Experience 
Selected works 
Work Experience 
GITAU JOHN 
P.O Box 941 
Ruiru 
Cell:0712456399 
g.huck@live.com 
GITAU JOHN 
P.O Box 941 
Ruiru 
Cell:0712456399 
g.huck@live.com
Experience 
Selected works 
Work Experience 
Project Experience 
Loresho villas - Loresho Nairobi 
City park Apartmaents-Parklands Nairobi 
Shanzu Waterfront - Shanzu 
Ravine Park Apartmants - Rhapta rd ,Westlands Nairobi 
Terrace Close Apartmants - Terrace Close ,Westlands Nairobi 
Karuri Residence - Karen Hills Housing Project, Karen Nairobi 
Bros Portico Mall - Juba, South Sudan 
George Residence - Kisii Town 
Doris wambui residence - Ruiru 
Thingira hotel - Ruiru 
Kitengela Heights - Kitengela 
Professional Experience 
STUDIO ARCHITECTTO / ARCAID ARCHITECTS 
Architectural Technitian 
Utilize Architecture and Landscape Architecture principles/ 
Concepts on a daily basis in conduction with the interdisplinary team 
Research into multiple Green/ Sustainable Materials and technologies 
along with integration and coordination with overall project design and team. 
Prepare and create all Technical and Coordination documents for integration of interdisciplinary team and 
approval for construction process per code and development condotions. 
Intergration and research of passive Housing techniques,Systems and materials 
ELEGAN T PROPERTIES 
Architectural Technitian 
Utilize Architecture and Landscape Architecture principles/ 
Concepts on a daily basis in conduction with the interdisplinary team 
Research into multiple Green/ Sustainable Materials and technologies 
along with integration and coordination with overall project design and team. 
Prepare and create all Technical and Coordination documents for integration of interdisciplinary team and 
approval for construction process per code and development condotions. 
Intergration and research of passive Housing techniques,Systems and materials 
Communication and Organization of Future/ Client Developments 
Educational Background 
JANUARY 2009 - NOVEMBER 2011 : Student Undertaking Diploma in architecture 
at Kenya Polytechnic University College 
JANUARY 2006 - NOVEMBER 2007 : Student at Jamhuri High School - 
C+ In KENYA CERTIFICATE OF SECONDARY EDUCATION 
JANUARY 2004 - NOVEMBER 2005 : Student at Karima Boys High School - 
Transferred 
JANUARY 1998 - NOVEMBER 2003 : Student at Naivasha Boys Boarding School - 
A in KENYA CERTIFICATE OF PRIMARY EDUCATION 
JANUARY 1995 - NOVEMBER 1997 : Student at St. Brigids Primary School. 
Transferred 
Computer skills 
Archicad 
Autodesk Revit 
Artlantis 
3ds max 
Re commendation 
TA L I A N O L A N G (Principal Partner) 
ODESEY INTERNATION LTD 
0724840050 
0724274139 
NAIROBI 
ARCH REUBEN KABBA U 
DREAMS ARCHITECTS 
P.O Box 52428 - 00200 
NAIROBI 
FERUZ ABUBAKAR 
VERBATIM CONSORTIUM 
0722654499 
NAIROBI
Experience 
Selected works 
Work Experience 
WAMBUI RESIDENCE
Experience 
Selected works 
Email:info @artetoarch.co.ke 
Work Experience 
GSPublisherEngine 5.0.100.100 
NOTES 
1.This drawing is protected under the copyright act and cannot be used or 
reproduced in part or in whole without authors consent 
2.All dimensions to be checked on site,written rule over scaled 
dimensions, any discrepancies to be reported to the architect before work 
commences 
3.All construction work to comply with the latest standard codes of 
practice,local authority by-law and fire regulations 
4.P.V. denotes permanent ventilation and must be provided above all doors 
and windows where indicated or shown 
5.All walls less than 200mm thick to be reinforced with hoop iron at every 
alternate course 
6.Water meter to be 300mm above g.l. 
7.D.P.C. denotes one layer of bituminous felt to be provided under all walls 
150mm above g.l. 
8.All r.c. works to structural engineers details depth of foundation to be 
determined on site and should not be less than 1200mm.provide one row of 
600x600x50mm precast concrete paving slabs around the building unless 
otherwise shown 
9.Heavy duty polythene sheeting and anti termite treatment to be provided 
under ground floor slab 
10.Plinth level to be minimum 300mm from proposed parking level or ground 
level 
11.All surface beds to be cast on well compacted and well consolidated filling 
12.Depth of foundation to be minimum 600mm below reduced ground level 
13.All pipes and services to be 450mm minimum below reduced ground level 
14.All inspection chambers within building area,drive way and parking areas to 
be heavy duty ,double seal air tight covers.Drains under building ,drive way 
and parking to be pvc pipes encased in 150mm concrete sorround 
PR OPOSED BUILTUP AREA 
REVISIONS ADDITIONS & ALTERATIONS 
NO DATE DESCRIPTION BY 
CONSULTA NTS 
DOR IS W A MBUI MWANGI 
PR OJECT 
Drawing type 
DESIGN AND DRAWN 
GHETAO J.H (g.huck@live.com) 
CHECK ED REG .NO SIGN 
01 DRAWING NO SCALE DA TE N.T.S 
1 :100 
FEB 2014 
CLIENT 
Client Signature 
Contacts :0712456399 
PR OPOSED RESIDE NT IAL HOUSE 
on p lot no. L .R . RUIR U/ R UIRU 
WEST BLOCK 4 /91 
1 
2 
3 
4 
5 
6 
A/8 
3,700 800 200 3,300 200 700 
A A 
200 2,800 200 1,000 200 3,500 200 
200 2,500 200 3,500 200 
200 4,800 200 
PV 
B 200 1,200 200 1,900 200 
B 
C C 
1 
2 
3 
4 
D D 
E E 
200 3,300 200 3,600 200 1,200 100 
200 3,500 200 
PANTRY 
ff tiles 
200 4,000 200 
200 4,800 200 3,300 200 
F - 150 
F 
PV 
G G 
1 
1 
2 
2 
3 
3 
4 
4 
5 
6 
A/8 
11,900 
F 
RG 
1,700 1,300 3,700 3,500 700 1,000 
A A 
200 2,000 200 1,300 200 3,300 200 1,400 200 
B B 
WC/SH 
C WC/SH 
ff tiles ff tiles 
C 
PV 
1 
2 
3 
4 
5 
6 
D D 
E E 
2 3 
ff tiles PV 
F F 
G G 
1 
2 
3 
4 
5 
18 x 167 = 3,000 
7 
8 
9 
10 
11 
12 
13 
14 
15 
16 
17 
18 
5 
1,525 1,500 1,775 350 2,500 350 500 1,000 1,000 375 1,800 375 1,350 
200 4,600 200 2,800 200 1,700 200 600 200 2,150 200 1,150 200 
1,100 3,800 1,500 1,500 1,500 5,000 
14,400 
400 1,000 200 6,700 2,700 550 350 
200 1,400 200 6,300 200 2,500 200 700 200 
1,700 1,300 3,700 3,500 700 1,000 
11,900 
1,000 375 1,800 375 2,950 1,000 1,500 500 1,525 1,500 1,875 
200 800 200 2,150 200 2,750 200 2,800 200 4,700 200 
1,100 3,800 1,500 1,500 1,500 5,000 
14,400 
400 1,000 
200 
1,300 2,200 200 1,300 200 3,500 250 1,000 350 
200 1,400 
200 
1,100 200 2,000 200 1,300 200 3,300 200 1,400 200 
200 6,100 200 2,800 200 
200 1,700 200 4,300 200 
200 4,800 200 
A/8 
A/9 
A/9 
PV 
PV 
PV 
PV PV 
PV 
PV 
PV 
PV 
PV 
PV 
BEDROOM 
ff tiles 
BEDROOM 
ff parquet 
BALCONY 
PV 
PV 
PV 
PV 
PV 
200 1,400 200 6,300 200 2,600 
5 
18 x 167 = 3,000 
2 3 
5 
100 
3,700 800 200 3,300 200 700 
100 
3,700 800 200 3,300 200 700 
100 
9,000 
6,300 1,500 1,200 7,900 
5,200 200 3,400 200 2,800 200 4,700 200 
3,600 3,800 1,500 1,500 1,500 5,000 
16,900 
700 1,500 500 1,500 1,500 2,700 800 200 
200 4,800 200 3,300 200 700 
1,300 3,700 3,500 700 
200 3,700 1,500 1,900 3,200 500 1,000 2,800 1,500 600 
200 3,300 200 3,600 200 2,800 200 2,500 200 3,500 200 
3,600 3,800 1,500 1,500 1,500 4,900 
9,450 
16,900 
200 5,000 3,600 200 
200 4,800 200 3,300 200 
PV PV 
PV 
PV 
PV 
PV 
PV 
PV 
BEDROOM 
ff tiles 
SUNKEN LOUNGE 
ff parquet 
WC/SH 
ff tiles 
DINING ROOM 
ff parquet 
PV 
PV 
PV 
FOYER 
ff tiles 
PV 
PV 
PV 
PV 
PV 
PV 
PV 
PV 
PV 
PV 
PV 
PV 
PV 
DECK 
ff tiles 
KITCHEN 
ff tiles 
1 
2 
3 
A/8 
A/9 
A/9 
ELEVATION 01 
SCALE 1:100 
STEEL C ASEMENT WINDOWS 
TO WINDOW & DOOR SCHEDULE 
RANDOM RUBBLE CLADDING 
TO ARCHITECTS APPROVAL . 
