1 | Energy Efficiency and Renewable Energy eere.energy.gov
New U.S. Department of Energy
– Lawrence Berkeley National
Laboratory Guide: Financing
Energy Upgrades for K-12
Schools
June 26th, 2013
Memphis & Shelby
County Sustainability
Summit
2
DOE’s State & Local Technical Assistance Program
• Strategic Energy Planning
• Program & Policy Design and
Implementation
• Financing Strategies
• Data Management and EM&V
• EE & RE Technologies
Priority Areas
•General Education (e.g., fact sheets, 101s)
• Case Studies
•Tools for Decision-Making
• Protocols (e.g., how-to guides, model
documents)
Resources
• Webinars
•Conferences & in-person trainings
• Better Buildings Project Teams
Peer
Exchange &
Trainings
•Level of effort will vary
•In-depth efforts will be focused on:
•High impact efforts
•Opportunities for replicability
•Filling gaps in the technical assistance marketplace
One-on-
One
3
• Resources
 Guide to Financing Energy Upgrades for K-12 Schools available on the
Solution Center
 Also featured: page dedicated to Energy Savings Performance Contracting
(ESPC) & other finance resources
 Guide to Performance-Based Contracting for K-12 Schools and improved
Solution Center portal for finance resources live later this year
• Peer exchange & trainings
 April webinar on the finance guide available on the Solution Center
 Join the Better Buildings Alliance and participate in Project Teams for
Financing Strategies or Energy Savings Performance Contracting, kicking
off this summer
• Apply for one-on-one assistance and peer matching
Priority Area: Financing Strategies
4
Significant Benefits for Schools
4
K-12 schools spend around $6 billion on
energy annually – more money than is
spent on textbooks and computers
combined.
There are significant benefits to making
clean energy upgrades, including:
• Lower energy bills
• Modernized infrastructure and
reduced facility maintenance costs
• Improved comfort, health, and safety
• Environmental benefits
• Educational opportunities
Financing guide & case studies:
http://www.eere.energy.gov/wip/solutio
ncenter/pdfs/financing_energy_upgrade
s_k-12.pdf
5
Key Principles
5
Principle 1. Start with Clear
Project Objectives
Principle 2. Pursue
Comprehensive Projects
Whenever Possible
Principle 3. Focus on Life-Cycle
Cost Analysis
GETTING TO “YES”
In addition to making the financial
case, successful projects require a
strong team of champions, and a
clear understanding of key hurdles
and how to make the case to a
variety of audiences. For an in-depth
treatment of these topics, see
Getting to “YES”: A Guide to
Developing a Persuasive Business
Case for Energy Efficiency :
http://energy.maryland.gov/Business
/businesscaseguide/
6
Financing Options for Schools
6
• Internal Cash
• Grants & Incentives
• Bonds
• Leasing
Arrangements
• Other Clean Energy-
Specific Financing
7
Internal Cash
7
• Simplest, most flexible and most direct way to pay for energy-related
improvements
• Projects paid directly with cash from the operating or capital budgets
• School retains all energy savings and often speeds project
implementation time by avoiding transaction delays
• However, the availability of internal funds is constrained by budget
limitations and competing operating and capital investment needs
Internal Cash Monies from existing school district budgets
Pros Cons
 Extremely flexible capital
 Not debt, so no interest or obligation to repay
 Significant competing needs for these flexible
funds
 Most school districts lack sufficient cash to fund all
(or any) EE/RE needs
8
Grants & Incentives
8
• Grants are external sources of
capital that neither schools nor
their taxpayers need to re-pay
• Grants can help to lower the
overall cost of project
• However, accepting a grant
obligates the school to perform
actions specified in the grant
agreement
Find Incentives in Your State
Check out the Database of State Incentives for
Renewables and Efficiency (DSIRE) at
www.dsireusa.org. Click on your state, and
then scroll down the list of incentives. Schools
are usually included under the “business”
incentives.
Grants
Monies from third parties such as Federal and State
governments, utility ratepayers, or foundations that
cover all or part of the costs of energy improvements
Pros Cons
 Best source of funds – reduces total project cost
 Not debt, so no interest or obligation for school
district or taxpayers to repay
 Limited availability
 Restricted uses
 Often covers only part of project costs
 Philanthropic and government grants require
planning and often a detailed proposal
9
Bonds
9
• Bonds are long-term debt obligations, and are commonly issued to
finance construction and/or improvements to public infrastructure
• General obligation bonds are most common; they often require voter
approval and are subject to debt limits
• Clean energy projects can be:
