Introduction
The purpose of a floor is to provide a level surface capable of supporting
the occupants of a building, equipment and sometimes internal partition.
To perform this function the following requirement must satisfy:
a. Adequate strength and stability b. Adequate fire resistance
c. Sound insulation d . Damp resistance
e. Thermal insulation
The floors resting directly on the ground surface are known as ground floors,
while the other floors of each storey situated above the ground level are
known as upper floors.
The major problems floor encounter:
1. Damp exclusion 2. Thermal insulation
Components of floor
• Sub-floor, base course or floor base
Object:
 to give proper support to the covering, so that it does not settle
 to provide the damp resistance and thermal insulation
• Floor covering or simply, flooring: different floors
Solid ground floor:
Floors directly resting on ground is called solid floor
Suspended floors:
Floors supported above the ground level are called suspended floors,
Major materials for construction
1. Cement concrete
2. Lime concrete
3. Stones
4. Bricks
5. Wooden clocks (for wooden floor only)
The material used for Floor finish or floor covering are:
1. Mud or mooram 9. Granolithic finish
2. Bricks 10. wood or timber
3. Flag stones 11. Asphalt
4. Concrete 12. Rubber
5. Terrazzo 13. Linoleum flooring
6. Mosaic 14. Cork
7. Tiles 15. Glass
8. Marble 16. Plastic or PVC
Selection of flooring material
• Initial cost: depends on the type of building; eg- marble being very
costly is used only for residential buildings
• Appearance: pleasing appearance; should produce desired color
effect
• Cleanliness: capable of being cleaned easily; should be non-
absorbent; should have resistance against absorption of oil, grease
etc.
• Durability: sufficient resistance to wear and tear, temperature
damages, disintegration with time and decay
• Damp resistance: should offer against dampness
• Sound insulation- should not be such that noise is produced when users
walk on it
• Thermal insulation
• Fire resistance
• Smoothness- should have even surface; should not be slippery
• Hardness- should be sufficiently hard so as to resist marks, imprints etc.
• Maintenance- should require least maintenance; repairs can be done
easily
Cement concrete flooring
Application: Commonly used for residential, commercial and industrial building
Merits: 1. moderately cheap
2. quite durable
3. easy to construct
Components: It consists of 2 parts
a. Base concrete
b. topping or wearing surface
Method of construction : 2 methods can be constructed
i. Monolithically
ii. Non monolithically
Monolithic: Construction takes place simultaneously, that is both the
base course component and topping construction immediately after
the other
Merits: 1. Good bond between the two components
2. Thickness of the floor can reduced (economic)
Demerits: 1. there is chance of topping is damages during subsequent
operations
2. Hair cracks are developed because of settlement of freshly laid
base course which is not set
3. Work progress is slow because of the workman has to wait atleast
till the initial setting of the base course
Keeping the problems, most cases, non-monolithic construction is
preferred.
Non – monolithic:
Base course thickness – 7.5 to 10 cm thick – lean cement concrete (1:3:6),
- Course aggregate size is 40mm
- It shall be laid over well compacted soil, compacted properly and leveled to rough surface.
- It is properly cured
Topping:
- Base course shall be hardened
- Cleaned with stiff broom
- Before making the topping it shall properly wetted
- Topping then laid in square or rectangular panels
- Panel size may be 1m x 1m, 2m x 2m
- It consists of concrete (1:2:4)
- Cement slurry pasted at the bottom of panel and base course for good bond
- After surface is properly cured 7 to 14days
Mosaic Flooring:
A Mosaic consists of many small pieces of stone
arranged to form a design or picture and are
common in cultural and religious centres.
It made of small pieces of broken tiles of china
glazed or of cement or of marble
This will be arranged in different pattern
Prepared concrete base, place the marble
powder and cement slurry paste
After keep the pieces of marbles or glass or
broken tiles
Then surface is gently rolled
Level the surface and use the polishing
machine
Marble Flooring:
 It is superior type of flooring
 Used where extra cleanliness is essential requirement
 Used in residential buildings, hospitals, sanitariums, temples etc.
 It will come in different sizes, usually rectangular and square shapes
 Prepared base course 20mm thick bedding mortar (1:4) placed
 Marble slabs are laid over it
 Thinner joints shall be maintained
 Level the all marble slabs and then use the polishing machines for
trim the oozing cement slurry joints
Terrazzo Flooring
Terrazzo consists of marble or other stone aggregate set in mortar and
ground and polished to a smooth surface
Flagstone flooring
Flagstone is a sedimentary rock that is split into layers along bedding
planes. Flagstone is usually a form of a sandstone composed
of feldspar and quartz.
Linoleum flooring
It is covering which is available in rolls. It is spread directly on concrete
or wooden flooring.
It is manufactured by mixing standardised linseed oil in gum, resins
pigments, wood flour, and other filler materials
These are normally 2 to 6mm thick; plain or printed.