COLOURED CONCRETE ROOFING TILES 
ON TIMBER TRUSS MEMBERS TO S.E DET 
225 X 25mm TIMBER FASCIA BOARD 
FINISHED & PAINTED TO ARCHITECT S 
APPROVAL 
200 mm THICK MEDIUM SIZE MACHINE CUT 
MASONRY STONES PLASTERED & PAINTED 
TO ARCHITECTS APPROVAL. 
YELLOW BUSH HAMMERED STONE 
TO ARCHITECTS APPROVAL . 
STEEL CASEMENT WINDOWS 
TO WINDOW & DOOR SCHEDULE 
PV 
PV PV 
PV 
PV PV 
PV 
ELEVATION 02 
SC ALE 1:100 
RANDOM RUBBLE CL ADDING 
TO ARCHITECT S APPROVAL . 
COLOURED CONCRETE ROOFING TILES 
ON TIMBER TRUSS MEMBERS TO S.E DET 
225 X 25mm TIMBER FASCIA BOARD 
FINISHED & PAINTED TO ARCHITECTS 
APPROVAL 
200 mm THICK MEDIUM SIZE MACHINE CUT 
MASONRY STONES PLASTERED & PAINTED 
TO ARCHITECT S APPROVAL. 
STEEL CASEMENT WINDOWS 
TO WINDOW & DOOR SCHEDULE 
YELLOW BUSH HAMMERED STONE 
TO ARCHITECT S APPROVAL . 
PV 
PV PV PV 
PV 
ELEVATION 03 
SC ALE 1:100 
RANDOM RUBBLE CLADDING 
T O ARCHITECTS APPROVAL . 
COLOURED CONCRETE ROOFING TILES 
ON TIMBER TRUSS MEMBERS TO S.E DET 
225 X 25mm TIMBER FASCIA BOARD 
FINISHED & PAINTED TO ARCHITECTS 
APPROVAL 
200 mm THICK MEDIUM SIZE MACHINE CUT 
MASONRY STONES PL ASTERED & PAINTED 
T O ARCHITECTS APPROVAL. 
YELLOW BUSH HAMMERED STONE 
T O ARCHITECTS APPROVAL . 
PV 
PV 
PV 
ELEVATION 04 
SCALE 1:100 
RANDOM RUBBLE CLADDING 
TO ARCHITECTS APPROVAL . 
COLOURED CONCRETE ROOFING TILES 
ON TIMBER TRUSS MEMBERS TO S.E DET 
225 X 25mm TIMBER FASCIA BOARD 
FINISHED & PAINTED TO ARCHITECTS 
APPROVAL 
200 mm THICK MEDIUM SIZE MACHINE CUT 
MASONRY ST ONES PL ASTERED & PAINTED 
TO ARCHITECTS APPROVAL. 
YELLOW BUSH HAMMERED STONE 
TO ARCHITECTS APPROVAL . 
PV PV 
PV 
PV 
PV 
PV 
PV 
15,400 
30,800 
TO SEPTIC 
TANK 
SOAK PIT 
IC IC IC IC 
IC 
IC 
IC 
OFF KIAMBU RUIRU ROAD 
WAMBUI RESIDENCE
NOTES 
1.This drawing is protected under the copyright act and cannot be used or 
reproduced in part or in whole without authors consent 
2.All dimensions to be checked on site,written rule over scaled 
dimensions, any discrepancies to be reported to the architect before work 
commences 
3.All construction work to comply with the latest standard codes of 
practice,local authority by-law and fire regulations 
4.P.V. denotes permanent ventilation and must be provided above all doors 
and windows where indicated or shown 
5.All walls less than 200mm thick to be reinforced with hoop iron at every 
alternate course 
6.Water meter to be 300mm above g.l. 
7.D.P.C. denotes one layer of bituminous felt to be provided under all walls 
150mm above g.l. 
8.All r.c. works to structural engineers details depth of foundation to be 
determined on site and should not be less than 1200mm.provide one row of 
600x600x50mm precast concrete paving slabs around the building unless 
otherwise shown 
9.Heavy duty polythene sheeting and anti termite treatment to be provided 
under ground floor slab 
10.Plinth level to be minimum 300mm from proposed parking level or ground 
level 
11.All surface beds to be cast on well compacted and well consolidated filling 
12.Depth of foundation to be minimum 600mm below reduced ground level 
13.All pipes and services to be 450mm minimum below reduced ground level 
14.All inspection ch ambers within building area,drive way and parking areas to 
be heavy duty ,double seal air tight covers.Drains under building ,drive way 
and parking to be pvc pipes encased in 150mm concrete sorround 
PROPOSED BUILTUP AR EA 
REVISIONS ADDITIONS & ALTERATIONS 
NO DATE DESCRIPTION BY 
Experience 
CONSULTA NTS 
Selected works 
PR OJECT 
Email:info @artetoarch.co.ke 
Work Experience 
GSPublisherEngine 5.0.100.100 
PR OPOSED RESIDENT IAL HOUSE 
on plot no. L.R. RUIRU/RUIRU 
W EST BL OC K 4/91 
Drawing type 
DESIGN AND DRA WN 
GHETAO J.H (g.huck@live.com) 
CHECKED REG .NO SIGN 
02 DRA WING NO SCALE DATE N.T.S 
1 :100 
FEB 2014 
CLIENT 
Client Signature 
Contacts :0712456399 
DORIS WA MBUI MWA NGI 
A 
A 
B 
B 
C 
C 
D 
D 
E 
E 
F 
F 
G 
G 
4,900 1,500 1,500 1,500 3,800 3,600 
3,000 2,700 
WALL CLADDED TO ARCHITECTS 
APPROVAL 
PORTUGUESE CLAY ROOFING TILES 
ON TIMBER TRUSS MEMBERS TO S.E 
DETAILS 
225 X 25mm TIMBER FASCIA BOARD 
FINISHED & PAINTED TO ARCHITECTS 
APPROVAL 
ROOF LEVEL 
FIRST FLOOR LEVEL 
GROUND FLOOR LEVEL 
PV PV PV PV PV 
PV PV PV PV 
PV PV PV PV 
PURPOSE MADE S TEEL CASEMENT 
WINDOWS TO WINDOW & DOOR 
SCHEDULE 
PURPOSE MADE SLIDDING 
DOOR TO WINDOW & DOOR 
SCHEDULE 
RC STAIRCASE TO S.E DET 
18 RISERS@150MM 
TREADS@300MM 
150 mm THICK R.C FLOOR SLAB ON 
1000g D.P.M TREATED WITH ANTI-TERMITE 
SOLUTION ON HARDCORE & BLINDING 
LAYER TO S.E DETAILS. 
600X 200 mm R.C STRIP FOUNDATION 
FOO TING ON BLINDING LAYER & 
FOUNDATION DEPTH TO BE 
DETERMINED ON SITE TO S.E DETAILS. 
5 
5 
4 
4 
3 
3 
2 
2 
1 
PV PV 
1 
700 3,500 3,700 1,300 
3,000 2,700 1,900 2,100 
ROOF LEVEL 
FIRST FLOOR LEVEL 
GROUND FLOOR LEVEL 
PV 
PORTUGUESE CLAY 
ROOFING TILES 
ON TIMBER TRUSS 
MEMBERS TO S.E 
DETAILS 
225 X 25mm TIMBER FASCIA 
BOARD 
FINISHED & PAINTED TO 
ARCHITECTS 
APPROVAL 
WATER TANK LEVEL 
PV 
PV PV 
TOP ROOF LEVEL 
POSITION OF COLD WATER TANKS ON 
APPROVED TIMBER SUPPORTS TO S.E 
DETAILS & TANKS CAPACIT Y TO M.E 
SPECIFICATION. 
PURPOSE MADE STEEL CASEMENT 
WINDOWS TO WINDOW & DOOR 
SCHEDULE 
150 mm THICK R.C FLOOR SLAB ON 
1000g D.P.M TREATED WITH ANTI-TERMITE 
SOLUTION ON HARDCORE & BLINDING 
LAYER TO S.E DETAILS. 
600X 200 mm R.C STRIP FOUNDATION 
FOOTING ON BLINDING LAYER & 
FOUNDATION DEPTH TO BE 
DETERMINED ON SITE TO S.E DETAILS. 
RC STAIRCASE TO S.E DET 
18 RISERS@150MM 
TREADS@300MM 
600 600 900 600 600 
450 
2,400 200 
100 100 
530 EQ EQ EQ EQ EQ 
2,700 
3,300 
750 
165 100 50 
485 
600 
50 
640 
Extra space to receive a fixed varvished mdf panel to 
18mm thick post-formed laminated mdf doors to 
20mm dia chrome pipe hanging rail 
Door pull handles to schedule 
approval. 
Mirror fixed on the back side 
of door to architect's approval 
2no. drawer on unitson rollers, 
consisting of 25mm softwood 
sides and mdf bottom with 18mm 
thick mdf front 
Shoe rack to approval 
100x12mm skirting 
approval. 
20mm thick shelving 
ELEVATION 01 
LOCATION: Bedroom (guest) 
Scale 1:25 
Light fitting with a pull switch to Eng's details. 
