Siemens - Power Generation Power Plants

19,676 views

Published on

Siemens Power Generation Power Plants

Published in: Technology, Business
2 Comments
36 Likes
Statistics
Notes
  • <br /><object type="application/x-shockwave-flash" data="http://www.youtube.com/v/m5_i-77GPgg?fs=1&amp;hl=en_US&amp;color1=0xe1600f&amp;color2=0xfebd01" width="350" height="288"><param name="movie" value="http://www.youtube.com/v/m5_i-77GPgg?fs=1&amp;hl=en_US&amp;color1=0xe1600f&amp;color2=0xfebd01"></param><embed src="http://www.youtube.com/v/m5_i-77GPgg?fs=1&amp;hl=en_US&amp;color1=0xe1600f&amp;color2=0xfebd01" width="350" height="288" type="application/x-shockwave-flash"></embed></object>
       Reply 
    Are you sure you want to  Yes  No
    Your message goes here
  • Know my vision about Social Media... http://www.slideshare.net/bernardes/social-media-1215419


    Profile: http://al-bernardes.sites.uol.com.br/EnglishProfile.htm
       Reply 
    Are you sure you want to  Yes  No
    Your message goes here
No Downloads
Views
Total views
19,676
On SlideShare
0
From Embeds
0
Number of Embeds
192
Actions
Shares
0
Downloads
2,392
Comments
2
Likes
36
Embeds 0
No embeds

No notes for slide

Siemens - Power Generation Power Plants

  1. 1. Combined Cycle Power Plants  back © Siemens AG 2009 Energy Sector
  2. 2. Combined Cycle Power Plants Combined Cycle Power Plants Key factors for competitiveness Comprehensive solutions 50 Hz Operating costs Plant performance Financials - SCC5-4000F 1S - SCC5-4000F 1S  Electricity price  Power output  Investment volume (SST5-5000)  Fuel price  Efficiency  Payment schedule - SCC5-4000F 2x1  Personnel costs  Availability  Project lead time 60 Hz  Consumables  Load regime  Debt / equity ratio - SCC6-5000F 2x1 Flex-Plant™30  Insurance  Interest rate - SCC6-5000F 1x1  Maintenance  Taxes Flex-Plant™30 - SCC6-5000F 1x1 Flex-Plant™10 Fast start-up development Proven and reliable 50 Hz Our goal is to optimize key factors that are within our sphere of influence - 60 Hz Standardization addresses all of these ■ Steam Power Plants ■ References 50 Hz ■ References 60 Hz Slide 2 Energy Sector © Siemens AG 2009
  3. 3. Combined Cycle Power Plants Combined Cycle Power Plants The reference power plant – Solving your power puzzle with Comprehensive solutions proven modular base design and options to meet your needs 50 Hz - SCC5-4000F 1S - SCC5-4000F 1S Modular base design (SST5-5000) - SCC5-4000F 2x1 HRSG type, 60 Hz e.g. BENSON - SCC6-5000F 2x1 or Drum Flex-Plant™30 Customer- The Siemens reference power plant - SCC6-5000F 1x1 Back-up Service Flex-Plant™30 specific options concept is an innovative synthesis of fuel packages (examples) standardization and flexibility. The - SCC6-5000F 1x1 Flex-Plant™10 Base combination of a pre-engineered design design with modular add-ons provides Fast start-up development the ideal basis for a successful project. Water Site-specific This approach helps to keep life-cycle Cooling Proven and reliable treatment options 50 Hz variants systems costs low while providing the flexibility (examples) 60 Hz to meet individual plant needs. Grid ■ Steam Power Plants connection ■ References 50 Hz ■ References 60 Hz Slide 3 Energy Sector © Siemens AG 2009
