PIPING FOREMAN
CAREER SUMMARY
To work as an piping Forman in the oil and gas industry To take up
challenging jobs all the time and crossing success as milestones in every
moment of my professional life by utilizing my technical skills and experience
gained from the industry while working in a professionally managed
environment of your esteemed organization.
QUALIFICATION
MATRIC from BISE GOVT, high school 35 JB Faisalabad.
COMPUTER SKILLS:
• Microsoft Application
• Microsoft Word, Excel
WORKING EXPERIENCE
Oil and gas Gulf exp, approx 08 year, More than 13 years experience in the
field of Piping, Erection & Quality Inspection for Petrochemical Industries.
• Company : Al Jaber Energy Services LLC, UAE.
Client : Samsung Engineering
Project : Ruwais Refinery Expansion Project EPC1
Designation : Piping Foreman
Period : Mar 2014 to tell now.
Responsibilities:
• Pipe spool fabrication and erection above ground and underground.
• Perform initial and in-process inspections of piping and welding, in
accordance with established inspection and test plans and assigned
witness, hold, and verification points.
• Check flow direction arrows on valves; verify that the properly identified
valves are installed in accordance with the flow diagram.
2. Monitoring & supervising the implementation of job as per the drawing
and specification of the project.
• Company :Al Jaber Energy Services LLC, UAE.
Client : SK E&C
Project : Ruwais Refinery Expansion Project EPC1
Designation : Piping Foreman
Period : Oct 2011 to Mar 2014.
Responsibilities:
• Perform inspection for piping line check and prepare categorized punch
list.
• Man power planning checking the safety clearance (JSA) and executing
the work with safety standards.
• Preparation of pressure test (hydro, pneumatic and service) packages for
the newly installed pipelines.
• Listing outstanding materials for Punch lists and following up with the
store for the material availability to avoid project delay.
• Set pipe anchors, guides, spring hangers and supports after hydro test.
Company : Asian Engineering Ltd, Pak.
Client : Hussain & Amjad Textiles
Project : Power House 9 Mega Watt Multan.
Designation : Piping Foreman
Period : DEC 2010 to SEP 2011
Responsibilities:
• Attending daily production review meeting and submitting daily
production reports.
• Preparing and executing weld plans for all shop and field joints of
spools.
• Preparing punch list after complete erection of each system for
checking proper gasket installation, supports and for tightening of
bolts.
• Pipe spool fabrication and erection above ground and underground.
• Company : Al Jaber Energy Services LLC, UAE.
Client : Technimout
Project : Borouge II
Designation : Piping Charge hand
Period : OCT 2008 to Nov 2010
3. Responsibilities:
• Perform initial and in-process inspections of piping and welding, in
accordance with established inspection and test plans and assigned
witness, hold, and verification points.
• Check flow direction arrows on valves; verify that the properly identified
valves are installed in accordance with the flow diagram.
• Monitoring & supervising the implementation of job as per the drawing
and specification of the project.
• Company : Al Jaber Energy Services LLC, UAE.
Client : Bechtel
Project : AGD II
Designation : Piping Charge Hand
Period : May 2006 to Jul 2008
Responsibilities:
• Inspection of material received like Pipes, flanges, gaskets, valves, etc.,
• Conduct erection of piping as per ISO both in fabrication shop and on
site.
• Inspecting fit ups, proper routing and all inline items like valves, gaskets,
supports etc.,
• Preparing daily and weekly fabrication report.
• Company : Habib Rafique Ltd, Pak.
Client : Parko Oil Refinery
Project : Mehmood Kot Qasbah Gujrat Pakistan
Designation : Fabricator
Period : Dec 2003 to Nov 2005
Responsibilities:
• Inspection of material received like Pipes, flanges, gaskets, valves, etc.,
• Fabrication as par isometric drawings,
• Conduct erection of piping as per ISO both in fabrication shop and on
site.
• Inspecting fit ups, proper routing and all inline items like valves, gaskets,
supports etc.
• Preparing daily and weekly welding report.
4. PERSONAL INFORMATION
Name : Rizwan Ali
Father Name : Ghulam Dastagir
Nationality : Pakistani
Date of Birth : 1th Jan, 1982
Contact No. : 00971559909245(UAE)
: 00923457709037(PAK)
PASSPORT DETAILS
Passport number : EW1795082
Place & Date of issue : Faisalabad (Punjab), 04/07/2011
Date of Expiry : 02/07/2016
Declaration.
I hereby declare that all the details furnished above are true to the best of my
knowledge and belief.