Pick up the correct statement from the following:
1) Dead weight tonnage of a ship:
i. Varies with latitude and season
ii. Is more than displacement tonnage
iii. Is the difference between displacement load and displacement
light of these statements
a) i) and ii) are correct,
b) ii) and iii) are correct,
c) i) and iii) are correct, 
d) Only iii) is correct.
2) By increasing the rise of lock gates,
i. The length of the gate will increase
ii. Transverse stress due to water pressure on the gate will
increase
iii. Compressive force on the gate will increase of these
statements
a) i) and ii) are correct, 
b) i) and iii) are correct,
c) Only ii) is correct,
d) Only iii) is correct.
Choose the correct answer of the following:
3) The minimum diameter of turning basin, where ships turn by going
ahead and without tug assistance should be:
i. L,
ii. 1.5 L,
iii.2 L,
iv. 4 L. 
Where “L” is the length of the largest ship to use the port.
4) The difference in height between highest water and lowest water is
called:
i. Mean range,
30 QUESTIONS IN HARBOR AND SHORE PROTECTION
Page
2
ii. Maximum range, 
iii. Maximum rise,
iv. Mean rise.
5) Which of the following structures protects the shore by trapping of
littoral drift?
i. Groynes, 
ii. Sea walls,
iii. Revetments,
iv. Moles.
6) Which of the following structures are constructed parallel to shore
line to develop a demarcating line between land area and water area?
i. Sea walls, bulk heads and groynes,
ii. Sea walls, bulk heads and revetments, 
iii. Sea walls, revetments, and groynes,
iv. Bulk heads, revetments, and groynes.
7) Which of the following type of sea walls results in greatest protection
of shore structures?
i. Vertical sea wall
ii. Sea wall with batter
iii. Steeped sea wall,
iv. Sea wall with concave face. 
8) What are the materials used in building a gravity dam?
--------------------------------------------------------------------------
--------------------------------------------------------------------------
--------------------------------------------------------------------------
--------------------------------------------------------------------------
9) A river training work is generally required when the river is:
i. Aggrading type
ii. Degrading type
30 QUESTIONS IN HARBOR AND SHORE PROTECTION
Page
3
iii. Meandering type 
iv. Both (a) and (b).
10) A river bend characterized by silting:
i. Scouring on concave side
ii. Silting on convex side
iii. Scouring on convex side and on concave side
iv. Scouring on concave side and silting convex side. 
11) The dock wall is designed as a gravity retaining wall and is tested
for:
i. Maximum water pressure from the dock without any back fill
ii. Back fill pressure when the dock is empty
iii. The load charge transmitted to the dock by the movement of
loaded vehicles or trains on the way
iv. All of the above. 
12) Due to the impact of water wave on a sea shore structure:
i. Weakens the foundation
ii. All of the above. 
iii. Vibrations are subjected
iv. Internal pressure is developed
13) Pick up the correct statement from the following:
i. The brick masonry retaining wall which is used for loading and
unloading of cargo is called guy wall
ii. The breakwater which can be used as a platform for loading
and unloading of cargo is called a mole
iii. Three types of break waters are generally provided in harbors
iv. All of the above. 
14) A harbor is a place where:
i. Ships get shelter and protection against destructive forces due
to sea waves
30 QUESTIONS IN HARBOR AND SHORE PROTECTION
Page
4
ii. All of the above. 
iii. Facilities are provided for receiving cargo and passengers
iv. Port buildings are constructed for commercial purposes.
15) The shape of docks and basins is generally kept:
i. Diamond shape gays
ii. Rectangular ways
iii. Inclined gays
iv. All of these. 
16) The important component of a sea port is:
i. Terminal buildings
ii. The docks.
iii. The harbor
iv. All of these 
17) On the sea shore structures, the water wave impact causes:
i. Compressive force due to collapse of the wave
ii. Shear force due to deflected vertical force
iii. All of the above. 
iv. Suction force due to water returning after striking
18) The width of the entrances of the harbors is restricted to:
i. 100 m
ii. 120 m
iii. 140 m
iv. 180 m 
19) A dock is:
i. Provided with a dock gate
ii. All the above. 
iii. An artificial basin for vessels where the variation of water in
the shore does not affect the level of water
30 QUESTIONS IN HARBOR AND SHORE PROTECTION
Page
5
iv. Provided with an arrangement to pump out water when
required
20) Pick up the correct statement from the following:
i. An artificial barrier )‫(حاحز‬ which makes the enclosed area safe
for anchorage of ships, is known as break water
ii. The break water whose inside is used as a platform for loading
and unloading is called a mole
iii. The length of the quay wall is governed by the length of the
largest vessel likely to be berthed,
iv. All the above. 
21) Consider the following statements: “Sand in mortar is needed
for:
i. Decreasing the quantity of cement
ii. Reducing shrinkage
iii. Decreasing the surface area of the building material
iv. Increasing the strength
a) ii, iii and iv are correct
b) i, ii and iii are correct
c) i, iii and iv are correct
d) i, ii and iv are correct.
22) Littoral drift ‫جن‬‫إ‬‫ل‬‫(ا‬
‫اف‬‫ر‬
‫الساحيل‬
) is:
i. The raised line of sand, parallel to the sea coast
ii. The slow movement of surface water at sea caused by the
wind
iii. A current parallel to the shore, caused due to tangential
component of the wind 
iv. A current perpendicular to the shore line caused due to wind.
23) Groynes are generally built:
i. Inclined up stream up to 30°
30 QUESTIONS IN HARBOR AND SHORE PROTECTION
Page
6
ii. Inclined downstream up to 30°
iii. Perpendicular to the bank
iv. All 
24) A river training work is generally required when the river is
i. Meandering
ii. Aggrading
iii. All 
iv. Degrading‫ز‬
25) What is sheet pile wall?
-------------------------------------------------------------------------
-------------------------------------------------------------------------
-------------------------------------------------------------------------
26) What is bulkhead sheet pile?
-------------------------------------------------------------------------
-------------------------------------------------------------------------
-------------------------------------------------------------------------
27) What is cover dam?
-------------------------------------------------------------------------
-------------------------------------------------------------------------
-------------------------------------------------------------------------
28) What are the advantages of building a lock?
-------------------------------------------------------------------------
-------------------------------------------------------------------------
-------------------------------------------------------------------------
29) What are the uses of Groynes?
-------------------------------------------------------------------------
-------------------------------------------------------------------------
-------------------------------------------------------------------------
30 QUESTIONS IN HARBOR AND SHORE PROTECTION
Page
7
30) How long does it take concrete to harden?
-------------------------------------------------------------------------
-------------------------------------------------------------------------
-------------------------------------------------------------------------

