Rollout eAMS Migrate our upstream business from JD Edwards to Oracle eBusiness Introduce a new operating unit for APLNG – Joint Venture In hindsight, any one of these components would have been a project with sufficient challenges to tackle on their own Page 4
Origin’s R12 project Origin’s R12 project was run during 2008 Originally scheduled for go – live in November 2008 Rescheduled to January 2009 Key lessons learnt from the project Post Implementation Review The R12 Upgrade should be a project in it’s own right if possible Allocate time and resources to understanding the mandatory new modules and functionality Upgrading customisations will take more effort than you expect Test early, test thoroughly Defect management and resolution will take more effort than you expect Training is important, but communications are critical  Page 5
R12 go live Go live went from 8th Jan – 11th Jan 2009 Implementations for the remainder of the project (upstream rollout, eAMS rollout ) occurred over the next 1-2 weeks Went live with version 12.0.5 Upgraded 2 existing operating units from R11 to R12 Implemented 2 new operating units in R12 Page 6
Whathappened in the 1st month after R12 go live …
Some of the key R12 issues we experienced were … Performance After go-live performance issues occurred Delays logging on Java forms slow Disconnections Workflow mailer backlog Required some fine tuning Ensure technical software versions and configurations are correct Web Cache software improved performance at remote sites Reverted to forms Socket Mode (from Servlet Mode) JVM sizing wrong for 11i and required resizing in R12 Tuned concurrent manager sizing Points to note This was not unexpected due to limited R12 implementations in Australia Ensure time scheduled for load testing Ensure Oracle and hardware vendor reviews and signs off on versions and configurations Page 8
Some of the key R12 issues we experienced were … Invoice Validation Performance What we saw Invoice validation was not completing overnight Operating units conflicting with each other If a run was terminated -> records locked Particularly an issue at month end -> couldn’t close payables until finished What we did Baby-sit invoice validation overnight Hot-fix supplied by Oracle to ensure indexes used Patch supplied to limit the number of records processed Points to note Ensure hot-fix and patch applied Ensure invoice validation in your regression test suite Page 9
Some of the key R12 issues we experienced were … Payables table structures changed What we saw Could not process R11 invoices in R12 What we did Data fixes to process some records Cancel R11 invoices and create R12 invoices Points to note Ensure all invoices processed before upgrade Develop in-flight process for those that can’t Ensure processes for how to handle R11 well communicated Reports What we saw Origin planned to move back to standard reports as much as possible What we did Many custom reports upgrade / developed after go live Points to note Commit to using Standard reports or plan (schedule / budget to do a lot of report upgrade / development) Page 10
Some of the key R12 issues we experienced were … New  / Reworked modules (Payments, eBusiness tax, SLA) What we saw These modules gave us the most issues What we did Steep learning curve Obtain outside assistance Points to note Plan (schedule / budget) to understand these modules before go-live Withholding Tax What we saw Withholding Tax did not work in R12 What we did Implement workarounds Long engagement with Oracle to resolve this SR Points to note Ensure the version you go live with contains the required patches Page 11
Which modules were impacted by R12 Page 12
What happened then … Transition to Support
The picture after 4 months … Page 14
Remediation Project Situation did not materially change as a result of transition to support Not sustainable for our business Remediation Project set up to address Objectives Return outstanding calls to Business as Usual level (target 275) Return outstanding SRs with Oracle to Business as Usual level (target 30) Reduce the number of new calls per day by 20% New calls to be actioned within our SLA Recommendation made on a patch release  Technical review undertaken Page 15
… And then …
Remediation Project 4-6 additional functional resources required for 4 months Availability Cost Travel and Accom Lot of work required with Oracle to progress critical SRs Focus required to ensure support process were appropriate Outside of difficult SRs, no real problems encountered  Technical review performed by Oracle – tactical hardware upgrade recommended Review of potential next patch release No official patch release would address our critical SRs Testing confirmed that a combination of several mega-patches (400-600 fixes in each patch), July CPC and a range of smaller patches would address our critical SRs Project Targets achieved Page 17
Service desk calls by module – after remediation Page 18
Tactical Hardware Upgrade Goals Address month end performance issues Create headroom to re-introduce end-user reporting capacity Ensure capacity available for coming 12 months Tasks Transform from 1-tier to 2-tier architecture New server plus additional memory required Proof of concept, Regression Test, Performance Test Timeframes Very tight timeframes to meet project deadlines and half year-end reporting Approval thru to implement in 2 months Results Very successful Performance issues gone Project deadlines not impacted Half Year end not impacted Page 19
Patch Release Goals Implement solutions to critical SRs Retain performance of Invoice validation Tasks Scope and build test cases Use of structured test cases and defect management  Integration Testing, User Acceptance Testing 5 -6 FTEs Timeframes Originally 3 months, Grew to 4 months Significant effort to resolve Tax config issues for upgraded operating units Results Very Successful Improved stability of P2P particularly Invoice Workbench Identified some tax config issues resulting from the R12 upgrade 1 minor issue post go-live Now have formal set of P2P test cases which are used for regression testing Page 20
… Finally…
Service desk calls by module – after patch release Page 22
In Summary In the 12 months since go live Origin has had 4 months of Project Heightened Support 4 months of Remediation project Rolled out a new operating unit for our NZ business Hardware upgrade Re - implemented APLNG operating unit Rolled out eAMS to multiple sites across the business Major patch release This has been achieved by Significant hard work by my support team and our project team in Brisbane Significant hard work, patience and support from our business stakeholders Important assistance from Oracle at the crunch times Last 12 months was probably the 12 months we had to have as we were early adopters of R12 (thanks Paul Keating) Page 23
Final Thoughts Consider carefully before including any other scope  in your R12 project Make sure your technical environment and hardware is set up to perform to R12 requirements early on in your project Consider carefully whether you want to upgrade to R12 or re-implement R12.  Plan for expert assistance from Oracle to assist with  New Payments engine  E-Business Tax Sub Ledger Accounting Don’t plan on a short Heightened Support period – minimum 3 month ends Plan for a period of Remediation and/or stabilization for some months after that Plan for a hardware health check post stabilization Regression Testing is all-important in an R12 environment Page 24
H:\Documents\Life After Upgrading To  R12

