Elements LEVEL 1
NOT ENGAGED
LEVEL 2
EXPERIMENTING
LEVEL 3
ENLIGHTENED
LEVEL 4
GOOD PRACTICE
LEVEL 5
BEST PRACTICE
Planning Education No formal training provided.
Planners have attended
a formal planner training
course or workshop.
Planners have been formally
trained. Affected individuals
have been provided
awareness training but
nothing related to specific
expectations.
Processes are well
defined, with maintenance
and operations leaders
given specific training on
expectations with additional
on-the-job coaching.
All affected individuals have
received specific training
to expectations. Training is
ongoing for new hires. All
personnel modeling expected
behaviors.
Planner Role and
Responsibilities
No planner role identified.
Role and responsibilities
not clearly defined. Planner
is involved with reactive
work and parts chasing. No
dedicated planner.
Planners develop and
assemble limited job
packages. Dedicated planner
as a full-time resource.
Unclear expectations.
Expectations of full-time
planners well defined. Still
an excessive amount of time
spent on non-core activities.
Planners strictly focused
on future work. Zero
involvement with
reactive work. Roles and
responsibilities are clearly
adhered to.
Standard Work
Procedures
No effective work procedures
or accurate time estimates
developed by planner.
High level work procedures
developed for large jobs and
outages. Heavily dependent
on OEM manuals. Standard
set of expectations for job
plan content not established.
Standardized format for
job plans established;
expectations on quality and
content are subjective. No
clear expectations for which
jobs should have a detailed
plan developed.
Formal expectations
developed for job plan format
and content that is generally
followed. Job plans are
developed for work on critical
assets. Moving towards
quantitative vs. subjective
inspection criteria.
Level IV + Evidence of
continuous improvement
system in place.
Craftspersons involved in
review and approval process.
Labor Estimation
Job plans have no estimated
labor hours assigned.
Jobs are grossly
overestimated (1/2 shift or full
shift) and not taken seriously
in scheduling process. No
formal estimating techniques
are used.
Job estimates are generally
more accurate; basic
estimating process applied.
Estimates are usually
accepted as being accurate
but are often overridden.
Jobs are broken down into
steps and tasks with a time
estimate rolled up into a total.
Accepted as accurate and
utilized in building the weekly
schedule.
Level IV + Job plan includes
estimates for coordination
and other outside resources.
Estimates adjusted based on
history/craft feedback.
Job Site Visits
Job site visits are rare or
non-existent while “planning”
work.
Planner visits job sites for
“high profile” jobs only while
planning work.
Planner visits large or
complex job sites during
planning only when no pre-
existing job plan exists.
Planner reviews some job
plans with maintenance
supervisors and technicians
at the job site to ensure
completeness.
Job site visits and significant
interaction with those who
will perform the work is a
standard practice.
Identification of Safety
Requirements
No identification of Safety/
Tag out/Permit requirements
by the planner.
Planner includes high-level
references to site safety
policies on work order.
Planner makes reference to
generic safety procedures
or requirements on the
work order based on the
equipment type/environment.
Planner prepares detailed
list of safety hazards and
references permits required
based on job task breakdown
and site visit.
Level IV + Methods to
address these hazards
are provided. Permits are
pre-populated as much as
possible and included in the
work packet.
Bill of Materials (BOM)
Management
Equipment-specific BOMs do
not existent.
Some BOMs developed,
but only for a small portion
of equipment. Most are
incomplete or inaccurate;
almost never formally
reviewed or corrected/
updated.
Level II + Some BOMs are
linked to drawings, item
number, and lead time for
delivery.
Level III + Formal plan
in place to address
shortcomings on BOMs.
Focus on equipment
level. Plan is clearly being
executed with results of
efforts evident.
BOMs developed to the
component level with minor
exceptions. Continuous
improvement and corrections
a standard process. BOMs
are standard part of CAPEX
process.
Determination of
Required Materials
No predetermination of
needed materials. Materials
acquisition is entirely up to
technicians “on the fly” while
executing job.
Technicians identify their own
materials and the planner
places the order. List is quite
often inaccurate. Job delays
from missing material are
common.
Planners work with
maintenance supervisors and
technicians along with past
job history to develop list.
Storeroom runs during job
execution still common.
BOMs and job history
utilized, but gaps exist.
Planner expends a significant
amount of time researching
materials. Job delays from
missing materials only
occasionally occur.
BOMs and past job history
leveraged extensively.
Delays in job execution due
to missing materials are a
very rare occurrence.
Continued on back...
LEVEL 1
NOT ENGAGED
LEVEL 1
NOT ENGAGED
LEVEL 2
EXPERIMENTING
LEVEL 2
EXPERIMENTING
LEVEL 4
GOOD PRACTICE
LEVEL 4
GOOD PRACTICE
LEVEL 5
BEST PRACTICE
LEVEL 5
BEST PRACTICE
PLANNINGPLANNING Ways to Measure Your
Planning and Scheduling, 1
Maturity Matrix
North America • Europe • Latin America • Middle East • Asia-Pacific
GPAllied EMEA
Guldensporenpark 21-Blok C
B-9820 Merelbeke, Belgium
o. +32(0)9.210.17.20
f. +32(0)9.210.17.28
www.gpallied.com
World Headquarters
4200 Faber Place Drive
Charleston, SC 29405
o. 888.335.8276
f. 843.414.5779
Elements LEVEL 1
NOT ENGAGED
LEVEL 2
EXPERIMENTING
LEVEL 3
ENLIGHTENED
LEVEL 4
GOOD PRACTICE
LEVEL 5
BEST PRACTICE
Materials Kitting
No kitting process in place.
Materials acquired “on the
fly” by technicians and
supervisors.
Materials lay down areas
exist in storeroom; informal
process, much confusion and
inaccuracy.
Materials kitting and staging
occurs for most outage jobs
and only ad hoc for weekly/
daily work. Technicians drive
the process.
Materials kitting and staging
occurs for all outage jobs
and most weekly/daily work.
Storeroom personnel receive
pick-lists and assemble the
kits.
Kitting is standard practice
with few errors. Kits are kept
in a secure area, verified for
accuracy against the work
order and easily identified.
Work Order Closeout
Work orders are not returned
to the planner for closeout.
Work orders are returned
to planner for closeout,
but contain very little
if any useful feedback
(“Fixed, Done, Complete”).
Work orders are returned to
planner with hours (actual
almost always matches
estimate) and no indication
of missing materials. Planner
occasionally makes updates.
Level III + Improvement
suggestions, materials
consumed, and actual
hours spent. History allows
management reporting on
MTBF and Planned vs.
Actual hours.
Level IV + Component
codes and failure codes.
Failure information can be
discerned from work order
history to drive reliability
improvements.
Scheduling Meeting
Participation
Scheduling meetings
not held. Organization
completely reactive.
Scheduling meeting only
occurs for outages attended
only by maintenance
personnel. Production does
not attend.
Scheduling meeting occurs
with a standard agenda,
date, time, and required
attendees. Production
attends meetings on
occasion, but not actively
engaged when present.
Schedule not taken seriously.
Level III + Attendees are on
time and actively engaged
in the scheduling meeting.
Moderate level of confidence
exists in the developed
schedule. Maintenance
driven.
Scheduling meeting occurs
like clockwork and is efficient
- standard time, place,
agenda. Operations drives
meetings. Formal approval
process (Maintenance
and Operations). Senior
Management sponsorship.
Operations/
Maintenance Use
of Backlog for
Scheduling
Backlog is not considered
when developing a schedule.
Daily reactive coordination
occurs vs. weekly
scheduling.
Backlog largely inaccurate
and not taken seriously. Next
week’s schedule originates
from both the backlog and
on-the-spot production
requests. Many very old (>90
days) jobs on the backlog;
backlog is large.
Schedule is developed using
a combination of backlog
and last minute emergency
lists. Team understands the
importance of scheduling
from the backlog, but still
struggles with execution.
Backlog is generally
considered accurate and
most jobs are only scheduled
from backlog, not necessarily
strictly from the ready
backlog (total backlog as
well).
Ready backlog is the primary
driver for building the
schedule. Backlog size and
age appropriate.
Schedule
Communication
Largely verbal agreements
and informal lists. Shared
only between small subset of
workforce.
Schedule is published on a
network drive or emailed.
Rarely viewed/passive
communication/small subset
of organization aware of
existence.
Schedule is passively
posted and displayed in
maintenance shops/areas
only. Frequency of updates
sporadic and rarely paid
attention to.
Schedule is published
and displayed in all areas.
Schedule is regularly posted
at set date/time/place;
awareness of schedule
content/importance varies.
Level IV + Schedule is
regularly and actively
reviewed with personnel
at set date/time/place;
published at least one
week in advance. Minimal
coordination delays.
Resource Utilization
Personnel react entirely
to radio/trouble calls from
production/maintenance
supervisors. Resource
availability not known.
Available resources not
taken into consideration
during scheduling. Personnel
select their jobs from an
assignment box; no names
listed. Resource utilization
low.
Scheduling based
on availability of
resources; significant
portion of schedule
empty to accommodate
“emergencies”. Resources
not scheduled to 100%
availability.
Labor Hours formally
scheduled to 100%. Front
line supervisors react to
schedule breakers, but
no formal process exists.
Resource utilization is
moderate. Jobs assigned to
personnel the day prior to
work.
Level IV + Formal process
in place for “schedule
breakers”. Resource
utilization is very high.
Personnel assigned to jobs
the week before. Schedule
breakers analyzed for
improvement.
Measuring Schedule
Compliance
Not measured. No
accountabilities set.
Number of work orders
completed is tracked.
Numbers are suspect to
manipulation; methods of
measurement are sporadic
and variable. No system of
accountability.
Only tracking work order
completion rate. Formal
standard in place but not
consistently followed.
Measurement published
regularly; results not used to
drive improvement.
Compliance measured by
dividing the total number of
labor hours completed by the
total number of labor hours
scheduled. Measurements
formalized and trended, but
not always followed.
Level IV + Method formalized
and consistently followed.
Organization regularly tracks
and seeks out improvement
opportunities.
PLANNINGPLANNING
LEVEL 1
NOT ENGAGED
LEVEL 1
NOT ENGAGED
LEVEL 2
EXPERIMENTING
LEVEL 2
EXPERIMENTING
LEVEL 4
GOOD PRACTICE
LEVEL 4
GOOD PRACTICE
LEVEL 5
BEST PRACTICE
LEVEL 5
BEST PRACTICE
Ways to Measure Your
Planning and Scheduling, 1
Maturity Matrix
North America • Europe • Latin America • Middle East • Asia-Pacific
GPAllied EMEA
Guldensporenpark 21-Blok C
B-9820 Merelbeke, Belgium
o. +32(0)9.210.17.20
f. +32(0)9.210.17.28
www.gpallied.com
World Headquarters
4200 Faber Place Drive
Charleston, SC 29405
o. 888.335.8276
f. 843.414.5779

