CHAPTER 4
Business-Level Strategy




                          4–1
“Competitive   strategy      is   about
being     different.    It        means
deliberately choosing to perform
activities differently or to perform
different activities than rivals to
deliver a unique mix of value.”
        Michael E. Porter
K NOWLEDGE O BJECTIVES

 Studying this chapter should provide you with the strategic
 management knowledge needed to:
 1. Define business-level strategy.
 2. Discuss the relationship between customers and
    business-level strategies in terms of who, what, and
    how.
 3. Explain the differences among business-level
    strategies.
 4. Use the five forces of competition model to explain how
    above-average returns can be earned through each
    business-level strategy.
 5. Describe the risks of using each of the business-level
    strategies.
                                                               4–3
Business-Level Strategy (Defined)
• An integrated and coordinated set of
  commitments and actions the firm uses to gain a
  competitive advantage by exploiting core
  competencies in specific product markets.




                                                4–4
Strategy and Competitive Advantage

 • Competitive advantage exists when a firm’s
   strategy gives it an edge in
    Attracting customers and
    Defending against competitive forces

      Key to Gaining a Competitive Advantage
 • Convince customers firm’s product / service
   offers superior value
    A good product at a low price
    A superior product worth paying more for
    A best-value product
What Is Competitive Strategy?

 • Deals exclusively with a company’s business
   plans to compete successfully

    Specific efforts to please customers

    Offensive and defensive moves
     to counter maneuvers of rivals

    Responses to prevailing market conditions

    Initiatives to strengthen its market position

 • Narrower in scope than business strategy
Core Competencies and Strategy
                  Resources and superior capabilities that are
    Core
                  sources of competitive advantage over a
 Competencies
                  firm’s rivals


                  An integrated and coordinated set of
   Strategy       actions taken to exploit core competencies
                  and gain competitive advantage


                  Providing value to customers and gaining
 Business-level
                  competitive advantage by exploiting core
   Strategy
                  competencies in individual product markets



                                                                 4–7
Customers: Their Relationship to Business-
Level Strategies
                            Who will be
                             served?


        Key Issues
             in               What needs will
       Business-level          be satisfied?
         Strategy

                           How will those
                         needs be satisfied?


                                                4–8
Effectively Managing Relationships with
Customers
• Firms must manage all aspects of their
  relationship with customers.
   Reach: firm’s success and connection to customers
   Richness: depth and detail of two-way flow of
    information between the firm and the customer
   Affiliation: facilitation of useful interactions with
    customers




                                                            4–9
Who: Determining the Customers to Serve
• Market segmentation
   A process used to cluster people with similar needs
    into individual and identifiable groups.




               All Customers
      Consumer                        Industrial
       Markets                         Markets



                                                          4–10
Market Segmentation
• Consumer Markets          • Industrial Markets
   Demographic factors        End-use segments
   Socioeconomic factors      Product segments
   Geographic factors         Geographic segments
   Psychological factors      Common buying factor
                                segments
   Consumption patterns
                               Customer size
   Perceptual factors
                                segments



                                                   4–11
TABLE   4.1       Basis for Customer Segmentation

  Consumer Markets
  • Demographic factors (age, income, sex, etc.)
  • Socioeconomic factors (social class, stage in the family life cycle)
  • Geographic factors (cultural, regional, and national differences)
  • Psychological factors (lifestyle, personality traits)
  • Consumption patterns (heavy, moderate, and light users)
  • Perceptual factors (benefit segmentation, perceptual mapping)

  Industrial Markets
  •     End-use segments (identified by SIC code)
  •     Product segments (based on technological differences or
        production economics)
  •     Geographic segments (defined by boundaries between countries or
        by regional differences within them)
  •     Common buying factor segments (cut across product market and
        geographic segments)
  •     Customer size segments
                                                                           4–12
What: Determining Which Customer
      Needs to Satisfy
• Customer needs are related to a product’s
  benefits and features.
• Customer needs are neither right nor wrong,
  good nor bad.
• Customer needs represent desires in terms of
  features and performance capabilities.




                                                 4–13
How: Determining Core Competencies
     Necessary to Satisfy Customer Needs
• Firms use core competencies to implement value
  creating strategies that satisfy customers’ needs.
• Only firms with capacity to continuously improve,
  innovate and upgrade their competencies can
  expect to meet and/or exceed customer
  expectations across time.




                                                  4–14
The Purpose of a Business-Level Strategy
• Business-Level Strategies
    Are intended to create differences between the firm’s
     position relative to those of its rivals.

• To position itself, the firm must decide whether it
  intends to:
    Perform activities differently or
    Perform different activities as compared to its rivals.




                                                               4–15
Types of Potential Competitive Advantage
• Achieving lower overall costs than rivals
    Performing activities differently (reducing process
     costs)

• Possessing the capability to differentiate the
  firm’s product or service and command a
  premium price
    Performing different (more highly valued) activities.




                                                             4–16
FIGURE 4.1   The External Environment




                                        4–17
Competitive Scope
• Broad Scope
   The firm competes in many
    customer segments.

• Narrow Scope
   The firm selects a segment or
    group of segments in the
    industry and tailors its strategy
    to serving them at the
    exclusion of others.



                                        4–18
Types of Business-Level Strategies

                     Competitive Advantage

                      Cost                 Uniqueness


        Broad    Cost Leadership         Differentiation
        Target
                             Integrated Cost
Competitive
                               Leadership/
  Scope                       Differentiation

        Narrow    Focused Cost              Focused
        Target     Leadership            Differentiation



                                                           4–19
FIGURE 4.2   Five Business-Level Strategies




                                              4–20
Low-Cost Provider Strategies
                Keys to Success
• Make achievement of meaningful lower costs
  than rivals the theme of firm’s strategy

• Include features and services in product
  offering that buyers consider essential

• Find approaches to achieve a cost advantage
  in ways difficult for rivals to copy or match

  Low-cost leadership means low overall costs, not
    just low manufacturing or production costs!
Translating a Low-Cost Advantage into Higher
Profits: Two Options

 Option 1: Use lower-cost edge to
 under-price competitors and attract
 price-sensitive buyers in enough
 numbers to increase total profits

 Option 2: Maintain present price, be
 content with present market share,
 and use lower-cost edge to earn a
 higher profit margin on each unit sold,
 thereby increasing total profits
Approaches to Securing
a Cost Advantage

           Approach 1
    Do a better job than rivals of
  performing value chain activities
   efficiently and cost effectively