More Related Content

What's hot

Using bpm to automate project workflows with primavera
Using bpm to automate project workflows with primaveraUsing bpm to automate project workflows with primavera
Using bpm to automate project workflows with primavera
p6academy
 
Strategy and erp in-the-cloud
Strategy and erp in-the-cloudStrategy and erp in-the-cloud
Strategy and erp in-the-cloud
Berry Clemens
 
OOW09 R12.1 Standalone Solutions
OOW09 R12.1 Standalone SolutionsOOW09 R12.1 Standalone Solutions
OOW09 R12.1 Standalone Solutions
jucaab
 
Oracle primavera p6 and ebs projects where do they meet ppt
Oracle primavera p6 and ebs projects   where do they meet pptOracle primavera p6 and ebs projects   where do they meet ppt
Oracle primavera p6 and ebs projects where do they meet ppt
p6academy
 

What's hot (20)

Panaya oatug r12.2-upgrade
Panaya oatug r12.2-upgradePanaya oatug r12.2-upgrade
Panaya oatug r12.2-upgrade
 
Going to Oracle EBS Release 12? Upgrading Is Faster, Better and Cheaper than ...
Going to Oracle EBS Release 12? Upgrading Is Faster, Better and Cheaper than ...Going to Oracle EBS Release 12? Upgrading Is Faster, Better and Cheaper than ...
Going to Oracle EBS Release 12? Upgrading Is Faster, Better and Cheaper than ...
 
Primavera Unifier: How to Tame Complexity and Achieve Success
Primavera Unifier: How to Tame Complexity and Achieve SuccessPrimavera Unifier: How to Tame Complexity and Achieve Success
Primavera Unifier: How to Tame Complexity and Achieve Success
 
Reporting Basics of Project Management
Reporting Basics of Project ManagementReporting Basics of Project Management
Reporting Basics of Project Management
 
Using bpm to automate project workflows with primavera
Using bpm to automate project workflows with primaveraUsing bpm to automate project workflows with primavera
Using bpm to automate project workflows with primavera
 
Upgrading PeopleSoft Financials from 8.9 to 9.2 – Advice You Need to Know fro...
Upgrading PeopleSoft Financials from 8.9 to 9.2 – Advice You Need to Know fro...Upgrading PeopleSoft Financials from 8.9 to 9.2 – Advice You Need to Know fro...
Upgrading PeopleSoft Financials from 8.9 to 9.2 – Advice You Need to Know fro...
 
Oracle EBS R12.2 - The Upgrade Know-How Factory
Oracle EBS R12.2 - The Upgrade Know-How FactoryOracle EBS R12.2 - The Upgrade Know-How Factory
Oracle EBS R12.2 - The Upgrade Know-How Factory
 
Oracle Primavera P6 partner programs
Oracle Primavera P6 partner programsOracle Primavera P6 partner programs
Oracle Primavera P6 partner programs
 
Primavera Cost Unifier cost controls and project delivery modules tips and tr...
Primavera Cost Unifier cost controls and project delivery modules tips and tr...Primavera Cost Unifier cost controls and project delivery modules tips and tr...
Primavera Cost Unifier cost controls and project delivery modules tips and tr...
 