Mirror fixed to wall with foam backing to approval 
1,200 900 1,200 
2,400 200 
2,400 200 
100 100 
100 100 
2,700 
2,200 
L[76]05 
550 550 550 550 
2no. drawer on unitson rollers, 
consisting of 25mm softwood 
sides and mdf bottom with 18mm 
thick mdf front 
Extra space to receive a 
fixed varvished mdf panel 
to approval. 
18mm thick post-formed 
laminated mdf doors to 
approval. 
20mm thick shelving 
20mm dia chrome 
pipe hanging rail 
Door pull handles to 
schedule 
Mirror fixed on the back side 
of door to architect's approval 
2no. drawer on unitson rollers, 
consisting of 25mm softwood 
sides and mdf bottom with 18mm 
thick mdf front 
100x12mm skirting 
Shoe rack to approval 


	 
 
LOCATION: Bedroom 2 
600 
3,300 
20mm dia chrome pipe 
hanging rail 
Shoe rack to det 
18mm thick post-formed 
laminated mdf doors to approval.
LOCATION: Bedroom (guest) 
2,200 
550 550 550 550 
600 
01 
2no. drawer on unitson rollers, 
consisting of 25mm softwood 
sides and mdf bottom with 18mm 
thick mdf front 
20mm dia chrome pipe 
hanging rail 
Shoe rack to det
Scale 1:25 
18mm thick post-formed 
laminated mdf doors to approval. 
LOCATION: Bedroom 2 
GSPublisherEngine 0.0.100.100 
F1 D 
10 800 1000 800 1400 
3000 1850 1500 3600 100 F 22500 1.5 800 1800 5600 
B 
NO.  OF 
PERSONS 
2 
2 
200 800 200 D 200 800 200 
A 
A A 
B 
F1 
200 600 200 
200 
500 200 
300 
F2 
600x450mm MH cover  frame 
GL GL 
E 
500 
3M 
VARIES (3-6M) 
150 
100 600 150 
A 100 B 100 C 
Invert level of 
incoming drain 
125mm RC cover slab 
to engineer's detail 
600x450mm cover 
and frame 
Sub-soil drain 
190mm thick  masonry 
stone wall with 10mm 
rendering to approval 
150mm rc cover slab 
150mm thick base slab 
600x450mm cover 
and frame 
140mm thick 
masonry wall 
1:3:6 conc. 
200mm dia. stone blocks 
for loose ground  or where 
specified 
12mm dia. ms bars 
at 150mm 
c/c bothways 
Outlet 
manhole 
Inlet 
manhole 
TWL 
10mm water proofing 
rendering to approval 
Section A-A 
SEPTIC TANK DETAILS 
Floor plan 
Section B-B 
B 
SOAK PIT 
Floor plan 
 1.Soak pits o be used 
 on soils with good absorption 
 eg sand,red soil etc 
2.Depth to be specified 
 NB. 
E A C 
B 6000 
3000 
1400 
C 
1200 
E 
3600 
F2 
800 20 2 1400 1200 1400 1500 
1400 4000 2000 2 D 
1500 1400 
12000 
30 
DIMENSIONS IN MM 
40 800 1600 
3000 
1400 4000 2400 2 E 
1500 1300 
15000 50 800 
1600 
2800 
800 1400 
CAPACITY 
IN 
LITRES 
8600 3600 1.5 G 
1500 1200 
45000 
DESLUDGING 
INTERVAL 
(YEARS) 
1800 3600 1200 
200 800 5600 2040 
1500 
1000 
H 67500 300 7600 3800 4000 2260 1500 11600 
I 90000 400 8800 4400 13400 4600 
2380 
1.5 800 
1500 1.5 800 
inlet 
Typical section 
9000 
TYPE 
WAMBUI RESIDENCE
Experience 
Selected works 
Work Experience 
GEORGE RESIDENCE
Experience 
Selected works 
Work Experience 
KITENGELA HEIGHTS
Experience 
Selected works 
Work Experience 
THINGIRA HOTEL
Experience 
Selected works 
Work Experience 
SHANZU WATERFRONT
Experience 
Selected works 
Work Experience 
SHANZU WATERFRONT
Experience 
Selected works 
Work Experience 
A 2 
1,200 800 2,000 1,200 2,100 1,700 900 1,100 2,000 600 1,400 1,200 1,400 1,400 2,100 1,900 4,000 
200 1,000 200 1,800 200 6,050 100 2,300 100 3,700 100 2,400 100 6,750 200 1,800 200 
W 4 W7 W4 swp 
Clk rm wc 
Clk rm (ff.cer.tiles) 
worktop worktop 
F 
arch 
300 3,600 300 
200 
W2 
600 100 1,900 100 1,500 100 
D 2-­pv 
Lift 
Shaft 
Dhobi 
W 2 
Clk rm 
(ff. cer.tiles) 
Dining 
ff.cer.tiles 
sh 
Clk rm 
A B C D E F G H I J K L 
1,200 2,100 1,700 900 1,100 2,000 600 1,400 1,200 1,400 1,400 2,100 1,900 4,000 
1,200 500 1,200 1,800 1,200 2,000 600 1,650 1,200 1,350 600 1,275 750 2,275 1,200 2,600 1,200 600 
(ff.cer.tiles) 
worktop worktop 
F 
Clk rm 
4,900 100 1,100 100 600 1,200 600 100 
1,200 6,600 
W 3 W3 
2,050 
100 
D4-­pv 
200 3,100 200 2,450 100 2,950 200 1,800 200 7,800 200 3,800 200 
22 x 152 = 3,350 
1 
2 
3 
4 
5 
6 
7 
8 
9 
10 
11 
12 
13 
14 
15 
16 
17 
18 
19 
20 
21 
22 
W DR 
L 
L 
L 
L 
L 
L 
L 
L 
L 
25,200 
600 100 1,900 100 1,500 100 1,100 100 
Clk rm 
Clk rm 
3,300 200 5,350 100 2,300 100 2,300 100 5,250 200 1,800 200 1,800 200 
23,200 
20,100 
L 
L 
200 1,000 200 6,050 100 2,300 100 3,700 2,500 100 6,750 200 1,800 200 600 200 
1,640 2,760 500 1,775 300 1,750 300 1,775 500 4,400 3,500 1,400 
3,900 1,200 1,800 1,200 900 600 3,100 600 1,100 750 2,800 750 500 2,000 2,000 
4,400 1,900 2,600 500 1,600 4,400 200 4,700 
1,000 3,600 1,400 200 4,700 
300 
200 4,200 200 1,500 200 2,900 200 1,600 200 2,050 100 2,050 200 4,500 200 
500 3,600 1,000 1,000 300 200 300 3,600 300 
2,850 100 1,250 
200 1,000 200 1,900 200 2,450 100 1,400 100 
1,200 200 1,800 200 1,200 200 1,000 
200 1,250 2,100 
200 600 200 4,200 200 6,400 200 4,200 200 4,500 200 600 200 
200 3,800 200 
1,250 
100 
3,150 
4,400 4,800 1,200 600 4,400 4,700 
1,750 100 300 1,000 
1,200 
6,600 
1,400 1,000 1,200 600 
100 600 1,300 1,200 
600 600 1,000 450 
1,600 100 2,000 
1,550 400 900 
20,300 
x x 
01 
02 
03 
04 
wc 
whb 
sh 
wrd 
wardrobe 
sink 
dhobi sink 
fridge 
cooker 
Ensuite 
Bedroom 
Ensuite 
Bedroom 
Lift Shaft 
Kitchen 
Dhobi 
Pantry 
Sitting Room 
Ensuite 
Bedroom 
Master 
Bedroom 
walk in closet 
whb 
wc 
sh 
whb 
ff.cer.tiles 
ff.cer.tiles 
ff.cer.tiles 
(ff.cer.tiles) 
ff.cer.tiles 
(ff.cer.tiles) 
arch 
arch arch 
GROUND FLOOR 
W 4 
W1 
D1-­pv 
Lobby 
ff.cer.tiles 
pcc vents 
Balcony 
Balcony 
ic 
ic 
ic 
ic 
ic 
ic 
gt 
ic 
gt 
To Bio-­Digester/ 
Treatment Plant 
shelves 
3 
1 
2 
3I 
4 
5 
6 
C 1 F1 H1 
island 
wc 
sh 
Balcony 
D2-­pv 
D2-­pv 
D2-­pv 
D3 
D 2-­pv D2-­pv 
D3 
whb 
D4-­pv 
D6-­pv 
Clk rm 
(ff.cer.tiles) 
wc 
arch arch arch 
W2 
W 2 
W4 W5 
W3 W3 
vents vents vents vents 
3 
W3 W3 
W 4 
W4 
ic 
W5 W5 
arch 
bath tub 
D2-­pv 
W7 
ic 
gt 
Elec Duct 
Lobby 
sh 
(ff.cer.tiles) 
(ff.cer.tiles) 
D4-­pv 
arch 
Foyer 
ff.cer.tiles 
Dining 
ff.cer.tiles 
D3 
Void Above 
Void Above 
Void Above 
arch 
D7-­pv 
wrd 
tv 
ac 
ac 
tv 
tv 
ac 
tv 
ac tv 
ac 
tv 
dryer washer 
ac 
wardrobe 
wardrobe 
wardrobe 
22 x 152 = 3,350 
1 
2 
3 
4 
5 
6 
7 
8 
9 
10 
11 
12 
13 
14 
15 
16 
17 
18 
19 
20 
21 
22 
W DR 
L 
L 
L 
L 
L 
x x 
01 
02 
03 
04 
1,200 600 1,600 1,400 1,200 1,300 600 2,800 600 1,100 750 2,800 750 
500 
850 1,150 4,000 
1,100 200 1,800 1,300 1,200 1,800 1,200 1,450 
600 
1,400 1,200 1,350 
600 
1,275 750 2,275 1,200 2,600 1,200 600 2,000 
1,640 2,760 500 1,775 300 1,750 300 1,775 500 3,000 1,200 1,400 2,100 1,400 