           Approach 2
                                            Control
   Revamp value chain to bypass             costs!
cost-producing activities that add little
                                            By-pass
 value from the buyer’s perspective          costs!
Approach 1: Controlling the Cost Drivers
•   Capture scale economies; avoid scale diseconomies
•   Capture learning and experience curve effects
•   Control percentage of capacity utilization
•   Pursue efforts to boost sales and spread costs such as
    R&D and advertising over more units
•   Improve supply chain efficiency
•   Substitute use of low-cost for high-cost raw materials
•   Use online systems and sophisticated software to
    achieve operating efficiencies
•   Adopt labor-saving operating methods
•   Use bargaining power to gain concessions from suppliers
•   Compare vertical integration vs. outsourcing
Approach 2: Revamping the Value Chain
• Use direct-to-end-user sales/marketing methods
• Make greater use of online technology
  applications
• Streamline operations by eliminating low-value-
  added or unnecessary work steps
• Relocate facilities closer to suppliers or
  customers
• Offer basic, no-frills product/service
• Offer a limited product/service as opposed to a
  full product/service line
Wal-Mart’s Approach to
Managing Its Value Chain
Institute extensive information sharing with vendors via online
 Institute extensive information sharing with vendors via online
systems
 systems
Pursue global procurement of some items and centralize most
 Pursue global procurement of some items and centralize most
purchasing activities
 purchasing activities

Invest in state-of-the-art automation at its distribution centers
 Invest in state-of-the-art automation at its distribution centers

Strive to optimize the product mix and achieve greater sales
 Strive to optimize the product mix and achieve greater sales
turnover
 turnover
Install security systems and store operating procedures that lower
 Install security systems and store operating procedures that lower
shrinkage rates
 shrinkage rates
Negotiate preferred real estate rental and leasing rates with real
 Negotiate preferred real estate rental and leasing rates with real
estate developers and owners of its store sites
 estate developers and owners of its store sites
Manage and compensate its workforce in a manner to yield lower
 Manage and compensate its workforce in a manner to yield lower
labor costs
 labor costs
Keys to Success in Achieving
Low-Cost Leadership
 • Scrutinize each cost-creating activity, identifying cost drivers
 • Use knowledge about cost drivers to manage
   costs of each activity down year after year
 • Find ways to restructure value chain to eliminate
   nonessential work steps and low-value activities
 • Work diligently to create cost-conscious corporate cultures
      Feature broad employee participation in continuous cost-
       improvement efforts and limited perks for executives
      Strive to operate with exceptionally small corporate staffs
 • Aggressively pursue investments in resources and capabilities that
   promise to drive costs out of the business
Characteristics of a Low-Cost Provider
• Cost conscious corporate culture
• Employee participation in cost-control efforts
• Ongoing efforts to benchmark costs
• Intensive scrutiny of budget requests
• Programs promoting continuous cost
  improvement

 Successful low-cost producers champion
   frugality but wisely and aggressively
   invest in cost-saving improvements !
When Does a Low-Cost
Strategy Work Best?
• Price competition is vigorous
• Product is standardized or readily available
  from many suppliers
• There are few ways to achieve
  differentiation that have value to buyers
• Most buyers use product in same ways
• Buyers incur low switching costs
• Buyers are large and have
  significant bargaining power
• Industry newcomers use introductory low prices
  to attract buyers and build customer base
Pitfalls of Low-Cost Strategies

 • Being overly aggressive in cutting price
 • Low cost methods are easily imitated by rivals
 • Becoming too fixated on reducing costs
   and ignoring
     Buyer interest in additional features
     Declining buyer sensitivity to price
     Changes in how the product is used

 • Technological breakthroughs open up cost
   reductions for rivals
Cost Leadership Strategy
• An integrated set of actions taken to produce
  goods or services with features that are
  acceptable to customers at the lowest cost,
  relative to that of competitors with features that
  are acceptable to customers.
    Relatively standardized products
    Features acceptable to many customers
    Lowest competitive price




                                                       4–31
Cost Leadership Strategy
• Cost saving actions required by this strategy:
   Building efficient scale facilities
   Tightly controlling production costs and overhead
   Minimizing costs of sales, R&D and service
   Building efficient manufacturing facilities
   Monitoring costs of activities provided by outsiders
   Simplifying production processes




                                                           4–32
How to Obtain a Cost Advantage


    Determine                        Reconfigure
    and control                      Value Chain
    Cost Drivers                     if needed


  Alter production process    New raw material
  Change in automation        Forward integration
  New distribution channel    Backward integration
  New advertising media       Change location relative
  Direct sales in place of     to suppliers or buyers
   indirect sales

                                                           4–33
FIGURE 4.3   Examples of Value-Creating Activities Associated
             with the Cost Leadership Strategy




                                                                4–34
Value-Creating Activities for Cost Leadership
• Cost-effective MIS               • Monitor suppliers’
                                     performances
• Few management layers
                                   • Link suppliers’ products to
• Simplified planning
                                     production processes
• Consistent policies
                                   • Economies of scale
• Effecting training
                                   • Efficient-scale facilities
• Easy-to-use manufacturing
                                   • Effective delivery schedules
  technologies
                                   • Low-cost transportation
• Investments in technologies
                                   • Highly trained sales force
• Finding low cost raw materials
                                   • Proper pricing



                                                                    4–35
Cost Leadership Strategy: Competitors

     Rivalry with                     • Due to cost leader’s
 Existing Competitors                   advantageous position:
             Threat of                   Rivals hesitate to compete
               new
             entrants                     on basis of price.
  Rivalry
   among                 Bargaining
                          power of
                                         Lack of price competition
 competing
    firms                 suppliers       leads to greater profits.

    Threat of      Bargaining
    substitute      power of
    products         buyers




                                                                      4–36
Cost Leadership Strategy: Buyers

   Bargaining Power                    • Can mitigate buyers’
      of Buyers                          power by:
                                          Driving prices far below
              Threat of
                new                        competitors, causing
              entrants
   Rivalry
                                           them to exit, thus
                          Bargaining
    among
                           power of        shifting power with
  competing
     firms                 suppliers       buyers back to the firm.
     Threat of      Bargaining
     substitute      power of
     products         buyers




                                                                      4–37
Cost Leadership Strategy: Suppliers

  Bargaining Power                    • Can mitigate suppliers’
     of Suppliers                       power by:
             Threat of                   Being able to absorb
               new
             entrants
                                          cost increases due to
  Rivalry
                         Bargaining
                                          low cost position.
   among
 competing                power of
    firms                 suppliers      Being able to make very
                                          large purchases,
    Threat of
    substitute
                   Bargaining
                    power of
                                          reducing chance of
    products         buyers               supplier using power.



                                                                    4–38
Cost Leadership Strategy: New Entrants

    The Threat of                     • Can frighten off new
  Potential Entrants                    entrants due to:
             Threat of                   Their need to enter on a
               new
             entrants
                                          large scale in order to be
   Rivalry
                         Bargaining
                                          cost competitive.
   among
 competing                power of
    firms                 suppliers      The time it takes to
                                          move down the learning
    Threat of
    substitute
                   Bargaining
                    power of
                                          curve.
    products         buyers




                                                                       4–39
Cost Leadership Strategy: Substitutes

        Product                       • Cost leader is well
       Substitutes                      positioned to:
             Threat of
                                         Make investments to be
               new
             entrants
                                          first to create substitutes.
   Rivalry
   among                 Bargaining      Buy patents developed by
 competing                power of
    firms                 suppliers       potential substitutes.