More Related Content

What's hot (20)

Report on concrete
Report on concreteReport on concrete
Report on concrete
 
Solid Ground Floors
 Solid Ground Floors  Solid Ground Floors
Solid Ground Floors
 
Types of ground floors
Types of ground floorsTypes of ground floors
Types of ground floors
 
2. intro to construction material
2. intro to construction material2. intro to construction material
2. intro to construction material
 
Partition wall
Partition wallPartition wall
Partition wall
 
7 building construction part 1 pre-construction work,dampness and doors - edit
7 building construction part 1   pre-construction work,dampness and doors - edit7 building construction part 1   pre-construction work,dampness and doors - edit
7 building construction part 1 pre-construction work,dampness and doors - edit
 
Roof covering
Roof coveringRoof covering
Roof covering
 
Floors by chakamba john
Floors  by chakamba johnFloors  by chakamba john
Floors by chakamba john
 
Chapter 4 (e) cavity walls
Chapter 4 (e) cavity wallsChapter 4 (e) cavity walls
Chapter 4 (e) cavity walls
 
Building
BuildingBuilding
Building
 
Composite masonry
Composite masonryComposite masonry
Composite masonry
 
Masonary wall
Masonary wallMasonary wall
Masonary wall
 
Partiton wall and adhesives
Partiton wall and adhesivesPartiton wall and adhesives
Partiton wall and adhesives
 
wall masonary,door,paint and trusses
wall masonary,door,paint and trusseswall masonary,door,paint and trusses
wall masonary,door,paint and trusses
 
Construction materials
Construction materialsConstruction materials
Construction materials
 
ROOFS PART 1.pdf
ROOFS PART 1.pdfROOFS PART 1.pdf
ROOFS PART 1.pdf
 
Roofs & Floors(civil engg.)
Roofs & Floors(civil engg.)Roofs & Floors(civil engg.)
Roofs & Floors(civil engg.)
 
https://civiltech-p.blogspot.com/2021/04/basic-components-of-building-structu...
https://civiltech-p.blogspot.com/2021/04/basic-components-of-building-structu...https://civiltech-p.blogspot.com/2021/04/basic-components-of-building-structu...
https://civiltech-p.blogspot.com/2021/04/basic-components-of-building-structu...
 
Partition walls
Partition walls Partition walls
Partition walls
 
Partition wall
Partition wallPartition wall
Partition wall
 

Similar to Floors

Flooring and types of flooring
Flooring and types of flooringFlooring and types of flooring
Flooring and types of flooringSVKM'S IOT DHULE
 
Chapter 8 floorings
Chapter 8 flooringsChapter 8 floorings
Chapter 8 flooringsKHUSHBU SHAH
 
Bmc flooring
Bmc flooring   Bmc flooring
Bmc flooring Cutegalrj
 
7 building construction part 2 flooring,roofs,staircase and maintance - edit
7 building construction part 2   flooring,roofs,staircase and maintance - edit7 building construction part 2   flooring,roofs,staircase and maintance - edit
7 building construction part 2 flooring,roofs,staircase and maintance - editmuhammadumairallahdi
 