o Wrapped into a larger bond ballot measure
o Offered as a stand-alone project for voter approval (for larger projects)
General Obligation Bonds (GO)
Debt secured by the obligation to levy and collect
property taxes sufficient to pay annual debt service
Pros Cons
 Flexible capital for funding a range of clean energy
projects (often subject to voter approval)
 Lowest cost debt due to robust security and tax
exempt interest
 Increased revenue for school district (in most
cases because taxpayers repay debt
 Long terms (20-30 yrs)
 Voter approval required (in most cases)
 Counts against statutory debt limit restrictions
 High fixed issuance costs, including obtaining a
legal opinion, setting up a trustee, and retaining
accounting services
 Long development time (~9 months+) to prepare
package of funding requests and gain voter
support
10
Federally-Subsidized Bonds
10
• Qualified Energy Conservation Bonds (QECBs) can be used for a
range of “qualified energy conservation projects” including those that
reduce energy consumption in publicly owned buildings.
• Qualified Zone Academy Bonds (QZABs) can be used for a range of
energy and non-energy facilities renovation projects in disadvantaged
communities, but are more complicated to deploy because they
require a partnership with a private entity that must make a
contribution to the school to improve student education.
More info on QECBs:
http://www1.eere.energy.gov/wip/solutioncenter/financialproducts/QECB.html
More info on QZABs:
http://www2.ed.gov/programs/qualifiedzone/faq.html
11
Lease Financing
11
• Leases often have slightly higher rates than
bonds and require the school district (instead
of the taxpayers) to repay the debt
• However, leases are a faster and more
flexible tool, and can be set up so that energy
savings are greater than debt payments
• Methods of procuring lease financing include:
o Private-Placement Agreements (or single investor leases)
o Certificates of Participation (COPs)
In many states, leases are
popular because they are
often not subject to school
district debt limits or voter
approval
Leasing Arrangements
School district leases property from a lessor, the underlying
security is the leased equipment or real estate.
Pros Cons
 Often voter approval not required
 Often not subject to debt limitations
 Flexible capital for funding a range of EE projects
 Tax exemption lowers costs
 Flexible terms (5-15 years)
 Short development time (3months)
 School district (not taxpayers) must repay the debt
 Higher interest rates than GO debt
 Reserve fund and capitalized interest typically required
12
Other Clean Energy Financing Options
12
• Power Purchase Agreements - A third
party owns, operates and maintains a
renewable energy system installed on
school district property, e.g. rooftop solar
photovolatics (PV). The school district
pays the third party a pre-negotiated rate
for the power generated.
• On-utility bill financing (OBF) entails a utility (or third party) lending
the up-front capital for energy-related improvements. The school
repays this loan through a line item on the utility bill.
• Revolving loan funds (RLFs) are pools of capital from which loans are
made – as loans are repaid, the capital is then re-lent for another
project.
13
Williamson County School District (TN)
13
Organization Size: 42 schools (32,000 students in K-12)
Primary Work Completed: Replace cooling towers, boilers, HVAC units,
heat exchanger; lighting retrofits; energy management control systems
Project Cost: $5.7 million
Type of Financing: Lease-purchase agreement, bank note, general
obligation bond
Simple Payback Period: 6.5 years (net project cost / savings per year)
Key Benefits: Lower energy bills, replace aging equipment, improved
energy controls, funding for an energy resource manager
14
DOE Better Buildings Initiative & K-12 Schools
• Better Buildings Initiative: make municipal,
commercial and industrial buildings 20% more
efficient by 2020
• Better Buildings Challenge
o Partners, including K-12 school districts, make
a commitment, take action, and share results
o DOE provides recognition, technical
assistance, and facilitates connections among
energy stakeholders
• Better Buildings Alliance
o Same general criteria, but not quite as
stringent
o Project Teams offer long-term opportunities
for peer exchange, including finance and ESPC
15
• Visit the Solution Center (Guide is featured on homepage)
www.eere.energy.gov/wip/solutioncenter/
• Submit an application for assistance
www.eere.energy.gov/wip/solutioncenter/technical_assistance.html
• Join the Better Buildings Challenge or Alliance
For more information email Crystal McDonald at crystal.mcdonald@ee.doe.gov
• Sign up for our mailing list and email us your
questions/suggestions
TechnicalAssistanceProgram@ee.doe.gov
How to Get Engaged with DOE