More Related Content

Similar to harbor and shore protection.docx

20150421031337318
2015042103133731820150421031337318
20150421031337318
James Prs
 
H & d ppt 06 repair docks
H & d ppt 06 repair docksH & d ppt 06 repair docks
H & d ppt 06 repair docks
Hasna Hassan
 
Ijmet 10 01_189
Ijmet 10 01_189Ijmet 10 01_189
Ijmet 10 01_189
IAEME Publication
 
Chapter 1_INFRASTRUCTURE & DRILLING.pdf
Chapter 1_INFRASTRUCTURE & DRILLING.pdfChapter 1_INFRASTRUCTURE & DRILLING.pdf
Chapter 1_INFRASTRUCTURE & DRILLING.pdf
KaisBenAbdallah2
 
i&hs.docx
i&hs.docxi&hs.docx
i&hs.docx
Mood Naik
 
Design_and_Construction_of_Embankment_Da (2).pdf
Design_and_Construction_of_Embankment_Da (2).pdfDesign_and_Construction_of_Embankment_Da (2).pdf
Design_and_Construction_of_Embankment_Da (2).pdf
YeshiharegAlemu
 
Design_and_Construction_of_Embankment_Da (1).pdf
Design_and_Construction_of_Embankment_Da (1).pdfDesign_and_Construction_of_Embankment_Da (1).pdf
Design_and_Construction_of_Embankment_Da (1).pdf
YeshiharegAlemu
 
Chapter 5 - Floods (Part 2)
Chapter 5 - Floods (Part 2)Chapter 5 - Floods (Part 2)
Chapter 5 - Floods (Part 2)
GeographyByTian
 
S2 GE Slides - Floods (Part 2)
S2 GE Slides - Floods (Part 2)S2 GE Slides - Floods (Part 2)
S2 GE Slides - Floods (Part 2)
LEEENNA
 
