SlideShare a Scribd company logo
1 of 21
Group Four
Banquet: Takeaway & Restaurant App
ProjectManagementAreas
Project Management Area Presenter
Introduction Dáire
Initiation Dáire
Scope Stephen
Schedule Martina
Cost Emma
Quality Stephen
Human Resources Martina
Communications Emma
Risk Dáire
Procurement Floriana
Conclusions Floriana
Presenters
Introduction
• Fully comprehensive dining app
• Allows for take away pre-order, home delivery, and
restaurant booking
• Integrates into existing reservation software, or can act
as a standalone.
• Initially launching in Dublin, with a view to expanding
nationwide if Scope allows for this in the future.
• Supports different payment options, including credit card,
PayPal and cash for all dining options.
What is Banquet?
ProjectInitiation
Our Goals
• Specific: 10,000 users and 100
restaurants
• Measurable: Apps
downloaded/subscribers
• Actionable: Group covers of various
areas required (restaurants,
software, payments)
• Realistic: Market research on food
apps
• Time: End of H1 2017
Benefits:
• Quantifiable
o Cash flows
o Downloads
o Restaurant sign ups
• Non-quantifiable
o User sentiment
o Restaurant promotion of app
Aaaaaaaaaaa
Scope Management 1
ScopeManagement
Banquet Scope
• App Works on across multiple
platforms
• Easy payments with PayPal and
remember me feature on the App
• Easy Search by the following
1. Location.
2. A-Z guide.
3. User rating.
4. Booking Availability.
• Integrating into Restaurants
Booking software, e.g.
“OpenTable”.
• User Reviews per Restaurant.
• Setting up loyalty user discount.
Work Breakdown Structure
Aaaaaaaaaaa
Scope Management 2
ScopeManagement
Stakeholders
Stakeholders
• CEO of Banquet
• Restaurant Owner
• R&D manager
• Customer Service
ScheduleManagement
Critical Path Management
Activity Management
Office - Hire UCD enterprise pod until we have office up and running
Software Development
A. Communication:
- Initially have daily stand-up meeting and weekly formal meeting
B. Software Release:
- 4 months for the development of the software (1 month contingency)
- Beta trial/soft release to friends, family and limited client base
- Fix software bugs (2 weeks)
Clients - Build client base while carrying out market research in parallel
ScheduleManagement
Project Schedule: Gantt Chart
Today
Month
Week 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Initiation
Charter
Scope Document
Planning
Office Space
UCD enterprise pod
App R&D
Design
Training
Beta test
Software release
Market Research & Advertising
Market Research
Advertising
Build Client Base
Sales
Jun-17Jan-17 Feb-17 Mar-17 Apr-17 May-17
CostManagement
Plan & Budget
• The Cost Management Plan for
Banquet includes establishing the
estimated budget and measuring
actual spending against the
planned budget.
• Actual costs and variances from
the budgeted cost will be
monitored (S-Curve) and reported
regularly to the Steering committee
and project sponsors.
• Steering committee approval will
be required for any cost change
over five per cent.
CostManagement
Provisions
Aaaaaaaaaaa
Quality Management 1
QualityManagement
Quality
Quality Planning
• Ensure as much as possible all app code is written by
in house R&D.
• Integration with 3rd party such as PayPal need to be put
in place.
Quality Assurance
• Soft release to market using “Test Flight” to get
customer feedback and issues two months before
release.
• Schedule software updates.
Quality Control
• Customer feedback on the App Store & Google Play
Store.
HumanResourceManagement
Project Organisation Chart
HumanResourceManagement
Roles & Responsibilities: RACI grid
Responsible R Accountable A Consulted C Informed I
Project
Charter
Scope
Document
Project
Schedule
Budget
Control
Code
Development
App
Testing
App
Training
Marketing Sales
Customer
Service
Aquire
Office Space
Human
Resources
Accounts
IT
Maintenance
Contracts,
Patents, etc.
R R R R I C I A C I C C C I C
A A A A A A
I C I I I I R R R I I
A A
I I I C C C C R I C I I
A
I I I C C C R C I C I I
A
C C C I R R R I I C I C C C
A A A
I I I I I R
A
I R C I
R
C C I I I I I I I
Project
Manager
Office
Manager
Designer
Sponsor
(CEO)
IT
Technician
Marketing
Agency
Sales
Manager
Customer
Service
Manager
Lawyer
HumanResourceManagement
Anticipated Problems
Integrative Negotiations
Skills Matrix
primary skill
secondary skill
interest
Tasks/Participant
Office
Manager
Customer
Service
Manager
R&D
Member
IT
Technician
Accounts
App Design
Customer Services
Sales
Problem Solution
- Customer (well known brand) will not sign up
unless assured e.g. 200 orders a month
- Offered a joint marketing campaign
- Promote our app by piggy backing their brand
CommunicationsManagement
Plan & Reporting
Ensuring timely and appropriate generation, collection, dissemination, and storage of project information.
• All project documents will be stored in Google Drive – accessible by all
stakeholders: https://www.dropbox.com/projectmanagement/Banquet%Docs (Including
current and archived historical versions)
• Project Tracking:
• Critical project milestones, will be tracked on the Gantt chart Martina previously outlined,
and sent on a weekly basis.
• Status updates will be given via a RAG report which will be sent on a weekly basis.
CommunicationsManagement
Reporting Frequency Matrix
RiskManagement
Assessment Matrix
Impact
Significant Bugs in app
affecting usability
Not finishing in
time for launch
Running out of money,
unable to complete app
Moderate
Sugar tax
Low
Low Moderate High
Probability
Types of risk
identified:
• Financial risk
• Technical risk
• Implementation risk
RiskManagement
Risk Responses and Contingencies
Risk Response Contingency
Bugs in app Minimise through beta testing
Swift corrections of issues and
open and honest dialogue
with customers
Not finishing in time
for launch
Minimise via setting deadline for one
month before launch date
Completion of app during
extra time, death march until
completed
Running out of money
Avoidance by closely monitor S curve
variation and correcting where needed.
Usage of contingency budget
Sugar tax
Do nothing as this would be government
mandated
Work with restaurants to
assess impact and offer
support where possible
ProcurementManagement
Procurement Plan
PROCUREMENT
MANAGEMENT PLAN
WBS
Identification of two
activities to outsource
The reasons for
outsourcing are:
- Technical or management
ability;
- Reduce inventory costs
PROJECT SCOPE
STATEMENT
Definition of:
- Technical requirements;
- List of deliverables
attempted
INFLUENCERS
Environmental Factors:
• Past marketing agencies
performance and
reputation;
•Typical contractual terms
and conditions for the legal
services;
• Marketplace conditions.
ProcurementManagement
Procurement Tools
In order to identify the activities to outsource, we used three different tools:
Make or buy
analysis
Market
Research
Expert
Purchasing
Judgement
Conclusions
Conclusions
We believe that this project will be successful because:
•The goals are achievable;
• The timeframes are reasonable;
• The budget and the contingencies estimated allow us
to proceed within the planned schedule and without
incurring any scope creep
TIME
SCOPE
COST