More Related Content

What's hot

Johnson Controls Inc.
Johnson Controls Inc. Johnson Controls Inc.
Johnson Controls Inc.
Contract Connections
 
Aci mass heat-loan-carlfawcett-csg
Aci mass heat-loan-carlfawcett-csgAci mass heat-loan-carlfawcett-csg
Aci mass heat-loan-carlfawcett-csg
Conservation Services Group
 
Johnson Controls 2010 Energy Efficiency Indicator Webcast
Johnson Controls 2010 Energy Efficiency Indicator WebcastJohnson Controls 2010 Energy Efficiency Indicator Webcast
Johnson Controls 2010 Energy Efficiency Indicator Webcast
International Facility Management Association
 
Koshy Cherail - AEEE
Koshy Cherail - AEEE Koshy Cherail - AEEE
Koshy Cherail - AEEE
guest17a0764
 
March 22, 2013 Revenue Generation Task Force Meeting
March 22, 2013 Revenue Generation Task Force MeetingMarch 22, 2013 Revenue Generation Task Force Meeting
March 22, 2013 Revenue Generation Task Force Meeting
LSU Communications & University Relations
 
Pace slides
Pace slidesPace slides
Pace slides
olson2727
 
Guy Doyle - Green Growth Diagnostics for Africa
Guy Doyle - Green Growth Diagnostics for AfricaGuy Doyle - Green Growth Diagnostics for Africa
Guy Doyle - Green Growth Diagnostics for Africa
Institute of Development Studies
 
High Performance Building Program Presentation 2011
High Performance Building Program Presentation 2011High Performance Building Program Presentation 2011
High Performance Building Program Presentation 2011
Conor Merrigan
 
Shaping the Tradability of US Energy Efficiency
Shaping the Tradability of  US Energy EfficiencyShaping the Tradability of  US Energy Efficiency
Shaping the Tradability of US Energy Efficiency
Center for Energy and Environment
 
How to Implement Air Purification Technology for Charter Schools
How to Implement Air Purification Technology for Charter SchoolsHow to Implement Air Purification Technology for Charter Schools
How to Implement Air Purification Technology for Charter Schools
Charter School Capital
 
IFC-EE-financing-examples-presentation-ashutosh-tandon
IFC-EE-financing-examples-presentation-ashutosh-tandonIFC-EE-financing-examples-presentation-ashutosh-tandon
IFC-EE-financing-examples-presentation-ashutosh-tandon
OECD Environment
 
How businesses can approach investment to increase energy efficiency
 How businesses can approach investment to increase energy efficiency How businesses can approach investment to increase energy efficiency
How businesses can approach investment to increase energy efficiency
Centrica Business Solutions
 