    Threat of      Bargaining
                                         Lower prices in order to
    substitute      power of              maintain value position.
    products         buyers




                                                                         4–40
Cost Leadership Strategy (cont’d)
• Competitive Risks
   Processes used to produce and distribute good or
    service may become obsolete due to competitors’
    innovations.
   Focus on cost reductions may occur at expense of
    customers’ perceptions of differentiation
   Competitors, using their own core competencies, may
    successfully imitate the cost leader’s strategy.




                                                       4–41
Differentiation Strategies

                      Objective
• Incorporate differentiating features that cause
  buyers to prefer firm’s product or service over
  brands of rivals
                 Keys to Success
• Find ways to differentiate that create value for
  buyers and are not easily matched or cheaply
  copied by rivals
• Not spending more to achieve differentiation
  than the price premium that can be charged
Benefits of Successful Differentiation

 A product / service with unique,
 appealing attributes allows a firm to

      Command a premium price and/or
                                     Which
      Increase unit sales and/or    hat is
                                    unique?

      Build brand loyalty

           = Competitive Advantage
Types of Differentiation Themes
•   Unique taste – Dr. Pepper
•   Multiple features – Microsoft Windows and Office
•   Wide selection and one-stop shopping – Home Depot,
    Amazon.com
•   Superior service -- FedEx, Ritz-Carlton
•   Spare parts availability – Caterpillar
•   Engineering design and performance – Mercedes,
    BMW
•   Prestige – Rolex
•   Product reliability – Johnson & Johnson
•   Quality manufacture – Karastan, Michelin, Toyota
•   Technological leadership – 3M Corporation
•   Top-of-line image – Ralph Lauren, Starbucks, Chanel
Sustaining Differentiation:
Keys to Competitive Advantage
 • Most appealing approaches to differentiation
    Those hardest for rivals to match or imitate
    Those buyers will find most appealing
 • Best choices to gain a longer-lasting, more
   profitable competitive edge
    New product innovation
    Technical superiority
    Product quality and reliability
    Comprehensive customer service
    Unique competitive capabilities
Where to Find Differentiation
Opportunities in the Value Chain
 • Purchasing and procurement activities
 • Product R&D and product design activities
 • Production process / technology-related activities
 • Manufacturing / production activities
 • Distribution-related activities
 • Marketing, sales, and customer service activities

                  Internally    Activities, Costs,
    Activities,
                  Performed        & Margins of      Buyer/User
     Costs, &
                  Activities,   Forward Channel        Value
    Margins of
                   Costs, &          Allies &         Chains
    Suppliers
                   Margins      Strategic Partners
How to Achieve a
Differentiation-Based Advantage
                    Approach 1
      Incorporate product features/attributes that
    lower buyer’s overall costs of using product
                   Approach 2
    Incorporate features/attributes that raise the
    performance a buyer gets out of the product
                     Approach 3
  Incorporate features/attributes that enhance buyer
    satisfaction in non-economic or intangible ways
                 Approach 4
   Compete on the basis of superior capabilities
Importance of Perceived Value
• Buyers seldom pay for value that is not
  perceived

• Price premium of a differentiation strategy
  reflects

   Value actually delivered to the buyer

     and

   Value perceived by the buyer

• Actual and perceived value can differ when
  buyers are unable to assess their experience
Signaling Value as Well
as Delivering Value
• Incomplete knowledge of buyers causes them to
  judge value based on such signals as
    Price
    Attractive packaging
    Extensive ad campaigns
    Ad content and image
    Seller facilities or professionalism and
     personality of employees
    Having a list of prestigious customers
• Signals of value may be as important as
  actual value when
    Nature of differentiation is hard to quantify
    Buyers are making first-time purchases
    Repurchase is infrequent
    Buyers are unsophisticated
For Discussion: Your Opinion
A low-cost provider strategy can defeat a
differentiation strategy when buyers are satisfied
with a basic product and don’t think “extra”
attributes are worth a higher price. True or false?
Explain.
Differentiation Strategy
• An integrated set of actions taken to produce
  goods or services (at an acceptable cost) that
  customers perceive as being different in ways
  that are important to them.
    Focus is on nonstandardized products
    Appropriate when customers value differentiated
     features more than they value low cost.




                                                       4–51
How to Obtain a Differentiation Advantage

   Control                                   Reconfigure
   Cost Drivers                              Value Chain to
   if needed                                 maximize



         Lower buyers’ costs
         Raise performance of product or service
         Create sustainability through:
             Customer perceptions of uniqueness
             Customer reluctance to switch to non-
              unique product or service

                                                              4–52
Figure 4.4   Examples of Value-Creating Activities Associated
             with the Differentiation Strategy




                                                                4–53
Value-Creating Activities and Differentiation
• Highly developed MIS            • High quality replacement parts
• Emphasis on quality             • Superior handling of incoming
                                    raw materials
• Worker compensation for
  creativity/productivity         • Attractive products
• Use of subjective performance   • Rapid response to customer
  measures                          specifications
• Basic research capability       • Order-processing procedures
• Technology                      • Customer credit
• High quality raw materials      • Personal relationships
• Delivery of products




                                                                 4–54
Differentiation Strategy: Competitors

       Rivalry with                    • Defends against
       Competitors                       competitors because brand
                                         loyalty to differentiated
              Threat of                  product offsets price
                new
              entrants                   competition.
   Rivalry
    among                 Bargaining
  competing                power of
     firms                 suppliers


     Threat of      Bargaining
     substitute      power of
     products         buyers




                                                                     4–55
Differentiation Strategy: Buyers

    Bargaining Power                   • Can mitigate buyers’ power
       of Buyers                         because well differentiated
                                         products reduce customer
              Threat of                  sensitivity to price increases.
                new
              entrants
   Rivalry
    among                 Bargaining
  competing                power of
     firms                 suppliers


     Threat of      Bargaining
     substitute      power of
     products         buyers




                                                                       4–56
Differentiation Strategy: Suppliers

   Bargaining Power                    • Can mitigate suppliers’
      of Suppliers                       power by:
                                           Absorbing price increases
              Threat of                     due to higher margins.
                new
              entrants                     Passing along higher
   Rivalry
    among                 Bargaining        supplier prices because
                           power of
  competing
                           suppliers        buyers are loyal to
     firms
                                            differentiated brand.
     Threat of      Bargaining
     substitute      power of
     products         buyers




                                                                        4–57
Differentiation Strategy: New Entrants

     The Threat of                     • Can defend against new
   Potential Entrants                    entrants because:
                                          New products must surpass
              Threat of                    proven products.
                new
              entrants                    New products must be at least
    Rivalry
    among                 Bargaining       equal to performance of proven
                           power of
  competing
                           suppliers       products, but offered at lower
     firms
                                           prices.
     Threat of      Bargaining
     substitute      power of
     products         buyers




                                                                       4–58
Differentiation Strategy: Substitutes

        Product                        • Well positioned relative to
       Substitutes                       substitutes because:
                                          Brand loyalty to a
              Threat of                    differentiated product tends
                new                        to reduce customers’ testing
              entrants
    Rivalry
                                           of new products or switching
                          Bargaining
    among
                           power of
                                           brands.
  competing
     firms                 suppliers


     Threat of      Bargaining
     substitute      power of
     products         buyers




                                                                          4–59
Competitive Risks of Differentiation
• The price differential between the differentiator’s product
  and the cost leader’s product becomes too large.
• Differentiation ceases to provide value for which
  customers are willing to pay.
• Experience narrows customers’ perceptions of the value
  of differentiated features.
• Counterfeit goods replicate differentiated features of the
  firm’s products.