More Related Content

What's hot

Hot Box: An Android App Marketing Plan
Hot Box: An Android App Marketing PlanHot Box: An Android App Marketing Plan
Hot Box: An Android App Marketing PlanAKHIL KUMAR GUDIPOODI
 
Marketing plan for mobile app
Marketing plan for mobile appMarketing plan for mobile app
Marketing plan for mobile appApoorva S
 
Final assignment OF IIM-L INTERNSHIP - GETFIT MARKETING PLAN
Final assignment OF IIM-L INTERNSHIP - GETFIT MARKETING PLANFinal assignment OF IIM-L INTERNSHIP - GETFIT MARKETING PLAN
Final assignment OF IIM-L INTERNSHIP - GETFIT MARKETING PLANAnkan Mukherjee
 
Marketing plan for mobile app (study fun)
Marketing plan for  mobile app (study fun)Marketing plan for  mobile app (study fun)
Marketing plan for mobile app (study fun)Nana Aditya Gorla
 
Marketing Plan for Mobile App
Marketing Plan for Mobile AppMarketing Plan for Mobile App
Marketing Plan for Mobile AppPratyush Singh
 
Marketing plan for an android app
Marketing plan for an android appMarketing plan for an android app
Marketing plan for an android appPrateek Jain
 
Restaurant Finder Android Application project Presentation
Restaurant Finder Android Application project PresentationRestaurant Finder Android Application project Presentation
Restaurant Finder Android Application project PresentationAbhinav Jain
 