More Related Content

What's hot

rm_-_34_certified_maintenance_reliability_professional_(cmrp)
rm_-_34_certified_maintenance_reliability_professional_(cmrp)rm_-_34_certified_maintenance_reliability_professional_(cmrp)
rm_-_34_certified_maintenance_reliability_professional_(cmrp)Ahmad Antar Hebeshy
 
SMRP (1997) Proactive Maintenance Slides by John Day - 1997
SMRP (1997) Proactive Maintenance Slides by John Day - 1997SMRP (1997) Proactive Maintenance Slides by John Day - 1997
SMRP (1997) Proactive Maintenance Slides by John Day - 1997Ricky Smith CMRP, CMRT
 
Turnaround Project Planner Primer
Turnaround Project Planner PrimerTurnaround Project Planner Primer
Turnaround Project Planner Primerahmad bassiouny
 
Best Practices in Maintenance and Reliability
Best Practices in Maintenance and ReliabilityBest Practices in Maintenance and Reliability
Best Practices in Maintenance and ReliabilityRicky Smith CMRP, CMRT
 
Reliability centred maintenance
Reliability centred maintenanceReliability centred maintenance
Reliability centred maintenanceSHIVAJI CHOUDHURY
 
Maintenance planning systems
Maintenance planning  systemsMaintenance planning  systems
Maintenance planning systemsAnil Mohindru
 