                                                            4–60
When Does a Differentiation
Strategy Work Best?
 • There are many ways to differentiate a product
   that have value and please customers

 • Buyer needs and uses are diverse

 • Few rivals are following a similar
   differentiation approach

 • Technological change and
   product innovation are fast-paced
Pitfalls of Differentiation Strategies

 • Appealing product features are easily copied by
   rivals
 • Buyers see little value in unique attributes of product
 • Overspending on efforts to differentiate the product
   offering, thus eroding profitability
 • Over-differentiating such that product
   features exceed buyers’ needs
 • Charging a price premium
   buyers perceive is too high
 • Not striving to open up meaningful gaps in quality,
   service, or performance features vis-à-vis rivals’
   products
Focus / Niche Strategies

 • Involve concentrated attention on a narrow piece
   of the total market
                     Objective
         Serve niche buyers better than rivals

                  Keys to Success
 • Choose a market niche where buyers
   have distinctive preferences, special
   requirements, or unique needs
 • Develop unique capabilities to serve
   needs of target buyer segment
Approaches to Defining a Market Niche


• Geographic uniqueness


• Specialized requirements in
  using product/service


• Special product attributes
  appealing only to niche buyers
Examples of Focus Strategies

 • Animal Planet and History Channel
    Cable TV
 • Google
    Internet search engines
 • Porsche
    Sports cars
 • Cannondale
    Top-of-the line mountain bikes
 • Enterprise Rent-a-Car
    Provides rental cars to repair garage customers
 • Bandag
    Specialist in truck tire recapping
Focus / Niche Strategies
and Competitive Advantage

                   Approach 1

• Achieve lower costs than rivals in
  serving a well-defined buyer segment –
             Focused low-cost strategy

                   Approach 2               Which
                                            hat is
                                           unique?




• Offer a product appealing to unique
  preferences of a well-defined buyer segment –
          Focused differentiation strategy
What Makes a Niche
Attractive for Focusing?
 • Big enough to be profitable and offers good
   growth potential
 • Not crucial to success of industry leaders
 • Costly or difficult for multi-segment competitors
   to meet specialized needs of niche members
 • Focuser has resources and capabilities
   to effectively serve an attractive niche
 • Few other rivals are specializing in same niche
 • Focuser can defend against challengers via
   superior ability to serve niche members
Risks of a Focus Strategy
• Competitors find effective ways to match
  a focuser’s capabilities in serving niche


• Niche buyers’ preferences shift towards product
  attributes desired by majority of buyers – niche
  becomes part of overall market


• Segment becomes so attractive it becomes
  crowded with rivals, causing segment profits to
  be splintered
Focus Strategies
• An integrated set of actions taken to produce
  goods or services that serve the needs of a
  particular competitive segment.
   Particular buyer group—youths or senior citizens
   Different segment of a product line—professional
    craftsmen versus do-it-yourselfers
   Different geographic markets—East coast versus
    West coast




                                                       4–69
Focus Strategies (cont’d)
• Types of focused strategies
    Focused cost leadership strategy
    Focused differentiation strategy
• To implement a focus strategy, firms must be
  able to:
    Complete various primary and support activities in a
     competitively superior manner, in order to develop
     and sustain a competitive advantage and earn above-
     average returns.




                                                       4–70
Factors That Drive Focused Strategies
• Large firms may overlook small niches.
• A firm may lack the resources needed to compete in the
  broader market.
• A firm is able to serve a narrow market segment more
  effectively than can its larger industry-wide competitors.
• Focusing allows the firm to direct its resources to certain
  value chain activities to build competitive advantage.




                                                               4–71
Competitive Risks of Focus Strategies
• A focusing firm may be “outfocused” by its competitors.
• A large competitor may set its sights on a firm’s niche
  market.
• Customer preferences in niche market may change to
  more closely resemble those of the broader market.




                                                            4–72
Best-Cost Provider Strategies

 • Combine a strategic emphasis on low-cost
   with a strategic emphasis on differentiation
     Make an upscale product at a lower cost
     Give customers more value for the money

                     Objectives
 • Deliver superior value by meeting or exceeding
   buyer expectations on product attributes and
   beating their price expectations
 • Be the low-cost provider of a product with good-
   to-excellent product attributes, then use cost
   advantage to underprice comparable brands
Competitive Strength of a
Best-Cost Provider Strategy
• A best-cost provider’s competitive advantage is
  based on its capability to include upscale attributes
  at a lower cost than rivals’ comparable products
• To achieve competitive advantage,
  a company must be able to
    Incorporate attractive features at a lower cost than rivals
    Manufacture a good-to-excellent quality product at a
     lower cost than rivals
    Develop a product that delivers good-to-excellent
     performance at a lower cost than rivals
    Provide attractive customer
     service at a lower cost than rivals
When Does a Best-Cost
Provider Strategy Work Best?


 • Where buyer diversity makes
   product differentiation the norm and



 • Where many buyers are also
   sensitive to price and value
Risk of a Best-Cost Provider Strategy
• A best-cost provider may get squeezed
  between strategies of firms using low-cost and
  differentiation strategies


   Low-cost leaders may be able to siphon
    customers away with a lower price


   High-end differentiators may be able to
    steal customers away with better product
    attributes
Test Your Knowledge
Which of the following are distinguishing features of a best-
cost provider strategy (based on the comparisons of the five
generic competitive strategies shown in Figure 5.1)?

   A. The strategic target is price-conscious buyers

   B. A marketing emphasis on charging a slightly higher price
      than rival brands having comparable features and
      attributes

   C. A product line that stresses wide selection, many product
      variations, and emphasis on differentiating features

   D. A competitive advantage based on more value for the
      money

   E. Using constant product innovation, excellent R&D skills,
      and periodic technological breakthroughs to sustain the
Integrated Cost Leadership/
Differentiation Strategy
• A firm that successfully uses an integrated cost
  leadership/differentiation strategy should be in a
  better position to:
    Adapt quickly to environmental changes.
    Learn new skills and technologies more quickly.
    Effectively leverage its core competencies while
     competing against its rivals.




                                                        4–78
Integrated Cost Leadership/
Differentiation Strategy (cont’d)
• Commitment to strategic flexibility is necessary
  for implementation of integrated cost
  leadership/differentiation strategy.
   Flexible manufacturing systems (FMS)
   Information networks
   Total quality management (TQM) systems




                                                     4–79
Flexible Manufacturing Systems
• Computer-controlled processes used to produce
  a variety of products in moderate, flexible
  quantities with a minimum of manual
  intervention.
   Goal is to eliminate the “low-cost-versus-wide
    product-variety” tradeoff.
   Allows firms to produce large variety of products at
    relatively low costs.