  4. 4. Combined Cycle Power Plants Combined Cycle Power Plants Advantages of reference power plant Comprehensive solutions 50 Hz - SCC5-4000F 1S Advantages of an integrated reference power plant program - SCC5-4000F 1S (SST5-5000)  Lead time reduction - SCC5-4000F 2x1 60 Hz  Availability and plant efficiency increase - SCC6-5000F 2x1 Flex-Plant™30  High operational flexibility - SCC6-5000F 1x1 Flex-Plant™30  Optimized operations and service effort - SCC6-5000F 1x1 Flex-Plant™10  Detailed information to support project conceptual / Fast start-up development permitting phase Proven and reliable 50 Hz  Standardized components 60 Hz ■ Steam Power Plants ■ References 50 Hz ■ References 60 Hz Slide 4 Energy Sector © Siemens AG 2009
  5. 5. Combined Cycle Power Plants Combined Cycle Power Plants Lead time reduction Comprehensive solutions 50 Hz - SCC5-4000F 1S Reference power plant designs facilitate implementation due to: - SCC5-4000F 1S (SST5-5000)  Pre-configured modular components - SCC5-4000F 2x1 60 Hz  Schedule-driven project planning and - SCC6-5000F 2x1 Flex-Plant™30 management - SCC6-5000F 1x1 Flex-Plant™30  The use of experienced proven suppliers - SCC6-5000F 1x1 and equipment Flex-Plant™10 Fast start-up  Highly trained personnel development Proven and reliable 50 Hz 60 Hz ■ Steam Power Plants ■ References 50 Hz ■ References 60 Hz Slide 5 Energy Sector © Siemens AG 2009
  6. 6. Combined Cycle Power Plants Combined Cycle Power Plants Reference power plant program scope Comprehensive solutions optimization – Single Shaft 50 Hz - SCC5-4000F 1S - SCC5-4000F 1S (SST5-5000) SCC Power Train SCC Power Island SCC Power Block SCC Turnkey - SCC5-4000F 2x1 § SGT-PAC § SCC Power Train §SCC Power Island §SCC Power Block • SST-PAC w/o § HRSG • Detailed design of Turbine building, • Additional fuel supply systems 60 Hz condenser § Condenser incl. air removal foundation and structures and cooling systems - SCC6-5000F 2x1 • Steam turbine • HVAC inside Power Block area • Water treatment system Flex-Plant™30 incl. auxiliaries • Cranes inside turbine building • Raw water system w/o piping § Boiler feed pumps • Water/ Steam cycle • Waste water system - SCC6-5000F 1x1 • Generator incl. § Condensate pumps • Cooling water system with wet • Tanks Flex-Plant™30 auxiliaries § Critical valves cooling tower and circulating water • Additional pumps - buildings/structures • SSS Clutch § Fuel pre-heater with filter, - cranes/hoists - SCC6-5000F 1x1 • Service- and closed cooling water • ST electrical and metering station etc. system Flex-Plant™10 • Electrical equipment - fire protection/fighting I&C § Power Island controls - plant piping/ Fast start-up • Power Block controls • Options § Options valves - electrical • Fire Fighting inside Power Block plant development • Options • Erection/Commissioning • Further options Proven and reliable 50 Hz Power Train equipment System integration / Replication of standardized Total EPC plant wrap 60 Hz performance / delivery Optimized operability components ■ Steam Power Plants ■ References 50 Hz ■ References 60 Hz Modularization with options for flexibility standardization to reduce risk and project schedule Slide 6 Energy Sector © Siemens AG 2009