Day in the Life of a Proactive Maintenance Planner
Day in the Life of a Proactive Maintenance PlannerDay in the Life of a Proactive Maintenance Planner
Day in the Life of a Proactive Maintenance PlannerRicky Smith CMRP, CMRT
 
20141209_AM Pillar_Introduction
20141209_AM Pillar_Introduction20141209_AM Pillar_Introduction
20141209_AM Pillar_IntroductionHenrik Gantzel
 
Reliability Engineering Maturity Matrix
Reliability Engineering Maturity MatrixReliability Engineering Maturity Matrix
Reliability Engineering Maturity MatrixRicky Smith CMRP, CMRT
 
Maintenance strategy
Maintenance strategyMaintenance strategy
Maintenance strategygumma alsgier
 
Top 10 Best Maintenance Practices For Your CMMS
Top 10 Best Maintenance Practices For Your CMMSTop 10 Best Maintenance Practices For Your CMMS
Top 10 Best Maintenance Practices For Your CMMSeMaint Enterprises
 
Kaizen ~ Continuous Process Improvement (Cpi)
Kaizen ~  Continuous Process Improvement (Cpi)Kaizen ~  Continuous Process Improvement (Cpi)
Kaizen ~ Continuous Process Improvement (Cpi)Anand Subramaniam
 
Maintenance Planning and Scheduling Maturity Matrix #1
Maintenance Planning and Scheduling Maturity Matrix #1Maintenance Planning and Scheduling Maturity Matrix #1
Maintenance Planning and Scheduling Maturity Matrix #1Ricky Smith CMRP, CMRT
 

What's hot (20)

KPI SMRP Presentation
KPI SMRP PresentationKPI SMRP Presentation
KPI SMRP Presentation
 
rm_-_34_certified_maintenance_reliability_professional_(cmrp)
rm_-_34_certified_maintenance_reliability_professional_(cmrp)rm_-_34_certified_maintenance_reliability_professional_(cmrp)
rm_-_34_certified_maintenance_reliability_professional_(cmrp)
 
SMRP (1997) Proactive Maintenance Slides by John Day - 1997
SMRP (1997) Proactive Maintenance Slides by John Day - 1997SMRP (1997) Proactive Maintenance Slides by John Day - 1997
SMRP (1997) Proactive Maintenance Slides by John Day - 1997
 
Turnaround Project Planner Primer
Turnaround Project Planner PrimerTurnaround Project Planner Primer
Turnaround Project Planner Primer
 
Best Practices in Maintenance and Reliability
Best Practices in Maintenance and ReliabilityBest Practices in Maintenance and Reliability
Best Practices in Maintenance and Reliability
 
Reliability centred maintenance
Reliability centred maintenanceReliability centred maintenance
Reliability centred maintenance
 
Maintenance planning systems
Maintenance planning  systemsMaintenance planning  systems
Maintenance planning systems
 
Day in the Life of a Proactive Maintenance Planner
Day in the Life of a Proactive Maintenance PlannerDay in the Life of a Proactive Maintenance Planner
Day in the Life of a Proactive Maintenance Planner
 
20141209_AM Pillar_Introduction
20141209_AM Pillar_Introduction20141209_AM Pillar_Introduction
20141209_AM Pillar_Introduction
 
Reliability Engineering Maturity Matrix
Reliability Engineering Maturity MatrixReliability Engineering Maturity Matrix
Reliability Engineering Maturity Matrix
 
World Class Maintenance WebEx Slides
World Class Maintenance WebEx SlidesWorld Class Maintenance WebEx Slides
World Class Maintenance WebEx Slides
 
Maintenance strategy
Maintenance strategyMaintenance strategy
Maintenance strategy
 
EAM Continuum
EAM ContinuumEAM Continuum
EAM Continuum
 
TPM: Planned Maintenance
TPM: Planned MaintenanceTPM: Planned Maintenance
TPM: Planned Maintenance
 
Layered process audit
Layered process audit Layered process audit
Layered process audit
 
Top 10 Best Maintenance Practices For Your CMMS
Top 10 Best Maintenance Practices For Your CMMSTop 10 Best Maintenance Practices For Your CMMS
Top 10 Best Maintenance Practices For Your CMMS
 
Maintenance KPI
Maintenance KPIMaintenance KPI
Maintenance KPI
 
Kaizen ~ Continuous Process Improvement (Cpi)
Kaizen ~  Continuous Process Improvement (Cpi)Kaizen ~  Continuous Process Improvement (Cpi)
Kaizen ~ Continuous Process Improvement (Cpi)
 
Maintenance Planning and Scheduling Maturity Matrix #1
Maintenance Planning and Scheduling Maturity Matrix #1Maintenance Planning and Scheduling Maturity Matrix #1
Maintenance Planning and Scheduling Maturity Matrix #1
 
Dwm ppt
Dwm pptDwm ppt
Dwm ppt
 

Viewers also liked

Maintenance management
Maintenance managementMaintenance management
Maintenance managementawantika diwan
 
Maintenance types
Maintenance typesMaintenance types
Maintenance typesMotasem Ash
 
Effective Spare Parts Management - 8 rules
Effective Spare Parts Management - 8 rulesEffective Spare Parts Management - 8 rules
Effective Spare Parts Management - 8 rulesLogio_official
 
Maintenance Management
Maintenance ManagementMaintenance Management
Maintenance ManagementBisina Keshara
 
Allied Intro (Short)
Allied Intro (Short)Allied Intro (Short)
Allied Intro (Short)Chris Colson
 
Energy Management Program Maturity Matrix
Energy Management Program Maturity MatrixEnergy Management Program Maturity Matrix
Energy Management Program Maturity MatrixRicky Smith CMRP, CMRT
 
The Planning Maturity Curve (Palo Alto June 15)
The Planning Maturity Curve (Palo Alto June 15)The Planning Maturity Curve (Palo Alto June 15)
The Planning Maturity Curve (Palo Alto June 15)Ben Lamorte
 
Top 10 Reasons Why Maintenance Planning Fails
Top 10 Reasons Why Maintenance Planning FailsTop 10 Reasons Why Maintenance Planning Fails
Top 10 Reasons Why Maintenance Planning FailsRicky Smith CMRP, CMRT
 