Marketing Strategy: 'Plan It' App
Marketing Strategy: 'Plan It' AppMarketing Strategy: 'Plan It' App
Marketing Strategy: 'Plan It' AppSourab Mangrulkar
 
Pragati marketing plan for a mobile app
Pragati   marketing plan for a mobile appPragati   marketing plan for a mobile app
Pragati marketing plan for a mobile appPiyush Kumar Maske
 
Marketing plan for mobile app
Marketing plan for mobile appMarketing plan for mobile app
Marketing plan for mobile appSanthosh S
 
Mobile App design trends you must watch out in coming years
Mobile App design trends you must watch out in coming yearsMobile App design trends you must watch out in coming years
Mobile App design trends you must watch out in coming yearsAkhilesh Choudhary
 
Restaurants and Mobile
Restaurants and MobileRestaurants and Mobile
Restaurants and Mobilegetsapps
 
Mobile apps for restaurants
Mobile apps for restaurantsMobile apps for restaurants
Mobile apps for restaurantsEarly Motion
 
Marketing plan for mobile app- Paperback
Marketing plan for mobile app- PaperbackMarketing plan for mobile app- Paperback
Marketing plan for mobile app- PaperbackIvySinha
 
Restaurants & Mobile Apps
Restaurants & Mobile AppsRestaurants & Mobile Apps
Restaurants & Mobile AppsClarkonline
 
Marketing plan for an android app - Kitchen Mate
Marketing plan for an android app - Kitchen MateMarketing plan for an android app - Kitchen Mate
Marketing plan for an android app - Kitchen MateAshish Chauhan
 

What's hot (20)

Hot Box: An Android App Marketing Plan
Hot Box: An Android App Marketing PlanHot Box: An Android App Marketing Plan
Hot Box: An Android App Marketing Plan
 
Marketing plan for mobile app
Marketing plan for mobile appMarketing plan for mobile app
Marketing plan for mobile app
 
Final assignment OF IIM-L INTERNSHIP - GETFIT MARKETING PLAN
Final assignment OF IIM-L INTERNSHIP - GETFIT MARKETING PLANFinal assignment OF IIM-L INTERNSHIP - GETFIT MARKETING PLAN
Final assignment OF IIM-L INTERNSHIP - GETFIT MARKETING PLAN
 
Marketing plan for mobile app (study fun)
Marketing plan for  mobile app (study fun)Marketing plan for  mobile app (study fun)
Marketing plan for mobile app (study fun)
 
Marketing Plan for Mobile App
Marketing Plan for Mobile AppMarketing Plan for Mobile App
Marketing Plan for Mobile App
 
Marketing plan for an android app
Marketing plan for an android appMarketing plan for an android app
Marketing plan for an android app
 
App marketing-ecommbrunch
App marketing-ecommbrunchApp marketing-ecommbrunch
App marketing-ecommbrunch
 
Restaurant Finder Android Application project Presentation
Restaurant Finder Android Application project PresentationRestaurant Finder Android Application project Presentation
Restaurant Finder Android Application project Presentation
 
Marketing Strategy: 'Plan It' App
Marketing Strategy: 'Plan It' AppMarketing Strategy: 'Plan It' App
Marketing Strategy: 'Plan It' App
 
Pragati marketing plan for a mobile app
Pragati   marketing plan for a mobile appPragati   marketing plan for a mobile app
Pragati marketing plan for a mobile app
 
Marketing plan for mobile app
Marketing plan for mobile appMarketing plan for mobile app
Marketing plan for mobile app
 
Appsvswebsitenew
AppsvswebsitenewAppsvswebsitenew
Appsvswebsitenew
 
Marketing plan
Marketing planMarketing plan
Marketing plan
 
Mobile App design trends you must watch out in coming years
Mobile App design trends you must watch out in coming yearsMobile App design trends you must watch out in coming years
Mobile App design trends you must watch out in coming years
 
Restaurants and Mobile
Restaurants and MobileRestaurants and Mobile
Restaurants and Mobile
 
Marketing Plan- Final project
Marketing Plan- Final projectMarketing Plan- Final project
Marketing Plan- Final project
 
Mobile apps for restaurants
Mobile apps for restaurantsMobile apps for restaurants
Mobile apps for restaurants
 