FLOORS AND FLOORING MATERIALS.pptx
FLOORS AND FLOORING MATERIALS.pptxFLOORS AND FLOORING MATERIALS.pptx
FLOORS AND FLOORING MATERIALS.pptxDeepak Pradhan
 
FLOORS AND FLOORING
FLOORS AND FLOORINGFLOORS AND FLOORING
FLOORS AND FLOORINGnamePPS
 
CEM_Unit-II_Lecture Notes.pdf
CEM_Unit-II_Lecture Notes.pdfCEM_Unit-II_Lecture Notes.pdf
CEM_Unit-II_Lecture Notes.pdfAnujaJape2
 
Trabajo De Tecnologia
Trabajo De TecnologiaTrabajo De Tecnologia
Trabajo De TecnologiaBlancaycharo
 
Floor finishes - flooring and finish types
Floor finishes - flooring and finish typesFloor finishes - flooring and finish types
Floor finishes - flooring and finish typesAnqaParvez
 
pointing, plastering, bonding
pointing, plastering, bondingpointing, plastering, bonding
pointing, plastering, bondingRAHUL SINHA
 
flooring1-170727171834.docx
flooring1-170727171834.docxflooring1-170727171834.docx
flooring1-170727171834.docxRaviPrakash23882
 
Floorfinishes 140306101020-phpapp02
Floorfinishes 140306101020-phpapp02Floorfinishes 140306101020-phpapp02
Floorfinishes 140306101020-phpapp02jitendrapatel354
 
Flooring Types and Techniques
Flooring Types and TechniquesFlooring Types and Techniques
Flooring Types and TechniquesSunayana Miglani
 

Similar to Floors (20)

Flooring and types of flooring
Flooring and types of flooringFlooring and types of flooring
Flooring and types of flooring
 
Flooring and types of flooring
Flooring and types of flooringFlooring and types of flooring
Flooring and types of flooring
 
Flooring
FlooringFlooring
Flooring
 
Flooring.pptx
Flooring.pptxFlooring.pptx
Flooring.pptx
 
Chapter 8 floorings
Chapter 8 flooringsChapter 8 floorings
Chapter 8 floorings
 
Bmc flooring
Bmc flooring   Bmc flooring
Bmc flooring
 
7 building construction part 2 flooring,roofs,staircase and maintance - edit
7 building construction part 2   flooring,roofs,staircase and maintance - edit7 building construction part 2   flooring,roofs,staircase and maintance - edit
7 building construction part 2 flooring,roofs,staircase and maintance - edit
 
FLOORS AND FLOORING MATERIALS.pptx
FLOORS AND FLOORING MATERIALS.pptxFLOORS AND FLOORING MATERIALS.pptx
FLOORS AND FLOORING MATERIALS.pptx
 
Slab
SlabSlab
Slab
 
FLOORS AND FLOORING
FLOORS AND FLOORINGFLOORS AND FLOORING
FLOORS AND FLOORING
 
CEM_Unit-II_Lecture Notes.pdf
CEM_Unit-II_Lecture Notes.pdfCEM_Unit-II_Lecture Notes.pdf
CEM_Unit-II_Lecture Notes.pdf
 
BC repair floors ppt
BC repair floors pptBC repair floors ppt
BC repair floors ppt
 
Trabajo De Tecnologia
Trabajo De TecnologiaTrabajo De Tecnologia
Trabajo De Tecnologia
 
Floor finishes - flooring and finish types
Floor finishes - flooring and finish typesFloor finishes - flooring and finish types
Floor finishes - flooring and finish types
 
pointing, plastering, bonding
pointing, plastering, bondingpointing, plastering, bonding
pointing, plastering, bonding
 
FLOOR FINISHES
FLOOR FINISHESFLOOR FINISHES
FLOOR FINISHES
 
flooring1-170727171834.docx
flooring1-170727171834.docxflooring1-170727171834.docx
flooring1-170727171834.docx
 