Maintenance Planning and Scheduling, Lagos
Maintenance Planning and Scheduling, LagosMaintenance Planning and Scheduling, Lagos
Maintenance Planning and Scheduling, LagosIfeoma Onyemachi
 
Tool Box Training - Work Order Close Out(1)
Tool Box Training - Work Order Close Out(1)Tool Box Training - Work Order Close Out(1)
Tool Box Training - Work Order Close Out(1)Ricky Smith CMRP, CMRT
 
The Top 10 Reasons Maintenance Planning Is Not Effective
The Top 10 Reasons Maintenance Planning Is Not EffectiveThe Top 10 Reasons Maintenance Planning Is Not Effective
The Top 10 Reasons Maintenance Planning Is Not EffectiveRicky Smith CMRP, CMRT
 
Maintenance Scorecard
Maintenance ScorecardMaintenance Scorecard
Maintenance Scorecardyoan_ariesta
 
Addressing sustainable development guidelines cps es efficient_carbon
Addressing sustainable development guidelines cps es efficient_carbonAddressing sustainable development guidelines cps es efficient_carbon
Addressing sustainable development guidelines cps es efficient_carbonZolt Energy
 

Viewers also liked (17)

Maintenance Planner Job Description
Maintenance Planner Job DescriptionMaintenance Planner Job Description
Maintenance Planner Job Description
 
Maintenence management
Maintenence managementMaintenence management
Maintenence management
 
Maintenance planning and scheduling
Maintenance planning and schedulingMaintenance planning and scheduling
Maintenance planning and scheduling
 
Maintenance management
Maintenance managementMaintenance management
Maintenance management
 
Maintenance
MaintenanceMaintenance
Maintenance
 
Maintenance types
Maintenance typesMaintenance types
Maintenance types
 
Effective Spare Parts Management - 8 rules
Effective Spare Parts Management - 8 rulesEffective Spare Parts Management - 8 rules
Effective Spare Parts Management - 8 rules
 
Maintenance Management
Maintenance ManagementMaintenance Management
Maintenance Management
 
Allied Intro (Short)
Allied Intro (Short)Allied Intro (Short)
Allied Intro (Short)
 
Energy Management Program Maturity Matrix
Energy Management Program Maturity MatrixEnergy Management Program Maturity Matrix
Energy Management Program Maturity Matrix
 
The Planning Maturity Curve (Palo Alto June 15)
The Planning Maturity Curve (Palo Alto June 15)The Planning Maturity Curve (Palo Alto June 15)
The Planning Maturity Curve (Palo Alto June 15)
 
Top 10 Reasons Why Maintenance Planning Fails
Top 10 Reasons Why Maintenance Planning FailsTop 10 Reasons Why Maintenance Planning Fails
Top 10 Reasons Why Maintenance Planning Fails
 
Maintenance Planning and Scheduling, Lagos
Maintenance Planning and Scheduling, LagosMaintenance Planning and Scheduling, Lagos
Maintenance Planning and Scheduling, Lagos
 
Tool Box Training - Work Order Close Out(1)
Tool Box Training - Work Order Close Out(1)Tool Box Training - Work Order Close Out(1)
Tool Box Training - Work Order Close Out(1)
 
The Top 10 Reasons Maintenance Planning Is Not Effective
The Top 10 Reasons Maintenance Planning Is Not EffectiveThe Top 10 Reasons Maintenance Planning Is Not Effective
The Top 10 Reasons Maintenance Planning Is Not Effective
 
Maintenance Scorecard
Maintenance ScorecardMaintenance Scorecard
Maintenance Scorecard
 
Addressing sustainable development guidelines cps es efficient_carbon
Addressing sustainable development guidelines cps es efficient_carbonAddressing sustainable development guidelines cps es efficient_carbon
Addressing sustainable development guidelines cps es efficient_carbon
 

Similar to Maintenance Planning and Scheduling Maturity Matrix - #1 of 2

Tool Box Talk - Maintenance Planning and Scheduling
Tool Box Talk - Maintenance Planning and SchedulingTool Box Talk - Maintenance Planning and Scheduling
Tool Box Talk - Maintenance Planning and SchedulingRicky Smith CMRP, CMRT
 
The Basics of the A3-method (a repackaged version of Toyota Kata)
The Basics of the A3-method (a repackaged version of Toyota Kata)The Basics of the A3-method (a repackaged version of Toyota Kata)
The Basics of the A3-method (a repackaged version of Toyota Kata)Teemu Toivonen
 
Project Management
Project ManagementProject Management
Project Managementvinchurkar
 
Lean Projects with A3 Method
Lean Projects with A3 MethodLean Projects with A3 Method
Lean Projects with A3 MethodNitor
 
Many organizations invest substantial resources in creating their ow.pdf
Many organizations invest substantial resources in creating their ow.pdfMany organizations invest substantial resources in creating their ow.pdf
Many organizations invest substantial resources in creating their ow.pdffederaleyecare
 
Maintenance Management Process
Maintenance Management ProcessMaintenance Management Process
Maintenance Management ProcessPIPINAZRIN
 
_deped_order_no._2_rpms RPMS of All teachers
_deped_order_no._2_rpms RPMS of All teachers_deped_order_no._2_rpms RPMS of All teachers
_deped_order_no._2_rpms RPMS of All teachersRolanMinerva5
 
Annual performance review
Annual performance reviewAnnual performance review
Annual performance reviewDuKien
 
Project management (A Basic Approach)
Project management (A Basic Approach)Project management (A Basic Approach)
Project management (A Basic Approach)Jed Concepcion
 
Performance Rating and Promotion
Performance Rating and PromotionPerformance Rating and Promotion
Performance Rating and PromotionEzra Dave Ignacio
 
Project Management slide 2
Project Management slide 2Project Management slide 2
Project Management slide 2Ahmed Alageed
 
IMPORTANCE OF PLANNING IN MANAGEMENT – ADVANTAGES & LIMITATIONS OF PLANNING C...
IMPORTANCE OF PLANNING IN MANAGEMENT – ADVANTAGES & LIMITATIONS OF PLANNING C...IMPORTANCE OF PLANNING IN MANAGEMENT – ADVANTAGES & LIMITATIONS OF PLANNING C...
IMPORTANCE OF PLANNING IN MANAGEMENT – ADVANTAGES & LIMITATIONS OF PLANNING C...Gurunanak institute of hotel management
 