San Diego County Office Of Education ENERGY PLANNING GUIDE
San Diego County Office Of Education ENERGY PLANNING GUIDESan Diego County Office Of Education ENERGY PLANNING GUIDE
San Diego County Office Of Education ENERGY PLANNING GUIDE
Center for Sustainable Energy
 
India's energy-efficiency-financing-platform-presentation-vineeta-kanwal
India's energy-efficiency-financing-platform-presentation-vineeta-kanwalIndia's energy-efficiency-financing-platform-presentation-vineeta-kanwal
India's energy-efficiency-financing-platform-presentation-vineeta-kanwal
OECD Environment
 
Regulation to allow Green Liens for Retrofits - GBF2009
Regulation to allow Green Liens for Retrofits - GBF2009Regulation to allow Green Liens for Retrofits - GBF2009
Regulation to allow Green Liens for Retrofits - GBF2009
Toronto 2030 District
 
Renewable Power Generation Costs in 2012: IRENA Analysis
Renewable Power Generation Costs in 2012: IRENA AnalysisRenewable Power Generation Costs in 2012: IRENA Analysis
Renewable Power Generation Costs in 2012: IRENA Analysis
Michael Taylor
 
מצגת מבוא על אסקו
מצגת מבוא על אסקומצגת מבוא על אסקו
מצגת מבוא על אסקו
Hanan E. Levy
 
Lessons from commercial banks’ experience with lending to green SME investmen...
Lessons from commercial banks’ experience with lending to green SME investmen...Lessons from commercial banks’ experience with lending to green SME investmen...
Lessons from commercial banks’ experience with lending to green SME investmen...
OECD Environment
 
Investments in water private and public investments
Investments in water private and public investmentsInvestments in water private and public investments
Investments in water private and public investments
Eugene Chao
 
Review of Benefit-cost testing for Energy Efficiency Programs
Review of Benefit-cost testing for Energy Efficiency ProgramsReview of Benefit-cost testing for Energy Efficiency Programs
Review of Benefit-cost testing for Energy Efficiency Programs
Center for Energy and Environment
 

What's hot (20)

Johnson Controls Inc.
Johnson Controls Inc. Johnson Controls Inc.
Johnson Controls Inc.
 
Aci mass heat-loan-carlfawcett-csg
Aci mass heat-loan-carlfawcett-csgAci mass heat-loan-carlfawcett-csg
Aci mass heat-loan-carlfawcett-csg
 
Johnson Controls 2010 Energy Efficiency Indicator Webcast
Johnson Controls 2010 Energy Efficiency Indicator WebcastJohnson Controls 2010 Energy Efficiency Indicator Webcast
Johnson Controls 2010 Energy Efficiency Indicator Webcast
 
Koshy Cherail - AEEE
Koshy Cherail - AEEE Koshy Cherail - AEEE
Koshy Cherail - AEEE
 
March 22, 2013 Revenue Generation Task Force Meeting
March 22, 2013 Revenue Generation Task Force MeetingMarch 22, 2013 Revenue Generation Task Force Meeting
March 22, 2013 Revenue Generation Task Force Meeting
 
Pace slides
Pace slidesPace slides
Pace slides
 
Guy Doyle - Green Growth Diagnostics for Africa
Guy Doyle - Green Growth Diagnostics for AfricaGuy Doyle - Green Growth Diagnostics for Africa
Guy Doyle - Green Growth Diagnostics for Africa
 
High Performance Building Program Presentation 2011
High Performance Building Program Presentation 2011High Performance Building Program Presentation 2011
High Performance Building Program Presentation 2011
 
Shaping the Tradability of US Energy Efficiency
Shaping the Tradability of  US Energy EfficiencyShaping the Tradability of  US Energy Efficiency
Shaping the Tradability of US Energy Efficiency
 
How to Implement Air Purification Technology for Charter Schools
How to Implement Air Purification Technology for Charter SchoolsHow to Implement Air Purification Technology for Charter Schools
How to Implement Air Purification Technology for Charter Schools
 