Marketing plan for mobile app- Paperback
Marketing plan for mobile app- PaperbackMarketing plan for mobile app- Paperback
Marketing plan for mobile app- Paperback
 
Restaurants & Mobile Apps
Restaurants & Mobile AppsRestaurants & Mobile Apps
Restaurants & Mobile Apps
 
Marketing plan for an android app - Kitchen Mate
Marketing plan for an android app - Kitchen MateMarketing plan for an android app - Kitchen Mate
Marketing plan for an android app - Kitchen Mate
 

Viewers also liked

Project Management Plan - Cafe Au Lait.PDF
Project Management Plan - Cafe Au Lait.PDFProject Management Plan - Cafe Au Lait.PDF
Project Management Plan - Cafe Au Lait.PDFGeoff Penhorwood
 
Restaurant project
Restaurant projectRestaurant project
Restaurant projectArun Kabra
 
Cafe construction project report
Cafe construction project reportCafe construction project report
Cafe construction project reportHagi Sahib
 
Business plan coffee shop
Business plan coffee shopBusiness plan coffee shop
Business plan coffee shopAmol Kadu
 
Restaurant Business Plan Presentation
Restaurant Business Plan PresentationRestaurant Business Plan Presentation
Restaurant Business Plan PresentationMahadi Hasan
 
Shinkansen Sushi Project Plan - Susan
Shinkansen Sushi Project Plan - SusanShinkansen Sushi Project Plan - Susan
Shinkansen Sushi Project Plan - Susanelsanora
 
Presentation Rjm Consulting Sum06
Presentation Rjm Consulting Sum06Presentation Rjm Consulting Sum06
Presentation Rjm Consulting Sum06jm0979
 
Marketing Management - Business Plan
Marketing Management - Business PlanMarketing Management - Business Plan
Marketing Management - Business PlanShashank Natu
 
Social Media Monitoring/Reputation Management Consulting Project for Restaura...
Social Media Monitoring/Reputation Management Consulting Project for Restaura...Social Media Monitoring/Reputation Management Consulting Project for Restaura...
Social Media Monitoring/Reputation Management Consulting Project for Restaura...Elizabeth Kelly
 
Project Management Knowledge Area Applied on Construction Site Civil Eneginee...
Project Management Knowledge Area Applied on Construction Site Civil Eneginee...Project Management Knowledge Area Applied on Construction Site Civil Eneginee...
Project Management Knowledge Area Applied on Construction Site Civil Eneginee...Zakaria Yahya
 
Proposal for opening a new restaurant on jaipur
Proposal for opening a new restaurant on jaipurProposal for opening a new restaurant on jaipur
Proposal for opening a new restaurant on jaipurAkash Kshirsagar
 
Halim Hani HH-UWR001-UNDERWATER RESTAURANT
Halim Hani  HH-UWR001-UNDERWATER RESTAURANTHalim Hani  HH-UWR001-UNDERWATER RESTAURANT
Halim Hani HH-UWR001-UNDERWATER RESTAURANTHalim Hani
 

Viewers also liked (19)

Sample of Business Plan
Sample of Business PlanSample of Business Plan
Sample of Business Plan
 
Project Management Plan - Cafe Au Lait.PDF
Project Management Plan - Cafe Au Lait.PDFProject Management Plan - Cafe Au Lait.PDF
Project Management Plan - Cafe Au Lait.PDF
 
Restaurant project
Restaurant projectRestaurant project
Restaurant project
 
Cafe construction project report
Cafe construction project reportCafe construction project report
Cafe construction project report
 
Business plan coffee shop
Business plan coffee shopBusiness plan coffee shop
Business plan coffee shop
 
Restaurant Business Plan Presentation
Restaurant Business Plan PresentationRestaurant Business Plan Presentation
Restaurant Business Plan Presentation
 
Business Plan
Business PlanBusiness Plan
Business Plan
 
Shinkansen Sushi Project Plan - Susan
Shinkansen Sushi Project Plan - SusanShinkansen Sushi Project Plan - Susan
Shinkansen Sushi Project Plan - Susan
 
Presentation Rjm Consulting Sum06
Presentation Rjm Consulting Sum06Presentation Rjm Consulting Sum06
Presentation Rjm Consulting Sum06
 
Unique Restaurants
Unique RestaurantsUnique Restaurants
Unique Restaurants
 
Marketing Management - Business Plan
Marketing Management - Business PlanMarketing Management - Business Plan
Marketing Management - Business Plan
 
Pull's Coffee _ Company Profile
Pull's Coffee _ Company ProfilePull's Coffee _ Company Profile
Pull's Coffee _ Company Profile
 
Social Media Monitoring/Reputation Management Consulting Project for Restaura...
Social Media Monitoring/Reputation Management Consulting Project for Restaura...Social Media Monitoring/Reputation Management Consulting Project for Restaura...
Social Media Monitoring/Reputation Management Consulting Project for Restaura...
 