200 4,200 200 6,400 200 4,200 200 4,500 200 
200 1,000 200 5,450 100 2,300 100 2,300 100 5,250 200 1,800 200 3,800 200 
6,300 200 2,400 200 
200 4,200 200 4,600 200 1,000 200 4,800 200 4,500 200 
500 3,600 700 1,000 600 
4,400 4,800 1,800 4,400 4,700 
100 
1,750 100 300 1,000 
4,900 100 1,100 
100 
600 1,200 600 100 
1,600 100 2,000 
2,850 100 1,250 
1,450 100 400 900 
1,250 100 3,150 
20,300 
800 25,200 
600 1,400 1,000 1,200 600 
600 1,300 1,200 1,250 600 
200 1,800 200 3,100 200 2,450 100 3,150 1,800 200 7,800 200 5,800 
1,200 6,600 
Ensuite 
Bedroom 
Master 
Bedroom 
ff.cer.tiles ff.cer.tiles 
arch 
FIRST FLOOR 
pcc vents 
Balcony 
Balcony 
Balcony 
swp 
wp 
swp 
wp 
A B C D E F G H I J K L 
C 1 F 1 H 1 
fridge 
cooker 
Kitchen 
(ff. cer.tiles) 
island 
sink 
dhobi sink 
shelves 
D2-­pv 
vents 
W1 
Pantry 
walk in closet 
whb 
wc 
sh 
whb 
(ff.cer.tiles) 
D2-­pv 
D3 
bath tub 
D 2-­pv 
Lobby 
sh 
D3 
D 6-­pv 
W3 W 3 
W 5 
W 3 W 3 
Elec 
Duct 
wc 
whb 
sh 
wardrobe 
Ensuite 
Bedroom 
Ensuite 
Bedroom 
ff.cer.tiles 
ff.cer.tiles 
D2 -­pv D2-­pv 
D 3 
D4 -­pv 
W 3 W3 W4 W4 W 5 W 5 
swp 
vents 
D 1-­ pv 
Lobby 
ff.cer. tiles 
Foyer 
ff.cer.tiles 
arch 
arch arch arch 
arch 
D4-­pv 
D4-­pv 
Sitting Room 
ff. cer.tiles 
1 
2 
3 I 
4 
5 
6 
A 1 
A 4 
A 3 
Void 
Below 
Void 
Below 
Void 
Below 
wc 
whb 
( ff.cer. tiles) 
D7-­pv 
tv 
ac 
ac 
tv 
tv 
ac 
tv 
ac tv 
ac 
dryer washer 
ac 
tv 
wardrobe 
wardrobe 
wardrobe 
A B C D E F G H I J K L 
1,200 800 1,200 800 1,200 2,100 1,700 900 1,100 2,000 600 1,400 1,200 1,400 1,400 2,100 1,900 4,000 
200 1,000 200 8,450 100 3,700 100 2,400 100 6,750 200 1,800 200 
1,200 4,050 750 600 750 600 750 1,450 1,200 1,350 600 1,275 750 2,275 1,200 2,600 1,200 600 850 1,150 
L 
swp 1 
1,600 100 2,000 
3,150 
Clk rm 
(ff.cer.tiles) 
100 3,100 100 2,450 2,600 100 1,100 100 600 1,200 600 100 
arch 
worktop worktop 
D2-­pv 
W 2 
Dining 
ff.cer.tiles 
D4-­pv 
x x 
L 
pcc vents 
Clk rm 
(ff.cer.tiles) 
sh 
Clk rm 
Sitting Room 
ff.cer.tiles 
A B C D E F G H I J K L 
C 1 F 1 H 1 
Dhobi 
2,000 1,200 800 1,200 2,100 1,700 900 1,100 2,000 600 1,400 1,200 1,400 1,400 2,100 1,900 4,000 
200 1,000 200 6,050 100 2,300 100 3,700 100 2,400 100 6,750 200 1,800 200 
swp swp 1 
Clk rm wc 
Clk rm (ff.cer.tiles) 
worktop worktop 
22 x 152 = 3,350 
1 
2 
3 
4 
5 
6 
7 
8 
9 
10 
11 
12 
13 
14 
15 
16 
17 
18 
19 
20 
21 
22 
F 
W DR 
L 
L 
L 
L 
L 
L 
L 
L 
L 
arch 
1,250 2,100 1,250 200 2,100 3,900 
W2 Pantry 
D2 -­pv 
D4 -­pv 
Dining 
ff.cer.tiles 
x x 
01 
1,200 6,600 
825 100 1,250 
100 
02 
03 
04 
1,200 1,300 1,200 1,800 1,200 1,200 
600 
1,650 1,200 1,350 
600 
1,275 750 2,275 1,200 2,600 1,200 600 2,000 
2,150 300 1,900 550 1,775 300 1,750 300 1,775 500 4,200 200 2,100 300 2,100 200 
4,750 600 100 1,900 100 1,500 100 
Clk rm 
(ff.cer.tiles) 
sh 
Clk rm 
900 1,200 1,400 1,200 1,250 600 2,850 600 1,100 750 2,800 750 500 2,000 6,000 
200 5,350 100 2,300 100 2,300 100 5,250 200 1,800 200 5,800 200 
1,600 1,400 1,600 4,700 
600 
4,600 1,700 2,600 500 1,000 
200 4,200 200 4,600 200 6,000 200 4,500 200 
Dhobi 
200 3,100 200 2,450 100 2,950 200 1,800 200 7,800 200 3,800 4,000 200 
4,400 4,800 1,800 4,400 4,700 
100 
1,750 100 300 1,000 
4,900 100 1,100 
100 
600 1,200 600 100 
1,600 100 2,000 
1,250 100 3,150 
600 1,400 1,000 1,200 
600 1,300 1,200 1,250 600 
825 100 1,000 
1,550 400 900 
25,200 
200 4,150 250 6,400 200 4,200 200 4,500 200 
20,300 
arch 
Lift 
Shaft 
SECOND FLOOR 
pcc vents 
Balcony 
Balcony 
Balcony 
swp 
wp 
2 
3 
4 
5 
6 
wp 
Ensuite 
Bedroom 
Master 
Bedroom 
ff.cer. tiles ff.cer.tiles 
fridge 
cooker 
Kitchen 
(ff.cer.tiles) 
island 
sink 
dhobi sink 
shelves 
D2-­ pv 
walk in closet 
whb 
wc 
sh 
whb 
(ff.cer.tiles) 
D2-­ pv 
D3 
bath tub 
D2 -­pv 
Lobby 
sh 
D3 
D6-­pv 
vents 
arch 
arch arch 
A 2 
A 1 
A 4 
arch 
A 3 
wc 
whb 
sh 
wardrobe 
Ensuite 
Bedroom 
Ensuite 
Bedroom 
ff.cer.tiles 
ff.cer. tiles 
D2 -­pv D2-­ pv 
D 3 
D4 -­pv 
W 3 W3 W4 W4 W 5 W 5 
swp 
D4 -­pv 
wc 
whb 
(ff.cer. tiles) 
D7 -­pv 
Elec 
Duct 
Sitting Room 
ff.cer.tiles 
W 4 W 7 W 4 
W 3 W3 
W5 
W3 W 3 
D1-­pv 
W 1 W 2 
tv 
ac 
ac 
tv 
tv 
ac 
tv 
ac tv 
ac 
dryer washer 
ac 
tv 
wardrobe 
wardrobe 
wardrobe 
22 x 152 = 3,350 
1 
2 
3 
4 
5 
6 
7 
8 
9 
10 
11 
12 
13 
14 
15 
16 
17 
18 
19 
20 
21 
22 
F 
1 
2 
3 
4 
5 
6 
7 
8 
9 
10 
11 
12 
13 
14 
15 
16 
17 
18 
19 
20 
W DR 
L 
L 
01 
02 
03 
04 
05 
1,640 2,760 6,800 1,966 300 1,934 2,860 2,040 
900 1,200 1,400 1,200 1,300 600 2,800 600 1,100 750 2,800 750 300 200 1,800 200 6,000 
200 5,350 100 2,300 100 7,650 200 1,800 200 5,800 200 
4,600 1,700 2,600 500 1,000 600 3,000 1,400 200 4,700 
200 3,100 200 1,750 100 3,650 
200 6,400 200 4,200 200 
825 100 1,000 100 825 100 
600 100 1,900 100 1,500 100 
600 1,400 1,000 1,200 600 200 1,600 100 
200 1,750 100 600 1,250 1,950 1,250 600 200 
1,250 100 3,150 
200 4,200 200 6,400 200 4,200 200 4,500 200 
20,300 
1,550 400 900 
200 4,200 200 4,600 200 1,600 200 4,200 200 4,500 200 
25,200 
4,400 4,800 1,800 4,400 4,700 
arch 
Lift Shaft 
PENT HOUSE LOWER FLOOR 
Balcony 
Balcony 
Balcony 
swp 
wp 
2 
3 
4 
5 
6 
wp 
wc 
whb 
sh 
wardrobe 
Ensuite 
Bedroom 
Ensuite 
Bedroom 
ff. cer.tiles 
ff.cer.tiles 
D2-­pv D 2-­pv 
D3 
D4-­pv 
W3 W3 W 4 W 4 W5 W5 
swp 
C1 F1 H1 
A2 
A 1 
A 4 
A3 
fridge 
cooker 
Kitchen 
(ff.cer.tiles) 
island 
sin 
k 
dhobi sink 
shelves 
D 2-­pv 
Pantry 
vents 
arch 
arch 
arch 
arch 
Ensuite 
Bedroom 
ff.cer.tiles 
walk in closet 
wc 
whb 
D 2-­pv 
bath tub 
Lobby 
sh 
D3 
D6-­ pv 
Study 
arch 
wc 
whb 
(ff.cer.tiles) 
D7-­pv 
W7 
W4 W 5 
W3 
W 5 W 5 W 5 
W 3 
D1-­pv 
W1 
W2 
D4-­pv 
tv 
ac 
ac 
tv 
tv 
ac 
tv 
ac tv 
ac 
dryer washer 
ac 
Elec 
Duct 
wardrobe 
wardrobe 
GENERAL NOTES 
1.This drawing is protected under the copyright act and cannot be 
used or reproduced in part or in whole without authors consent 
2.All dimensions to be checked on site,written rule over scaled 
dimensions, any discrepancies to be reported to the architect before 
work commences 
3.All construction work to comply with the latest standard codes of 
practice,local authority by-­law and fire regulations 
4.P.V. denotes permanent ventilation and must be provided above all 
doors and windows where indicated or shown 
5.All walls less than 200mm thick to be reinforced with hoop iron at 
every alternate course 
6.Water meter to be 300mm above g.l. 