IFC-EE-financing-examples-presentation-ashutosh-tandon
IFC-EE-financing-examples-presentation-ashutosh-tandonIFC-EE-financing-examples-presentation-ashutosh-tandon
IFC-EE-financing-examples-presentation-ashutosh-tandon
 
How businesses can approach investment to increase energy efficiency
 How businesses can approach investment to increase energy efficiency How businesses can approach investment to increase energy efficiency
How businesses can approach investment to increase energy efficiency
 
San Diego County Office Of Education ENERGY PLANNING GUIDE
San Diego County Office Of Education ENERGY PLANNING GUIDESan Diego County Office Of Education ENERGY PLANNING GUIDE
San Diego County Office Of Education ENERGY PLANNING GUIDE
 
India's energy-efficiency-financing-platform-presentation-vineeta-kanwal
India's energy-efficiency-financing-platform-presentation-vineeta-kanwalIndia's energy-efficiency-financing-platform-presentation-vineeta-kanwal
India's energy-efficiency-financing-platform-presentation-vineeta-kanwal
 
Regulation to allow Green Liens for Retrofits - GBF2009
Regulation to allow Green Liens for Retrofits - GBF2009Regulation to allow Green Liens for Retrofits - GBF2009
Regulation to allow Green Liens for Retrofits - GBF2009
 
Renewable Power Generation Costs in 2012: IRENA Analysis
Renewable Power Generation Costs in 2012: IRENA AnalysisRenewable Power Generation Costs in 2012: IRENA Analysis
Renewable Power Generation Costs in 2012: IRENA Analysis
 
מצגת מבוא על אסקו
מצגת מבוא על אסקומצגת מבוא על אסקו
מצגת מבוא על אסקו
 
Lessons from commercial banks’ experience with lending to green SME investmen...
Lessons from commercial banks’ experience with lending to green SME investmen...Lessons from commercial banks’ experience with lending to green SME investmen...
Lessons from commercial banks’ experience with lending to green SME investmen...
 
Investments in water private and public investments
Investments in water private and public investmentsInvestments in water private and public investments
Investments in water private and public investments
 
Review of Benefit-cost testing for Energy Efficiency Programs
Review of Benefit-cost testing for Energy Efficiency ProgramsReview of Benefit-cost testing for Energy Efficiency Programs
Review of Benefit-cost testing for Energy Efficiency Programs
 

Viewers also liked

Project Management Certification - EDUC 6135
Project Management Certification - EDUC 6135Project Management Certification - EDUC 6135
Project Management Certification - EDUC 6135
SIROD2U
 
Industrial energy efficiency program best practices
Industrial energy efficiency program best practicesIndustrial energy efficiency program best practices
Industrial energy efficiency program best practices
TNenergy
 
Mb0045 summer 2014
Mb0045 summer 2014Mb0045 summer 2014
Mb0045 summer 2014
Rajesh Kumar Singh
 
Advanced energy design guides a blueprint for cutting your campus energy us...
Advanced energy design guides   a blueprint for cutting your campus energy us...Advanced energy design guides   a blueprint for cutting your campus energy us...
Advanced energy design guides a blueprint for cutting your campus energy us...
TNenergy
 
Technology at work in your facility solar & led lighting
Technology at work in your facility   solar & led lightingTechnology at work in your facility   solar & led lighting
Technology at work in your facility solar & led lighting
TNenergy
 
Changing behavior from the inside out – the keys to effective employee engage...
Changing behavior from the inside out – the keys to effective employee engage...Changing behavior from the inside out – the keys to effective employee engage...
Changing behavior from the inside out – the keys to effective employee engage...
TNenergy
 
The ABCs of Performance Contracting
The ABCs of Performance ContractingThe ABCs of Performance Contracting
The ABCs of Performance Contracting
TNenergy
 
Mb0040 assignment spring_2016
Mb0040 assignment spring_2016Mb0040 assignment spring_2016
Mb0040 assignment spring_2016
Rajesh Kumar Singh
 