Project management basic and introduction
Project management basic and introductionProject management basic and introduction
Project management basic and introductionLopamudra Das
 
The project plan
The project planThe project plan
The project planVatsalaPG
 

Similar to Maintenance Planning and Scheduling Maturity Matrix - #1 of 2 (20)

Tool Box Talk - Maintenance Planning and Scheduling
Tool Box Talk - Maintenance Planning and SchedulingTool Box Talk - Maintenance Planning and Scheduling
Tool Box Talk - Maintenance Planning and Scheduling
 
PRESTO @ SUPSI
PRESTO @ SUPSIPRESTO @ SUPSI
PRESTO @ SUPSI
 
The Basics of the A3-method (a repackaged version of Toyota Kata)
The Basics of the A3-method (a repackaged version of Toyota Kata)The Basics of the A3-method (a repackaged version of Toyota Kata)
The Basics of the A3-method (a repackaged version of Toyota Kata)
 
Project Management
Project ManagementProject Management
Project Management
 
Lean Projects with A3 Method
Lean Projects with A3 MethodLean Projects with A3 Method
Lean Projects with A3 Method
 
final ppt.pptx
final ppt.pptxfinal ppt.pptx
final ppt.pptx
 
Many organizations invest substantial resources in creating their ow.pdf
Many organizations invest substantial resources in creating their ow.pdfMany organizations invest substantial resources in creating their ow.pdf
Many organizations invest substantial resources in creating their ow.pdf
 
Maintenance Management Process
Maintenance Management ProcessMaintenance Management Process
Maintenance Management Process
 
_deped_order_no._2_rpms RPMS of All teachers
_deped_order_no._2_rpms RPMS of All teachers_deped_order_no._2_rpms RPMS of All teachers
_deped_order_no._2_rpms RPMS of All teachers
 
Annual performance review
Annual performance reviewAnnual performance review
Annual performance review
 
Project management (A Basic Approach)
Project management (A Basic Approach)Project management (A Basic Approach)
Project management (A Basic Approach)
 
Keynote Lister Sto 061411
Keynote Lister Sto 061411Keynote Lister Sto 061411
Keynote Lister Sto 061411
 
Performance Rating and Promotion
Performance Rating and PromotionPerformance Rating and Promotion
Performance Rating and Promotion
 
Project Management slide 2
Project Management slide 2Project Management slide 2
Project Management slide 2
 
IMPORTANCE OF PLANNING IN MANAGEMENT – ADVANTAGES & LIMITATIONS OF PLANNING C...
IMPORTANCE OF PLANNING IN MANAGEMENT – ADVANTAGES & LIMITATIONS OF PLANNING C...IMPORTANCE OF PLANNING IN MANAGEMENT – ADVANTAGES & LIMITATIONS OF PLANNING C...
IMPORTANCE OF PLANNING IN MANAGEMENT – ADVANTAGES & LIMITATIONS OF PLANNING C...
 
10. scope+and+nature+of+planning
10. scope+and+nature+of+planning10. scope+and+nature+of+planning
10. scope+and+nature+of+planning
 
Project management basic and introduction
Project management basic and introductionProject management basic and introduction
Project management basic and introduction
 
The project plan
The project planThe project plan
The project plan
 
Project Management: Your Guide in Acing the Project
Project Management: Your Guide in Acing the ProjectProject Management: Your Guide in Acing the Project
Project Management: Your Guide in Acing the Project
 
Project
ProjectProject
Project
 

More from Ricky Smith CMRP, CMRT

Skills of a Proactive Maintenance Technician
Skills of a Proactive Maintenance TechnicianSkills of a Proactive Maintenance Technician
Skills of a Proactive Maintenance TechnicianRicky Smith CMRP, CMRT
 
Day in the Life (DILO) of a Proactive Maintenance Manager
Day in the Life (DILO) of a Proactive Maintenance ManagerDay in the Life (DILO) of a Proactive Maintenance Manager
Day in the Life (DILO) of a Proactive Maintenance ManagerRicky Smith CMRP, CMRT
 
Day in the life of a Proactive Maintenance Supervisor
Day in the life of a Proactive Maintenance SupervisorDay in the life of a Proactive Maintenance Supervisor
Day in the life of a Proactive Maintenance SupervisorRicky Smith CMRP, CMRT
 
How to know if your maintenance planning and scheduling is not effective
How to know if your maintenance planning and scheduling is not effectiveHow to know if your maintenance planning and scheduling is not effective
How to know if your maintenance planning and scheduling is not effectiveRicky Smith CMRP, CMRT
 
Day in the life of a Proactive Maintenance Supervisor
Day in the life of a Proactive Maintenance SupervisorDay in the life of a Proactive Maintenance Supervisor
Day in the life of a Proactive Maintenance SupervisorRicky Smith CMRP, CMRT
 
Day in the Life of a Proactive Maintenance Technician Article
Day in the Life of a Proactive Maintenance Technician  ArticleDay in the Life of a Proactive Maintenance Technician  Article
Day in the Life of a Proactive Maintenance Technician ArticleRicky Smith CMRP, CMRT
 
Best Maintenance Repair Practices Article
Best Maintenance Repair Practices ArticleBest Maintenance Repair Practices Article
Best Maintenance Repair Practices ArticleRicky Smith CMRP, CMRT
 
Tool Box Talk - Maintenance Parts Checkout
Tool Box Talk - Maintenance Parts CheckoutTool Box Talk - Maintenance Parts Checkout
Tool Box Talk - Maintenance Parts CheckoutRicky Smith CMRP, CMRT
 
Tool Box Talk - Lubrication of Bearings
Tool Box Talk - Lubrication of BearingsTool Box Talk - Lubrication of Bearings
Tool Box Talk - Lubrication of BearingsRicky Smith CMRP, CMRT
 
Top 7 Reasons why Maintenance Work Orders are Closed Out Accurately
Top 7 Reasons why Maintenance Work Orders are Closed Out AccuratelyTop 7 Reasons why Maintenance Work Orders are Closed Out Accurately
Top 7 Reasons why Maintenance Work Orders are Closed Out AccuratelyRicky Smith CMRP, CMRT
 