Navigating Through SAP S/4HANA Code Corrections with Confidence
Navigating Through SAP S/4HANA Code Corrections with ConfidenceNavigating Through SAP S/4HANA Code Corrections with Confidence
Navigating Through SAP S/4HANA Code Corrections with Confidence
 
PeopleSoft 9.2 Upgrade - A Roadmap
PeopleSoft 9.2 Upgrade - A RoadmapPeopleSoft 9.2 Upgrade - A Roadmap
PeopleSoft 9.2 Upgrade - A Roadmap
 
Use of unifier with primavera
Use of unifier with primaveraUse of unifier with primavera
Use of unifier with primavera
 
What's New in Unifier 16.1
What's New in Unifier 16.1What's New in Unifier 16.1
What's New in Unifier 16.1
 
Strategy and erp in-the-cloud
Strategy and erp in-the-cloudStrategy and erp in-the-cloud
Strategy and erp in-the-cloud
 
Integrating primavera p6 with oracle erp which technology path is right for...
Integrating primavera p6 with oracle erp   which technology path is right for...Integrating primavera p6 with oracle erp   which technology path is right for...
Integrating primavera p6 with oracle erp which technology path is right for...
 
To Upgrade or to Re-implement Dynamics NAV? That is the Question | BDO Connec...
To Upgrade or to Re-implement Dynamics NAV? That is the Question | BDO Connec...To Upgrade or to Re-implement Dynamics NAV? That is the Question | BDO Connec...
To Upgrade or to Re-implement Dynamics NAV? That is the Question | BDO Connec...
 
OOW09 R12.1 Standalone Solutions
OOW09 R12.1 Standalone SolutionsOOW09 R12.1 Standalone Solutions
OOW09 R12.1 Standalone Solutions
 
Requirements engineering
Requirements engineeringRequirements engineering
Requirements engineering
 
Oracle primavera p6 and ebs projects where do they meet ppt
Oracle primavera p6 and ebs projects   where do they meet pptOracle primavera p6 and ebs projects   where do they meet ppt
Oracle primavera p6 and ebs projects where do they meet ppt
 
PeopleSoft 9.2 Upgrade Readiness Assessment and Health Check
PeopleSoft 9.2 Upgrade Readiness Assessment and Health Check PeopleSoft 9.2 Upgrade Readiness Assessment and Health Check
PeopleSoft 9.2 Upgrade Readiness Assessment and Health Check
 

Viewers also liked

Insync10 IBM JDE Sol Ed Announcement
Insync10 IBM JDE Sol Ed AnnouncementInsync10 IBM JDE Sol Ed Announcement
Insync10 IBM JDE Sol Ed Announcement
InSync Conference
 
Ndevr & CSBP GHG Accounting Software
Ndevr & CSBP GHG Accounting SoftwareNdevr & CSBP GHG Accounting Software
Ndevr & CSBP GHG Accounting Software
InSync Conference
 
The performance of the Vietnamese monochord
The performance of the Vietnamese monochordThe performance of the Vietnamese monochord
The performance of the Vietnamese monochord
lequangtn
 
IBM and Oracle Joint Solution Centre
IBM and Oracle Joint Solution CentreIBM and Oracle Joint Solution Centre
IBM and Oracle Joint Solution Centre
InSync Conference
 
Presentation For Companies World Cleanup 2012
Presentation For Companies World Cleanup 2012Presentation For Companies World Cleanup 2012
Presentation For Companies World Cleanup 2012
Martin Pold
 
Rotating and Tessellateing Web2 Tool Logos
Rotating and Tessellateing Web2 Tool LogosRotating and Tessellateing Web2 Tool Logos
Rotating and Tessellateing Web2 Tool Logos
Rhysj1
 

Viewers also liked (20)

Cameron downing presentation
Cameron downing presentationCameron downing presentation
Cameron downing presentation
 
14 dicas para promover o word of-mouth (social media marketing)
14 dicas  para promover o word of-mouth (social media marketing)14 dicas  para promover o word of-mouth (social media marketing)
14 dicas para promover o word of-mouth (social media marketing)
 
Melbourne streamlining earned value with hd published
Melbourne streamlining earned value with hd publishedMelbourne streamlining earned value with hd published
Melbourne streamlining earned value with hd published
 