  7. 7. Combined Cycle Power Plants Combined Cycle Power Plants Reference power plant program scope Comprehensive solutions optimization – Multi Shaft 50 Hz - SCC5-4000F 1S - SCC5-4000F 1S SCC SCC (SST5-5000) SCC Power Island SCC Turnkey SGT PAC Thermal Equipment - SCC5-4000F 2x1 • Gas turbines for fuel gas § SGT-PAC § SCC Thermal Equipment §SCC Power Island incl. auxiliaries 60 Hz • Air intake / exhaust • SST-PAC w/o condenser § Condenser incl. air removal • Buildings/structures system • Steam turbine incl. system • Cranes and HVAC (Turbine hall) - SCC6-5000F 2x1 • Plant Cooling systems • Fuel gas system auxiliaries w/o piping § Boiler feed pumps Flex-Plant™30 • Water treatment - skids • Generator incl. § Condensate pumps • Raw water system - SCC6-5000F 1x1 - connecting pipes auxiliaries § Critical valves • Waste water system Flex-Plant™30 • Gas turbine generators • ST electrical and I&C • Tanks incl. auxiliaries § Fuel pre-heater with filter, • § HRSG Plant piping/valves - SCC6-5000F 1x1 • Fire protection GT metering station etc. • Electrical equipment § Options Flex-Plant™10 • GT electrical and I&C § Power Island controls • Plant control system • Options § Options • Additional fire protection/fighting Fast start-up • Erection/Commissioning • Further Options development Proven and reliable 50 Hz Performance/Delivery Cycle optimization / System integration / Total EPC plant wrap 60 Hz Performance wrap Optimized operability ■ Steam Power Plants ■ References 50 Hz ■ References 60 Hz Modularization with options for flexibility Standardization to enhance implementation of project schedule Slide 7 Energy Sector © Siemens AG 2009
  8. 8. Combined Cycle Power Plants Combined Cycle Power Plants Reference power plants – Combined cycle plant portfolio Comprehensive solutions 50 Hz - SCC5-4000F 1S Single Shaft - SCC5-4000F 1S 50 Hz: SCC5-1000F 1S (SST5-5000) SCC5-4000F 1S - SCC5-4000F 2x1 60 Hz - SCC6-5000F 2x1 Flex-Plant™30 - SCC6-5000F 1x1 Flex-Plant™30 - SCC6-5000F 1x1 Flex-Plant™10 Fast start-up development Multi Shaft Proven and reliable 50 Hz: SCC5-4000F 2x1 50 Hz 60 Hz 60 Hz: SCC6-5000F 1x1 Flex-Plant™10 SCC6-5000F 1x1 Flex-Plant™30 ■ Steam Power Plants SCC6-5000F 2x1 Flex-Plant™30 ■ References 50 Hz ■ References 60 Hz Slide 8 Energy Sector © Siemens AG 2009
  9. 9. Combined Cycle Power Plants Combined Cycle Power Plants SCC5-4000F 1S (SST5-3000) for warm climate conditions Comprehensive solutions 50 Hz - SCC5-4000F 1S Major components Performance (net) Design data - SCC5-4000F 1S Gas turbine: SGT5-4000F ISO Ambient conditions: (SST5-5000) Steam turbine: SST5-3000 Power: 416 MW 15°C (59°F), 1013 mbar, - SCC5-4000F 2x1 60% humidity Generator: SGen5-2000H Efficiency: 58.2% 60 Hz Condenser pressure: - SCC6-5000F 2x1 Flex-Plant™30 50 mbar (1.5” HgA) - SCC6-5000F 1x1 Flex-Plant™30 Design features - SCC6-5000F 1x1 Flex-Plant™10 HRSG: 3P-RH, horizontal type Fast start-up development Steam parameters: HP 125 bar/565°C, IP 30 bar/565°C, LP 5 bar/235°C 1810 psi/1050°F, 435 psi/1022°F, 72.5 psi/455°F Proven and reliable Cold end: Cooling tower, induced draft, 8 cells 50 Hz 60 Hz (ACC and once-through cooling options) Fuel system: Natural gas with preheating/fuel oil backup (option) ■ Steam Power Plants Pump redundancies: ■ References 50 Hz Condensate: 2x 100% Circulating water: 2x 50% ■ References 60 Hz Feedwater: 2x 100% Closed cooling water: 2x 100% Service cooling water: 1x 100% Slide 9 Energy Sector © Siemens AG 2009