Offshore platform ln1_au_06_12_2019
Offshore platform ln1_au_06_12_2019Offshore platform ln1_au_06_12_2019
Offshore platform ln1_au_06_12_2019
UnitedLiftTechnologi
 
Design , Analysis and Optimization of Intze Type Water Tank With Sloshing Effect
Design , Analysis and Optimization of Intze Type Water Tank With Sloshing EffectDesign , Analysis and Optimization of Intze Type Water Tank With Sloshing Effect
Design , Analysis and Optimization of Intze Type Water Tank With Sloshing Effect
IRJET Journal
 
Challenges and prospects of Bay Container Terminal, Chittagong.
Challenges and prospects of Bay Container Terminal, Chittagong.Challenges and prospects of Bay Container Terminal, Chittagong.
Challenges and prospects of Bay Container Terminal, Chittagong.
MOHIMENUL
 
Final ppt of ts
Final ppt of tsFinal ppt of ts
Final ppt of ts
Mohd omer Ahmed
 
5_6334673197882934274.pdf
5_6334673197882934274.pdf5_6334673197882934274.pdf
5_6334673197882934274.pdf
mohsin mohammad
 
Maintenance of various_structures0
Maintenance of various_structures0Maintenance of various_structures0
Maintenance of various_structures0
GMKukshi
 
Maintenance of various_structures
Maintenance of various_structuresMaintenance of various_structures
Maintenance of various_structures
GMKukshi
 
Burj Al Arab
Burj Al ArabBurj Al Arab
Burj Al Arab
Daniela Villa
 
Under water welding ppt
Under water welding pptUnder water welding ppt
Under water welding ppt
M4UBIHARI
 
IRJET- Analysis of Loads and Design of Passenger Boat Berthing Structure ...
IRJET-  	  Analysis of Loads and Design of Passenger Boat Berthing Structure ...IRJET-  	  Analysis of Loads and Design of Passenger Boat Berthing Structure ...
IRJET- Analysis of Loads and Design of Passenger Boat Berthing Structure ...
IRJET Journal
 
PROBABILISTIC MODELING OF THE COLLISION.pptx
PROBABILISTIC MODELING OF THE COLLISION.pptxPROBABILISTIC MODELING OF THE COLLISION.pptx
PROBABILISTIC MODELING OF THE COLLISION.pptx
SaptarshiBasu23
 

Similar to harbor and shore protection.docx (20)

20150421031337318
2015042103133731820150421031337318
20150421031337318
 
H & d ppt 06 repair docks
H & d ppt 06 repair docksH & d ppt 06 repair docks
H & d ppt 06 repair docks
 
Ijmet 10 01_189
Ijmet 10 01_189Ijmet 10 01_189
Ijmet 10 01_189
 
Chapter 1_INFRASTRUCTURE & DRILLING.pdf
Chapter 1_INFRASTRUCTURE & DRILLING.pdfChapter 1_INFRASTRUCTURE & DRILLING.pdf
Chapter 1_INFRASTRUCTURE & DRILLING.pdf
 
i&hs.docx
i&hs.docxi&hs.docx
i&hs.docx
 
Design_and_Construction_of_Embankment_Da (2).pdf
Design_and_Construction_of_Embankment_Da (2).pdfDesign_and_Construction_of_Embankment_Da (2).pdf
Design_and_Construction_of_Embankment_Da (2).pdf
 
Design_and_Construction_of_Embankment_Da (1).pdf
Design_and_Construction_of_Embankment_Da (1).pdfDesign_and_Construction_of_Embankment_Da (1).pdf
Design_and_Construction_of_Embankment_Da (1).pdf
 
Chapter 5 - Floods (Part 2)
Chapter 5 - Floods (Part 2)Chapter 5 - Floods (Part 2)
Chapter 5 - Floods (Part 2)
 
S2 GE Slides - Floods (Part 2)
S2 GE Slides - Floods (Part 2)S2 GE Slides - Floods (Part 2)
S2 GE Slides - Floods (Part 2)
 
Offshore platform ln1_au_06_12_2019
Offshore platform ln1_au_06_12_2019Offshore platform ln1_au_06_12_2019
Offshore platform ln1_au_06_12_2019
 
Design , Analysis and Optimization of Intze Type Water Tank With Sloshing Effect
Design , Analysis and Optimization of Intze Type Water Tank With Sloshing EffectDesign , Analysis and Optimization of Intze Type Water Tank With Sloshing Effect
Design , Analysis and Optimization of Intze Type Water Tank With Sloshing Effect
 
Challenges and prospects of Bay Container Terminal, Chittagong.
Challenges and prospects of Bay Container Terminal, Chittagong.Challenges and prospects of Bay Container Terminal, Chittagong.
Challenges and prospects of Bay Container Terminal, Chittagong.
 