7.D.P.C. denotes one layer of bituminous felt to be provided under all 
walls 150mm above g.l. 
8.All r.c. works to structural engineers details depth of foundation to 
be determined on site and should not be less than 1200mm.provide 
one row of 600x600x50mm precast concrete paving slabs around the 
building unless otherwise shown 
9.Heavy duty polythene sheeting and anti termite treatment to be 
provided under ground floor slab 
10.Plinth level to be minimum 300mm from proposed parking level 
or ground level 
11.All surface beds to be cast on well compacted and well consolidated 
filling 
12.Depth of foundation to be minimum 600mm below reduced ground 
level 
13.All pipes and services to be 450mm minimum below reduced 
ground level 
14.All inspection chambers within building area,drive way and 
parking areas to be heavy duty ,double seal air tight covers.Drains 
under building ,drive way and parking to be pvc pipes encased in 
150mm concrete sorround 
REVISIONS ADDITIONS  ALTERATIONS 
NO DATE DESCRIPTION BY 
CONSULTANTS 
client 
client signature 
project 
PROPOSED APARTMENTS ON 
PLOT No. MN/ I /16633 
SHANZU,MOMBASA 
drawing type 
DESIGN  DRAWN BY 
floor plans 
CHECKED REG NO. SIGN 
JOB NO. DRAWING NO . SCALE DATE 
1: 100 
Dec 2012 20 -­12 -­01 
SHANZU WATERFRONT

GITAU JOHN PORTFOLIO

  • 1.
    Experience Selected works Work Experience GITAU JOHN P.O Box 941 Ruiru Cell:0712456399 g.huck@live.com GITAU JOHN P.O Box 941 Ruiru Cell:0712456399 g.huck@live.com
  • 2.
    Experience Selected works Work Experience Project Experience Loresho villas - Loresho Nairobi City park Apartmaents-Parklands Nairobi Shanzu Waterfront - Shanzu Ravine Park Apartmants - Rhapta rd ,Westlands Nairobi Terrace Close Apartmants - Terrace Close ,Westlands Nairobi Karuri Residence - Karen Hills Housing Project, Karen Nairobi Bros Portico Mall - Juba, South Sudan George Residence - Kisii Town Doris wambui residence - Ruiru Thingira hotel - Ruiru Kitengela Heights - Kitengela Professional Experience STUDIO ARCHITECTTO / ARCAID ARCHITECTS Architectural Technitian Utilize Architecture and Landscape Architecture principles/ Concepts on a daily basis in conduction with the interdisplinary team Research into multiple Green/ Sustainable Materials and technologies along with integration and coordination with overall project design and team. Prepare and create all Technical and Coordination documents for integration of interdisciplinary team and approval for construction process per code and development condotions. Intergration and research of passive Housing techniques,Systems and materials ELEGAN T PROPERTIES Architectural Technitian Utilize Architecture and Landscape Architecture principles/ Concepts on a daily basis in conduction with the interdisplinary team Research into multiple Green/ Sustainable Materials and technologies along with integration and coordination with overall project design and team. Prepare and create all Technical and Coordination documents for integration of interdisciplinary team and approval for construction process per code and development condotions. Intergration and research of passive Housing techniques,Systems and materials Communication and Organization of Future/ Client Developments Educational Background JANUARY 2009 - NOVEMBER 2011 : Student Undertaking Diploma in architecture at Kenya Polytechnic University College JANUARY 2006 - NOVEMBER 2007 : Student at Jamhuri High School - C+ In KENYA CERTIFICATE OF SECONDARY EDUCATION JANUARY 2004 - NOVEMBER 2005 : Student at Karima Boys High School - Transferred JANUARY 1998 - NOVEMBER 2003 : Student at Naivasha Boys Boarding School - A in KENYA CERTIFICATE OF PRIMARY EDUCATION JANUARY 1995 - NOVEMBER 1997 : Student at St. Brigids Primary School. Transferred Computer skills Archicad Autodesk Revit Artlantis 3ds max Re commendation TA L I A N O L A N G (Principal Partner) ODESEY INTERNATION LTD 0724840050 0724274139 NAIROBI ARCH REUBEN KABBA U DREAMS ARCHITECTS P.O Box 52428 - 00200 NAIROBI FERUZ ABUBAKAR VERBATIM CONSORTIUM 0722654499 NAIROBI
  • 3.
    Experience Selected works Work Experience WAMBUI RESIDENCE
  • 4.
    Experience Selected works Email:info @artetoarch.co.ke Work Experience GSPublisherEngine 5.0.100.100 NOTES 1.This drawing is protected under the copyright act and cannot be used or reproduced in part or in whole without authors consent 2.All dimensions to be checked on site,written rule over scaled dimensions, any discrepancies to be reported to the architect before work commences 3.All construction work to comply with the latest standard codes of practice,local authority by-law and fire regulations 4.P.V. denotes permanent ventilation and must be provided above all doors and windows where indicated or shown 5.All walls less than 200mm thick to be reinforced with hoop iron at every alternate course 6.Water meter to be 300mm above g.l. 7.D.P.C. denotes one layer of bituminous felt to be provided under all walls 150mm above g.l. 8.All r.c. works to structural engineers details depth of foundation to be determined on site and should not be less than 1200mm.provide one row of 600x600x50mm precast concrete paving slabs around the building unless otherwise shown 9.Heavy duty polythene sheeting and anti termite treatment to be provided under ground floor slab 10.Plinth level to be minimum 300mm from proposed parking level or ground level 11.All surface beds to be cast on well compacted and well consolidated filling 12.Depth of foundation to be minimum 600mm below reduced ground level 13.All pipes and services to be 450mm minimum below reduced ground level 14.All inspection chambers within building area,drive way and parking areas to be heavy duty ,double seal air tight covers.Drains under building ,drive way and parking to be pvc pipes encased in 150mm concrete sorround PR OPOSED BUILTUP AREA REVISIONS ADDITIONS & ALTERATIONS NO DATE DESCRIPTION BY CONSULTA NTS DOR IS W A MBUI MWANGI PR OJECT Drawing type DESIGN AND DRAWN GHETAO J.H (g.huck@live.com) CHECK ED REG .NO SIGN 01 DRAWING NO SCALE DA TE N.T.S 1 :100 FEB 2014 CLIENT Client Signature Contacts :0712456399 PR OPOSED RESIDE NT IAL HOUSE on p lot no. L .R . RUIR U/ R UIRU WEST BLOCK 4 /91 1 2 3 4 5 6 A/8 3,700 800 200 3,300 200 700 A A 200 2,800 200 1,000 200 3,500 200 200 2,500 200 3,500 200 200 4,800 200 PV B 200 1,200 200 1,900 200 B C C 1 2 3 4 D D E E 200 3,300 200 3,600 200 1,200 100 200 3,500 200 PANTRY ff tiles 200 4,000 200 200 4,800 200 3,300 200 F - 150 F PV G G 1 1 2 2 3 3 4 4 5 6 A/8 11,900 F RG 1,700 1,300 3,700 3,500 700 1,000 A A 200 2,000 200 1,300 200 3,300 200 1,400 200 B B WC/SH C WC/SH ff tiles ff tiles C PV 1 2 3 4 5 6 D D E E 2 3 ff tiles PV F F G G 1 2 3 4 5 18 x 167 = 3,000 7 8 9 10 11 12 13 14 15 16 17 18 5 1,525 1,500 1,775 350 2,500 350 500 1,000 1,000 375 1,800 375 1,350 200 4,600 200 2,800 200 1,700 200 600 200 2,150 200 1,150 200 1,100 3,800 1,500 1,500 1,500 5,000 14,400 400 1,000 200 6,700 2,700 550 350 200 1,400 200 6,300 200 2,500 200 700 200 1,700 1,300 3,700 3,500 700 1,000 11,900 1,000 375 1,800 375 2,950 1,000 1,500 500 1,525 1,500 1,875 200 800 200 2,150 200 2,750 200 2,800 200 4,700 200 1,100 3,800 1,500 1,500 1,500 5,000 14,400 400 1,000 200 1,300 2,200 200 1,300 200 3,500 250 1,000 350 200 1,400 200 1,100 200 2,000 200 1,300 200 3,300 200 1,400 200 200 6,100 200 2,800 200 200 1,700 200 4,300 200 200 4,800 200 A/8 A/9 A/9 PV PV PV PV PV PV PV PV PV PV PV BEDROOM ff tiles BEDROOM ff parquet BALCONY PV PV PV PV PV 200 1,400 200 