Foot Lock 2010 (Eng) 2
Foot Lock 2010 (Eng) 2Foot Lock 2010 (Eng) 2
Foot Lock 2010 (Eng) 2
 
Insync10 IBM JDE Sol Ed Announcement
Insync10 IBM JDE Sol Ed AnnouncementInsync10 IBM JDE Sol Ed Announcement
Insync10 IBM JDE Sol Ed Announcement
 
Xbrl Outsourcing Services
Xbrl Outsourcing ServicesXbrl Outsourcing Services
Xbrl Outsourcing Services
 
Ndevr & CSBP GHG Accounting Software
Ndevr & CSBP GHG Accounting SoftwareNdevr & CSBP GHG Accounting Software
Ndevr & CSBP GHG Accounting Software
 
Asian Games 1990
Asian Games 1990Asian Games 1990
Asian Games 1990
 
The performance of the Vietnamese monochord
The performance of the Vietnamese monochordThe performance of the Vietnamese monochord
The performance of the Vietnamese monochord
 
TurboTax in Social TY 2009
TurboTax in Social TY 2009TurboTax in Social TY 2009
TurboTax in Social TY 2009
 
Insync10 1608 0830 vella
Insync10 1608 0830 vellaInsync10 1608 0830 vella
Insync10 1608 0830 vella
 
CGS-Customer Generated Solutions at TurboTax
CGS-Customer Generated Solutions at TurboTaxCGS-Customer Generated Solutions at TurboTax
CGS-Customer Generated Solutions at TurboTax
 
Asian Games 1966
Asian Games 1966Asian Games 1966
Asian Games 1966
 
Improve your JD Edwards audit (and your business) with the right security model
Improve your JD Edwards audit (and your business) with the right security modelImprove your JD Edwards audit (and your business) with the right security model
Improve your JD Edwards audit (and your business) with the right security model
 
How to make HR more credible
How to make HR more credibleHow to make HR more credible
How to make HR more credible
 
Xmas Merry Music x
Xmas Merry Music xXmas Merry Music x
Xmas Merry Music x
 
IBM and Oracle Joint Solution Centre
IBM and Oracle Joint Solution CentreIBM and Oracle Joint Solution Centre
IBM and Oracle Joint Solution Centre
 
Xbrl Training Session
Xbrl Training SessionXbrl Training Session
Xbrl Training Session
 
Presentation For Companies World Cleanup 2012
Presentation For Companies World Cleanup 2012Presentation For Companies World Cleanup 2012
Presentation For Companies World Cleanup 2012
 
Rotating and Tessellateing Web2 Tool Logos
Rotating and Tessellateing Web2 Tool LogosRotating and Tessellateing Web2 Tool Logos
Rotating and Tessellateing Web2 Tool Logos
 

Similar to H:\Documents\Life After Upgrading To R12

Kevin Holland
Kevin HollandKevin Holland
Kevin Holland
ksholland
 
Fin pre upgrade_setup_opstips
Fin pre upgrade_setup_opstipsFin pre upgrade_setup_opstips
Fin pre upgrade_setup_opstips
Ratnakar Kumar
 
Updated resume(Senior Oracle Applications DBA)
Updated resume(Senior Oracle Applications DBA)Updated resume(Senior Oracle Applications DBA)
Updated resume(Senior Oracle Applications DBA)
Irfanuddin Syed
 

Similar to H:\Documents\Life After Upgrading To R12 (20)

DocID_1080606_1_EBS_Collab10_April2010_mod.pdf
DocID_1080606_1_EBS_Collab10_April2010_mod.pdfDocID_1080606_1_EBS_Collab10_April2010_mod.pdf
DocID_1080606_1_EBS_Collab10_April2010_mod.pdf
 
R12 upgrade webinar
R12 upgrade webinarR12 upgrade webinar
R12 upgrade webinar
 
Kevin Holland
Kevin HollandKevin Holland
Kevin Holland
 
VMworld 2013: Moving Enterprise Application Dev/Test to VMware’s Internal Pri...
VMworld 2013: Moving Enterprise Application Dev/Test to VMware’s Internal Pri...VMworld 2013: Moving Enterprise Application Dev/Test to VMware’s Internal Pri...
VMworld 2013: Moving Enterprise Application Dev/Test to VMware’s Internal Pri...
 