  10. 10. Combined Cycle Power Plants Combined Cycle Power Plants SCC5-4000F 1S (SST5-5000) for cold climate conditions Comprehensive solutions 50 Hz - SCC5-4000F 1S Major components Performance (net) Design data - SCC5-4000F 1S Gas turbine: SGT5-4000F Design ISO Ambient conditions: (SST5-5000) Steam turbine: SST5-5000 Power: 427 MW 416 MW 10°C (50°F), 1013 mbar, - SCC5-4000F 2x1 77% humidity Efficiency: 58.7 % 58.2% 60 Hz Generator: SGen5-2000H Condenser pressure: - SCC6-5000F 2x1 Flex-Plant™30 25 mbar (0.7” HgA) - SCC6-5000F 1x1 Flex-Plant™30 Design features - SCC6-5000F 1x1 Flex-Plant™10 HRSG: 3P-RH, horizontal arrangement Fast start-up development Steam parameters: HP 125 bar/565°C, IP 30 bar/565°C, LP 5 bar/235°C 1810 psi/1050°F, 435 psi/1050°F, 72.5 psi/455°F Proven and reliable Cold end: Once-through cooling 50 Hz 60 Hz Fuel system: Natural gas with preheating/fuel oil backup (option) Pump redundancies: ■ Steam Power Plants Condensate: 2x 100% or 1x 100% Circulating water: 2x 50% ■ References 50 Hz Feedwater: 2x 100% or 1x 100% Closed cooling water: 2x 100% ■ References 60 Hz Service cooling water: 1x 100% Slide 10 Energy Sector © Siemens AG 2009
  11. 11. Combined Cycle Power Plants Combined Cycle Power Plants SCC5-4000F 2x1 Comprehensive solutions 50 Hz - SCC5-4000F 1S Major components Performance (net) Design data - SCC5-4000F 1S Gas turbine: SGT5-4000F ISO Ambient conditions: (SST5-5000) Steam turbine: SST5-5000 Power: 832 MW 32°C (90°F), 1013 mbar, - SCC5-4000F 2x1 80% humidity Generator: SGen5-1000A Efficiency: 58.2% 60 Hz Condenser pressure: - SCC6-5000F 2x1 Flex-Plant™30 100 mbar (3.0” HgA) - SCC6-5000F 1x1 Flex-Plant™30 Design features - SCC6-5000F 1x1 Flex-Plant™10 HRSG: 3P-RH, horizontal arrangement Fast start-up development Steam parameters: HP 125 bar/565°C, IP 30 bar/565°C, LP 5 bar/235°C 1810 psi/1050°F, 435 psi/1050°F, 72.5 psi/455°F Proven and reliable Cold end: Cooling tower, induced draft 50 Hz 60 Hz (ACC and once-through cooling options) Fuel system: Natural gas with preheating/fuel oil backup (option) ■ Steam Power Plants Pump redundancies: ■ References 50 Hz Condensate: 3x 50% or 2x 50%Circulating water: 2x 50% ■ References 60 Hz Feedwater: 3x 50% or 2x 50% Closed cooling water: 2x 100% Service cooling water:1x 100% Slide 11 Energy Sector © Siemens AG 2009
  12. 12. Combined Cycle Power Plants Combined Cycle Power Plants SCC6-5000F 2x1 Flex-Plant™30 Comprehensive solutions 50 Hz - SCC5-4000F 1S Major components Performance (net) Design data - SCC5-4000F 1S Gas turbine: SGT6-5000F ISO Ambient conditions: (SST5-5000) 59 °F (15°C), 1013 mbar, Steam turbine: SST-5000 Power: 590 MW - SCC5-4000F 2x1 60% humidity Generator: SGen6-1000A Efficiency: 57.2% 60 Hz Condenser pressure: - SCC6-5000F 2x1 1.5” HgA (50 mbar) Flex-Plant™30 - SCC6-5000F 1x1 Flex-Plant™30 Design features - SCC6-5000F 1x1 Flex-Plant™10 HRSG: 3P-RH, horizontal arrangement Fast start-up development Steam parameters: HP 1850 psi/1050°F, IP 380 psi/1050°F, LP 55 psi/540°F 128 bar/565°C, 26 bar/565°C, 3.8 bar/282°C Proven and reliable Cold end: Cooling tower, induced draft 50 Hz 60 Hz Fuel system: Natural gas with preheating/fuel oil backup (option) Pump redundancies: ■ Steam Power Plants Condensate: 3x 50% or 2x 50%Circulating water: 2x 50% ■ References 50 Hz Feedwater: 3x 50% or 2x 50% Closed cooling water: 2x 100% ■ References 60 Hz Service cooling water:2x 100% Condenser: Wet surface/2-pass/nondivided water box Slide 12 Energy Sector © Siemens AG 2009
