OS-0402-HE
Issued Date: Revision No:
15 Mar 2013 00
HANDING/TAKING OVER REPORT FOR ENGINEERS
(SECOND ENGINEER & THIRD ENGINEER-WKE-IF
COMPLEMENTED)
ICON SHIP MANAGEMENT SDN. BHD.
Ship Name :SK LINE 76@ICON IKHLAS Port :KEMAMAN
Date : 20 JANUARY 2014 Voyage:
Instructions:-
 The Engineer being relieved will prepare this report in duplicate. One copy ro be sent to
respective Superintendent In-Charged, and one to be retained on board.
 This report shall be submitted via e-mail attachment (pdf file) at least one week prior
signing-off to respective Superintendent In-Charged.
 Whenever there is insufficient space available, supplemental sheet to be added, In case
items to be accounted for are not onboard, explanation is required.
 The information on this report will be filled out within reasonable times prior to change
of Chief Engineer so that this report will require minimum updating during the day of
handing over.
 The document will be duly signed with date and time after it has been reviewed by the
incoming Engineer in the presence of outgoing Engineer and witness by Chief Engineer
on board.
The incoming Engineer has duly taken over the ship __________on the ________(Date)
at________hrs(Time)
Name and Signature of Incoming Engineer :- MIOR MOHD ASHRUL
Name and Signature of Outgoing Engineer : AZIZUL BIN KASIM
Name and Signature of Chief Engineer :-SHAHRIZAL B. ZAINAL ABIDIN
OS-0402-HE
Issued Date: Revision No:
15 Mar 2013 00
HANDING/TAKING OVER REPORT FOR ENGINEERS
(SECOND ENGINEER & THIRD ENGINEER-WKE-IF
COMPLEMENTED)
ICON SHIP MANAGEMENT SDN. BHD.
For the following sections, please narrate on the location, completeness (missing pages,
volumes) and discrepancies. Comments should be brief, preferably providing reference to files
maintained onboard and communication on the subject matter.
A) DOCUMENTS,RECORD BOOKS AND
INVENTORIES UNDER MY CARE
Inventory of ship’s documents(inclusive of
instrument/equipment/stores/technical
manual/ship’s plan under my care )
ALL MANUAL IN E/R DESKTOP (SOFTCOPY).
HARD COPY YOU CAN FIND IT IN ELECT
INSPECTION STORE,CHIEF ENGINNER CABIN & IN
E.C.R.
Equipment maintenance record book
under my care (include comments on
immediate concerns)
Checklist for DP observed when vessel engaged
with DP operation
Inventory of spare parts and stores,
chemicals, lubricating oils and hydraulic
oils.
INVENTORY CAN BE FOUND IN 2/E FOLDER
OS-0402-HE
Issued Date: Revision No:
15 Mar 2013 00
HANDING/TAKING OVER REPORT FOR ENGINEERS
(SECOND ENGINEER & THIRD ENGINEER-WKE-IF
COMPLEMENTED)
ICON SHIP MANAGEMENT SDN. BHD.
Handing over notes with regard to
machineries and maintenance planned.
SINCE VESSEL UNDER WARRANTY PERIOD,IN
FUTURE IF ANY FAULTY FINDINGS,PLEASE INFORM
2ND& CHIEF ENGINEER A.S.A.P FOR FURTHER
ACTION & INSTRUCTION.
Report on any abnormal operation of the
engine and auxiliaries
Please carried out frequent inspection on mud
pump and brine pump gland packing due we are
using in location.
Inventory of hand tools, precision
tools/equipment and their location.
ALL SPECIAL TOOL ARE KEEP IN E/R STORE C/W
THEIR RESPECTIVE BOXES.
Maintenance in progress and due near
future.
A/E #2& 500 HOUR MAINTENANCE INTERVAL
NEARLY.PLEASE REFER WITH E/R STAFF &
MANUAL.
OS-0402-HE
Issued Date: Revision No:
15 Mar 2013 00
HANDING/TAKING OVER REPORT FOR ENGINEERS
(SECOND ENGINEER & THIRD ENGINEER-WKE-IF
COMPLEMENTED)
ICON SHIP MANAGEMENT SDN. BHD.
Any outstanding instructions from Chief
Engineer
ALL MACHINERIES IN GOOD WORKING ORDER.
IN ADDITIONAL,PLEASE REFER TO CHIEF ENGINEER
STANDING ORDER BOOK
B) Personnel matters. (To be filled up by Second Engineer if sign-off)
Technical ability of the engine room staff
(Second engineer only-comment on ability
of engine-room staff)
2nd engineer have to comment on ER staff ability
-Good on work plan and job done.
Name and Signature of Incoming Chief Engineer:-_______________________________
Name and Signature of Outgoing Chief Engineer:-_______________________________
Name and Signature of Master :-________________________________