OOW15 - Customer Success Stories: Upgrading to Oracle E-Business Suite 12.2
OOW15 - Customer Success Stories: Upgrading to Oracle E-Business Suite 12.2 OOW15 - Customer Success Stories: Upgrading to Oracle E-Business Suite 12.2
OOW15 - Customer Success Stories: Upgrading to Oracle E-Business Suite 12.2
 
Oracle E-Business Suite 12.2 - The Upgrade to End All Upgrades
Oracle E-Business Suite 12.2 - The Upgrade to End All UpgradesOracle E-Business Suite 12.2 - The Upgrade to End All Upgrades
Oracle E-Business Suite 12.2 - The Upgrade to End All Upgrades
 
Leveraging On-Demand Compensation Management In A Global Environment
Leveraging On-Demand Compensation Management In A Global EnvironmentLeveraging On-Demand Compensation Management In A Global Environment
Leveraging On-Demand Compensation Management In A Global Environment
 
Value of-upgrading-to-r12.1-projects
Value of-upgrading-to-r12.1-projectsValue of-upgrading-to-r12.1-projects
Value of-upgrading-to-r12.1-projects
 
Global Fixed Assets
Global Fixed AssetsGlobal Fixed Assets
Global Fixed Assets
 
Rightsizing oracle-upgrade-to-ebs-r12
Rightsizing oracle-upgrade-to-ebs-r12Rightsizing oracle-upgrade-to-ebs-r12
Rightsizing oracle-upgrade-to-ebs-r12
 
sap nw bw7.3 on sap hana ramp up project approach (2)
sap nw bw7.3 on sap hana ramp up project approach (2)sap nw bw7.3 on sap hana ramp up project approach (2)
sap nw bw7.3 on sap hana ramp up project approach (2)
 
OOW15 - Planning Your Upgrade to Oracle E-Business Suite 12.2
OOW15 - Planning Your Upgrade to Oracle E-Business Suite 12.2OOW15 - Planning Your Upgrade to Oracle E-Business Suite 12.2
OOW15 - Planning Your Upgrade to Oracle E-Business Suite 12.2
 
Hyperion 11.2 vs Cloud: Should I Stay or Should I Go?
Hyperion 11.2 vs Cloud: Should I Stay or Should I Go?Hyperion 11.2 vs Cloud: Should I Stay or Should I Go?
Hyperion 11.2 vs Cloud: Should I Stay or Should I Go?
 
Paresh_Pandit_CV
Paresh_Pandit_CVParesh_Pandit_CV
Paresh_Pandit_CV
 
Fin pre upgrade_setup_opstips
Fin pre upgrade_setup_opstipsFin pre upgrade_setup_opstips
Fin pre upgrade_setup_opstips
 
Updated resume(Senior Oracle Applications DBA)
Updated resume(Senior Oracle Applications DBA)Updated resume(Senior Oracle Applications DBA)
Updated resume(Senior Oracle Applications DBA)
 
The John Hancock Monitoring Story, FutureStack17
The John Hancock Monitoring Story, FutureStack17The John Hancock Monitoring Story, FutureStack17
The John Hancock Monitoring Story, FutureStack17
 
Ashish_Resume7.1
Ashish_Resume7.1Ashish_Resume7.1
Ashish_Resume7.1
 
SAP Overview
SAP OverviewSAP Overview
SAP Overview
 
Rahul Resume
Rahul ResumeRahul Resume
Rahul Resume
 

More from InSync Conference

In Sync Running Apps On Oracle
In Sync  Running Apps On OracleIn Sync  Running Apps On Oracle
In Sync Running Apps On Oracle
InSync Conference
 
Optim Insync10 Paul Griffin presentation
Optim Insync10 Paul Griffin presentationOptim Insync10 Paul Griffin presentation
Optim Insync10 Paul Griffin presentation
InSync Conference
 
Nswh Insync 2010 Ammar Customer Presentation
Nswh Insync 2010 Ammar Customer PresentationNswh Insync 2010 Ammar Customer Presentation
Nswh Insync 2010 Ammar Customer Presentation
InSync Conference
 
InSync10 Implement JDE Financial Analytics and Make Better Decisions
InSync10  Implement JDE Financial Analytics and Make Better DecisionsInSync10  Implement JDE Financial Analytics and Make Better Decisions
InSync10 Implement JDE Financial Analytics and Make Better Decisions
InSync Conference
 
Ebs operational reporting at santos evaluation, selection & implementation
Ebs operational reporting at santos evaluation, selection & implementationEbs operational reporting at santos evaluation, selection & implementation
Ebs operational reporting at santos evaluation, selection & implementation
InSync Conference
 
Santos change management utility, our alternative to application change manag...
Santos change management utility, our alternative to application change manag...Santos change management utility, our alternative to application change manag...
Santos change management utility, our alternative to application change manag...
InSync Conference
 

More from InSync Conference (20)

