Personal Information
Name: Hady Naim Sawaya
Date & Place of Birth: August 17th 1976, Tripoli, Lebanon
Nationality: Lebanese
Status: Married
Address: Amioun, El Koura
Phone: 961-70-154078 (Lebanon – Mobile)
E-mail: hsavoya@gmail.com
Objective Looking to join a reputable company where I can acquire a challenging position within the field of Civil
Engineering and Management
Education 1994 – (1999)
 Lebanese University -Branch I- FACULTY OF ENGINEERING - (TRIPOLI)
MASTERS IN CIVIL ENGINEER
1981 – (1994)
 School: “College Des Freres” - (DEDDEH-KOURA)
BACCALAUREATE IN MATHEMATICS
Professional
Experience
April 2014 – December 2016 / Zerock For Construction (Congo)
 Les Arcades (concrete work completed and finishing activities in progress)
(Comprising of a commercial center and two towers)
- Commercial Center is 3 stories high (3,000 m2 each)
- First tower is 8 stories
- Second tower is 9 stories
- Both towers are 400 m2 per floor
Construction Manager in charge of:
1. Coordination between the concrete, finishing and electro-mechanical tasks
2. Cast of 7,000 m3 of concrete
3. Execution of the finishing work
4. Materials order
5. Preparation of contractors certificate
 Pointe Parc (Concrete work in progress)
(Comprising of 1 basement of 900 m2
and 9 stories of 650 m2
each).
Construction Manager in charge of:
1. Cast of 4,500 m3 of concrete
 Le Triangle (Project completed in 9 months on March 2016)
(Building comprising of RDC and 2 stories. This project includes 15 studios).
Construction Manager in charge of:
1. Finishing work
2. Coordination between finishing and electro-mechanical works
3. Cost and quality control
4. Material orders
5. Preparation of contractors certificate
August 2008 - April 2014 / Polygon sal (Lebanon)
 Les Residences Bustros Project – Rmeil, Achrafieh
(Building comprising of 14 high standard finishing Stories and 5 Basements)
- Basements are 900 m2 each used as parking. Floor is Epoxy painted; walls and ceilings are
Roullo painted.
- Building is equipped with external mechanical cladding
- Each floor is one apartment, 560 m2 (VRV HVAC system)
Construction Manager in charge of:
1. Coordination with the consultant, the client and the promoter
2. Coordination between the concrete, finishing and electro-mechanical contractors
3. Inspection and supervision on the executed concrete and finishing works
4. Cost, planning and quality control
5. Material orders
6. Preparation of contractors certificate
 Renovation and Extension of St. Elie Catholic Cathedral - Solidere
Construction Manager in charge of:
1- Coordination with the consultant, the client and the promoter
2- Coordination between the concrete, finishing and electro-mechanical contractors
3- Inspection and Supervision on the executed concrete and finishing works
4- Cost, planning and quality control
5- Material orders
6- Preparation of contractors certificate
 Renovation of Mme Assouad Residence - Achrafieh
Construction Manager in charge of:
1- Coordination with the consultant, the client and the promoter
2- Coordination between the concrete, finishing and electro-mechanical contractors
3- Supervision on the executed work
4- Cost, planning and quality control
5- Material orders
6- Preparation of contractors certificate
Dec 2007 - Aug 2008 / Arcon (KSA)
 Structural warehouse at Sharq project – Khoubar
Construction Manager in charge of:
1- Coordination with the consultant and the client
2- Coordination between the finishing and electro-mechanical contractors
3- Cost and planning control
Jan 2004 – July 2007 / ITB Nigeria limited. (Nigeria)
 TINAPA HOTEL – Calabar
(5 Stories Building, 2500 m2
each floor)
Project Engineer in charge of:
1- The structure: 8000 m3 of concrete using table system.
2- The finishing works: Block-work, plastering, tiling, paint, false ceiling…
3- Coordination between the structural and the electro-mechanical work on site
 GENERAL HOSPITAL – Bayelsa
Project Engineer In charge of:
1. The structure: 20000 m3 of concrete
2. The finishing works: Block-work, plastering, tiling, paint, false ceiling…
Apr 2003 - Jan 2004 / Bauer Foundation Specialists (Lebanon)
 FOUR SEASONS HOTEL, Site Engineer – Beirut
The work was execution of secant piles, stressing of anchors and injection of grout.
Sept 2001 – Apr 2003 / Mid Contracting (Lebanon)
 LE ROYAL HOTEL, Site Engineer – Dbayeih
In charge of finishing work at the main entrance and the ballroom (block-work, tiling,
paint, plastering, false ceiling, wooden work…).
Training
Sept 2000 - May 2001 / Bauer foundation specialists (Lebanon)
 Site engineer
The work included execution of secant piles, stressing of anchors and injection of grout.
Sept 1999 - Sept 2000
 Military service
Languages Speaking Writing Reading
Arabic Excellent Excellent Excellent
French Very Good Good Very Good
English Very Good Good Very Good
Software
Knowledge
 Autocad
 MS Word, Excel, MS Project

Hady Sawaya CV

  • 1.