Resume_TMurugan
Resume_TMuruganResume_TMurugan
Resume_TMurugan
Murugan Thangadurai
 
Swd nov17 light
Swd nov17 lightSwd nov17 light
Swd nov17 light
RuskEagles
 
Success = Helping the People You Can Help the Most and Getting Rich at the Sa...
Success = Helping the People You Can Help the Most and Getting Rich at the Sa...Success = Helping the People You Can Help the Most and Getting Rich at the Sa...
Success = Helping the People You Can Help the Most and Getting Rich at the Sa...
Paul Krupin
 
Agradecimientos a Niñas y Niños de la E.B. Mi Jardin II
Agradecimientos a Niñas y Niños de la E.B. Mi Jardin IIAgradecimientos a Niñas y Niños de la E.B. Mi Jardin II
Agradecimientos a Niñas y Niños de la E.B. Mi Jardin II
Oscar Briceño
 
Proceso de la micro waltha
Proceso de la micro walthaProceso de la micro waltha
Proceso de la micro waltha
Elizabeth Cruz
 
Dating Advice for Men
Dating Advice for MenDating Advice for Men
Dating Advice for Men
Kelvin Nick
 
Plug in-electric-vehicle-update 3-12-13
Plug in-electric-vehicle-update 3-12-13Plug in-electric-vehicle-update 3-12-13
Plug in-electric-vehicle-update 3-12-13
TNenergy
 
Massachusetts policies for combined heat & power
Massachusetts policies for combined heat & powerMassachusetts policies for combined heat & power
Massachusetts policies for combined heat & power
TNenergy
 
Division A
Division ADivision A
Division A
waimansoo
 
2017_01_16 ТАРЯНИК Г.Д. Голова ради ветеранів лікарні
2017_01_16 ТАРЯНИК Г.Д. Голова ради ветеранів лікарні 2017_01_16 ТАРЯНИК Г.Д. Голова ради ветеранів лікарні
2017_01_16 ТАРЯНИК Г.Д. Голова ради ветеранів лікарні
Дніпропетровська обласна клінічна лікарня ім. І.І. Мечникова
 
Coaching knowres talk
Coaching knowres talkCoaching knowres talk
Coaching knowres talk
Salome van Coller
 
SRC Toastmasters
SRC ToastmastersSRC Toastmasters
SRC Toastmasters
waimansoo
 

Viewers also liked (20)

Project Management Certification - EDUC 6135
Project Management Certification - EDUC 6135Project Management Certification - EDUC 6135
Project Management Certification - EDUC 6135
 
Industrial energy efficiency program best practices
Industrial energy efficiency program best practicesIndustrial energy efficiency program best practices
Industrial energy efficiency program best practices
 
Mb0045 summer 2014
Mb0045 summer 2014Mb0045 summer 2014
Mb0045 summer 2014
 
Advanced energy design guides a blueprint for cutting your campus energy us...
Advanced energy design guides   a blueprint for cutting your campus energy us...Advanced energy design guides   a blueprint for cutting your campus energy us...
Advanced energy design guides a blueprint for cutting your campus energy us...
 
Technology at work in your facility solar & led lighting
Technology at work in your facility   solar & led lightingTechnology at work in your facility   solar & led lighting
Technology at work in your facility solar & led lighting
 
Changing behavior from the inside out – the keys to effective employee engage...
Changing behavior from the inside out – the keys to effective employee engage...Changing behavior from the inside out – the keys to effective employee engage...
Changing behavior from the inside out – the keys to effective employee engage...
 