                                                           4–80
Information Networks
• Link companies electronically with their
  suppliers, distributors, and customers.
   Facilitate efforts to satisfy customer expectations in
    terms of product quality and delivery speed.
   Improve flow of work among employees in the firm
    and their counterparts at suppliers and distributors.
   Customer relationship management (CRM)




                                                             4–81
Total Quality Management (TQM) Systems
• Emphasize total commitment to the customer
  through continuous improvement using:
   Data-driven, problem-solving approaches
   Empowerment of employee groups and teams
• Benefits
   Increased customer satisfaction
   Lower costs
   Reduced time-to-market for innovative products




                                                     4–82
Risks of the Integrated Cost Leadership/
Differentiation Strategy
• Often involves compromises
   Becoming neither the lowest cost nor the most
    differentiated firm.
• Becoming “stuck in the middle”
   Lacking the strong commitment and expertise that
    accompanies firms following either a cost leadership
    or a differentiated strategy.




                                                           4–83
Deciding Which Generic
Competitive Strategy to Use
 • Each positions a company differently in its market and
   competitive environment
 • Each establishes a central theme for how a company will
   endeavor to outcompete rivals
 • Each creates some boundaries for maneuvering as
   market circumstances unfold
 • Each points to different ways of experimenting with the
   basics of the strategy
 • Each entails differences in product line, production
   emphasis, marketing emphasis, and means to sustain
   the strategy

   The big risk – Selecting a “stuck in the middle” strategy!
       This rarely produces a sustainable competitive
      advantage or a distinctive competitive position!
Generic stratgies