Frank munz oracle fusion middleware and aws cloud services in sync11
Frank munz oracle fusion middleware and aws cloud services in sync11Frank munz oracle fusion middleware and aws cloud services in sync11
Frank munz oracle fusion middleware and aws cloud services in sync11
 
Pythian MySQL - database for the web based economy
Pythian   MySQL - database for the web based economyPythian   MySQL - database for the web based economy
Pythian MySQL - database for the web based economy
 
In Sync Running Apps On Oracle
In Sync  Running Apps On OracleIn Sync  Running Apps On Oracle
In Sync Running Apps On Oracle
 
P6 r8
P6 r8P6 r8
P6 r8
 
P6 analytics
P6 analyticsP6 analytics
P6 analytics
 
Upk presentation insync
Upk presentation insync Upk presentation insync
Upk presentation insync
 
Oracle Fusion Middleware for JD Edwards
Oracle Fusion Middleware for JD EdwardsOracle Fusion Middleware for JD Edwards
Oracle Fusion Middleware for JD Edwards
 
In sync10 grc_suite
In sync10 grc_suiteIn sync10 grc_suite
In sync10 grc_suite
 
In sync10 cliffgodwin-ebs-final
In sync10 cliffgodwin-ebs-finalIn sync10 cliffgodwin-ebs-final
In sync10 cliffgodwin-ebs-final
 
In sync10 cliffgodwin-appskeynote-final
In sync10 cliffgodwin-appskeynote-finalIn sync10 cliffgodwin-appskeynote-final
In sync10 cliffgodwin-appskeynote-final
 
Mnod linsync10 oba
Mnod linsync10 obaMnod linsync10 oba
Mnod linsync10 oba
 
D linsync10 ofa5yrs
D linsync10 ofa5yrsD linsync10 ofa5yrs
D linsync10 ofa5yrs
 
D linsync10 fusaapps
D linsync10 fusaappsD linsync10 fusaapps
D linsync10 fusaapps
 
Optim Insync10 Paul Griffin presentation
Optim Insync10 Paul Griffin presentationOptim Insync10 Paul Griffin presentation
Optim Insync10 Paul Griffin presentation
 
Nswh Insync 2010 Ammar Customer Presentation
Nswh Insync 2010 Ammar Customer PresentationNswh Insync 2010 Ammar Customer Presentation
Nswh Insync 2010 Ammar Customer Presentation
 
InSync10 Implement JDE Financial Analytics and Make Better Decisions
InSync10  Implement JDE Financial Analytics and Make Better DecisionsInSync10  Implement JDE Financial Analytics and Make Better Decisions
InSync10 Implement JDE Financial Analytics and Make Better Decisions
 
Ebs operational reporting at santos evaluation, selection & implementation
Ebs operational reporting at santos evaluation, selection & implementationEbs operational reporting at santos evaluation, selection & implementation
Ebs operational reporting at santos evaluation, selection & implementation
 
Santos change management utility, our alternative to application change manag...
Santos change management utility, our alternative to application change manag...Santos change management utility, our alternative to application change manag...
Santos change management utility, our alternative to application change manag...
 
More effective and more flexible security to lower your total cost of ownersh...
More effective and more flexible security to lower your total cost of ownersh...More effective and more flexible security to lower your total cost of ownersh...
More effective and more flexible security to lower your total cost of ownersh...
 
Under the Hood 11g Identity Management
Under the Hood  11g Identity ManagementUnder the Hood  11g Identity Management
Under the Hood 11g Identity Management
 

Recently uploaded

Recently uploaded (20)

GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
 
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
 
Behind the Scenes From the Manager's Chair: Decoding the Secrets of Successfu...
Behind the Scenes From the Manager's Chair: Decoding the Secrets of Successfu...Behind the Scenes From the Manager's Chair: Decoding the Secrets of Successfu...
Behind the Scenes From the Manager's Chair: Decoding the Secrets of Successfu...
 
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
 
Exploring UiPath Orchestrator API: updates and limits in 2024 🚀
Exploring UiPath Orchestrator API: updates and limits in 2024 🚀Exploring UiPath Orchestrator API: updates and limits in 2024 🚀
Exploring UiPath Orchestrator API: updates and limits in 2024 🚀
 
Custom Approval Process: A New Perspective, Pavel Hrbacek & Anindya Halder
Custom Approval Process: A New Perspective, Pavel Hrbacek & Anindya HalderCustom Approval Process: A New Perspective, Pavel Hrbacek & Anindya Halder
Custom Approval Process: A New Perspective, Pavel Hrbacek & Anindya Halder
 
"Impact of front-end architecture on development cost", Viktor Turskyi
"Impact of front-end architecture on development cost", Viktor Turskyi"Impact of front-end architecture on development cost", Viktor Turskyi
"Impact of front-end architecture on development cost", Viktor Turskyi
 
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
 
Integrating Telephony Systems with Salesforce: Insights and Considerations, B...
Integrating Telephony Systems with Salesforce: Insights and Considerations, B...Integrating Telephony Systems with Salesforce: Insights and Considerations, B...
Integrating Telephony Systems with Salesforce: Insights and Considerations, B...
 