Project Presentation Slides > UFRJ Restaurant
Project Presentation Slides > UFRJ RestaurantProject Presentation Slides > UFRJ Restaurant
Project Presentation Slides > UFRJ Restaurant
 
Project Management Knowledge Area Applied on Construction Site Civil Eneginee...
Project Management Knowledge Area Applied on Construction Site Civil Eneginee...Project Management Knowledge Area Applied on Construction Site Civil Eneginee...
Project Management Knowledge Area Applied on Construction Site Civil Eneginee...
 
CAFÉ Project Evaluation
CAFÉ Project EvaluationCAFÉ Project Evaluation
CAFÉ Project Evaluation
 
Wo-Men-X Cafe
Wo-Men-X Cafe Wo-Men-X Cafe
Wo-Men-X Cafe
 
Proposal for opening a new restaurant on jaipur
Proposal for opening a new restaurant on jaipurProposal for opening a new restaurant on jaipur
Proposal for opening a new restaurant on jaipur
 
Halim Hani HH-UWR001-UNDERWATER RESTAURANT
Halim Hani  HH-UWR001-UNDERWATER RESTAURANTHalim Hani  HH-UWR001-UNDERWATER RESTAURANT
Halim Hani HH-UWR001-UNDERWATER RESTAURANT
 

Similar to Group Presentation Final

PwC_Project_Manager_Sarath Chandra Gokul S.pptx
PwC_Project_Manager_Sarath Chandra Gokul S.pptxPwC_Project_Manager_Sarath Chandra Gokul S.pptx
PwC_Project_Manager_Sarath Chandra Gokul S.pptxShivamDubey304351
 
Pickup and Delivery App Development in 2024: Steps, Cost, Tech Stack
Pickup and Delivery App Development in 2024: Steps, Cost, Tech StackPickup and Delivery App Development in 2024: Steps, Cost, Tech Stack
Pickup and Delivery App Development in 2024: Steps, Cost, Tech StackZimbleCodeAustralia
 
Digital Strategy with Dyer & Blomfield
Digital Strategy with Dyer & BlomfieldDigital Strategy with Dyer & Blomfield
Digital Strategy with Dyer & BlomfieldMatty Blomfield
 
Power Of Technology With Custom Software App Development In Pennsylvania
Power Of Technology With Custom Software App Development In PennsylvaniaPower Of Technology With Custom Software App Development In Pennsylvania
Power Of Technology With Custom Software App Development In Pennsylvaniaostechnologies16
 
Optimizing Expenses Strategies for Managing Web App Development Costs.pdf
Optimizing Expenses Strategies for Managing Web App Development Costs.pdfOptimizing Expenses Strategies for Managing Web App Development Costs.pdf
Optimizing Expenses Strategies for Managing Web App Development Costs.pdfBitCot
 
Using FIORI to enhance user experience on SAP PPM
Using FIORI to enhance user experience on SAP PPMUsing FIORI to enhance user experience on SAP PPM
Using FIORI to enhance user experience on SAP PPMNeeraj Sahu
 
Badari garapati resume
Badari garapati resumeBadari garapati resume
Badari garapati resumeBadariGarapati
 
mgarcia_sr_digital_prod_res_final
mgarcia_sr_digital_prod_res_finalmgarcia_sr_digital_prod_res_final
mgarcia_sr_digital_prod_res_finalMartin J. Garcia
 
Risk Management Final Ppt (Mobile App Development).pptx
Risk Management Final Ppt (Mobile App Development).pptxRisk Management Final Ppt (Mobile App Development).pptx
Risk Management Final Ppt (Mobile App Development).pptxZiyad Zaidi
 
Quality management plan.pptx
Quality management plan.pptxQuality management plan.pptx
Quality management plan.pptxHardikPatel611017
 
How Much Does It Cost To Build A Pickup and Delivery App In 2023?
How Much Does It Cost To Build A Pickup and Delivery App In 2023?How Much Does It Cost To Build A Pickup and Delivery App In 2023?
How Much Does It Cost To Build A Pickup and Delivery App In 2023?ZimbleCodeAustralia
 
D team weekly powerpoint presentation spqm
D team weekly powerpoint presentation spqmD team weekly powerpoint presentation spqm
D team weekly powerpoint presentation spqmMiraj Mhaisuria
 
Companion by Minitab
Companion by MinitabCompanion by Minitab
Companion by MinitabGMSL S.r.l.
 