More Related Content

What's hot

En-Waleed Ibrahim Sr. Construction Piping Engineer cv
En-Waleed Ibrahim Sr. Construction Piping Engineer     cvEn-Waleed Ibrahim Sr. Construction Piping Engineer     cv
En-Waleed Ibrahim Sr. Construction Piping Engineer cvwaleed ibrahim
 
Resume Expediting & Inspection Engineer (Oil & Gas)
Resume Expediting & Inspection Engineer (Oil & Gas)Resume Expediting & Inspection Engineer (Oil & Gas)
Resume Expediting & Inspection Engineer (Oil & Gas)Sarim Mujtaba
 
Selvan CM Technician CV
Selvan CM Technician CVSelvan CM Technician CV
Selvan CM Technician CVkalki selvan
 
00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)Mohammad Khan
 
CV - S Atif Masroor - Document Control Manager / Specialist
CV - S Atif Masroor - Document Control Manager / SpecialistCV - S Atif Masroor - Document Control Manager / Specialist
CV - S Atif Masroor - Document Control Manager / SpecialistAtif Masroor
 
photo&i.fitter resume
photo&i.fitter resumephoto&i.fitter resume
photo&i.fitter resumeJohn Peter
 
Resume For Document Controller (Updated)
Resume For Document Controller (Updated)Resume For Document Controller (Updated)
Resume For Document Controller (Updated)Rizwan Younas
 
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)MOHAMMED ASLAM SHAREEF
 
Handover of duty or job responsibilities
Handover of duty or job responsibilitiesHandover of duty or job responsibilities
Handover of duty or job responsibilitiesGerald Manalili
 
experience certificate
experience certificateexperience certificate
experience certificateRohith P R
 
Piping Engineer CV -Sandip Karmakar
Piping Engineer CV -Sandip KarmakarPiping Engineer CV -Sandip Karmakar
Piping Engineer CV -Sandip KarmakarSandip Karmakar
 
CV Sajid Akhtar - Lead Document Controller - 01 Jan 2017
CV Sajid Akhtar - Lead Document Controller - 01 Jan 2017CV Sajid Akhtar - Lead Document Controller - 01 Jan 2017
CV Sajid Akhtar - Lead Document Controller - 01 Jan 2017Sajid Akhtar
 

What's hot (20)

En-Waleed Ibrahim Sr. Construction Piping Engineer cv
En-Waleed Ibrahim Sr. Construction Piping Engineer     cvEn-Waleed Ibrahim Sr. Construction Piping Engineer     cv
En-Waleed Ibrahim Sr. Construction Piping Engineer cv
 
Resume Expediting & Inspection Engineer (Oil & Gas)
Resume Expediting & Inspection Engineer (Oil & Gas)Resume Expediting & Inspection Engineer (Oil & Gas)
Resume Expediting & Inspection Engineer (Oil & Gas)
 
Selvan CM Technician CV
Selvan CM Technician CVSelvan CM Technician CV
Selvan CM Technician CV
 
CV OF MOHAMMAD ALI.doc-01
CV OF MOHAMMAD ALI.doc-01CV OF MOHAMMAD ALI.doc-01
CV OF MOHAMMAD ALI.doc-01
 
CV Piping Supervisor
CV Piping SupervisorCV Piping Supervisor
CV Piping Supervisor
 
00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)
 
CV - S Atif Masroor - Document Control Manager / Specialist
CV - S Atif Masroor - Document Control Manager / SpecialistCV - S Atif Masroor - Document Control Manager / Specialist
CV - S Atif Masroor - Document Control Manager / Specialist
 
photo&i.fitter resume
photo&i.fitter resumephoto&i.fitter resume
photo&i.fitter resume
 
Piping Engineer CV
Piping Engineer CVPiping Engineer CV
Piping Engineer CV
 
M.Saravanan - Resume
M.Saravanan - ResumeM.Saravanan - Resume
M.Saravanan - Resume
 
RESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISORRESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISOR
 
resume piping
resume pipingresume piping
resume piping
 
Resume For Document Controller (Updated)
Resume For Document Controller (Updated)Resume For Document Controller (Updated)
Resume For Document Controller (Updated)
 
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
 
Engr,imran cv.cement.
Engr,imran cv.cement.Engr,imran cv.cement.
Engr,imran cv.cement.
 