6,300 200 2,600 5 18 x 167 = 3,000 2 3 5 100 3,700 800 200 3,300 200 700 100 3,700 800 200 3,300 200 700 100 9,000 6,300 1,500 1,200 7,900 5,200 200 3,400 200 2,800 200 4,700 200 3,600 3,800 1,500 1,500 1,500 5,000 16,900 700 1,500 500 1,500 1,500 2,700 800 200 200 4,800 200 3,300 200 700 1,300 3,700 3,500 700 200 3,700 1,500 1,900 3,200 500 1,000 2,800 1,500 600 200 3,300 200 3,600 200 2,800 200 2,500 200 3,500 200 3,600 3,800 1,500 1,500 1,500 4,900 9,450 16,900 200 5,000 3,600 200 200 4,800 200 3,300 200 PV PV PV PV PV PV PV PV BEDROOM ff tiles SUNKEN LOUNGE ff parquet WC/SH ff tiles DINING ROOM ff parquet PV PV PV FOYER ff tiles PV PV PV PV PV PV PV PV PV PV PV PV PV DECK ff tiles KITCHEN ff tiles 1 2 3 A/8 A/9 A/9 ELEVATION 01 SCALE 1:100 STEEL C ASEMENT WINDOWS TO WINDOW & DOOR SCHEDULE RANDOM RUBBLE CLADDING TO ARCHITECTS APPROVAL . COLOURED CONCRETE ROOFING TILES ON TIMBER TRUSS MEMBERS TO S.E DET 225 X 25mm TIMBER FASCIA BOARD FINISHED & PAINTED TO ARCHITECT S APPROVAL 200 mm THICK MEDIUM SIZE MACHINE CUT MASONRY STONES PLASTERED & PAINTED TO ARCHITECTS APPROVAL. YELLOW BUSH HAMMERED STONE TO ARCHITECTS APPROVAL . STEEL CASEMENT WINDOWS TO WINDOW & DOOR SCHEDULE PV PV PV PV PV PV PV ELEVATION 02 SC ALE 1:100 RANDOM RUBBLE CL ADDING TO ARCHITECT S APPROVAL . COLOURED CONCRETE ROOFING TILES ON TIMBER TRUSS MEMBERS TO S.E DET 225 X 25mm TIMBER FASCIA BOARD FINISHED & PAINTED TO ARCHITECTS APPROVAL 200 mm THICK MEDIUM SIZE MACHINE CUT MASONRY STONES PLASTERED & PAINTED TO ARCHITECT S APPROVAL. STEEL CASEMENT WINDOWS TO WINDOW & DOOR SCHEDULE YELLOW BUSH HAMMERED STONE TO ARCHITECT S APPROVAL . PV PV PV PV PV ELEVATION 03 SC ALE 1:100 RANDOM RUBBLE CLADDING T O ARCHITECTS APPROVAL . COLOURED CONCRETE ROOFING TILES ON TIMBER TRUSS MEMBERS TO S.E DET 225 X 25mm TIMBER FASCIA BOARD FINISHED & PAINTED TO ARCHITECTS APPROVAL 200 mm THICK MEDIUM SIZE MACHINE CUT MASONRY STONES PL ASTERED & PAINTED T O ARCHITECTS APPROVAL. YELLOW BUSH HAMMERED STONE T O ARCHITECTS APPROVAL . PV PV PV ELEVATION 04 SCALE 1:100 RANDOM RUBBLE CLADDING TO ARCHITECTS APPROVAL . COLOURED CONCRETE ROOFING TILES ON TIMBER TRUSS MEMBERS TO S.E DET 225 X 25mm TIMBER FASCIA BOARD FINISHED & PAINTED TO ARCHITECTS APPROVAL 200 mm THICK MEDIUM SIZE MACHINE CUT MASONRY ST ONES PL ASTERED & PAINTED TO ARCHITECTS APPROVAL. YELLOW BUSH HAMMERED STONE TO ARCHITECTS APPROVAL . PV PV PV PV PV PV PV 15,400 30,800 TO SEPTIC TANK SOAK PIT IC IC IC IC IC IC IC OFF KIAMBU RUIRU ROAD WAMBUI RESIDENCE
  • 5.
    NOTES 1.This drawingis protected under the copyright act and cannot be used or reproduced in part or in whole without authors consent 2.All dimensions to be checked on site,written rule over scaled dimensions, any discrepancies to be reported to the architect before work commences 3.All construction work to comply with the latest standard codes of practice,local authority by-law and fire regulations 4.P.V. denotes permanent ventilation and must be provided above all doors and windows where indicated or shown 5.All walls less than 200mm thick to be reinforced with hoop iron at every alternate course 6.Water meter to be 300mm above g.l. 7.D.P.C. denotes one layer of bituminous felt to be provided under all walls 150mm above g.l. 8.All r.c. works to structural engineers details depth of foundation to be determined on site and should not be less than 1200mm.provide one row of 600x600x50mm precast concrete paving slabs around the building unless otherwise shown 9.Heavy duty polythene sheeting and anti termite treatment to be provided under ground floor slab 10.Plinth level to be minimum 300mm from proposed parking level or ground level 11.All surface beds to be cast on well compacted and well consolidated filling 12.Depth of foundation to be minimum 600mm below reduced ground level 13.All pipes and services to be 450mm minimum below reduced ground level 14.All inspection ch ambers within building area,drive way and parking areas to be heavy duty ,double seal air tight covers.Drains under building ,drive way and parking to be pvc pipes encased in 150mm concrete sorround PROPOSED BUILTUP AR EA REVISIONS ADDITIONS & ALTERATIONS NO DATE DESCRIPTION BY Experience CONSULTA NTS Selected works PR OJECT Email:info @artetoarch.co.ke Work Experience GSPublisherEngine 5.0.100.100 PR OPOSED RESIDENT IAL HOUSE on plot no. L.R. RUIRU/RUIRU W EST BL OC K 4/91 Drawing type DESIGN AND DRA WN GHETAO J.H (g.huck@live.com) CHECKED REG .NO SIGN 02 DRA WING NO SCALE DATE N.T.S 1 :100 FEB 2014 CLIENT Client Signature Contacts :0712456399 DORIS WA MBUI MWA NGI A A B B C C D D E E F F G G 4,900 1,500 1,500 1,500 3,800 3,600 3,000 2,700 WALL CLADDED TO ARCHITECTS APPROVAL PORTUGUESE CLAY ROOFING TILES ON TIMBER TRUSS MEMBERS TO S.E DETAILS 225 X 25mm TIMBER FASCIA BOARD FINISHED & PAINTED TO ARCHITECTS APPROVAL ROOF LEVEL FIRST FLOOR LEVEL GROUND FLOOR LEVEL PV PV PV PV PV PV PV PV PV PV PV PV PV PURPOSE MADE S TEEL CASEMENT WINDOWS TO WINDOW & DOOR SCHEDULE PURPOSE MADE SLIDDING DOOR TO WINDOW & DOOR SCHEDULE RC STAIRCASE TO S.E DET 18 RISERS@150MM TREADS@300MM 150 mm THICK R.C FLOOR SLAB ON 1000g D.P.M TREATED WITH ANTI-TERMITE SOLUTION ON HARDCORE & BLINDING LAYER TO S.E DETAILS. 600X 200 mm R.C STRIP FOUNDATION FOO TING ON BLINDING LAYER & FOUNDATION DEPTH TO BE DETERMINED ON SITE TO S.E DETAILS. 5 5 4 4 3 3 2 2 1 PV PV 1 700 3,500 3,700 1,300 3,000 2,700 1,900 2,100 ROOF LEVEL FIRST FLOOR LEVEL GROUND FLOOR LEVEL PV PORTUGUESE CLAY ROOFING TILES ON TIMBER TRUSS MEMBERS TO S.E DETAILS 225 X 25mm TIMBER FASCIA BOARD FINISHED & PAINTED TO ARCHITECTS APPROVAL WATER TANK LEVEL PV PV PV TOP ROOF LEVEL POSITION OF COLD WATER TANKS ON APPROVED TIMBER SUPPORTS TO S.E DETAILS & TANKS CAPACIT Y TO M.E SPECIFICATION. PURPOSE MADE STEEL CASEMENT WINDOWS TO WINDOW & DOOR SCHEDULE 150 mm THICK R.C FLOOR SLAB ON 1000g D.P.M TREATED WITH ANTI-TERMITE SOLUTION ON HARDCORE & BLINDING LAYER TO S.E DETAILS. 600X 200 mm R.C STRIP FOUNDATION FOOTING ON BLINDING LAYER & FOUNDATION DEPTH TO BE DETERMINED ON SITE TO S.E DETAILS. RC STAIRCASE TO S.E DET 18 RISERS@150MM TREADS@300MM 600 600 900 600 600 450 2,400 200 100 100 530 EQ EQ EQ EQ EQ 2,700 3,300 750 165 100 50 485 600 50 640 Extra space to receive a fixed varvished mdf panel to 18mm thick post-formed laminated mdf doors to 20mm dia chrome pipe hanging rail Door pull handles to schedule approval. Mirror fixed on the back side of door to architect's approval 2no. drawer on unitson rollers, consisting of 25mm softwood sides and mdf bottom with 18mm thick mdf front Shoe rack to approval 100x12mm skirting approval. 20mm thick shelving ELEVATION 01 LOCATION: Bedroom (guest) Scale 1:25 Light fitting with a pull switch to Eng's details. Mirror fixed to wall with foam backing to approval 1,200 900 1,200 2,400 200 2,400 200 100 100 100 100 2,700 2,200 L[76]05 550 550 550 550 2no. drawer on unitson rollers, consisting of 25mm softwood sides and mdf bottom with 18mm thick mdf front Extra space to receive a fixed varvished mdf panel to approval. 18mm thick post-formed laminated mdf doors to approval. 20mm thick shelving 20mm dia chrome pipe hanging rail Door pull handles to schedule Mirror fixed on the back side of door to architect's approval 2no. drawer on unitson rollers, consisting of 25mm softwood sides and mdf bottom with 18mm thick mdf front 100x12mm skirting Shoe rack to approval LOCATION: Bedroom 2 600 3,300 20mm dia chrome pipe hanging rail Shoe rack to det 18mm thick post-formed laminated mdf doors to approval.