Evelyn Chou | Resume | 2020
Evelyn Chou | Resume | 2020Evelyn Chou | Resume | 2020
Evelyn Chou | Resume | 2020Evelyn Chou
 

Similar to Group Presentation Final (20)

PwC_Project_Manager_Sarath Chandra Gokul S.pptx
PwC_Project_Manager_Sarath Chandra Gokul S.pptxPwC_Project_Manager_Sarath Chandra Gokul S.pptx
PwC_Project_Manager_Sarath Chandra Gokul S.pptx
 
Pickup and Delivery App Development in 2024: Steps, Cost, Tech Stack
Pickup and Delivery App Development in 2024: Steps, Cost, Tech StackPickup and Delivery App Development in 2024: Steps, Cost, Tech Stack
Pickup and Delivery App Development in 2024: Steps, Cost, Tech Stack
 
Digital Strategy with Dyer & Blomfield
Digital Strategy with Dyer & BlomfieldDigital Strategy with Dyer & Blomfield
Digital Strategy with Dyer & Blomfield
 
Power Of Technology With Custom Software App Development In Pennsylvania
Power Of Technology With Custom Software App Development In PennsylvaniaPower Of Technology With Custom Software App Development In Pennsylvania
Power Of Technology With Custom Software App Development In Pennsylvania
 
Optimizing Expenses Strategies for Managing Web App Development Costs.pdf
Optimizing Expenses Strategies for Managing Web App Development Costs.pdfOptimizing Expenses Strategies for Managing Web App Development Costs.pdf
Optimizing Expenses Strategies for Managing Web App Development Costs.pdf
 
Using FIORI to enhance user experience on SAP PPM
Using FIORI to enhance user experience on SAP PPMUsing FIORI to enhance user experience on SAP PPM
Using FIORI to enhance user experience on SAP PPM
 
Rajesh_B_Mishra
Rajesh_B_MishraRajesh_B_Mishra
Rajesh_B_Mishra
 
Badari garapati resume
Badari garapati resumeBadari garapati resume
Badari garapati resume
 
Inspira - Portfolio [en]
Inspira - Portfolio [en]Inspira - Portfolio [en]
Inspira - Portfolio [en]
 
mgarcia_sr_digital_prod_res_final
mgarcia_sr_digital_prod_res_finalmgarcia_sr_digital_prod_res_final
mgarcia_sr_digital_prod_res_final
 
Risk Management Final Ppt (Mobile App Development).pptx
Risk Management Final Ppt (Mobile App Development).pptxRisk Management Final Ppt (Mobile App Development).pptx
Risk Management Final Ppt (Mobile App Development).pptx
 
Enterprise solution
Enterprise solutionEnterprise solution
Enterprise solution
 
Presentation 1 .pptx
Presentation 1 .pptxPresentation 1 .pptx
Presentation 1 .pptx
 
Quality management plan.pptx
Quality management plan.pptxQuality management plan.pptx
Quality management plan.pptx
 
ripandeep kaur .pptx
ripandeep kaur .pptxripandeep kaur .pptx
ripandeep kaur .pptx
 
How Much Does It Cost To Build A Pickup and Delivery App In 2023?
How Much Does It Cost To Build A Pickup and Delivery App In 2023?How Much Does It Cost To Build A Pickup and Delivery App In 2023?
How Much Does It Cost To Build A Pickup and Delivery App In 2023?
 
