Fortissimo 2 Call-1
Webinar for Proposers
Guy Lonsdale
scapos AG
2/03/2016
ICT INNOVATION
FOR MANUFACTURING SMEs
Part of the 
Factories of the 
Future (FoF) 
Initiative
Copyright © 2016 Members of the Fortissimo 2 Consortium02.03.2016 3
• Fortissimo – 2013-2016
Business relevant investigations and
demonstrations of simulation services in the
Fortissimo HPC Cloud creating future business
benefits for manufacturing SMEs
• Fortissimo 2 – 2015-2018
Builds on the success of Fortissimo and aims to
extend and demonstrate the business potential
of an ecosystem for HPC-Cloud services,
specifically for applications involving simulation
of coupled physical processes or high-
performance data analytics.
The Fortissimo Projects
Fortissimo Goal & Ambition
• Goal: provide SMEs with easy and cost‐effective
access to advanced simulation services through a 
Cloud infrastructure consisting of HPC resources,  
software applications, expertise, and tools
• Ambition: become THE portal of choice for HPC 
expertise and service provision, delivered by 
Europe’s major HPC technology providers
Copyright © Members of the Fortissimo Consortium 2015 4
Marketplace Services
Copyright © Members of the Fortissimo Consortium 2015 5
Simulation‐as‐a‐Service
HPC Platform‐as‐a‐Service
HPC Infrastructure
Support Consultancy
Business 
Container
Code 
Validation
Matchmaking Registry
The Fortissimo HPC‐Cloud
What does Fortissimo success look like?
• Two levels:
1. 50‐60 successful ‘experiments’ with SMEs 
delivering real business impact through HPC
2. Well‐managed successful project delivering Core 
Services, Open Calls and working Marketplace
• Vital statistics:
– €22m costs / €16m funding
– Approx. 130 partners (14 core – remainder 
experiment partners – many SMEs)
– 53 experiments – €180,000‐€250,000 / 3‐5 partners
Copyright © Members of the Fortissimo Consortium 2015 7
Successful Fortissimo Open Calls – high demand
• Two Open Calls
– Call 1: 65 proposals – funded 22 new experiments
– Call 2: 82 proposals – funded 11 new experiments
– All run as per EC best practice
• Optimised arrangements for SMEs
– Protecting their IPR through experiment ‘IP bubble’
– Dealing with cash‐flow within EC grant constraints
Copyright © Members of the Fortissimo Consortium 2015 8
Pipistrel success story
• SME based in Slovenia
• Light aircraft manufacturer
• New aircraft design
– Wind tunnel too expensive
– CFD on HPC Cloud solution
• Large detailed models
– 20‐30 days in‐house
– 2‐3 days in HPC Cloud
• Design cycle transformed
• 10x cheaper and 10x faster
Copyright © Members of the Fortissimo Consortium 2015 9
Experiment Partners:
Pipistrel
XLAB; Arctur
Ergolines success story
• SME based in Italy
• Speciality steels technology
• Simulation of slag carry‐over 
from ladle to tundish
– New monitoring system 
developed
– Better overall steel quality
– Reduced re‐melting
• On average 6,000 tonnes of 
lost steel per year saved
• Saving between €420,000 ‐
€600,000 per year
Copyright © Members of the Fortissimo Consortium 2015 10
Experiment Partners:
Ergolines
Arctur
Flange Tightening – Texas Controls
Copyright 2015 Members of the Fortissimo Consortium 11
Experiment Partners:
Texas Controls
AIMEN
CESGA
• A Spanish SME offering tightening and 
sealing solutions to large industrial 
facilities in the industrial, power 
generation and oil & gas sectors.
• HPC Simulation based design of flange 
tightening operations leads to:
– 33% time‐saving 
– Reduced manpower costs & reduced 
“down time” of the equipment 
– End‐user savings of 180 K€ per 
tightening
– Estimated annual savings of 5,4 M€ for 
Texas customers
HPC‐Cloud based Urban Planning ‐ IES
IES is a Scottish SME (with offices 
world‐wide). 