  • 6.
    LOCATION: Bedroom (guest) 2,200 550 550 550 550 600 01 2no. drawer on unitson rollers, consisting of 25mm softwood sides and mdf bottom with 18mm thick mdf front 20mm dia chrome pipe hanging rail Shoe rack to det
  • 7.
    Scale 1:25 18mmthick post-formed laminated mdf doors to approval. LOCATION: Bedroom 2 GSPublisherEngine 0.0.100.100 F1 D 10 800 1000 800 1400 3000 1850 1500 3600 100 F 22500 1.5 800 1800 5600 B NO. OF PERSONS 2 2 200 800 200 D 200 800 200 A A A B F1 200 600 200 200 500 200 300 F2 600x450mm MH cover frame GL GL E 500 3M VARIES (3-6M) 150 100 600 150 A 100 B 100 C Invert level of incoming drain 125mm RC cover slab to engineer's detail 600x450mm cover and frame Sub-soil drain 190mm thick masonry stone wall with 10mm rendering to approval 150mm rc cover slab 150mm thick base slab 600x450mm cover and frame 140mm thick masonry wall 1:3:6 conc. 200mm dia. stone blocks for loose ground or where specified 12mm dia. ms bars at 150mm c/c bothways Outlet manhole Inlet manhole TWL 10mm water proofing rendering to approval Section A-A SEPTIC TANK DETAILS Floor plan Section B-B B SOAK PIT Floor plan 1.Soak pits o be used on soils with good absorption eg sand,red soil etc 2.Depth to be specified NB. E A C B 6000 3000 1400 C 1200 E 3600 F2 800 20 2 1400 1200 1400 1500 1400 4000 2000 2 D 1500 1400 12000 30 DIMENSIONS IN MM 40 800 1600 3000 1400 4000 2400 2 E 1500 1300 15000 50 800 1600 2800 800 1400 CAPACITY IN LITRES 8600 3600 1.5 G 1500 1200 45000 DESLUDGING INTERVAL (YEARS) 1800 3600 1200 200 800 5600 2040 1500 1000 H 67500 300 7600 3800 4000 2260 1500 11600 I 90000 400 8800 4400 13400 4600 2380 1.5 800 1500 1.5 800 inlet Typical section 9000 TYPE WAMBUI RESIDENCE
  • 8.
    Experience Selected works Work Experience GEORGE RESIDENCE
  • 9.
    Experience Selected works Work Experience KITENGELA HEIGHTS
  • 10.
    Experience Selected works Work Experience THINGIRA HOTEL
  • 11.
    Experience Selected works Work Experience SHANZU WATERFRONT
  • 12.
    Experience Selected works Work Experience SHANZU WATERFRONT
  • 13.
    Experience Selected works Work Experience A 2 1,200 800 2,000 1,200 2,100 1,700 900 1,100 2,000 600 1,400 1,200 1,400 1,400 2,100 1,900 4,000 200 1,000 200 1,800 200 6,050 100 2,300 100 3,700 100 2,400 100 6,750 200 1,800 200 W 4 W7 W4 swp Clk rm wc Clk rm (ff.cer.tiles) worktop worktop F arch 300 3,600 300 200 W2 600 100 1,900 100 1,500 100 D 2-­pv Lift Shaft Dhobi W 2 Clk rm (ff. cer.tiles) Dining ff.cer.tiles sh Clk rm A B C D E F G H I J K L 1,200 2,100 1,700 900 1,100 2,000 600 1,400 1,200 1,400 1,400 2,100 1,900 4,000 1,200 500 1,200 1,800 1,200 2,000 600 1,650 1,200 1,350 600 1,275 750 2,275 1,200 2,600 1,200 600 (ff.cer.tiles) worktop worktop F Clk rm 4,900 100 1,100 100 600 1,200 600 100 1,200 6,600 W 3 W3 2,050 100 D4-­pv 200 3,100 200 2,450 100 2,950 200 1,800 200 7,800 200 3,800 200 22 x 152 = 3,350 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 W DR L L L L L L L L L 25,200 600 100 1,900 100 1,500 100 1,100 100 Clk rm Clk rm 3,300 200 5,350 100 2,300 100 2,300 100 5,250 200 1,800 200 1,800 200 23,200 20,100 L L 200 1,000 200 6,050 100 2,300 100 3,700 2,500 100 6,750 200 1,800 200 600 200 1,640 2,760 500 1,775 300 1,750 300 1,775 500 4,400 3,500 1,400 3,900 1,200 1,800 1,200 900 600 3,100 600 1,100 750 2,800 750 500 2,000 2,000 4,400 1,900 2,600 500 1,600 4,400 200 4,700 1,000 3,600 1,400 200 4,700 300 200 4,200 200 1,500 200 2,900 200 1,600 200 2,050 100 2,050 200 4,500 200 500 3,600 1,000 1,000 300 200 300 3,600 300 2,850 100 1,250 200 1,000 200 1,900 200 2,450 100 1,400 100 1,200 200 1,800 200 1,200 200 1,000 200 1,250 2,100 200 600 200 4,200 200 6,400 200 4,200 200 4,500 200 600 200 200 3,800 200 1,250 100 3,150 4,400 4,800 1,200 600 4,400 4,700 1,750 100 300 1,000 1,200 6,600 1,400 1,000 1,200 600 100 600 1,300 1,200 600 600 1,000 450 1,600 100 2,000 1,550 400 900 20,300 x x 01 02 03 04 wc whb sh wrd wardrobe sink dhobi sink fridge cooker Ensuite Bedroom Ensuite Bedroom Lift Shaft Kitchen Dhobi Pantry Sitting Room Ensuite Bedroom Master Bedroom walk in closet whb wc sh whb ff.cer.tiles ff.cer.tiles ff.cer.tiles (ff.cer.tiles) ff.cer.tiles (ff.cer.tiles) arch arch arch GROUND FLOOR W 4 W1 D1-­pv Lobby ff.cer.tiles pcc vents Balcony Balcony ic ic ic ic ic ic gt ic gt To Bio-­Digester/ Treatment Plant shelves 3 1 2 3I 4 5 6 C 1 F1 H1 island wc sh Balcony D2-­pv D2-­pv D2-­pv D3 D 2-­pv D2-­pv D3 whb D4-­pv D6-­pv Clk rm (ff.cer.tiles) wc arch arch arch W2 W 2 W4 W5 W3 W3 vents vents vents vents 3 W3 W3 W 4 W4 ic W5 W5 arch bath tub D2-­pv W7 ic gt Elec Duct Lobby sh (ff.cer.tiles) (ff.cer.tiles) D4-­pv arch Foyer ff.cer.tiles Dining ff.cer.tiles D3 Void Above Void Above Void Above arch D7-­pv wrd tv ac ac tv tv ac tv ac tv ac tv dryer washer ac wardrobe wardrobe wardrobe 22 x 152 = 3,350 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 W DR L L L L L x x 01 02 03 04 1,200 600 1,600 1,400 1,200 1,300 600 2,800 600 1,100 750 2,800 750 500 850 1,150 4,000 1,100 200 1,800 1,300 1,200 1,800 1,200 1,450 600 1,400 1,200 1,350 600 1,275 750 2,275 1,200 2,600 1,200 600 2,000 1,640 2,760 500 1,775 300 1,750 300 1,775 500 3,000 1,200 1,400 2,100 1,400 200 4,200 200 6,400 200 4,200 200 4,500 200 200 1,000 200 5,450 100 2,300 100 2,300 100 5,250 200 1,800 200 3,800 200 6,300 200 2,400 200 200 4,200 200 4,600 200 1,000 200 4,800 200 4,500 200 500 3,600 700 1,000 600 4,400 4,800 1,800 4,400 4,700 100 1,750 100 300 1,000 4,900 100 1,100 100 600 1,200 600 100 1,600 100 2,000 2,850 100 1,250 1,450 100 400 900 1,250 100 3,150 20,300 800 25,200 600 1,400 1,000 1,200 600 600 1,300 1,200 1,250 600 200 1,800 200 3,100 200 2,450 100 3,150 1,800 200 7,800 200 5,800 1,200 6,600 Ensuite Bedroom Master Bedroom ff.cer.tiles ff.cer.tiles arch FIRST FLOOR pcc vents Balcony Balcony Balcony swp wp swp wp A B C D E F G H I J K L C 1 F 1 H 1 fridge cooker Kitchen (ff. cer.tiles) island sink dhobi sink shelves D2-­pv vents W1 Pantry walk in closet whb wc sh whb (ff.cer.tiles) D2-­pv D3 bath tub D 2-­pv Lobby sh D3 D 6-­pv W3 W 3 W 5 W 3 W 3 Elec Duct wc whb sh wardrobe Ensuite Bedroom Ensuite Bedroom