D team weekly powerpoint presentation spqm
D team weekly powerpoint presentation spqmD team weekly powerpoint presentation spqm
D team weekly powerpoint presentation spqm
 
Companion by Minitab
Companion by MinitabCompanion by Minitab
Companion by Minitab
 
Nirupama_Ragunathan
Nirupama_RagunathanNirupama_Ragunathan
Nirupama_Ragunathan
 
Evelyn Chou | Resume | 2020
Evelyn Chou | Resume | 2020Evelyn Chou | Resume | 2020
Evelyn Chou | Resume | 2020
 

Group Presentation Final

  • 1. Group Four Banquet: Takeaway & Restaurant App
  • 2. ProjectManagementAreas Project Management Area Presenter Introduction Dáire Initiation Dáire Scope Stephen Schedule Martina Cost Emma Quality Stephen Human Resources Martina Communications Emma Risk Dáire Procurement Floriana Conclusions Floriana Presenters
  • 3. Introduction • Fully comprehensive dining app • Allows for take away pre-order, home delivery, and restaurant booking • Integrates into existing reservation software, or can act as a standalone. • Initially launching in Dublin, with a view to expanding nationwide if Scope allows for this in the future. • Supports different payment options, including credit card, PayPal and cash for all dining options. What is Banquet?
  • 4. ProjectInitiation Our Goals • Specific: 10,000 users and 100 restaurants • Measurable: Apps downloaded/subscribers • Actionable: Group covers of various areas required (restaurants, software, payments) • Realistic: Market research on food apps • Time: End of H1 2017 Benefits: • Quantifiable o Cash flows o Downloads o Restaurant sign ups • Non-quantifiable o User sentiment o Restaurant promotion of app
  • 5. Aaaaaaaaaaa Scope Management 1 ScopeManagement Banquet Scope • App Works on across multiple platforms • Easy payments with PayPal and remember me feature on the App • Easy Search by the following 1. Location. 2. A-Z guide. 3. User rating. 4. Booking Availability. • Integrating into Restaurants Booking software, e.g. “OpenTable”. • User Reviews per Restaurant. • Setting up loyalty user discount. Work Breakdown Structure
  • 6. Aaaaaaaaaaa Scope Management 2 ScopeManagement Stakeholders Stakeholders • CEO of Banquet • Restaurant Owner • R&D manager • Customer Service
  • 7. ScheduleManagement Critical Path Management Activity Management Office - Hire UCD enterprise pod until we have office up and running Software Development A. Communication: - Initially have daily stand-up meeting and weekly formal meeting B. Software Release: - 4 months for the development of the software (1 month contingency) - Beta trial/soft release to friends, family and limited client base - Fix software bugs (2 weeks) Clients - Build client base while carrying out market research in parallel
  • 8. ScheduleManagement Project Schedule: Gantt Chart Today Month Week 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Initiation Charter Scope Document Planning Office Space UCD enterprise pod App R&D Design Training Beta test Software release Market Research & Advertising Market Research Advertising Build Client Base Sales Jun-17Jan-17 Feb-17 Mar-17 Apr-17 May-17
  • 9. CostManagement Plan & Budget • The Cost Management Plan for Banquet includes establishing the estimated budget and measuring actual spending against the planned budget. • Actual costs and variances from the budgeted cost will be monitored (S-Curve) and reported regularly to the Steering committee and project sponsors. • Steering committee approval will be required for any cost change over five per cent.
  • 11. Aaaaaaaaaaa Quality Management 1 QualityManagement Quality Quality Planning • Ensure as much as possible all app code is written by in house R&D. • Integration with 3rd party such as PayPal need to be put in place. Quality Assurance • Soft release to market using “Test Flight” to get customer feedback and issues two months before release. • Schedule software updates. Quality Control • Customer feedback on the App Store & Google Play Store.
  • 13. HumanResourceManagement Roles & Responsibilities: RACI grid Responsible R Accountable A Consulted C Informed I Project Charter Scope Document Project Schedule Budget Control Code Development App Testing App Training Marketing Sales Customer Service Aquire Office Space Human Resources Accounts IT Maintenance Contracts, Patents, etc. R R R R I C I A C I C C C I C A A A A A A I C I I I I R R R I I A A I I I C C C C R I C I I A I I I C C C R C I C I I A C C C I R R R I I C I C C C A A A I I I I I R A I R C I R C C I I I I I I I Project Manager Office Manager Designer Sponsor (CEO) IT Technician Marketing Agency Sales Manager Customer Service Manager Lawyer
  • 14. HumanResourceManagement Anticipated Problems Integrative Negotiations Skills Matrix primary skill secondary skill interest Tasks/Participant Office Manager Customer Service Manager R&D Member IT Technician Accounts App Design Customer Services Sales Problem Solution - Customer (well known brand) will not sign up unless assured e.g. 200 orders a month - Offered a joint marketing campaign - Promote our app by piggy backing their brand
  • 15. CommunicationsManagement Plan & Reporting Ensuring timely and appropriate generation, collection, dissemination, and storage of project information. • All project documents will be stored in Google Drive – accessible by all stakeholders: https://www.dropbox.com/projectmanagement/Banquet%Docs (Including current and archived historical versions) • Project Tracking: • Critical project milestones, will be tracked on the Gantt chart Martina previously outlined, and sent on a weekly basis. • Status updates will be given via a RAG report which will be sent on a weekly basis.
  • 17. RiskManagement Assessment Matrix Impact Significant Bugs in app affecting usability Not finishing in time for launch Running out of money, unable to complete app Moderate Sugar tax Low Low Moderate High Probability Types of risk identified: • Financial risk • Technical risk • Implementation risk
  • 18. RiskManagement Risk Responses and Contingencies Risk Response Contingency Bugs in app Minimise through beta testing Swift corrections of issues and open and honest dialogue with customers Not finishing in time for launch Minimise via setting deadline for one month before launch date Completion of app during extra time, death march until completed Running out of money Avoidance by closely monitor S curve variation and correcting where needed. Usage of contingency budget Sugar tax Do nothing as this would be government mandated Work with restaurants to assess impact and offer support where possible
  • 19. ProcurementManagement Procurement Plan PROCUREMENT MANAGEMENT PLAN WBS Identification of two activities to outsource The reasons for outsourcing are: - Technical or management ability; - Reduce inventory costs PROJECT SCOPE STATEMENT Definition of: - Technical requirements; - List of deliverables attempted INFLUENCERS Environmental Factors: • Past marketing agencies performance and reputation; •Typical contractual terms and conditions for the legal services; • Marketplace conditions.
  • 20. ProcurementManagement Procurement Tools In order to identify the activities to outsource, we used three different tools: Make or buy analysis Market Research Expert Purchasing Judgement
  • 21. Conclusions Conclusions We believe that this project will be successful because: •The goals are achievable; • The timeframes are reasonable; • The budget and the contingencies estimated allow us to proceed within the planned schedule and without incurring any scope creep TIME SCOPE COST