Connector Corner: Automate dynamic content and events by pushing a button
Connector Corner: Automate dynamic content and events by pushing a buttonConnector Corner: Automate dynamic content and events by pushing a button
Connector Corner: Automate dynamic content and events by pushing a button
 
Bits & Pixels using AI for Good.........
Bits & Pixels using AI for Good.........Bits & Pixels using AI for Good.........
Bits & Pixels using AI for Good.........
 
In-Depth Performance Testing Guide for IT Professionals
In-Depth Performance Testing Guide for IT ProfessionalsIn-Depth Performance Testing Guide for IT Professionals
In-Depth Performance Testing Guide for IT Professionals
 
IoT Analytics Company Presentation May 2024
IoT Analytics Company Presentation May 2024IoT Analytics Company Presentation May 2024
IoT Analytics Company Presentation May 2024
 
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
 
Knowledge engineering: from people to machines and back
Knowledge engineering: from people to machines and backKnowledge engineering: from people to machines and back
Knowledge engineering: from people to machines and back
 
UiPath Test Automation using UiPath Test Suite series, part 3
UiPath Test Automation using UiPath Test Suite series, part 3UiPath Test Automation using UiPath Test Suite series, part 3
UiPath Test Automation using UiPath Test Suite series, part 3
 
Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...
Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...
Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...
 
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
 
10 Differences between Sales Cloud and CPQ, Blanka Doktorová
10 Differences between Sales Cloud and CPQ, Blanka Doktorová10 Differences between Sales Cloud and CPQ, Blanka Doktorová
10 Differences between Sales Cloud and CPQ, Blanka Doktorová
 