    Personal Information Name: HadyNaim Sawaya Date & Place of Birth: August 17th 1976, Tripoli, Lebanon Nationality: Lebanese Status: Married Address: Amioun, El Koura Phone: 961-70-154078 (Lebanon – Mobile) E-mail: hsavoya@gmail.com Objective Looking to join a reputable company where I can acquire a challenging position within the field of Civil Engineering and Management Education 1994 – (1999)  Lebanese University -Branch I- FACULTY OF ENGINEERING - (TRIPOLI) MASTERS IN CIVIL ENGINEER 1981 – (1994)  School: “College Des Freres” - (DEDDEH-KOURA) BACCALAUREATE IN MATHEMATICS Professional Experience April 2014 – December 2016 / Zerock For Construction (Congo)  Les Arcades (concrete work completed and finishing activities in progress) (Comprising of a commercial center and two towers) - Commercial Center is 3 stories high (3,000 m2 each) - First tower is 8 stories - Second tower is 9 stories - Both towers are 400 m2 per floor Construction Manager in charge of: 1. Coordination between the concrete, finishing and electro-mechanical tasks 2. Cast of 7,000 m3 of concrete 3. Execution of the finishing work 4. Materials order 5. Preparation of contractors certificate  Pointe Parc (Concrete work in progress) (Comprising of 1 basement of 900 m2 and 9 stories of 650 m2 each). Construction Manager in charge of: 1. Cast of 4,500 m3 of concrete  Le Triangle (Project completed in 9 months on March 2016) (Building comprising of RDC and 2 stories. This project includes 15 studios). Construction Manager in charge of: 1. Finishing work 2. Coordination between finishing and electro-mechanical works 3. Cost and quality control 4. Material orders 5. Preparation of contractors certificate
  • 2.
    August 2008 -April 2014 / Polygon sal (Lebanon)  Les Residences Bustros Project – Rmeil, Achrafieh (Building comprising of 14 high standard finishing Stories and 5 Basements) - Basements are 900 m2 each used as parking. Floor is Epoxy painted; walls and ceilings are Roullo painted. - Building is equipped with external mechanical cladding - Each floor is one apartment, 560 m2 (VRV HVAC system) Construction Manager in charge of: 1. Coordination with the consultant, the client and the promoter 2. Coordination between the concrete, finishing and electro-mechanical contractors 3. Inspection and supervision on the executed concrete and finishing works 4. Cost, planning and quality control 5. Material orders 6. Preparation of contractors certificate  Renovation and Extension of St. Elie Catholic Cathedral - Solidere Construction Manager in charge of: 1- Coordination with the consultant, the client and the promoter 2- Coordination between the concrete, finishing and electro-mechanical contractors 3- Inspection and Supervision on the executed concrete and finishing works 4- Cost, planning and quality control 5- Material orders 6- Preparation of contractors certificate  Renovation of Mme Assouad Residence - Achrafieh Construction Manager in charge of: 1- Coordination with the consultant, the client and the promoter 2- Coordination between the concrete, finishing and electro-mechanical contractors 3- Supervision on the executed work 4- Cost, planning and quality control 5- Material orders 6- Preparation of contractors certificate Dec 2007 - Aug 2008 / Arcon (KSA)  Structural warehouse at Sharq project – Khoubar Construction Manager in charge of: 1- Coordination with the consultant and the client 2- Coordination between the finishing and electro-mechanical contractors 3- Cost and planning control
  • 3.
    Jan 2004 –July 2007 / ITB Nigeria limited. (Nigeria)  TINAPA HOTEL – Calabar (5 Stories Building, 2500 m2 each floor) Project Engineer in charge of: 1- The structure: 8000 m3 of concrete using table system. 2- The finishing works: Block-work, plastering, tiling, paint, false ceiling… 3- Coordination between the structural and the electro-mechanical work on site  GENERAL HOSPITAL – Bayelsa Project Engineer In charge of: 1. The structure: 20000 m3 of concrete 2. The finishing works: Block-work, plastering, tiling, paint, false ceiling… Apr 2003 - Jan 2004 / Bauer Foundation Specialists (Lebanon)  FOUR SEASONS HOTEL, Site Engineer – Beirut The work was execution of secant piles, stressing of anchors and injection of grout. Sept 2001 – Apr 2003 / Mid Contracting (Lebanon)  LE ROYAL HOTEL, Site Engineer – Dbayeih In charge of finishing work at the main entrance and the ballroom (block-work, tiling, paint, plastering, false ceiling, wooden work…). Training Sept 2000 - May 2001 / Bauer foundation specialists (Lebanon)  Site engineer The work included execution of secant piles, stressing of anchors and injection of grout. Sept 1999 - Sept 2000  Military service Languages Speaking Writing Reading Arabic Excellent Excellent Excellent French Very Good Good Very Good English Very Good Good Very Good Software Knowledge  Autocad  MS Word, Excel, MS Project