ff.cer.tiles ff.cer.tiles D2 -­pv D2-­pv D 3 D4 -­pv W 3 W3 W4 W4 W 5 W 5 swp vents D 1-­ pv Lobby ff.cer. tiles Foyer ff.cer.tiles arch arch arch arch arch D4-­pv D4-­pv Sitting Room ff. cer.tiles 1 2 3 I 4 5 6 A 1 A 4 A 3 Void Below Void Below Void Below wc whb ( ff.cer. tiles) D7-­pv tv ac ac tv tv ac tv ac tv ac dryer washer ac tv wardrobe wardrobe wardrobe A B C D E F G H I J K L 1,200 800 1,200 800 1,200 2,100 1,700 900 1,100 2,000 600 1,400 1,200 1,400 1,400 2,100 1,900 4,000 200 1,000 200 8,450 100 3,700 100 2,400 100 6,750 200 1,800 200 1,200 4,050 750 600 750 600 750 1,450 1,200 1,350 600 1,275 750 2,275 1,200 2,600 1,200 600 850 1,150 L swp 1 1,600 100 2,000 3,150 Clk rm (ff.cer.tiles) 100 3,100 100 2,450 2,600 100 1,100 100 600 1,200 600 100 arch worktop worktop D2-­pv W 2 Dining ff.cer.tiles D4-­pv x x L pcc vents Clk rm (ff.cer.tiles) sh Clk rm Sitting Room ff.cer.tiles A B C D E F G H I J K L C 1 F 1 H 1 Dhobi 2,000 1,200 800 1,200 2,100 1,700 900 1,100 2,000 600 1,400 1,200 1,400 1,400 2,100 1,900 4,000 200 1,000 200 6,050 100 2,300 100 3,700 100 2,400 100 6,750 200 1,800 200 swp swp 1 Clk rm wc Clk rm (ff.cer.tiles) worktop worktop 22 x 152 = 3,350 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 F W DR L L L L L L L L L arch 1,250 2,100 1,250 200 2,100 3,900 W2 Pantry D2 -­pv D4 -­pv Dining ff.cer.tiles x x 01 1,200 6,600 825 100 1,250 100 02 03 04 1,200 1,300 1,200 1,800 1,200 1,200 600 1,650 1,200 1,350 600 1,275 750 2,275 1,200 2,600 1,200 600 2,000 2,150 300 1,900 550 1,775 300 1,750 300 1,775 500 4,200 200 2,100 300 2,100 200 4,750 600 100 1,900 100 1,500 100 Clk rm (ff.cer.tiles) sh Clk rm 900 1,200 1,400 1,200 1,250 600 2,850 600 1,100 750 2,800 750 500 2,000 6,000 200 5,350 100 2,300 100 2,300 100 5,250 200 1,800 200 5,800 200 1,600 1,400 1,600 4,700 600 4,600 1,700 2,600 500 1,000 200 4,200 200 4,600 200 6,000 200 4,500 200 Dhobi 200 3,100 200 2,450 100 2,950 200 1,800 200 7,800 200 3,800 4,000 200 4,400 4,800 1,800 4,400 4,700 100 1,750 100 300 1,000 4,900 100 1,100 100 600 1,200 600 100 1,600 100 2,000 1,250 100 3,150 600 1,400 1,000 1,200 600 1,300 1,200 1,250 600 825 100 1,000 1,550 400 900 25,200 200 4,150 250 6,400 200 4,200 200 4,500 200 20,300 arch Lift Shaft SECOND FLOOR pcc vents Balcony Balcony Balcony swp wp 2 3 4 5 6 wp Ensuite Bedroom Master Bedroom ff.cer. tiles ff.cer.tiles fridge cooker Kitchen (ff.cer.tiles) island sink dhobi sink shelves D2-­ pv walk in closet whb wc sh whb (ff.cer.tiles) D2-­ pv D3 bath tub D2 -­pv Lobby sh D3 D6-­pv vents arch arch arch A 2 A 1 A 4 arch A 3 wc whb sh wardrobe Ensuite Bedroom Ensuite Bedroom ff.cer.tiles ff.cer. tiles D2 -­pv D2-­ pv D 3 D4 -­pv W 3 W3 W4 W4 W 5 W 5 swp D4 -­pv wc whb (ff.cer. tiles) D7 -­pv Elec Duct Sitting Room ff.cer.tiles W 4 W 7 W 4 W 3 W3 W5 W3 W 3 D1-­pv W 1 W 2 tv ac ac tv tv ac tv ac tv ac dryer washer ac tv wardrobe wardrobe wardrobe 22 x 152 = 3,350 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 F 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 W DR L L 01 02 03 04 05 1,640 2,760 6,800 1,966 300 1,934 2,860 2,040 900 1,200 1,400 1,200 1,300 600 2,800 600 1,100 750 2,800 750 300 200 1,800 200 6,000 200 5,350 100 2,300 100 7,650 200 1,800 200 5,800 200 4,600 1,700 2,600 500 1,000 600 3,000 1,400 200 4,700 200 3,100 200 1,750 100 3,650 200 6,400 200 4,200 200 825 100 1,000 100 825 100 600 100 1,900 100 1,500 100 600 1,400 1,000 1,200 600 200 1,600 100 200 1,750 100 600 1,250 1,950 1,250 600 200 1,250 100 3,150 200 4,200 200 6,400 200 4,200 200 4,500 200 20,300 1,550 400 900 200 4,200 200 4,600 200 1,600 200 4,200 200 4,500 200 25,200 4,400 4,800 1,800 4,400 4,700 arch Lift Shaft PENT HOUSE LOWER FLOOR Balcony Balcony Balcony swp wp 2 3 4 5 6 wp wc whb sh wardrobe Ensuite Bedroom Ensuite Bedroom ff. cer.tiles ff.cer.tiles D2-­pv D 2-­pv D3 D4-­pv W3 W3 W 4 W 4 W5 W5 swp C1 F1 H1 A2 A 1 A 4 A3 fridge cooker Kitchen (ff.cer.tiles) island sin k dhobi sink shelves D 2-­pv Pantry vents arch arch arch arch Ensuite Bedroom ff.cer.tiles walk in closet wc whb D 2-­pv bath tub Lobby sh D3 D6-­ pv Study arch wc whb (ff.cer.tiles) D7-­pv W7 W4 W 5 W3 W 5 W 5 W 5 W 3 D1-­pv W1 W2 D4-­pv tv ac ac tv tv ac tv ac tv ac dryer washer ac Elec Duct wardrobe wardrobe GENERAL NOTES 1.This drawing is protected under the copyright act and cannot be used or reproduced in part or in whole without authors consent 2.All dimensions to be checked on site,written rule over scaled dimensions, any discrepancies to be reported to the architect before work commences 3.All construction work to comply with the latest standard codes of practice,local authority by-­law and fire regulations 4.P.V. denotes permanent ventilation and must be provided above all doors and windows where indicated or shown 5.All walls less than 200mm thick to be reinforced with hoop iron at every alternate course 6.Water meter to be 300mm above g.l. 7.D.P.C. denotes one layer of bituminous felt to be provided under all walls 150mm above g.l. 8.All r.c. works to structural engineers details depth of foundation to be determined on site and should not be less than 1200mm.provide one row of 600x600x50mm precast concrete paving slabs around the building unless otherwise shown 9.Heavy duty polythene sheeting and anti termite treatment to be provided under ground floor slab 10.Plinth level to be minimum 300mm from proposed parking level or ground level 11.All surface beds to be cast on well compacted and well consolidated filling 12.Depth of foundation to be minimum 600mm below reduced ground level 13.All pipes and services to be 450mm minimum below reduced ground level 14.All inspection chambers within building area,drive way and parking areas to be heavy duty ,double seal air tight covers.Drains under building ,drive way and parking to be pvc pipes encased in 150mm concrete sorround REVISIONS ADDITIONS ALTERATIONS NO DATE DESCRIPTION BY CONSULTANTS client client signature project PROPOSED APARTMENTS ON PLOT No. MN/ I /16633 SHANZU,MOMBASA drawing type DESIGN DRAWN BY floor plans CHECKED REG NO. SIGN JOB NO. DRAWING NO . SCALE DATE 1: 100 Dec 2012 20 -­12 -­01 SHANZU WATERFRONT