Final ppt of ts
Final ppt of tsFinal ppt of ts
Final ppt of ts
 
5_6334673197882934274.pdf
5_6334673197882934274.pdf5_6334673197882934274.pdf
5_6334673197882934274.pdf
 
Maintenance of various_structures0
Maintenance of various_structures0Maintenance of various_structures0
Maintenance of various_structures0
 
Maintenance of various_structures
Maintenance of various_structuresMaintenance of various_structures
Maintenance of various_structures
 
Burj Al Arab
Burj Al ArabBurj Al Arab
Burj Al Arab
 
Under water welding ppt
Under water welding pptUnder water welding ppt
Under water welding ppt
 
IRJET- Analysis of Loads and Design of Passenger Boat Berthing Structure ...
IRJET-  	  Analysis of Loads and Design of Passenger Boat Berthing Structure ...IRJET-  	  Analysis of Loads and Design of Passenger Boat Berthing Structure ...
IRJET- Analysis of Loads and Design of Passenger Boat Berthing Structure ...
 
PROBABILISTIC MODELING OF THE COLLISION.pptx
PROBABILISTIC MODELING OF THE COLLISION.pptxPROBABILISTIC MODELING OF THE COLLISION.pptx
PROBABILISTIC MODELING OF THE COLLISION.pptx
 

More from Dr. Ezzat Elsayed Gomaa

Summer training
Summer  trainingSummer  training
Summer training
Dr. Ezzat Elsayed Gomaa
 
notes in fluid mechanics
notes in fluid mechanicsnotes in fluid mechanics
notes in fluid mechanics
Dr. Ezzat Elsayed Gomaa
 
Worked examples
  Worked examples  Worked examples
Worked examples
Dr. Ezzat Elsayed Gomaa
 
Seven edition in fluid mechanics White
Seven edition in fluid mechanics WhiteSeven edition in fluid mechanics White
Seven edition in fluid mechanics White
Dr. Ezzat Elsayed Gomaa
 
Manometers, Pitot tube and Pumps & Turbines Final.
Manometers,  Pitot tube  and Pumps & Turbines Final.Manometers,  Pitot tube  and Pumps & Turbines Final.
Manometers, Pitot tube and Pumps & Turbines Final.
Dr. Ezzat Elsayed Gomaa
 
Examination in open channel flow
Examination in open channel flowExamination in open channel flow
Examination in open channel flow
Dr. Ezzat Elsayed Gomaa
 
clarifier-calculations
clarifier-calculationsclarifier-calculations
clarifier-calculations
Dr. Ezzat Elsayed Gomaa
 
worked examples
worked examples worked examples
worked examples
Dr. Ezzat Elsayed Gomaa
 
Examples solutions in open channel flow
Examples solutions in open channel flowExamples solutions in open channel flow
Examples solutions in open channel flow
Dr. Ezzat Elsayed Gomaa
 
solved problems in hydrostatic
solved problems in hydrostatic solved problems in hydrostatic
solved problems in hydrostatic
Dr. Ezzat Elsayed Gomaa
 
Solved Examples in fluid mechanics final
Solved Examples in fluid mechanics finalSolved Examples in fluid mechanics final
Solved Examples in fluid mechanics final
Dr. Ezzat Elsayed Gomaa
 
Solved Examples in fluid mechanics
Solved Examples in fluid mechanics Solved Examples in fluid mechanics
Solved Examples in fluid mechanics
Dr. Ezzat Elsayed Gomaa
 
Problem solving in fluid mechanics
Problem solving in fluid mechanicsProblem solving in fluid mechanics
Problem solving in fluid mechanics
Dr. Ezzat Elsayed Gomaa
 
sheet of pipe flow
sheet of pipe flowsheet of pipe flow
sheet of pipe flow
Dr. Ezzat Elsayed Gomaa
 