  13. 13. Combined Cycle Power Plants Combined Cycle Power Plants SCC6-5000F 1x1 Flex-Plant™30 Comprehensive solutions 50 Hz - SCC5-4000F 1S Major components Performance (net) Design data - SCC5-4000F 1S Gas turbine: SGT6-5000F ISO Ambient conditions: (SST5-5000) 85 °F (29°C), 1013 mbar, Steam turbine: SST-900 Power: 295 MW - SCC5-4000F 2x1 60% humidity Generator: SGen6-1000A Efficiency: 57% 60 Hz Condenser pressure: - SCC6-5000F 2x1 30.5” HgA (1.034 bar) Flex-Plant™30 - SCC6-5000F 1x1 Flex-Plant™30 Design features - SCC6-5000F 1x1 Flex-Plant™10 HRSG: 3P-RH, horizontal arrangement Fast start-up Steam parameters: HP 1850 psi/1050°F, IP 380 psi/1050°F, LP 55 psi/540°F development 128 bar/565°C, 26 bar/565°C, 3.8 bar/282°C Proven and reliable Cold end: Cooling tower, induced draft 50 Hz Fuel system: Natural gas / fuel oil backup 60 Hz (option) ■ Steam Power Plants Pump redundancies: ■ References 50 Hz Condensate: 1x 100% or 2x 100% Circulating water: 2x 50% Feedwater: 1x 100% or 2x 100% Closed cooling water: 2x 100% ■ References 60 Hz Service cooling water: 2x 100% Condenser: Wet surface/2-pass/nondivided water box Slide 13 Energy Sector © Siemens AG 2009
  14. 14. Combined Cycle Power Plants Combined Cycle Power Plants SCC6-5000F 1x1 Flex-Plant™10 Comprehensive solutions 50 Hz - SCC5-4000F 1S Major components Performance (net) Design data - SCC5-4000F 1S Gas turbine: SGT6-5000F 85°F Ambient conditions: (SST5-5000) 1013 mbar, Steam turbine: SST-800 Power: 250 MW - SCC5-4000F 2x1 60% humidity Generator: SGen6-1000A Efficiency: 48% 60 Hz Condenser pressure: - SCC6-5000F 2x1 30.5” HgA (1.034 bar) Flex-Plant™30 - SCC6-5000F 1x1 Flex-Plant™30 Design features - SCC6-5000F 1x1 Flex-Plant™10 HRSG: 1P, non-reheat, horizontal arrangement Fast start-up development Steam parameters: 1450 psi / 930°F (100 bar / 500°C) Cold end: Fin-fan condenser Proven and reliable 50 Hz Fuel system: Natural gas / fuel oil backup 60 Hz (option) Pump redundancies: ■ Steam Power Plants Condensate: 1x 100% or 2x 100% ■ References 50 Hz Feedwater: 1x 100% or 2x 100% ■ References 60 Hz SCR: Conventional SCR Slide 14 Energy Sector © Siemens AG 2009
  15. 15. Combined Cycle Power Plants Combined Cycle Power Plants Economic benefits for fast start-up plants Comprehensive solutions 50 Hz - SCC5-4000F 1S Operating benefits Ancillary services Market environment - SCC5-4000F 1S  Fuel savings  Capacity payments  Uncertain Markets (SST5-5000) - SCC5-4000F 2x1  Higher efficiency  KWh price for  Seasonal electricity 60 Hz ancillary Energy demand  Less emissions - SCC6-5000F 2x1  Spinning reserve  Developing wind Flex-Plant™30  Flexible operation credits energy - SCC6-5000F 1x1 Flex-Plant™30 - SCC6-5000F 1x1 Flex-Plant™10 Additional earnings Higher profit through Fast start-up Fast start-up Lower start-up costs through new products usage of high price development development in liberalized markets markets Proven and reliable 50 Hz 60 Hz ■ Steam Power Plants ■ References 50 Hz Fast start-up capability enhances your plant profitability ■ References 60 Hz Slide 15 Energy Sector © Siemens AG 2009