Pradeep s (resume)
Pradeep s (resume)Pradeep s (resume)
Pradeep s (resume)
 
Handover of duty or job responsibilities
Handover of duty or job responsibilitiesHandover of duty or job responsibilities
Handover of duty or job responsibilities
 
experience certificate
experience certificateexperience certificate
experience certificate
 
Piping Engineer CV -Sandip Karmakar
Piping Engineer CV -Sandip KarmakarPiping Engineer CV -Sandip Karmakar
Piping Engineer CV -Sandip Karmakar
 
CV Sajid Akhtar - Lead Document Controller - 01 Jan 2017
CV Sajid Akhtar - Lead Document Controller - 01 Jan 2017CV Sajid Akhtar - Lead Document Controller - 01 Jan 2017
CV Sajid Akhtar - Lead Document Controller - 01 Jan 2017
 

Similar to Form-OS-0402-HE- Handing Taking Over Report For Engineers rev00 NEW.DOCX

Form-OS-0402-HE- Handing Taking Over Report For Engineers rev00 NEW - Copy.DOCX
Form-OS-0402-HE- Handing Taking Over Report For Engineers rev00 NEW - Copy.DOCXForm-OS-0402-HE- Handing Taking Over Report For Engineers rev00 NEW - Copy.DOCX
Form-OS-0402-HE- Handing Taking Over Report For Engineers rev00 NEW - Copy.DOCXMior Mohd Ashrul
 
Southern Transport Service SOP
Southern Transport Service SOPSouthern Transport Service SOP
Southern Transport Service SOPRichard Gibbens
 
RAUL FuENTECILLA CV UPDATED 2
RAUL FuENTECILLA CV UPDATED 2RAUL FuENTECILLA CV UPDATED 2
RAUL FuENTECILLA CV UPDATED 2RAUL FUENTECILLA
 
06 5759-tec ops-sect 3 (3.01-3.10)- repairs, maint & insp
06 5759-tec ops-sect 3 (3.01-3.10)- repairs, maint & insp06 5759-tec ops-sect 3 (3.01-3.10)- repairs, maint & insp
06 5759-tec ops-sect 3 (3.01-3.10)- repairs, maint & inspharish chandra CHOPRA
 
TECHNICAL WRITER DAY TO DAY JOB FLOW - Complete
TECHNICAL WRITER DAY TO DAY JOB FLOW - CompleteTECHNICAL WRITER DAY TO DAY JOB FLOW - Complete
TECHNICAL WRITER DAY TO DAY JOB FLOW - CompleteBahrun Sahib
 
Hse alert 49 - suspension of lifting operations
Hse alert  49 - suspension of lifting operationsHse alert  49 - suspension of lifting operations
Hse alert 49 - suspension of lifting operationsDwarika Bhushan Sharma
 
Chapter 8 - Ground Support Equipment.pdf
Chapter 8 - Ground Support Equipment.pdfChapter 8 - Ground Support Equipment.pdf
Chapter 8 - Ground Support Equipment.pdfAdelgafor Abdlesadig
 
OVIQ Sample Master
OVIQ Sample Master OVIQ Sample Master
OVIQ Sample Master OCIMF OVID
 
Indian navy-recruitment-2015
Indian navy-recruitment-2015Indian navy-recruitment-2015
Indian navy-recruitment-2015Madan Kumar
 
BV_IP-Solas chapter XV and related IP code.pptx
BV_IP-Solas chapter XV and related IP code.pptxBV_IP-Solas chapter XV and related IP code.pptx
BV_IP-Solas chapter XV and related IP code.pptxAWvE
 
Hussein resume 01.08.2019
Hussein resume 01.08.2019Hussein resume 01.08.2019
Hussein resume 01.08.2019Hussein Mhran
 
Bastidas Rodny English
Bastidas Rodny EnglishBastidas Rodny English
Bastidas Rodny EnglishR. R.B.B
 
Bastidas Rodny English
Bastidas Rodny EnglishBastidas Rodny English
Bastidas Rodny EnglishR. R.B.B
 
Bastidas Rodny English
Bastidas Rodny EnglishBastidas Rodny English
Bastidas Rodny EnglishR. R.B.B
 