Sheetproblems in open channel flow
Sheetproblems in open channel flowSheetproblems in open channel flow
Sheetproblems in open channel flow
Dr. Ezzat Elsayed Gomaa
 
Introduction to Hydraulics "Engineering is your job"
Introduction to Hydraulics "Engineering is your job"Introduction to Hydraulics "Engineering is your job"
Introduction to Hydraulics "Engineering is your job"
Dr. Ezzat Elsayed Gomaa
 
pelton wheel
pelton wheel pelton wheel
Quasi steady and un steady flow
Quasi steady and un steady flowQuasi steady and un steady flow
Quasi steady and un steady flow
Dr. Ezzat Elsayed Gomaa
 
Presentation on MCQ on fluid
Presentation on MCQ on fluidPresentation on MCQ on fluid
Presentation on MCQ on fluid
Dr. Ezzat Elsayed Gomaa
 
MCQ Ex in Fluid mechanics
MCQ Ex in Fluid mechanicsMCQ Ex in Fluid mechanics
MCQ Ex in Fluid mechanics
Dr. Ezzat Elsayed Gomaa
 

More from Dr. Ezzat Elsayed Gomaa (20)

Summer training
Summer  trainingSummer  training
Summer training
 
notes in fluid mechanics
notes in fluid mechanicsnotes in fluid mechanics
notes in fluid mechanics
 
Worked examples
  Worked examples  Worked examples
Worked examples
 
Seven edition in fluid mechanics White
Seven edition in fluid mechanics WhiteSeven edition in fluid mechanics White
Seven edition in fluid mechanics White
 
Manometers, Pitot tube and Pumps & Turbines Final.
Manometers,  Pitot tube  and Pumps & Turbines Final.Manometers,  Pitot tube  and Pumps & Turbines Final.
Manometers, Pitot tube and Pumps & Turbines Final.
 
Examination in open channel flow
Examination in open channel flowExamination in open channel flow
Examination in open channel flow
 
clarifier-calculations
clarifier-calculationsclarifier-calculations
clarifier-calculations
 
worked examples
worked examples worked examples
worked examples
 
Examples solutions in open channel flow
Examples solutions in open channel flowExamples solutions in open channel flow
Examples solutions in open channel flow
 
solved problems in hydrostatic
solved problems in hydrostatic solved problems in hydrostatic
solved problems in hydrostatic
 
Solved Examples in fluid mechanics final
Solved Examples in fluid mechanics finalSolved Examples in fluid mechanics final
Solved Examples in fluid mechanics final
 
Solved Examples in fluid mechanics
Solved Examples in fluid mechanics Solved Examples in fluid mechanics
Solved Examples in fluid mechanics
 
Problem solving in fluid mechanics
Problem solving in fluid mechanicsProblem solving in fluid mechanics
Problem solving in fluid mechanics
 
sheet of pipe flow
sheet of pipe flowsheet of pipe flow
sheet of pipe flow
 
Sheetproblems in open channel flow
Sheetproblems in open channel flowSheetproblems in open channel flow
Sheetproblems in open channel flow
 
Introduction to Hydraulics "Engineering is your job"
Introduction to Hydraulics "Engineering is your job"Introduction to Hydraulics "Engineering is your job"
Introduction to Hydraulics "Engineering is your job"
 
pelton wheel
pelton wheel pelton wheel
pelton wheel
 
Quasi steady and un steady flow
Quasi steady and un steady flowQuasi steady and un steady flow
Quasi steady and un steady flow
 
Presentation on MCQ on fluid
Presentation on MCQ on fluidPresentation on MCQ on fluid
Presentation on MCQ on fluid
 
MCQ Ex in Fluid mechanics
MCQ Ex in Fluid mechanicsMCQ Ex in Fluid mechanics
MCQ Ex in Fluid mechanics
 

Recently uploaded

spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
Madan Karki
 
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
171ticu
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
gerogepatton
 
Casting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdfCasting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdf
zubairahmad848137
 
Engineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdfEngineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdf
abbyasa1014
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
MIGUELANGEL966976
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
camseq
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
Madan Karki
 