Floorfinishes 140306101020-phpapp02
Floorfinishes 140306101020-phpapp02Floorfinishes 140306101020-phpapp02
Floorfinishes 140306101020-phpapp02
 
Flooring Types and Techniques
Flooring Types and TechniquesFlooring Types and Techniques
Flooring Types and Techniques
 
FLOORING
FLOORINGFLOORING
FLOORING
 

More from Rehmat Kaur

More from Rehmat Kaur (20)

Dcs
DcsDcs
Dcs
 
Cements
CementsCements
Cements
 
Admixtures
AdmixturesAdmixtures
Admixtures
 
Dcs assignment
Dcs assignmentDcs assignment
Dcs assignment
 
Cements
CementsCements
Cements
 
Admixtures
AdmixturesAdmixtures
Admixtures
 
Geotectnical ssignment
Geotectnical ssignmentGeotectnical ssignment
Geotectnical ssignment
 
Geomatics engg
Geomatics enggGeomatics engg
Geomatics engg
 
Geomatic notes
Geomatic notesGeomatic notes
Geomatic notes
 
06 e-flightplanning
06 e-flightplanning06 e-flightplanning
06 e-flightplanning
 
Cmwm (1)
Cmwm (1)Cmwm (1)
Cmwm (1)
 
Introductionto projectmanagement
Introductionto projectmanagementIntroductionto projectmanagement
Introductionto projectmanagement
 
Cmwm
CmwmCmwm
Cmwm
 
Introductionto projectmanagement
Introductionto projectmanagementIntroductionto projectmanagement
Introductionto projectmanagement
 
Gradually varied flow
Gradually varied flowGradually varied flow
Gradually varied flow
 
turbulent flow (2)
turbulent flow (2)turbulent flow (2)
turbulent flow (2)
 
boundary layer analysis (1)
boundary layer analysis (1)boundary layer analysis (1)
boundary layer analysis (1)
 
Strength of materials
Strength of materials Strength of materials
Strength of materials
 
Som
Som Som
Som
 
Roofs
RoofsRoofs
Roofs
 

Recently uploaded

Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
High Profile Call Girls Dahisar Arpita 9907093804 Independent Escort Service ...
High Profile Call Girls Dahisar Arpita 9907093804 Independent Escort Service ...High Profile Call Girls Dahisar Arpita 9907093804 Independent Escort Service ...
High Profile Call Girls Dahisar Arpita 9907093804 Independent Escort Service ...Call girls in Ahmedabad High profile
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxhumanexperienceaaa
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 

Recently uploaded (20)

Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
High Profile Call Girls Dahisar Arpita 9907093804 Independent Escort Service ...
High Profile Call Girls Dahisar Arpita 9907093804 Independent Escort Service ...High Profile Call Girls Dahisar Arpita 9907093804 Independent Escort Service ...
High Profile Call Girls Dahisar Arpita 9907093804 Independent Escort Service ...
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 