Tool Box Talk - How to Stop Hydraulic Leaks and Why
Tool Box Talk - How to Stop Hydraulic Leaks and WhyTool Box Talk - How to Stop Hydraulic Leaks and Why
Tool Box Talk - How to Stop Hydraulic Leaks and WhyRicky Smith CMRP, CMRT
 
PM Tool Box Talk 101 - Fundamentals of Preventive Maintenance
PM Tool Box Talk 101 - Fundamentals of Preventive MaintenancePM Tool Box Talk 101 - Fundamentals of Preventive Maintenance
PM Tool Box Talk 101 - Fundamentals of Preventive MaintenanceRicky Smith CMRP, CMRT
 
How to Develop an Effective Maintenance Skills Training Program
How to Develop an Effective Maintenance Skills Training ProgramHow to Develop an Effective Maintenance Skills Training Program
How to Develop an Effective Maintenance Skills Training ProgramRicky Smith CMRP, CMRT
 
PM Tool Box Talk 101 - Fundamentals of Preventive Maintenance
PM Tool Box Talk 101 -  Fundamentals of Preventive MaintenancePM Tool Box Talk 101 -  Fundamentals of Preventive Maintenance
PM Tool Box Talk 101 - Fundamentals of Preventive MaintenanceRicky Smith CMRP, CMRT
 
Day in the Life of (DILO) of a Proactive Maintenance Technician
Day in the Life of (DILO) of a Proactive Maintenance TechnicianDay in the Life of (DILO) of a Proactive Maintenance Technician
Day in the Life of (DILO) of a Proactive Maintenance TechnicianRicky Smith CMRP, CMRT
 
SMRP World Class Maintenance Slides John Day - Alcoa Mt Holly
SMRP World Class Maintenance Slides John Day - Alcoa Mt HollySMRP World Class Maintenance Slides John Day - Alcoa Mt Holly
SMRP World Class Maintenance Slides John Day - Alcoa Mt HollyRicky Smith CMRP, CMRT
 

More from Ricky Smith CMRP, CMRT (20)

Skills of a Proactive Maintenance Technician
Skills of a Proactive Maintenance TechnicianSkills of a Proactive Maintenance Technician
Skills of a Proactive Maintenance Technician
 
Day in the Life (DILO) of a Proactive Maintenance Manager
Day in the Life (DILO) of a Proactive Maintenance ManagerDay in the Life (DILO) of a Proactive Maintenance Manager
Day in the Life (DILO) of a Proactive Maintenance Manager
 
Day in the life of a Proactive Maintenance Supervisor
Day in the life of a Proactive Maintenance SupervisorDay in the life of a Proactive Maintenance Supervisor
Day in the life of a Proactive Maintenance Supervisor
 
How to know if your maintenance planning and scheduling is not effective
How to know if your maintenance planning and scheduling is not effectiveHow to know if your maintenance planning and scheduling is not effective
How to know if your maintenance planning and scheduling is not effective
 
Day in the life of a Proactive Maintenance Supervisor
Day in the life of a Proactive Maintenance SupervisorDay in the life of a Proactive Maintenance Supervisor
Day in the life of a Proactive Maintenance Supervisor
 
Day in the Life of a Proactive Maintenance Technician Article
Day in the Life of a Proactive Maintenance Technician  ArticleDay in the Life of a Proactive Maintenance Technician  Article
Day in the Life of a Proactive Maintenance Technician Article
 
Best Maintenance Repair Practices Article
Best Maintenance Repair Practices ArticleBest Maintenance Repair Practices Article
Best Maintenance Repair Practices Article
 
Tool Box Talk - Maintenance Parts Checkout
Tool Box Talk - Maintenance Parts CheckoutTool Box Talk - Maintenance Parts Checkout
Tool Box Talk - Maintenance Parts Checkout
 
Tool Box Talk - Lubrication of Bearings
Tool Box Talk - Lubrication of BearingsTool Box Talk - Lubrication of Bearings
Tool Box Talk - Lubrication of Bearings
 
Top 7 Reasons why Maintenance Work Orders are Closed Out Accurately
Top 7 Reasons why Maintenance Work Orders are Closed Out AccuratelyTop 7 Reasons why Maintenance Work Orders are Closed Out Accurately
Top 7 Reasons why Maintenance Work Orders are Closed Out Accurately
 
Tool Box Talk - How to Stop Hydraulic Leaks and Why
Tool Box Talk - How to Stop Hydraulic Leaks and WhyTool Box Talk - How to Stop Hydraulic Leaks and Why
Tool Box Talk - How to Stop Hydraulic Leaks and Why
 
Maintenance of Hydraulic Systems
Maintenance of Hydraulic SystemsMaintenance of Hydraulic Systems
Maintenance of Hydraulic Systems
 
PM Tool Box Talk 101 - Fundamentals of Preventive Maintenance
PM Tool Box Talk 101 - Fundamentals of Preventive MaintenancePM Tool Box Talk 101 - Fundamentals of Preventive Maintenance
PM Tool Box Talk 101 - Fundamentals of Preventive Maintenance
 
How to Develop an Effective Maintenance Skills Training Program
How to Develop an Effective Maintenance Skills Training ProgramHow to Develop an Effective Maintenance Skills Training Program
How to Develop an Effective Maintenance Skills Training Program
 
What is Lean Maintenance
What is Lean MaintenanceWhat is Lean Maintenance
What is Lean Maintenance
 
Best Maintenance Repair Practices
Best Maintenance Repair PracticesBest Maintenance Repair Practices
Best Maintenance Repair Practices
 
PM Tool Box Talk 101 - Fundamentals of Preventive Maintenance
PM Tool Box Talk 101 -  Fundamentals of Preventive MaintenancePM Tool Box Talk 101 -  Fundamentals of Preventive Maintenance
PM Tool Box Talk 101 - Fundamentals of Preventive Maintenance
 
Day in the Life of (DILO) of a Proactive Maintenance Technician
Day in the Life of (DILO) of a Proactive Maintenance TechnicianDay in the Life of (DILO) of a Proactive Maintenance Technician
Day in the Life of (DILO) of a Proactive Maintenance Technician
 