  16. 16. Combined Cycle Power Plants Combined Cycle Power Plants Reference power plants with fast-start technology Comprehensive solutions 50 Hz - SCC5-4000F 1S Plant start-up time reduction development - SCC5-4000F 1S Challenges: (SST5-5000) - SCC5-4000F 2x1  HRSG pressure ramp rate capability 60 Hz  Steam turbine ramp rate capability - SCC6-5000F 2x1  Piping warm up time Flex-Plant™30  Steam Chemistry - SCC6-5000F 1x1 Flex-Plant™30  Steam turbine back pressure limitations - SCC6-5000F 1x1 Flex-Plant™10 Findings: Fast start-up Fast start-up  Plants designed for exclusive base load development development operation had excessive start times due Proven and reliable to equipment restrictions 100 90 50 Hz 60 Hz Solutions: 80 70  Develop integrated plant technology to 60 ■ Steam Power Plants increase operating flexibility and fast-start 50 ■ References 50 Hz capability 40 ■ References 60 Hz 30 20 10 Slide 16 Energy Sector © Siemens AG 2009
  17. 17. Combined Cycle Power Plants Combined Cycle Power Plants Integrated plant technology for fast-start capabilities Comprehensive solutions 50 Hz - SCC5-4000F 1S BENSON once High-capacity ST stress - SCC5-4000F 1S through in HP section Desuperheater controller (SST5-5000) - SCC5-4000F 2x1 60 Hz - SCC6-5000F 2x1 Flex-Plant™30 - SCC6-5000F 1x1 Flex-Plant™30 Optimize GT Funnel load ramp - SCC6-5000F 1x1 Flex-Plant™10 Damper Fast start-up Fast start-up development development Proven and reliable 50 Hz 60 Hz Automated ■ Steam Power Plants Auxiliary Boiler drains and vents Condensate ■ References 50 Hz polishing ■ References 60 Hz plant An integration of proven technologies Slide 17 Energy Sector © Siemens AG 2009
  18. 18. Combined Cycle Power Plants Combined Cycle Power Plants SCC6-5000F 1x1 Flex-Plant™10 Comprehensive solutions 50 Hz Benefits Include: - SCC5-4000F 1S - SCC5-4000F 1S (SST5-5000)  Integration of proven technology and components - SCC5-4000F 2x1  Application of the high reliability of the SGT6-5000F 60 Hz - SCC6-5000F 2x1 Flex-Plant™30  Combined cycle performance for peaking application - SCC6-5000F 1x1  Fast ramp of the gas turbine (150MW in 10 Minutes) Flex-Plant™30 - SCC6-5000F 1x1  Improved start-up efficiency Flex-Plant™10 Fast start-up Fast start-up  Very low start-up emissions development development  Very low water consumption Proven and reliable 50 Hz 60 Hz ■ Steam Power Plants ■ References 50 Hz ■ References 60 Hz Slide 18 Energy Sector © Siemens AG 2009
  19. 19. Combined Cycle Power Plants Combined Cycle Power Plants Ribatejo EDP, Portugal Comprehensive solutions 50 Hz - SCC5-4000F 1S - SCC5-4000F 1S Commercial operation in spring 2004 (SST5-5000) - SCC5-4000F 2x1 and 2006 60 Hz - SCC6-5000F 2x1 Flex-Plant™30 Net output 1,180 MW - SCC6-5000F 1x1 Flex-Plant™30 3x Single Shaft CC 1S.V94.3A - SCC6-5000F 1x1 Flex-Plant™10 Fast start-up development Proven and reliable Proven and reliable 50 Hz 60 Hz ■ Steam Power Plants ■ References 50 Hz ■ References 60 Hz Slide 19 Energy Sector © Siemens AG 2009