HPC‐Cloud approach enables pay‐
as‐you go customer options 
reducing large model simulations 
from  days/weeks to hours/days.
Comparison with in‐house costs: 
50% reduction 
Copyright 2015 Members of the Fortissimo Consortium 12
Experiment Partners:
IES
U. Edinburgh (epcc)
Sports‐car aerodynamics ‐ Koenigsegg
The SME Koenigsegg designs & manufactures 
high‐performance sports‐cars.
Aerodynamics development for the 
Koenigsegg One:1 ‐ HPC‐based CFD: 
250km/h  250% higher down‐force 
440 km/h  50% higher down‐force
Savings in design & development, wind‐
tunnel use; 30% shortening of time to market
Copyright 2015 Members of the Fortissimo Consortium 13
Experiment Partners:
Koenigsesgg
ICON
NTUA
CINECA
Fortissimo – delivering for manufacturing SMEs
• Strong demand evident
• Many SMEs new to HPC but 
seeing real benefits
• Direct impact on
– Manufacturing costs
– Product quality
– Jobs and growth
• Next steps ‐ delivering open 
sustainable marketplace
Copyright © Members of the Fortissimo Consortium 2015 14
Copyright © 2016 Members of the Fortissimo 2 Consortium02.03.2016 15
Funded under first I4MS H2020 Call
Innovation Action
Start date: 1st November 2015
Duration: 36 months
Costs: € 11,162,114
Funding: € 9,999,769
Two open calls with total funding of €5,000,000
Fortissimo 2 - Vital statistics
Copyright © 2016 Members of the Fortissimo 2 Consortium02.03.2016 16
• Competitive call for HPC‐Cloud‐based Application 
Experiments for the Fortissimo 2 project, focusing on
modelling and simulation of coupled phenomena 
and high‐performance data analytics
• Augmenting the current set of experiments 
(& of course those of Fortissimo)
• In all cases targeting benefits for engineering and 
manufacturing SMEs and mid‐caps
Fortissimo 2 Call‐1 ‐ Objectives
Copyright © 2016 Members of the Fortissimo 2 Consortium02.03.2016 17
• Priority will be given to experiments driven by the
requirements of first-time HPC users and, by
implication, organisations engaging in Fortissimo
for the first time.
• Experiments should develop clear exploitation
paths ensuring business impact and wider
subsequent use of the services and technologies
developed. They should also investigate service
deployment in the Fortissimo marketplace.
Fortissimo 2 Call-1 – Key aspects
The original Fortissimo “cloud” of experiments
Copyright 2015 Members of the Fortissimo Consortium 18
….aerodynamics 
of light aircraft
…continuous casting
..design of metal flanges
…high pressure 
vessels
.. Multiphysics simulation .. CFD … automotive design
… tools for urban 
planning
… routing architecture 
optimisation..
.. correlation .. 
simulation & tests for 
mechatronics
… air‐quality over cities
… risers, moorings 
and flowlines ... low‐pressure 
die‐casting …
… CFD for 
turbomachinery
… structural crash tests
… eolian snow transport 
for civil engineering …
… commercial 
computational chemistry  
…  molecular simulation 
for industrial chemical 
engineering
.. CO2 emission prediction 
for automotive engines
July 2015
The 2nd Fortissimo “cloud” of experiments 
(integrated as a result of Call‐1)
Copyright 2015 Members of the Fortissimo Consortium 19
….platform for 
map conversion
… electrical harnesses
….tidal farm 
engineering
Manufacturing 
processes… laser welding, 
sheet‐metal forming, 
advanced casting
…. drug target 
binding
Manufacturing design… 
camshafts, gear 
transmission, high temp. 
chimneys, boat design
seismic processing .. 
oil & gas exploration
… simulation of pipeline 
components
… radar reflectors & 
antennas 
….environment 
engineering services
… rapid 
prototyping 
... 3D printing
optimisation … steel 
component manufacture
… operational decision 
support for manufacturing
Renewable energy … 
hydraulic turbines
Time‐temp integrators … 
Pharma logistics
… high temperature 
superconductors
crowd sensing … smart cities 
& large facilities
July 2015
The 3rd Fortissimo “cloud” of experiments 
(integrated as a result of Call‐2)
Copyright 2015 Members of the Fortissimo Consortium 20
Microscopy 
manufacture…
… Biomechanics
… environmental 
management
Maritime design & 
manufacture
fatigue assessment… 
off‐shore structures & 
vessels
… aerodynamic 
shape optimisation ... 