Procedure Based Maintenance
Procedure Based MaintenanceProcedure Based Maintenance
Procedure Based Maintenance
 
SMRP World Class Maintenance Slides John Day - Alcoa Mt Holly
SMRP World Class Maintenance Slides John Day - Alcoa Mt HollySMRP World Class Maintenance Slides John Day - Alcoa Mt Holly
SMRP World Class Maintenance Slides John Day - Alcoa Mt Holly
 

Recently uploaded

CELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxCELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxJiesonDelaCerna
 
Final demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxFinal demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxAvyJaneVismanos
 
AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.arsicmarija21
 
Gas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxGas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxDr.Ibrahim Hassaan
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersSabitha Banu
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxiammrhaywood
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfSumit Tiwari
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatYousafMalik24
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxOH TEIK BIN
 
Meghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media ComponentMeghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media ComponentInMediaRes1
 
MICROBIOLOGY biochemical test detailed.pptx
MICROBIOLOGY biochemical test detailed.pptxMICROBIOLOGY biochemical test detailed.pptx
MICROBIOLOGY biochemical test detailed.pptxabhijeetpadhi001
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Celine George
 
Blooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docxBlooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docxUnboundStockton
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...JhezDiaz1
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentInMediaRes1
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 

Recently uploaded (20)

CELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxCELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptx
 
Final demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxFinal demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptx
 
AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.
 
Gas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxGas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptx
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginners
 
9953330565 Low Rate Call Girls In Rohini Delhi NCR
9953330565 Low Rate Call Girls In Rohini  Delhi NCR9953330565 Low Rate Call Girls In Rohini  Delhi NCR
9953330565 Low Rate Call Girls In Rohini Delhi NCR
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice great
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptx
 
Meghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media ComponentMeghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media Component
 
MICROBIOLOGY biochemical test detailed.pptx
MICROBIOLOGY biochemical test detailed.pptxMICROBIOLOGY biochemical test detailed.pptx
MICROBIOLOGY biochemical test detailed.pptx
 
ESSENTIAL of (CS/IT/IS) class 06 (database)
ESSENTIAL of (CS/IT/IS) class 06 (database)ESSENTIAL of (CS/IT/IS) class 06 (database)
ESSENTIAL of (CS/IT/IS) class 06 (database)
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17
 
Blooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docxBlooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docx
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media Component
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 