Heat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation pptHeat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation ppt
mamunhossenbd75
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
Hitesh Mohapatra
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
IJECEIAES
 
Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...
bijceesjournal
 
CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
rpskprasana
 
The Python for beginners. This is an advance computer language.
The Python for beginners. This is an advance computer language.The Python for beginners. This is an advance computer language.
The Python for beginners. This is an advance computer language.
sachin chaurasia
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
IJECEIAES
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
KrishnaveniKrishnara1
 
Textile Chemical Processing and Dyeing.pdf
Textile Chemical Processing and Dyeing.pdfTextile Chemical Processing and Dyeing.pdf
Textile Chemical Processing and Dyeing.pdf
NazakatAliKhoso2
 
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have oneISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
Las Vegas Warehouse
 
Question paper of renewable energy sources
Question paper of renewable energy sourcesQuestion paper of renewable energy sources
Question paper of renewable energy sources
mahammadsalmanmech
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
171ticu
 

Recently uploaded (20)

spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
 
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
 
Casting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdfCasting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdf
 
Engineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdfEngineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdf
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
 
Heat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation pptHeat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation ppt
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
 
Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...
 
CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
 
The Python for beginners. This is an advance computer language.
The Python for beginners. This is an advance computer language.The Python for beginners. This is an advance computer language.
The Python for beginners. This is an advance computer language.
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
 
Textile Chemical Processing and Dyeing.pdf
Textile Chemical Processing and Dyeing.pdfTextile Chemical Processing and Dyeing.pdf
Textile Chemical Processing and Dyeing.pdf
 
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have oneISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
 
Question paper of renewable energy sources
Question paper of renewable energy sourcesQuestion paper of renewable energy sources
Question paper of renewable energy sources
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
 