Generic stratgies

  • 1.
  • 2.
    “Competitive strategy is about being different. It means deliberately choosing to perform activities differently or to perform different activities than rivals to deliver a unique mix of value.” Michael E. Porter
  • 3.
    K NOWLEDGE OBJECTIVES Studying this chapter should provide you with the strategic management knowledge needed to: 1. Define business-level strategy. 2. Discuss the relationship between customers and business-level strategies in terms of who, what, and how. 3. Explain the differences among business-level strategies. 4. Use the five forces of competition model to explain how above-average returns can be earned through each business-level strategy. 5. Describe the risks of using each of the business-level strategies. 4–3
  • 4.
    Business-Level Strategy (Defined) •An integrated and coordinated set of commitments and actions the firm uses to gain a competitive advantage by exploiting core competencies in specific product markets. 4–4
  • 5.
    Strategy and CompetitiveAdvantage • Competitive advantage exists when a firm’s strategy gives it an edge in  Attracting customers and  Defending against competitive forces Key to Gaining a Competitive Advantage • Convince customers firm’s product / service offers superior value  A good product at a low price  A superior product worth paying more for  A best-value product
  • 6.
    What Is CompetitiveStrategy? • Deals exclusively with a company’s business plans to compete successfully  Specific efforts to please customers  Offensive and defensive moves to counter maneuvers of rivals  Responses to prevailing market conditions  Initiatives to strengthen its market position • Narrower in scope than business strategy
  • 7.
    Core Competencies andStrategy Resources and superior capabilities that are Core sources of competitive advantage over a Competencies firm’s rivals An integrated and coordinated set of Strategy actions taken to exploit core competencies and gain competitive advantage Providing value to customers and gaining Business-level competitive advantage by exploiting core Strategy competencies in individual product markets 4–7
  • 8.
    Customers: Their Relationshipto Business- Level Strategies Who will be served? Key Issues in What needs will Business-level be satisfied? Strategy How will those needs be satisfied? 4–8
  • 9.
    Effectively Managing Relationshipswith Customers • Firms must manage all aspects of their relationship with customers.  Reach: firm’s success and connection to customers  Richness: depth and detail of two-way flow of information between the firm and the customer  Affiliation: facilitation of useful interactions with customers 4–9
  • 10.
    Who: Determining theCustomers to Serve • Market segmentation  A process used to cluster people with similar needs into individual and identifiable groups. All Customers Consumer Industrial Markets Markets 4–10
  • 11.
    Market Segmentation • ConsumerMarkets • Industrial Markets  Demographic factors  End-use segments  Socioeconomic factors  Product segments  Geographic factors  Geographic segments  Psychological factors  Common buying factor segments  Consumption patterns  Customer size  Perceptual factors segments 4–11
  • 12.
    TABLE 4.1 Basis for Customer Segmentation Consumer Markets • Demographic factors (age, income, sex, etc.) • Socioeconomic factors (social class, stage in the family life cycle) • Geographic factors (cultural, regional, and national differences) • Psychological factors (lifestyle, personality traits) • Consumption patterns (heavy, moderate, and light users) • Perceptual factors (benefit segmentation, perceptual mapping) Industrial Markets • End-use segments (identified by SIC code) • Product segments (based on technological differences or production economics) • Geographic segments (defined by boundaries between countries or by regional differences within them) • Common buying factor segments (cut across product market and geographic segments) • Customer size segments 4–12
  • 13.
    What: Determining WhichCustomer Needs to Satisfy • Customer needs are related to a product’s benefits and features. • Customer needs are neither right nor wrong, good nor bad. • Customer needs represent desires in terms of features and performance capabilities. 4–13
  • 14.
    How: Determining CoreCompetencies Necessary to Satisfy Customer Needs • Firms use core competencies to implement value creating strategies that satisfy customers’ needs. • Only firms with capacity to continuously improve, innovate and upgrade their competencies can expect to meet and/or exceed customer expectations across time. 4–14
  • 15.
    The Purpose ofa Business-Level Strategy • Business-Level Strategies  Are intended to create differences between the firm’s position relative to those of its rivals. • To position itself, the firm must decide whether it intends to:  Perform activities differently or  Perform different activities as compared to its rivals. 4–15
  • 16.
    Types of PotentialCompetitive Advantage • Achieving lower overall costs than rivals  Performing activities differently (reducing process costs) • Possessing the capability to differentiate the firm’s product or service and command a premium price  Performing different (more highly valued) activities. 4–16
  • 17.
    FIGURE 4.1 The External Environment 4–17
  • 18.
    Competitive Scope • BroadScope  The firm competes in many customer segments. • Narrow Scope  The firm selects a segment or group of segments in the industry and tailors its strategy to serving them at the exclusion of others. 4–18
  • 19.
    Types of Business-LevelStrategies Competitive Advantage Cost Uniqueness Broad Cost Leadership Differentiation Target Integrated Cost Competitive Leadership/ Scope Differentiation Narrow Focused Cost Focused Target Leadership Differentiation 4–19
  • 20.
    FIGURE 4.2 Five Business-Level Strategies 4–20
  • 21.
    Low-Cost Provider Strategies Keys to Success • Make achievement of meaningful lower costs than rivals the theme of firm’s strategy • Include features and services in product offering that buyers consider essential • Find approaches to achieve a cost advantage in ways difficult for rivals to copy or match Low-cost leadership means low overall costs, not just low manufacturing or production costs!
  • 22.
    Translating a Low-CostAdvantage into Higher Profits: Two Options Option 1: Use lower-cost edge to under-price competitors and attract price-sensitive buyers in enough numbers to increase total profits Option 2: Maintain present price, be content with present market share, and use lower-cost edge to earn a higher profit margin on each unit sold, thereby increasing total profits
  • 23.
    Approaches to Securing aCost Advantage Approach 1 Do a better job than rivals of performing value chain activities efficiently and cost effectively Approach 2 Control Revamp value chain to bypass costs! cost-producing activities that add little By-pass value from the buyer’s perspective costs!
  • 24.
    Approach 1: Controllingthe Cost Drivers • Capture scale economies; avoid scale diseconomies • Capture learning and experience curve effects • Control percentage of capacity utilization • Pursue efforts to boost sales and spread costs such as R&D and advertising over more units • Improve supply chain efficiency • Substitute use of low-cost for high-cost raw materials • Use online systems and sophisticated software to achieve operating efficiencies • Adopt labor-saving operating methods • Use bargaining power to gain concessions from suppliers • Compare vertical integration vs. outsourcing
  • 25.
    Approach 2: Revampingthe Value Chain • Use direct-to-end-user sales/marketing methods • Make greater use of online technology applications • Streamline operations by eliminating low-value- added or unnecessary work steps • Relocate facilities closer to suppliers or customers • Offer basic, no-frills product/service • Offer a limited product/service as opposed to a full product/service line
  • 26.
    Wal-Mart’s Approach to ManagingIts Value Chain Institute extensive information sharing with vendors via online Institute extensive information sharing with vendors via online systems systems Pursue global procurement of some items and centralize most Pursue global procurement of some items and centralize most purchasing activities purchasing activities Invest in state-of-the-art automation at its distribution centers Invest in state-of-the-art automation at its distribution centers Strive to optimize the product mix and achieve greater sales Strive to optimize the product mix and achieve greater sales turnover turnover Install security systems and store operating procedures that lower Install security systems and store operating procedures that lower shrinkage rates shrinkage rates Negotiate preferred real estate rental and leasing rates with real Negotiate preferred real estate rental and leasing rates with real estate developers and owners of its store sites estate developers and owners of its store sites Manage and compensate its workforce in a manner to yield lower Manage and compensate its workforce in a manner to yield lower labor costs labor costs
  • 27.
    Keys to Successin Achieving Low-Cost Leadership • Scrutinize each cost-creating activity, identifying cost drivers • Use knowledge about cost drivers to manage costs of each activity down year after year • Find ways to restructure value chain to eliminate nonessential work steps and low-value activities • Work diligently to create cost-conscious corporate cultures  Feature broad employee participation in continuous cost- improvement efforts and limited perks for executives  Strive to operate with exceptionally small corporate staffs • Aggressively pursue investments in resources and capabilities that promise to drive costs out of the business
  • 28.
    Characteristics of aLow-Cost Provider • Cost conscious corporate culture • Employee participation in cost-control efforts • Ongoing efforts to benchmark costs • Intensive scrutiny of budget requests • Programs promoting continuous cost improvement Successful low-cost producers champion frugality but wisely and aggressively invest in cost-saving improvements !
  • 29.
    When Does aLow-Cost Strategy Work Best? • Price competition is vigorous • Product is standardized or readily available from many suppliers • There are few ways to achieve differentiation that have value to buyers • Most buyers use product in same ways • Buyers incur low switching costs • Buyers are large and have significant bargaining power • Industry newcomers use introductory low prices to attract buyers and build customer base