Maintenance Planning and Scheduling Maturity Matrix - #1 of 2

  • 1. Elements LEVEL 1 NOT ENGAGED LEVEL 2 EXPERIMENTING LEVEL 3 ENLIGHTENED LEVEL 4 GOOD PRACTICE LEVEL 5 BEST PRACTICE Planning Education No formal training provided. Planners have attended a formal planner training course or workshop. Planners have been formally trained. Affected individuals have been provided awareness training but nothing related to specific expectations. Processes are well defined, with maintenance and operations leaders given specific training on expectations with additional on-the-job coaching. All affected individuals have received specific training to expectations. Training is ongoing for new hires. All personnel modeling expected behaviors. Planner Role and Responsibilities No planner role identified. Role and responsibilities not clearly defined. Planner is involved with reactive work and parts chasing. No dedicated planner. Planners develop and assemble limited job packages. Dedicated planner as a full-time resource. Unclear expectations. Expectations of full-time planners well defined. Still an excessive amount of time spent on non-core activities. Planners strictly focused on future work. Zero involvement with reactive work. Roles and responsibilities are clearly adhered to. Standard Work Procedures No effective work procedures or accurate time estimates developed by planner. High level work procedures developed for large jobs and outages. Heavily dependent on OEM manuals. Standard set of expectations for job plan content not established. Standardized format for job plans established; expectations on quality and content are subjective. No clear expectations for which jobs should have a detailed plan developed. Formal expectations developed for job plan format and content that is generally followed. Job plans are developed for work on critical assets. Moving towards quantitative vs. subjective inspection criteria. Level IV + Evidence of continuous improvement system in place. Craftspersons involved in review and approval process. Labor Estimation Job plans have no estimated labor hours assigned. Jobs are grossly overestimated (1/2 shift or full shift) and not taken seriously in scheduling process. No formal estimating techniques are used. Job estimates are generally more accurate; basic estimating process applied. Estimates are usually accepted as being accurate but are often overridden. Jobs are broken down into steps and tasks with a time estimate rolled up into a total. Accepted as accurate and utilized in building the weekly schedule. Level IV + Job plan includes estimates for coordination and other outside resources. Estimates adjusted based on history/craft feedback. Job Site Visits Job site visits are rare or non-existent while “planning” work. Planner visits job sites for “high profile” jobs only while planning work. Planner visits large or complex job sites during planning only when no pre- existing job plan exists. Planner reviews some job plans with maintenance supervisors and technicians at the job site to ensure completeness. Job site visits and significant interaction with those who will perform the work is a standard practice. Identification of Safety Requirements No identification of Safety/ Tag out/Permit requirements by the planner. Planner includes high-level references to site safety policies on work order. Planner makes reference to generic safety procedures or requirements on the work order based on the equipment type/environment. Planner prepares detailed list of safety hazards and references permits required based on job task breakdown and site visit. Level IV + Methods to address these hazards are provided. Permits are pre-populated as much as possible and included in the work packet. Bill of Materials (BOM) Management Equipment-specific BOMs do not existent. Some BOMs developed, but only for a small portion of equipment. Most are incomplete or inaccurate; almost never formally reviewed or corrected/ updated. Level II + Some BOMs are linked to drawings, item number, and lead time for delivery. Level III + Formal plan in place to address shortcomings on BOMs. Focus on equipment level. Plan is clearly being executed with results of efforts evident. BOMs developed to the component level with minor exceptions. Continuous improvement and corrections a standard process. BOMs are standard part of CAPEX process. Determination of Required Materials No predetermination of needed materials. Materials acquisition is entirely up to technicians “on the fly” while executing job. Technicians identify their own materials and the planner places the order. List is quite often inaccurate. Job delays from missing material are common. Planners work with maintenance supervisors and technicians along with past job history to develop list. Storeroom runs during job execution still common. BOMs and job history utilized, but gaps exist. Planner expends a significant amount of time researching materials. Job delays from missing materials only occasionally occur. BOMs and past job history leveraged extensively. Delays in job execution due to missing materials are a very rare occurrence. Continued on back... LEVEL 1 NOT ENGAGED LEVEL 1 NOT ENGAGED LEVEL 2 EXPERIMENTING LEVEL 2 EXPERIMENTING LEVEL 4 GOOD PRACTICE LEVEL 4 GOOD PRACTICE LEVEL 5 BEST PRACTICE LEVEL 5 BEST PRACTICE PLANNINGPLANNING Ways to Measure Your Planning and Scheduling, 1 Maturity Matrix North America • Europe • Latin America • Middle East • Asia-Pacific GPAllied EMEA Guldensporenpark 21-Blok C B-9820 Merelbeke, Belgium o. +32(0)9.210.17.20 f. +32(0)9.210.17.28 www.gpallied.com World Headquarters 4200 Faber Place Drive Charleston, SC 29405 o. 888.335.8276 f. 843.414.5779
  • 2. Elements LEVEL 1 NOT ENGAGED LEVEL 2 EXPERIMENTING LEVEL 3 ENLIGHTENED LEVEL 4 GOOD PRACTICE LEVEL 5 BEST PRACTICE Materials Kitting No kitting process in place. Materials acquired “on the fly” by technicians and supervisors. Materials lay down areas exist in storeroom; informal process, much confusion and inaccuracy. Materials kitting and staging occurs for most outage jobs and only ad hoc for weekly/ daily work. Technicians drive the process. Materials kitting and staging occurs for all outage jobs and most weekly/daily work. Storeroom personnel receive pick-lists and assemble the kits. Kitting is standard practice with few errors. Kits are kept in a secure area, verified for accuracy against the work order and easily identified. Work Order Closeout Work orders are not returned to the planner for closeout. Work orders are returned to planner for closeout, but contain very little if any useful feedback (“Fixed, Done, Complete”). Work orders are returned to planner with hours (actual almost always matches estimate) and no indication of missing materials. Planner occasionally makes updates. Level III + Improvement suggestions, materials consumed, and actual hours spent. History allows management reporting on MTBF and Planned vs. Actual hours. Level IV + Component codes and failure codes. Failure information can be discerned from work order history to drive reliability improvements. Scheduling Meeting Participation Scheduling meetings not held. Organization completely reactive. Scheduling meeting only occurs for outages attended only by maintenance personnel. Production does not attend. Scheduling meeting occurs with a standard agenda, date, time, and required attendees. Production attends meetings on occasion, but not actively engaged when present. Schedule not taken seriously. Level III + Attendees are on time and actively engaged in the scheduling meeting. Moderate level of confidence exists in the developed schedule. Maintenance driven. Scheduling meeting occurs like clockwork and is efficient - standard time, place, agenda. Operations drives meetings. Formal approval process (Maintenance and Operations). Senior Management sponsorship. Operations/ Maintenance Use of Backlog for Scheduling Backlog is not considered when developing a schedule. Daily reactive coordination occurs vs. weekly scheduling. Backlog largely inaccurate and not taken seriously. Next week’s schedule originates from both the backlog and on-the-spot production requests. Many very old (>90 days) jobs on the backlog; backlog is large. Schedule is developed using a combination of backlog and last minute emergency lists. Team understands the importance of scheduling from the backlog, but still struggles with execution. Backlog is generally considered accurate and most jobs are only scheduled from backlog, not necessarily strictly from the ready backlog (total backlog as well). Ready backlog is the primary driver for building the schedule. Backlog size and age appropriate. Schedule Communication Largely verbal agreements and informal lists. Shared only between small subset of workforce. Schedule is published on a network drive or emailed. Rarely viewed/passive communication/small subset of organization aware of existence. Schedule is passively posted and displayed in maintenance shops/areas only. Frequency of updates sporadic and rarely paid attention to. Schedule is published and displayed in all areas. Schedule is regularly posted at set date/time/place; awareness of schedule content/importance varies. Level IV + Schedule is regularly and actively reviewed with personnel at set date/time/place; published at least one week in advance. Minimal coordination delays. Resource Utilization Personnel react entirely to radio/trouble calls from production/maintenance supervisors. Resource availability not known. Available resources not taken into consideration during scheduling. Personnel select their jobs from an assignment box; no names listed. Resource utilization low. Scheduling based on availability of resources; significant portion of schedule empty to accommodate “emergencies”. Resources not scheduled to 100% availability. Labor Hours formally scheduled to 100%. Front line supervisors react to schedule breakers, but no formal process exists. Resource utilization is moderate. Jobs assigned to personnel the day prior to work. Level IV + Formal process in place for “schedule breakers”. Resource utilization is very high. Personnel assigned to jobs the week before. Schedule breakers analyzed for improvement. Measuring Schedule Compliance Not measured. No accountabilities set. Number of work orders completed is tracked. Numbers are suspect to manipulation; methods of measurement are sporadic and variable. No system of accountability. Only tracking work order completion rate. Formal standard in place but not consistently followed. Measurement published regularly; results not used to drive improvement. Compliance measured by dividing the total number of labor hours completed by the total number of labor hours scheduled. Measurements formalized and trended, but not always followed. Level IV + Method formalized and consistently followed. Organization regularly tracks and seeks out improvement opportunities. PLANNINGPLANNING LEVEL 1 NOT ENGAGED LEVEL 1 NOT ENGAGED LEVEL 2 EXPERIMENTING LEVEL 2 EXPERIMENTING LEVEL 4 GOOD PRACTICE LEVEL 4 GOOD PRACTICE LEVEL 5 BEST PRACTICE LEVEL 5 BEST PRACTICE Ways to Measure Your Planning and Scheduling, 1 Maturity Matrix North America • Europe • Latin America • Middle East • Asia-Pacific GPAllied EMEA Guldensporenpark 21-Blok C B-9820 Merelbeke, Belgium o. +32(0)9.210.17.20 f. +32(0)9.210.17.28 www.gpallied.com World Headquarters 4200 Faber Place Drive Charleston, SC 29405 o. 888.335.8276 f. 843.414.5779