Automotive design
Manufacturing 
composite structures .. 
Re‐inforced plastics
CAE for Motorcycle 
helmets
… safety & 
operation  ... 
Wave impact
Complex fluids … 
magnetic smart materials
… buoy design
July 2015
Copyright © 2016 Members of the Fortissimo 2 Consortium02.03.2016 21
The initial Fortisismo 2 “cloud” of experiments
….web‐based apps for 
aerodynamic simulation
…optimize layout of gas 
and flame detectors
…aeroacoustic simulation
…HPC Cloud services for 
the foundry industry
... Multiphysics simulation of 
box framed timber beams
… Big Data inside a crankshaft 
machining centre
… processing thermal high‐
speed image sequences with 
machine learning approaches
…near real time analysis 
of airframe test data
…dynamic interaction in train 
railways turnout system
… risers, moorings and 
flowlines
... data analytics for 
camshaft manufacturing
… simulation and modelling 
of rare earth magnets
… cloud service using data 
from vehicle diagnostic tools 
for failure predictions 
…  optimization of high 
performance gears
Copyright © 2016 Members of the Fortissimo 2 Consortium02.03.2016 22
• Proposed experiments should include all
participants necessary for the experiment,
which may include HPC and Big Data experts,
HPC Centres or ISVs either already included
within or external to the Fortissimo 2 consortium
• Experiments will employ the Fortissimo HPC
infrastructure using the HPC Centres already
involved in the project.
Open Call Partnering 
www.fortissimo‐project.eu/calls/partnering
www.fortissimo‐project.eu/partners.html
Copyright © 2016 Members of the Fortissimo 2 Consortium02.03.2016 23
Proposals: 
• (max.) 10‐page documents, in English, 
• The main section of the proposal should not exceed 10 pages in 
length. In addition a proposal description, a cover page and 2 pages 
of administrative data must be provided. Thus, with the inclusion of 
the cover page and administrative pages, the maximum page count 
is 13 pages.
• Proposals will be truncated to this page count and the 
independent expert evaluators will only be provided with the 
truncated version.
• Electronic submission (PDF, max 5 MB)
(tool access via: www.fortissimo‐project.eu/calls/submission.html)
Submission Deadline: 18th May, 2016, at 17:00 Brussels local time
Key Call Details – 1/2
Copyright © 2016 Members of the Fortissimo 2 Consortium02.03.2016 24
Funding
• New partners will be included as Third Parties (funding model following the same
principles as for H2020 project beneficiaries)
• Call-1 indicative funding budget for Third Parties = 1.31 M€
• The funding for an individual experiment may not exceed € 250 K (covering
all participants, i.e. both 3rd Parties and existing Fortissimo 2 beneficiaries).
• Max. funding for any Third Party = 150 K€ (across all experiments in which
that Third Party is involved (arising from both Fortissimo 2 open calls)
• The participation of existing Fortissimo 2 beneficiaries across all
experiments selected in Fortissimo 2 Call-1 may not exceed 25% of the total
funding assigned to Fortissimo 2 Call-1.
Expected duration of participation:
1st November 2016 to 30th April 2018
Key Call Details – 1/2
Copyright © 2016 Members of the Fortissimo 2 Consortium02.03.2016 25
Call Text (“introduction”)
Guideline for proposers (“proposers guide”)
Proposal Exemplar as Word document (“exemplar”)
Proposer-Evaluator check-list
(“check-list” tab at /calls)
Frequently Asked Questions
(“FAQ” tab at /calls)
Key Call-2 Documents
Documents & info pages: 
www.fortissimo‐project.eu/calls
Fortissimo 2 - Open Call Webinar

Fortissimo 2 - Open Call Webinar