  • 30.
    Pitfalls of Low-CostStrategies • Being overly aggressive in cutting price • Low cost methods are easily imitated by rivals • Becoming too fixated on reducing costs and ignoring  Buyer interest in additional features  Declining buyer sensitivity to price  Changes in how the product is used • Technological breakthroughs open up cost reductions for rivals
  • 31.
    Cost Leadership Strategy •An integrated set of actions taken to produce goods or services with features that are acceptable to customers at the lowest cost, relative to that of competitors with features that are acceptable to customers.  Relatively standardized products  Features acceptable to many customers  Lowest competitive price 4–31
  • 32.
    Cost Leadership Strategy •Cost saving actions required by this strategy:  Building efficient scale facilities  Tightly controlling production costs and overhead  Minimizing costs of sales, R&D and service  Building efficient manufacturing facilities  Monitoring costs of activities provided by outsiders  Simplifying production processes 4–32
  • 33.
    How to Obtaina Cost Advantage Determine Reconfigure and control Value Chain Cost Drivers if needed  Alter production process  New raw material  Change in automation  Forward integration  New distribution channel  Backward integration  New advertising media  Change location relative  Direct sales in place of to suppliers or buyers indirect sales 4–33
  • 34.
    FIGURE 4.3 Examples of Value-Creating Activities Associated with the Cost Leadership Strategy 4–34
  • 35.
    Value-Creating Activities forCost Leadership • Cost-effective MIS • Monitor suppliers’ performances • Few management layers • Link suppliers’ products to • Simplified planning production processes • Consistent policies • Economies of scale • Effecting training • Efficient-scale facilities • Easy-to-use manufacturing • Effective delivery schedules technologies • Low-cost transportation • Investments in technologies • Highly trained sales force • Finding low cost raw materials • Proper pricing 4–35
  • 36.
    Cost Leadership Strategy:Competitors Rivalry with • Due to cost leader’s Existing Competitors advantageous position: Threat of  Rivals hesitate to compete new entrants on basis of price. Rivalry among Bargaining power of  Lack of price competition competing firms suppliers leads to greater profits. Threat of Bargaining substitute power of products buyers 4–36
  • 37.
    Cost Leadership Strategy:Buyers Bargaining Power • Can mitigate buyers’ of Buyers power by:  Driving prices far below Threat of new competitors, causing entrants Rivalry them to exit, thus Bargaining among power of shifting power with competing firms suppliers buyers back to the firm. Threat of Bargaining substitute power of products buyers 4–37
  • 38.
    Cost Leadership Strategy:Suppliers Bargaining Power • Can mitigate suppliers’ of Suppliers power by: Threat of  Being able to absorb new entrants cost increases due to Rivalry Bargaining low cost position. among competing power of firms suppliers  Being able to make very large purchases, Threat of substitute Bargaining power of reducing chance of products buyers supplier using power. 4–38
  • 39.
    Cost Leadership Strategy:New Entrants The Threat of • Can frighten off new Potential Entrants entrants due to: Threat of  Their need to enter on a new entrants large scale in order to be Rivalry Bargaining cost competitive. among competing power of firms suppliers  The time it takes to move down the learning Threat of substitute Bargaining power of curve. products buyers 4–39
  • 40.
    Cost Leadership Strategy:Substitutes Product • Cost leader is well Substitutes positioned to: Threat of  Make investments to be new entrants first to create substitutes. Rivalry among Bargaining  Buy patents developed by competing power of firms suppliers potential substitutes. Threat of Bargaining  Lower prices in order to substitute power of maintain value position. products buyers 4–40
  • 41.
    Cost Leadership Strategy(cont’d) • Competitive Risks  Processes used to produce and distribute good or service may become obsolete due to competitors’ innovations.  Focus on cost reductions may occur at expense of customers’ perceptions of differentiation  Competitors, using their own core competencies, may successfully imitate the cost leader’s strategy. 4–41
  • 42.
    Differentiation Strategies Objective • Incorporate differentiating features that cause buyers to prefer firm’s product or service over brands of rivals Keys to Success • Find ways to differentiate that create value for buyers and are not easily matched or cheaply copied by rivals • Not spending more to achieve differentiation than the price premium that can be charged
  • 43.
    Benefits of SuccessfulDifferentiation A product / service with unique, appealing attributes allows a firm to  Command a premium price and/or Which  Increase unit sales and/or hat is unique?  Build brand loyalty = Competitive Advantage
  • 44.
    Types of DifferentiationThemes • Unique taste – Dr. Pepper • Multiple features – Microsoft Windows and Office • Wide selection and one-stop shopping – Home Depot, Amazon.com • Superior service -- FedEx, Ritz-Carlton • Spare parts availability – Caterpillar • Engineering design and performance – Mercedes, BMW • Prestige – Rolex • Product reliability – Johnson & Johnson • Quality manufacture – Karastan, Michelin, Toyota • Technological leadership – 3M Corporation • Top-of-line image – Ralph Lauren, Starbucks, Chanel
  • 45.
    Sustaining Differentiation: Keys toCompetitive Advantage • Most appealing approaches to differentiation  Those hardest for rivals to match or imitate  Those buyers will find most appealing • Best choices to gain a longer-lasting, more profitable competitive edge  New product innovation  Technical superiority  Product quality and reliability  Comprehensive customer service  Unique competitive capabilities
  • 46.
    Where to FindDifferentiation Opportunities in the Value Chain • Purchasing and procurement activities • Product R&D and product design activities • Production process / technology-related activities • Manufacturing / production activities • Distribution-related activities • Marketing, sales, and customer service activities Internally Activities, Costs, Activities, Performed & Margins of Buyer/User Costs, & Activities, Forward Channel Value Margins of Costs, & Allies & Chains Suppliers Margins Strategic Partners
  • 47.
    How to Achievea Differentiation-Based Advantage Approach 1 Incorporate product features/attributes that lower buyer’s overall costs of using product Approach 2 Incorporate features/attributes that raise the performance a buyer gets out of the product Approach 3 Incorporate features/attributes that enhance buyer satisfaction in non-economic or intangible ways Approach 4 Compete on the basis of superior capabilities
  • 48.
    Importance of PerceivedValue • Buyers seldom pay for value that is not perceived • Price premium of a differentiation strategy reflects  Value actually delivered to the buyer and  Value perceived by the buyer • Actual and perceived value can differ when buyers are unable to assess their experience
  • 49.
    Signaling Value asWell as Delivering Value • Incomplete knowledge of buyers causes them to judge value based on such signals as  Price  Attractive packaging  Extensive ad campaigns  Ad content and image  Seller facilities or professionalism and personality of employees  Having a list of prestigious customers • Signals of value may be as important as actual value when  Nature of differentiation is hard to quantify  Buyers are making first-time purchases  Repurchase is infrequent  Buyers are unsophisticated
  • 50.
    For Discussion: YourOpinion A low-cost provider strategy can defeat a differentiation strategy when buyers are satisfied with a basic product and don’t think “extra” attributes are worth a higher price. True or false? Explain.
  • 51.
    Differentiation Strategy • Anintegrated set of actions taken to produce goods or services (at an acceptable cost) that customers perceive as being different in ways that are important to them.  Focus is on nonstandardized products  Appropriate when customers value differentiated features more than they value low cost. 4–51
  • 52.
    How to Obtaina Differentiation Advantage Control Reconfigure Cost Drivers Value Chain to if needed maximize  Lower buyers’ costs  Raise performance of product or service  Create sustainability through:  Customer perceptions of uniqueness  Customer reluctance to switch to non- unique product or service 4–52
  • 53.
    Figure 4.4 Examples of Value-Creating Activities Associated with the Differentiation Strategy 4–53
  • 54.
    Value-Creating Activities andDifferentiation • Highly developed MIS • High quality replacement parts • Emphasis on quality • Superior handling of incoming raw materials • Worker compensation for creativity/productivity • Attractive products • Use of subjective performance • Rapid response to customer measures specifications • Basic research capability • Order-processing procedures • Technology • Customer credit • High quality raw materials • Personal relationships • Delivery of products 4–54
  • 55.
    Differentiation Strategy: Competitors Rivalry with • Defends against Competitors competitors because brand loyalty to differentiated Threat of product offsets price new entrants competition. Rivalry among Bargaining competing power of firms suppliers Threat of Bargaining substitute power of products buyers 4–55
  • 56.
    Differentiation Strategy: Buyers Bargaining Power • Can mitigate buyers’ power of Buyers because well differentiated products reduce customer Threat of sensitivity to price increases. new entrants Rivalry among Bargaining competing power of firms suppliers Threat of Bargaining substitute power of products buyers 4–56
  • 57.
    Differentiation Strategy: Suppliers Bargaining Power • Can mitigate suppliers’ of Suppliers power by:  Absorbing price increases Threat of due to higher margins. new entrants  Passing along higher Rivalry among Bargaining supplier prices because power of competing suppliers buyers are loyal to firms differentiated brand. Threat of Bargaining substitute power of products buyers 4–57
  • 58.