Floors

  • 2. Introduction The purpose of a floor is to provide a level surface capable of supporting the occupants of a building, equipment and sometimes internal partition. To perform this function the following requirement must satisfy: a. Adequate strength and stability b. Adequate fire resistance c. Sound insulation d . Damp resistance e. Thermal insulation The floors resting directly on the ground surface are known as ground floors, while the other floors of each storey situated above the ground level are known as upper floors. The major problems floor encounter: 1. Damp exclusion 2. Thermal insulation
  • 3. Components of floor • Sub-floor, base course or floor base Object:  to give proper support to the covering, so that it does not settle  to provide the damp resistance and thermal insulation • Floor covering or simply, flooring: different floors
  • 4. Solid ground floor: Floors directly resting on ground is called solid floor Suspended floors: Floors supported above the ground level are called suspended floors, Major materials for construction 1. Cement concrete 2. Lime concrete 3. Stones 4. Bricks 5. Wooden clocks (for wooden floor only)
  • 5. The material used for Floor finish or floor covering are: 1. Mud or mooram 9. Granolithic finish 2. Bricks 10. wood or timber 3. Flag stones 11. Asphalt 4. Concrete 12. Rubber 5. Terrazzo 13. Linoleum flooring 6. Mosaic 14. Cork 7. Tiles 15. Glass 8. Marble 16. Plastic or PVC
  • 6. Selection of flooring material • Initial cost: depends on the type of building; eg- marble being very costly is used only for residential buildings • Appearance: pleasing appearance; should produce desired color effect • Cleanliness: capable of being cleaned easily; should be non- absorbent; should have resistance against absorption of oil, grease etc. • Durability: sufficient resistance to wear and tear, temperature damages, disintegration with time and decay • Damp resistance: should offer against dampness
  • 7. • Sound insulation- should not be such that noise is produced when users walk on it • Thermal insulation • Fire resistance • Smoothness- should have even surface; should not be slippery • Hardness- should be sufficiently hard so as to resist marks, imprints etc. • Maintenance- should require least maintenance; repairs can be done easily
  • 8. Cement concrete flooring Application: Commonly used for residential, commercial and industrial building Merits: 1. moderately cheap 2. quite durable 3. easy to construct Components: It consists of 2 parts a. Base concrete b. topping or wearing surface Method of construction : 2 methods can be constructed i. Monolithically ii. Non monolithically
  • 9. Monolithic: Construction takes place simultaneously, that is both the base course component and topping construction immediately after the other Merits: 1. Good bond between the two components 2. Thickness of the floor can reduced (economic) Demerits: 1. there is chance of topping is damages during subsequent operations 2. Hair cracks are developed because of settlement of freshly laid base course which is not set 3. Work progress is slow because of the workman has to wait atleast till the initial setting of the base course Keeping the problems, most cases, non-monolithic construction is preferred.
  • 10. Non – monolithic: Base course thickness – 7.5 to 10 cm thick – lean cement concrete (1:3:6), - Course aggregate size is 40mm - It shall be laid over well compacted soil, compacted properly and leveled to rough surface. - It is properly cured Topping: - Base course shall be hardened - Cleaned with stiff broom - Before making the topping it shall properly wetted - Topping then laid in square or rectangular panels - Panel size may be 1m x 1m, 2m x 2m - It consists of concrete (1:2:4) - Cement slurry pasted at the bottom of panel and base course for good bond - After surface is properly cured 7 to 14days
  • 11. Mosaic Flooring: A Mosaic consists of many small pieces of stone arranged to form a design or picture and are common in cultural and religious centres. It made of small pieces of broken tiles of china glazed or of cement or of marble This will be arranged in different pattern Prepared concrete base, place the marble powder and cement slurry paste After keep the pieces of marbles or glass or broken tiles Then surface is gently rolled Level the surface and use the polishing machine
  • 12. Marble Flooring:  It is superior type of flooring  Used where extra cleanliness is essential requirement  Used in residential buildings, hospitals, sanitariums, temples etc.  It will come in different sizes, usually rectangular and square shapes  Prepared base course 20mm thick bedding mortar (1:4) placed  Marble slabs are laid over it  Thinner joints shall be maintained  Level the all marble slabs and then use the polishing machines for trim the oozing cement slurry joints
  • 13. Terrazzo Flooring Terrazzo consists of marble or other stone aggregate set in mortar and ground and polished to a smooth surface
  • 14. Flagstone flooring Flagstone is a sedimentary rock that is split into layers along bedding planes. Flagstone is usually a form of a sandstone composed of feldspar and quartz.
  • 15. Linoleum flooring It is covering which is available in rolls. It is spread directly on concrete or wooden flooring. It is manufactured by mixing standardised linseed oil in gum, resins pigments, wood flour, and other filler materials These are normally 2 to 6mm thick; plain or printed.