Editor's Notes

  1. As you can see here, the planned budget for the Project clearly sets out all Direct & Indirect costs that will be incurred. Direct costs include Staff Salaries, Contractors, Infrastructure & Promotional costs. Printing, Utilities and Legal fees make up our indirect costs as well as a contingency of €18,150 which is 10% of our Direct costs. The total cost of the Project, including the contingency is €209,700. ***CLICK*** ***CLICK*** Any variances between budgeted vs. actual costs will be clearly charted on an S-Curve graph which will be regularly sent to the Steering Committee / Project Sponsors ***CLICK*** and their approval will be sought for any cost change over five per cent of the budgeted figure.
  2. We will take a number of steps to ensure the budgeted costs do not vary from the final actual costs. We have thoroughly researched similar projects, both in Ireland, as well as Internationally, to ensure that we set out realistic Scope criteria to try to avoid needing to hire additional resources to get the Project over the line on time. A MoSCoW analysis will be performed to prioritise our requirements and determine what are our Must, Should, Could and Would haves are. If there are unforeseen market events, such as a new competitor launching on the market or an existing market player coming after our USP, we have built in a contingency to the budget which can be used for outsourcing or overtime payments if necessary to launch ahead of schedule if needs be. We have approached a Marketing firm that we feel would be best placed to work on this Banquet project and we have gotten them to supply a detailed breakdown of their costs for this Tender Process. This will mean that they are not blind-siding us with additional costs at a later date and they will be more accountable overall.
  3. The way we set up the communications process ensures timely and appropriate generation, collection, dissemination, and storage of project information. ***CLICK*** All stakeholders will be given (read-only) access to the Dropbox link where all Project Plan documents are stored so they can view the progress at any point if needs be. ***CLICK*** Overall Project Status will be tracked on a Gantt Chart and the sub-task status will be maintained on a RAG report – both will be sent on a weekly basis.
  4. This is our full reporting frequency matrix which sets out what information is disseminated when and to whom.