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
 

H:\Documents\Life After Upgrading To R12

  • 1. Life after upgrading to R12 at Origin Presentation to: InSync Date: August 2010
  • 2. Origin in 2008 Page 2
  • 3. Origin in 2008 Oracle eBusiness version 11.5.10 Relatively low number of production issues Stable Production environment. Well known and understood processes No Performance issues Page 3
  • 4. Why did Origin go to R12 ? Origin had multiple requirements for an Asset Management system Decided to go for an enterprise-wide solution rather than multiple business unit specific solutions Oracle Asset Management Solution (eAMS) selected as the enterprise solution The functionality Origin required in their eAMS solution had R12 as a pre-requisite Project set up to Upgrade to R12 Rollout eAMS Migrate our upstream business from JD Edwards to Oracle eBusiness Introduce a new operating unit for APLNG – Joint Venture In hindsight, any one of these components would have been a project with sufficient challenges to tackle on their own Page 4
  • 5. Origin’s R12 project Origin’s R12 project was run during 2008 Originally scheduled for go – live in November 2008 Rescheduled to January 2009 Key lessons learnt from the project Post Implementation Review The R12 Upgrade should be a project in it’s own right if possible Allocate time and resources to understanding the mandatory new modules and functionality Upgrading customisations will take more effort than you expect Test early, test thoroughly Defect management and resolution will take more effort than you expect Training is important, but communications are critical Page 5
  • 6. R12 go live Go live went from 8th Jan – 11th Jan 2009 Implementations for the remainder of the project (upstream rollout, eAMS rollout ) occurred over the next 1-2 weeks Went live with version 12.0.5 Upgraded 2 existing operating units from R11 to R12 Implemented 2 new operating units in R12 Page 6
  • 7. Whathappened in the 1st month after R12 go live …
  • 8. Some of the key R12 issues we experienced were … Performance After go-live performance issues occurred Delays logging on Java forms slow Disconnections Workflow mailer backlog Required some fine tuning Ensure technical software versions and configurations are correct Web Cache software improved performance at remote sites Reverted to forms Socket Mode (from Servlet Mode) JVM sizing wrong for 11i and required resizing in R12 Tuned concurrent manager sizing Points to note This was not unexpected due to limited R12 implementations in Australia Ensure time scheduled for load testing Ensure Oracle and hardware vendor reviews and signs off on versions and configurations Page 8
  • 9. Some of the key R12 issues we experienced were … Invoice Validation Performance What we saw Invoice validation was not completing overnight Operating units conflicting with each other If a run was terminated -> records locked Particularly an issue at month end -> couldn’t close payables until finished What we did Baby-sit invoice validation overnight Hot-fix supplied by Oracle to ensure indexes used Patch supplied to limit the number of records processed Points to note Ensure hot-fix and patch applied Ensure invoice validation in your regression test suite Page 9
  • 10. Some of the key R12 issues we experienced were … Payables table structures changed What we saw Could not process R11 invoices in R12 What we did Data fixes to process some records Cancel R11 invoices and create R12 invoices Points to note Ensure all invoices processed before upgrade Develop in-flight process for those that can’t Ensure processes for how to handle R11 well communicated Reports What we saw Origin planned to move back to standard reports as much as possible What we did Many custom reports upgrade / developed after go live Points to note Commit to using Standard reports or plan (schedule / budget to do a lot of report upgrade / development) Page 10
  • 11. Some of the key R12 issues we experienced were … New / Reworked modules (Payments, eBusiness tax, SLA) What we saw These modules gave us the most issues What we did Steep learning curve Obtain outside assistance Points to note Plan (schedule / budget) to understand these modules before go-live Withholding Tax What we saw Withholding Tax did not work in R12 What we did Implement workarounds Long engagement with Oracle to resolve this SR Points to note Ensure the version you go live with contains the required patches Page 11
  • 12. Which modules were impacted by R12 Page 12
  • 13. What happened then … Transition to Support
  • 14. The picture after 4 months … Page 14
  • 15. Remediation Project Situation did not materially change as a result of transition to support Not sustainable for our business Remediation Project set up to address Objectives Return outstanding calls to Business as Usual level (target 275) Return outstanding SRs with Oracle to Business as Usual level (target 30) Reduce the number of new calls per day by 20% New calls to be actioned within our SLA Recommendation made on a patch release Technical review undertaken Page 15
  • 17. Remediation Project 4-6 additional functional resources required for 4 months Availability Cost Travel and Accom Lot of work required with Oracle to progress critical SRs Focus required to ensure support process were appropriate Outside of difficult SRs, no real problems encountered Technical review performed by Oracle – tactical hardware upgrade recommended Review of potential next patch release No official patch release would address our critical SRs Testing confirmed that a combination of several mega-patches (400-600 fixes in each patch), July CPC and a range of smaller patches would address our critical SRs Project Targets achieved Page 17
  • 18. Service desk calls by module – after remediation Page 18
  • 19. Tactical Hardware Upgrade Goals Address month end performance issues Create headroom to re-introduce end-user reporting capacity Ensure capacity available for coming 12 months Tasks Transform from 1-tier to 2-tier architecture New server plus additional memory required Proof of concept, Regression Test, Performance Test Timeframes Very tight timeframes to meet project deadlines and half year-end reporting Approval thru to implement in 2 months Results Very successful Performance issues gone Project deadlines not impacted Half Year end not impacted Page 19
  • 20. Patch Release Goals Implement solutions to critical SRs Retain performance of Invoice validation Tasks Scope and build test cases Use of structured test cases and defect management Integration Testing, User Acceptance Testing 5 -6 FTEs Timeframes Originally 3 months, Grew to 4 months Significant effort to resolve Tax config issues for upgraded operating units Results Very Successful Improved stability of P2P particularly Invoice Workbench Identified some tax config issues resulting from the R12 upgrade 1 minor issue post go-live Now have formal set of P2P test cases which are used for regression testing Page 20
  • 22. Service desk calls by module – after patch release Page 22
  • 23. In Summary In the 12 months since go live Origin has had 4 months of Project Heightened Support 4 months of Remediation project Rolled out a new operating unit for our NZ business Hardware upgrade Re - implemented APLNG operating unit Rolled out eAMS to multiple sites across the business Major patch release This has been achieved by Significant hard work by my support team and our project team in Brisbane Significant hard work, patience and support from our business stakeholders Important assistance from Oracle at the crunch times Last 12 months was probably the 12 months we had to have as we were early adopters of R12 (thanks Paul Keating) Page 23
  • 24. Final Thoughts Consider carefully before including any other scope in your R12 project Make sure your technical environment and hardware is set up to perform to R12 requirements early on in your project Consider carefully whether you want to upgrade to R12 or re-implement R12. Plan for expert assistance from Oracle to assist with New Payments engine E-Business Tax Sub Ledger Accounting Don’t plan on a short Heightened Support period – minimum 3 month ends Plan for a period of Remediation and/or stabilization for some months after that Plan for a hardware health check post stabilization Regression Testing is all-important in an R12 environment Page 24