The ABCs of Performance Contracting
The ABCs of Performance ContractingThe ABCs of Performance Contracting
The ABCs of Performance Contracting
 
Mb0040 assignment spring_2016
Mb0040 assignment spring_2016Mb0040 assignment spring_2016
Mb0040 assignment spring_2016
 
Resume_TMurugan
Resume_TMuruganResume_TMurugan
Resume_TMurugan
 
Swd nov17 light
Swd nov17 lightSwd nov17 light
Swd nov17 light
 
Success = Helping the People You Can Help the Most and Getting Rich at the Sa...
Success = Helping the People You Can Help the Most and Getting Rich at the Sa...Success = Helping the People You Can Help the Most and Getting Rich at the Sa...
Success = Helping the People You Can Help the Most and Getting Rich at the Sa...
 
Agradecimientos a Niñas y Niños de la E.B. Mi Jardin II
Agradecimientos a Niñas y Niños de la E.B. Mi Jardin IIAgradecimientos a Niñas y Niños de la E.B. Mi Jardin II
Agradecimientos a Niñas y Niños de la E.B. Mi Jardin II
 
Proceso de la micro waltha
Proceso de la micro walthaProceso de la micro waltha
Proceso de la micro waltha
 
Dating Advice for Men
Dating Advice for MenDating Advice for Men
Dating Advice for Men
 
Plug in-electric-vehicle-update 3-12-13
Plug in-electric-vehicle-update 3-12-13Plug in-electric-vehicle-update 3-12-13
Plug in-electric-vehicle-update 3-12-13
 
Massachusetts policies for combined heat & power
Massachusetts policies for combined heat & powerMassachusetts policies for combined heat & power
Massachusetts policies for combined heat & power
 
Division A
Division ADivision A
Division A
 
2017_01_16 ТАРЯНИК Г.Д. Голова ради ветеранів лікарні
2017_01_16 ТАРЯНИК Г.Д. Голова ради ветеранів лікарні 2017_01_16 ТАРЯНИК Г.Д. Голова ради ветеранів лікарні
2017_01_16 ТАРЯНИК Г.Д. Голова ради ветеранів лікарні
 
Coaching knowres talk
Coaching knowres talkCoaching knowres talk
Coaching knowres talk
 
SRC Toastmasters
SRC ToastmastersSRC Toastmasters
SRC Toastmasters
 

Similar to Financing energy upgrades for k 12 schools - u.s. dept. of energy

DOE Loan Programs Office by Wayne Killen
DOE Loan Programs Office by Wayne KillenDOE Loan Programs Office by Wayne Killen
DOE Loan Programs Office by Wayne Killen
Forth
 
Financing industrial energy efficiency & chp
Financing industrial energy efficiency & chpFinancing industrial energy efficiency & chp
Financing industrial energy efficiency & chp
TNenergy
 
November 21, 2013 | Next Steps: Financing solar for your business | Victor Ro...
November 21, 2013 | Next Steps: Financing solar for your business | Victor Ro...November 21, 2013 | Next Steps: Financing solar for your business | Victor Ro...
November 21, 2013 | Next Steps: Financing solar for your business | Victor Ro...
Fresh Energy
 
Energy Efficiency Loan Program
Energy Efficiency Loan ProgramEnergy Efficiency Loan Program
Energy Efficiency Loan Program
TNenergy
 
Peter lindstrom-si-presentation
Peter lindstrom-si-presentationPeter lindstrom-si-presentation
Peter lindstrom-si-presentation
University of Minnesota
 
Green Bank Prodcuts - Residential Solar
Green Bank Prodcuts - Residential SolarGreen Bank Prodcuts - Residential Solar
Green Bank Prodcuts - Residential Solar
Reed Hundt
 
Green Bank Products - Residential Solar
Green Bank Products - Residential SolarGreen Bank Products - Residential Solar
Green Bank Products - Residential Solar
CGC CGC
 
Energy Efficiency financing & evaluation criteria
Energy Efficiency  financing & evaluation criteriaEnergy Efficiency  financing & evaluation criteria
Energy Efficiency financing & evaluation criteria
ZAINI ABDUL WAHAB
 
Phoenix Energy Performance Contracting Presentation
Phoenix   Energy Performance Contracting PresentationPhoenix   Energy Performance Contracting Presentation
Phoenix Energy Performance Contracting Presentation
ICF_HCD
 