  20. 20. Combined Cycle Power Plants Combined Cycle Power Plants Panglima Power Sdn, Malaysia Comprehensive solutions 50 Hz - SCC5-4000F 1S - SCC5-4000F 1S Commercial operation in spring 2004 (SST5-5000) - SCC5-4000F 2x1 Net output 720 MW 60 Hz - SCC6-5000F 2x1 Flex-Plant™30 Multi Shaft CC 2.V94.3A - SCC6-5000F 1x1 Flex-Plant™30 - SCC6-5000F 1x1 Flex-Plant™10 Fast start-up development Proven and reliable Proven and reliable 50 Hz 60 Hz ■ Steam Power Plants ■ References 50 Hz ■ References 60 Hz Slide 20 Energy Sector © Siemens AG 2009
  21. 21. Combined Cycle Power Plants Combined Cycle Power Plants Shuweihat, Abu Dhabi, United Arab Emirates Comprehensive solutions 50 Hz - SCC5-4000F 1S - SCC5-4000F 1S Commercial operation in (SST5-5000) summer 2004 - SCC5-4000F 2x1 60 Hz Net output 1,500 MW - SCC6-5000F 2x1 Flex-Plant™30 - SCC6-5000F 1x1 Multi Shaft CC 5.V94.3A + 2 steam turbines Flex-Plant™30 with sea water desalination - SCC6-5000F 1x1 Flex-Plant™10 Fast start-up development Proven and reliable Proven and reliable 50 Hz 60 Hz ■ Steam Power Plants ■ References 50 Hz ■ References 60 Hz For more information click here Video Slide 21 Energy Sector © Siemens AG 2009
  22. 22. Combined Cycle Power Plants Combined Cycle Power Plants Santa Rita 1-4, San Lorenzo 1-2, Philippines Comprehensive solutions 50 Hz - SCC5-4000F 1S - SCC5-4000F 1S Commercial operation in 2000 and 2002 (SST5-5000) - SCC5-4000F 2x1 Net output 1,500 MW 60 Hz - SCC6-5000F 2x1 Flex-Plant™30 6x Single Shaft CC 1S.V84.3A - SCC6-5000F 1x1 Flex-Plant™30 - SCC6-5000F 1x1 Flex-Plant™10 Fast start-up development Proven and reliable Proven and reliable 50 Hz 60 Hz ■ Steam Power Plants ■ References 50 Hz ■ References 60 Hz The most fuel flexible plant worldwide. Fuels: Natural Gas, Distillate, Naphtha, Condensate, Mixtures Slide 22 Energy Sector © Siemens AG 2009
  23. 23. Combined Cycle Power Plants Combined Cycle Power Plants Merida, Mexico Comprehensive solutions 50 Hz - SCC5-4000F 1S - SCC5-4000F 1S Commercial operation in 2000 (SST5-5000) - SCC5-4000F 2x1 Net output 480 MW 60 Hz - SCC6-5000F 2x1 Flex-Plant™30 Multi Shaft CC 2.W501F - SCC6-5000F 1x1 Flex-Plant™30 - SCC6-5000F 1x1 Flex-Plant™10 Fast start-up development Proven and reliable Proven and reliable 50 Hz 60 Hz ■ Steam Power Plants ■ References 50 Hz ■ References 60 Hz Slide 23 Energy Sector © Siemens AG 2009
  24. 24. Combined Cycle Power Plants Combined Cycle Power Plants Ironwood, Pennsylvania Comprehensive solutions 50 Hz - SCC5-4000F 1S - SCC5-4000F 1S Commercial operation in 2001 (SST5-5000) - SCC5-4000F 2x1 Net output 700 MW 60 Hz - SCC6-5000F 2x1 Flex-Plant™30 Multi Shaft CC 2.W501G - SCC6-5000F 1x1 Flex-Plant™30 - SCC6-5000F 1x1 Flex-Plant™10 Fast start-up development Proven and reliable Proven and reliable 50 Hz 60 Hz ■ Steam Power Plants ■ References 50 Hz ■ References 60 Hz Slide 24 Energy Sector © Siemens AG 2009
  25. 25. Combined Cycle Power Plants Combined Cycle Power Plants Lakeside, Utah Comprehensive solutions 50 Hz - SCC5-4000F 1S - SCC5-4000F 1S Commercial operation in 2007 (SST5-5000) - SCC5-4000F 2x1 Net output 560 MW 60 Hz - SCC6-5000F 2x1 Flex-Plant™30 Multi Shaft CC 2.SCC6-5000F - SCC6-5000F 1x1 Flex-Plant™30 - SCC6-5000F 1x1 Flex-Plant™10 Fast start-up development Proven and reliable Proven and reliable 50 Hz 60 Hz 60 Hz ■ Steam Power Plants ■ References 50 Hz ■ References 60 Hz Slide 25 Energy Sector © Siemens AG 2009

×