Bastidas Rodny English
Bastidas Rodny EnglishBastidas Rodny English
Bastidas Rodny EnglishR. R.B.B
 
Bastidas Rodny English
Bastidas Rodny EnglishBastidas Rodny English
Bastidas Rodny EnglishR. R.B.B
 
Bastidas Rodny English
Bastidas Rodny EnglishBastidas Rodny English
Bastidas Rodny EnglishR. R.B.B
 

Similar to Form-OS-0402-HE- Handing Taking Over Report For Engineers rev00 NEW.DOCX (20)

Form-OS-0402-HE- Handing Taking Over Report For Engineers rev00 NEW - Copy.DOCX
Form-OS-0402-HE- Handing Taking Over Report For Engineers rev00 NEW - Copy.DOCXForm-OS-0402-HE- Handing Taking Over Report For Engineers rev00 NEW - Copy.DOCX
Form-OS-0402-HE- Handing Taking Over Report For Engineers rev00 NEW - Copy.DOCX
 
Southern Transport Service SOP
Southern Transport Service SOPSouthern Transport Service SOP
Southern Transport Service SOP
 
RAUL FuENTECILLA CV UPDATED 2
RAUL FuENTECILLA CV UPDATED 2RAUL FuENTECILLA CV UPDATED 2
RAUL FuENTECILLA CV UPDATED 2
 
06 5759-tec ops-sect 3 (3.01-3.10)- repairs, maint & insp
06 5759-tec ops-sect 3 (3.01-3.10)- repairs, maint & insp06 5759-tec ops-sect 3 (3.01-3.10)- repairs, maint & insp
06 5759-tec ops-sect 3 (3.01-3.10)- repairs, maint & insp
 
SHAH MAQSOOD CV
SHAH MAQSOOD CVSHAH MAQSOOD CV
SHAH MAQSOOD CV
 
Cv teasseer 1
Cv teasseer 1Cv teasseer 1
Cv teasseer 1
 
TECHNICAL WRITER DAY TO DAY JOB FLOW - Complete
TECHNICAL WRITER DAY TO DAY JOB FLOW - CompleteTECHNICAL WRITER DAY TO DAY JOB FLOW - Complete
TECHNICAL WRITER DAY TO DAY JOB FLOW - Complete
 
Hse alert 49 - suspension of lifting operations
Hse alert  49 - suspension of lifting operationsHse alert  49 - suspension of lifting operations
Hse alert 49 - suspension of lifting operations
 
Chapter 8 - Ground Support Equipment.pdf
Chapter 8 - Ground Support Equipment.pdfChapter 8 - Ground Support Equipment.pdf
Chapter 8 - Ground Support Equipment.pdf
 
SBAS350050102ENR0.pdf
SBAS350050102ENR0.pdfSBAS350050102ENR0.pdf
SBAS350050102ENR0.pdf
 
OVIQ Sample Master
OVIQ Sample Master OVIQ Sample Master
OVIQ Sample Master
 
Indian navy-recruitment-2015
Indian navy-recruitment-2015Indian navy-recruitment-2015
Indian navy-recruitment-2015
 
BV_IP-Solas chapter XV and related IP code.pptx
BV_IP-Solas chapter XV and related IP code.pptxBV_IP-Solas chapter XV and related IP code.pptx
BV_IP-Solas chapter XV and related IP code.pptx
 
Hussein resume 01.08.2019
Hussein resume 01.08.2019Hussein resume 01.08.2019
Hussein resume 01.08.2019
 
Bastidas Rodny English
Bastidas Rodny EnglishBastidas Rodny English
Bastidas Rodny English
 
Bastidas Rodny English
Bastidas Rodny EnglishBastidas Rodny English
Bastidas Rodny English
 
Bastidas Rodny English
Bastidas Rodny EnglishBastidas Rodny English
Bastidas Rodny English
 
Bastidas Rodny English
Bastidas Rodny EnglishBastidas Rodny English
Bastidas Rodny English
 
Bastidas Rodny English
Bastidas Rodny EnglishBastidas Rodny English
Bastidas Rodny English
 
Bastidas Rodny English
Bastidas Rodny EnglishBastidas Rodny English
Bastidas Rodny English
 