    Differentiation Strategy: NewEntrants The Threat of • Can defend against new Potential Entrants entrants because:  New products must surpass Threat of proven products. new entrants  New products must be at least Rivalry among Bargaining equal to performance of proven power of competing suppliers products, but offered at lower firms prices. Threat of Bargaining substitute power of products buyers 4–58
  • 59.
    Differentiation Strategy: Substitutes Product • Well positioned relative to Substitutes substitutes because:  Brand loyalty to a Threat of differentiated product tends new to reduce customers’ testing entrants Rivalry of new products or switching Bargaining among power of brands. competing firms suppliers Threat of Bargaining substitute power of products buyers 4–59
  • 60.
    Competitive Risks ofDifferentiation • The price differential between the differentiator’s product and the cost leader’s product becomes too large. • Differentiation ceases to provide value for which customers are willing to pay. • Experience narrows customers’ perceptions of the value of differentiated features. • Counterfeit goods replicate differentiated features of the firm’s products. 4–60
  • 61.
    When Does aDifferentiation Strategy Work Best? • There are many ways to differentiate a product that have value and please customers • Buyer needs and uses are diverse • Few rivals are following a similar differentiation approach • Technological change and product innovation are fast-paced
  • 62.
    Pitfalls of DifferentiationStrategies • Appealing product features are easily copied by rivals • Buyers see little value in unique attributes of product • Overspending on efforts to differentiate the product offering, thus eroding profitability • Over-differentiating such that product features exceed buyers’ needs • Charging a price premium buyers perceive is too high • Not striving to open up meaningful gaps in quality, service, or performance features vis-à-vis rivals’ products
  • 63.
    Focus / NicheStrategies • Involve concentrated attention on a narrow piece of the total market Objective Serve niche buyers better than rivals Keys to Success • Choose a market niche where buyers have distinctive preferences, special requirements, or unique needs • Develop unique capabilities to serve needs of target buyer segment
  • 64.
    Approaches to Defininga Market Niche • Geographic uniqueness • Specialized requirements in using product/service • Special product attributes appealing only to niche buyers
  • 65.
    Examples of FocusStrategies • Animal Planet and History Channel  Cable TV • Google  Internet search engines • Porsche  Sports cars • Cannondale  Top-of-the line mountain bikes • Enterprise Rent-a-Car  Provides rental cars to repair garage customers • Bandag  Specialist in truck tire recapping
  • 66.
    Focus / NicheStrategies and Competitive Advantage Approach 1 • Achieve lower costs than rivals in serving a well-defined buyer segment – Focused low-cost strategy Approach 2 Which hat is unique? • Offer a product appealing to unique preferences of a well-defined buyer segment – Focused differentiation strategy
  • 67.
    What Makes aNiche Attractive for Focusing? • Big enough to be profitable and offers good growth potential • Not crucial to success of industry leaders • Costly or difficult for multi-segment competitors to meet specialized needs of niche members • Focuser has resources and capabilities to effectively serve an attractive niche • Few other rivals are specializing in same niche • Focuser can defend against challengers via superior ability to serve niche members
  • 68.
    Risks of aFocus Strategy • Competitors find effective ways to match a focuser’s capabilities in serving niche • Niche buyers’ preferences shift towards product attributes desired by majority of buyers – niche becomes part of overall market • Segment becomes so attractive it becomes crowded with rivals, causing segment profits to be splintered
  • 69.
    Focus Strategies • Anintegrated set of actions taken to produce goods or services that serve the needs of a particular competitive segment.  Particular buyer group—youths or senior citizens  Different segment of a product line—professional craftsmen versus do-it-yourselfers  Different geographic markets—East coast versus West coast 4–69
  • 70.
    Focus Strategies (cont’d) •Types of focused strategies  Focused cost leadership strategy  Focused differentiation strategy • To implement a focus strategy, firms must be able to:  Complete various primary and support activities in a competitively superior manner, in order to develop and sustain a competitive advantage and earn above- average returns. 4–70
  • 71.
    Factors That DriveFocused Strategies • Large firms may overlook small niches. • A firm may lack the resources needed to compete in the broader market. • A firm is able to serve a narrow market segment more effectively than can its larger industry-wide competitors. • Focusing allows the firm to direct its resources to certain value chain activities to build competitive advantage. 4–71
  • 72.
    Competitive Risks ofFocus Strategies • A focusing firm may be “outfocused” by its competitors. • A large competitor may set its sights on a firm’s niche market. • Customer preferences in niche market may change to more closely resemble those of the broader market. 4–72
  • 73.
    Best-Cost Provider Strategies • Combine a strategic emphasis on low-cost with a strategic emphasis on differentiation  Make an upscale product at a lower cost  Give customers more value for the money Objectives • Deliver superior value by meeting or exceeding buyer expectations on product attributes and beating their price expectations • Be the low-cost provider of a product with good- to-excellent product attributes, then use cost advantage to underprice comparable brands
  • 74.
    Competitive Strength ofa Best-Cost Provider Strategy • A best-cost provider’s competitive advantage is based on its capability to include upscale attributes at a lower cost than rivals’ comparable products • To achieve competitive advantage, a company must be able to  Incorporate attractive features at a lower cost than rivals  Manufacture a good-to-excellent quality product at a lower cost than rivals  Develop a product that delivers good-to-excellent performance at a lower cost than rivals  Provide attractive customer service at a lower cost than rivals
  • 75.
    When Does aBest-Cost Provider Strategy Work Best? • Where buyer diversity makes product differentiation the norm and • Where many buyers are also sensitive to price and value
  • 76.
    Risk of aBest-Cost Provider Strategy • A best-cost provider may get squeezed between strategies of firms using low-cost and differentiation strategies  Low-cost leaders may be able to siphon customers away with a lower price  High-end differentiators may be able to steal customers away with better product attributes
  • 77.
    Test Your Knowledge Whichof the following are distinguishing features of a best- cost provider strategy (based on the comparisons of the five generic competitive strategies shown in Figure 5.1)? A. The strategic target is price-conscious buyers B. A marketing emphasis on charging a slightly higher price than rival brands having comparable features and attributes C. A product line that stresses wide selection, many product variations, and emphasis on differentiating features D. A competitive advantage based on more value for the money E. Using constant product innovation, excellent R&D skills, and periodic technological breakthroughs to sustain the
  • 78.
    Integrated Cost Leadership/ DifferentiationStrategy • A firm that successfully uses an integrated cost leadership/differentiation strategy should be in a better position to:  Adapt quickly to environmental changes.  Learn new skills and technologies more quickly.  Effectively leverage its core competencies while competing against its rivals. 4–78
  • 79.
    Integrated Cost Leadership/ DifferentiationStrategy (cont’d) • Commitment to strategic flexibility is necessary for implementation of integrated cost leadership/differentiation strategy.  Flexible manufacturing systems (FMS)  Information networks  Total quality management (TQM) systems 4–79
  • 80.
    Flexible Manufacturing Systems •Computer-controlled processes used to produce a variety of products in moderate, flexible quantities with a minimum of manual intervention.  Goal is to eliminate the “low-cost-versus-wide product-variety” tradeoff.  Allows firms to produce large variety of products at relatively low costs. 4–80
  • 81.
    Information Networks • Linkcompanies electronically with their suppliers, distributors, and customers.  Facilitate efforts to satisfy customer expectations in terms of product quality and delivery speed.  Improve flow of work among employees in the firm and their counterparts at suppliers and distributors.  Customer relationship management (CRM) 4–81
  • 82.
    Total Quality Management(TQM) Systems • Emphasize total commitment to the customer through continuous improvement using:  Data-driven, problem-solving approaches  Empowerment of employee groups and teams • Benefits  Increased customer satisfaction  Lower costs  Reduced time-to-market for innovative products 4–82
  • 83.
    Risks of theIntegrated Cost Leadership/ Differentiation Strategy • Often involves compromises  Becoming neither the lowest cost nor the most differentiated firm. • Becoming “stuck in the middle”  Lacking the strong commitment and expertise that accompanies firms following either a cost leadership or a differentiated strategy. 4–83
  • 84.
    Deciding Which Generic CompetitiveStrategy to Use • Each positions a company differently in its market and competitive environment • Each establishes a central theme for how a company will endeavor to outcompete rivals • Each creates some boundaries for maneuvering as market circumstances unfold • Each points to different ways of experimenting with the basics of the strategy • Each entails differences in product line, production emphasis, marketing emphasis, and means to sustain the strategy The big risk – Selecting a “stuck in the middle” strategy! This rarely produces a sustainable competitive advantage or a distinctive competitive position!

Editor's Notes

  • #51 True. A company employing a differentiation strategy may differentiate on the basis of some attribute that does not deliver adequate value to buyers, i.e. such as lowering a buyer’s cost to use the product or enhancing a buyer’s well being. If potential buyers look at a differentiated product offering and conclude “so what?”, buyers are indicating they are satisfied with a basic product.
  • #78 Answer: D