harbor and shore protection.docx

  • 1. 30 QUESTIONS IN HARBOR AND SHORE PROTECTION Page 0 Dr. EzzatEl Sayed G. SALEH 12/14/16
  • 2. 30 QUESTIONS IN HARBOR AND SHORE PROTECTION Page 1 Pick up the correct statement from the following: 1) Dead weight tonnage of a ship: i. Varies with latitude and season ii. Is more than displacement tonnage iii. Is the difference between displacement load and displacement light of these statements a) i) and ii) are correct, b) ii) and iii) are correct, c) i) and iii) are correct,  d) Only iii) is correct. 2) By increasing the rise of lock gates, i. The length of the gate will increase ii. Transverse stress due to water pressure on the gate will increase iii. Compressive force on the gate will increase of these statements a) i) and ii) are correct,  b) i) and iii) are correct, c) Only ii) is correct, d) Only iii) is correct. Choose the correct answer of the following: 3) The minimum diameter of turning basin, where ships turn by going ahead and without tug assistance should be: i. L, ii. 1.5 L, iii.2 L, iv. 4 L.  Where “L” is the length of the largest ship to use the port. 4) The difference in height between highest water and lowest water is called: i. Mean range,
  • 3. 30 QUESTIONS IN HARBOR AND SHORE PROTECTION Page 2 ii. Maximum range,  iii. Maximum rise, iv. Mean rise. 5) Which of the following structures protects the shore by trapping of littoral drift? i. Groynes,  ii. Sea walls, iii. Revetments, iv. Moles. 6) Which of the following structures are constructed parallel to shore line to develop a demarcating line between land area and water area? i. Sea walls, bulk heads and groynes, ii. Sea walls, bulk heads and revetments,  iii. Sea walls, revetments, and groynes, iv. Bulk heads, revetments, and groynes. 7) Which of the following type of sea walls results in greatest protection of shore structures? i. Vertical sea wall ii. Sea wall with batter iii. Steeped sea wall, iv. Sea wall with concave face.  8) What are the materials used in building a gravity dam? -------------------------------------------------------------------------- -------------------------------------------------------------------------- -------------------------------------------------------------------------- -------------------------------------------------------------------------- 9) A river training work is generally required when the river is: i. Aggrading type ii. Degrading type
  • 4. 30 QUESTIONS IN HARBOR AND SHORE PROTECTION Page 3 iii. Meandering type  iv. Both (a) and (b). 10) A river bend characterized by silting: i. Scouring on concave side ii. Silting on convex side iii. Scouring on convex side and on concave side iv. Scouring on concave side and silting convex side.  11) The dock wall is designed as a gravity retaining wall and is tested for: i. Maximum water pressure from the dock without any back fill ii. Back fill pressure when the dock is empty iii. The load charge transmitted to the dock by the movement of loaded vehicles or trains on the way iv. All of the above.  12) Due to the impact of water wave on a sea shore structure: i. Weakens the foundation ii. All of the above.  iii. Vibrations are subjected iv. Internal pressure is developed 13) Pick up the correct statement from the following: i. The brick masonry retaining wall which is used for loading and unloading of cargo is called guy wall ii. The breakwater which can be used as a platform for loading and unloading of cargo is called a mole iii. Three types of break waters are generally provided in harbors iv. All of the above.  14) A harbor is a place where: i. Ships get shelter and protection against destructive forces due to sea waves
  • 5. 30 QUESTIONS IN HARBOR AND SHORE PROTECTION Page 4 ii. All of the above.  iii. Facilities are provided for receiving cargo and passengers iv. Port buildings are constructed for commercial purposes. 15) The shape of docks and basins is generally kept: i. Diamond shape gays ii. Rectangular ways iii. Inclined gays iv. All of these.  16) The important component of a sea port is: i. Terminal buildings ii. The docks. iii. The harbor iv. All of these  17) On the sea shore structures, the water wave impact causes: i. Compressive force due to collapse of the wave ii. Shear force due to deflected vertical force iii. All of the above.  iv. Suction force due to water returning after striking 18) The width of the entrances of the harbors is restricted to: i. 100 m ii. 120 m iii. 140 m iv. 180 m  19) A dock is: i. Provided with a dock gate ii. All the above.  iii. An artificial basin for vessels where the variation of water in the shore does not affect the level of water
  • 6. 30 QUESTIONS IN HARBOR AND SHORE PROTECTION Page 5 iv. Provided with an arrangement to pump out water when required 20) Pick up the correct statement from the following: i. An artificial barrier )‫(حاحز‬ which makes the enclosed area safe for anchorage of ships, is known as break water ii. The break water whose inside is used as a platform for loading and unloading is called a mole iii. The length of the quay wall is governed by the length of the largest vessel likely to be berthed, iv. All the above.  21) Consider the following statements: “Sand in mortar is needed for: i. Decreasing the quantity of cement ii. Reducing shrinkage iii. Decreasing the surface area of the building material iv. Increasing the strength a) ii, iii and iv are correct b) i, ii and iii are correct c) i, iii and iv are correct d) i, ii and iv are correct. 22) Littoral drift ‫جن‬‫إ‬‫ل‬‫(ا‬ ‫اف‬‫ر‬ ‫الساحيل‬ ) is: i. The raised line of sand, parallel to the sea coast ii. The slow movement of surface water at sea caused by the wind iii. A current parallel to the shore, caused due to tangential component of the wind  iv. A current perpendicular to the shore line caused due to wind. 23) Groynes are generally built: i. Inclined up stream up to 30°
  • 7. 30 QUESTIONS IN HARBOR AND SHORE PROTECTION Page 6 ii. Inclined downstream up to 30° iii. Perpendicular to the bank iv. All  24) A river training work is generally required when the river is i. Meandering ii. Aggrading iii. All  iv. Degrading‫ز‬ 25) What is sheet pile wall? ------------------------------------------------------------------------- ------------------------------------------------------------------------- ------------------------------------------------------------------------- 26) What is bulkhead sheet pile? ------------------------------------------------------------------------- ------------------------------------------------------------------------- ------------------------------------------------------------------------- 27) What is cover dam? ------------------------------------------------------------------------- ------------------------------------------------------------------------- ------------------------------------------------------------------------- 28) What are the advantages of building a lock? ------------------------------------------------------------------------- ------------------------------------------------------------------------- ------------------------------------------------------------------------- 29) What are the uses of Groynes? ------------------------------------------------------------------------- ------------------------------------------------------------------------- -------------------------------------------------------------------------
  • 8. 30 QUESTIONS IN HARBOR AND SHORE PROTECTION Page 7 30) How long does it take concrete to harden? ------------------------------------------------------------------------- ------------------------------------------------------------------------- -------------------------------------------------------------------------