Form-OS-0402-HE- Handing Taking Over Report For Engineers rev00 NEW.DOCX

  • 1. OS-0402-HE Issued Date: Revision No: 15 Mar 2013 00 HANDING/TAKING OVER REPORT FOR ENGINEERS (SECOND ENGINEER & THIRD ENGINEER-WKE-IF COMPLEMENTED) ICON SHIP MANAGEMENT SDN. BHD. Ship Name :SK LINE 76@ICON IKHLAS Port :KEMAMAN Date : 20 JANUARY 2014 Voyage: Instructions:-  The Engineer being relieved will prepare this report in duplicate. One copy ro be sent to respective Superintendent In-Charged, and one to be retained on board.  This report shall be submitted via e-mail attachment (pdf file) at least one week prior signing-off to respective Superintendent In-Charged.  Whenever there is insufficient space available, supplemental sheet to be added, In case items to be accounted for are not onboard, explanation is required.  The information on this report will be filled out within reasonable times prior to change of Chief Engineer so that this report will require minimum updating during the day of handing over.  The document will be duly signed with date and time after it has been reviewed by the incoming Engineer in the presence of outgoing Engineer and witness by Chief Engineer on board. The incoming Engineer has duly taken over the ship __________on the ________(Date) at________hrs(Time) Name and Signature of Incoming Engineer :- MIOR MOHD ASHRUL Name and Signature of Outgoing Engineer : AZIZUL BIN KASIM Name and Signature of Chief Engineer :-SHAHRIZAL B. ZAINAL ABIDIN
  • 2. OS-0402-HE Issued Date: Revision No: 15 Mar 2013 00 HANDING/TAKING OVER REPORT FOR ENGINEERS (SECOND ENGINEER & THIRD ENGINEER-WKE-IF COMPLEMENTED) ICON SHIP MANAGEMENT SDN. BHD. For the following sections, please narrate on the location, completeness (missing pages, volumes) and discrepancies. Comments should be brief, preferably providing reference to files maintained onboard and communication on the subject matter. A) DOCUMENTS,RECORD BOOKS AND INVENTORIES UNDER MY CARE Inventory of ship’s documents(inclusive of instrument/equipment/stores/technical manual/ship’s plan under my care ) ALL MANUAL IN E/R DESKTOP (SOFTCOPY). HARD COPY YOU CAN FIND IT IN ELECT INSPECTION STORE,CHIEF ENGINNER CABIN & IN E.C.R. Equipment maintenance record book under my care (include comments on immediate concerns) Checklist for DP observed when vessel engaged with DP operation Inventory of spare parts and stores, chemicals, lubricating oils and hydraulic oils. INVENTORY CAN BE FOUND IN 2/E FOLDER
  • 3. OS-0402-HE Issued Date: Revision No: 15 Mar 2013 00 HANDING/TAKING OVER REPORT FOR ENGINEERS (SECOND ENGINEER & THIRD ENGINEER-WKE-IF COMPLEMENTED) ICON SHIP MANAGEMENT SDN. BHD. Handing over notes with regard to machineries and maintenance planned. SINCE VESSEL UNDER WARRANTY PERIOD,IN FUTURE IF ANY FAULTY FINDINGS,PLEASE INFORM 2ND& CHIEF ENGINEER A.S.A.P FOR FURTHER ACTION & INSTRUCTION. Report on any abnormal operation of the engine and auxiliaries Please carried out frequent inspection on mud pump and brine pump gland packing due we are using in location. Inventory of hand tools, precision tools/equipment and their location. ALL SPECIAL TOOL ARE KEEP IN E/R STORE C/W THEIR RESPECTIVE BOXES. Maintenance in progress and due near future. A/E #2& 500 HOUR MAINTENANCE INTERVAL NEARLY.PLEASE REFER WITH E/R STAFF & MANUAL.
  • 4. OS-0402-HE Issued Date: Revision No: 15 Mar 2013 00 HANDING/TAKING OVER REPORT FOR ENGINEERS (SECOND ENGINEER & THIRD ENGINEER-WKE-IF COMPLEMENTED) ICON SHIP MANAGEMENT SDN. BHD. Any outstanding instructions from Chief Engineer ALL MACHINERIES IN GOOD WORKING ORDER. IN ADDITIONAL,PLEASE REFER TO CHIEF ENGINEER STANDING ORDER BOOK B) Personnel matters. (To be filled up by Second Engineer if sign-off) Technical ability of the engine room staff (Second engineer only-comment on ability of engine-room staff) 2nd engineer have to comment on ER staff ability -Good on work plan and job done. Name and Signature of Incoming Chief Engineer:-_______________________________ Name and Signature of Outgoing Chief Engineer:-_______________________________ Name and Signature of Master :-________________________________