Funding and project development strategies for energy improvement
Funding and project development strategies for energy improvementFunding and project development strategies for energy improvement
Funding and project development strategies for energy improvement
ESRConline
 
Fact Sheet: Commercial PACE Financing
Fact Sheet: Commercial PACE FinancingFact Sheet: Commercial PACE Financing
Fact Sheet: Commercial PACE Financing
The Solar Foundation
 
Driving Change by Dan Janosec
Driving Change by Dan JanosecDriving Change by Dan Janosec
Driving Change by Dan Janosec
Forth
 
Successful Small Business Energy Efficiency Program Practices
Successful Small Business Energy Efficiency Program PracticesSuccessful Small Business Energy Efficiency Program Practices
Successful Small Business Energy Efficiency Program Practices
Seth William Nowak
 
Models for Financing Clean Energy- SWEEP 2009
Models for Financing Clean Energy- SWEEP 2009Models for Financing Clean Energy- SWEEP 2009
Models for Financing Clean Energy- SWEEP 2009
HarcourtBrownEF
 
business-models.pdf
business-models.pdfbusiness-models.pdf
business-models.pdf
ImadRiaz2
 
Overview: MN Guaranteed Energy Savings Program
Overview: MN Guaranteed Energy Savings ProgramOverview: MN Guaranteed Energy Savings Program
Overview: MN Guaranteed Energy Savings Program
University of Minnesota
 
Shared re modelruleswebinar
Shared re modelruleswebinarShared re modelruleswebinar
Shared re modelruleswebinar
VoteSolar
 
Course on Regulation and Sustainable Energy in Developing Countries - Session...
Course on Regulation and Sustainable Energy in Developing Countries - Session...Course on Regulation and Sustainable Energy in Developing Countries - Session...
Course on Regulation and Sustainable Energy in Developing Countries - Session...
Leonardo ENERGY
 
Dominion Energy Efficiency Collaborative Presentation
Dominion Energy Efficiency Collaborative PresentationDominion Energy Efficiency Collaborative Presentation
Dominion Energy Efficiency Collaborative Presentation
Mary Shoemaker
 
Self Guide Es Finance
Self Guide Es FinanceSelf Guide Es Finance
Self Guide Es Finance
Michael Winters
 

Similar to Financing energy upgrades for k 12 schools - u.s. dept. of energy (20)

DOE Loan Programs Office by Wayne Killen
DOE Loan Programs Office by Wayne KillenDOE Loan Programs Office by Wayne Killen
DOE Loan Programs Office by Wayne Killen
 
Financing industrial energy efficiency & chp
Financing industrial energy efficiency & chpFinancing industrial energy efficiency & chp
Financing industrial energy efficiency & chp
 
November 21, 2013 | Next Steps: Financing solar for your business | Victor Ro...
November 21, 2013 | Next Steps: Financing solar for your business | Victor Ro...November 21, 2013 | Next Steps: Financing solar for your business | Victor Ro...
November 21, 2013 | Next Steps: Financing solar for your business | Victor Ro...
 
Energy Efficiency Loan Program
Energy Efficiency Loan ProgramEnergy Efficiency Loan Program
Energy Efficiency Loan Program
 
Peter lindstrom-si-presentation
Peter lindstrom-si-presentationPeter lindstrom-si-presentation
Peter lindstrom-si-presentation
 
Green Bank Prodcuts - Residential Solar
Green Bank Prodcuts - Residential SolarGreen Bank Prodcuts - Residential Solar
Green Bank Prodcuts - Residential Solar
 
Green Bank Products - Residential Solar
Green Bank Products - Residential SolarGreen Bank Products - Residential Solar
Green Bank Products - Residential Solar
 
Energy Efficiency financing & evaluation criteria
Energy Efficiency  financing & evaluation criteriaEnergy Efficiency  financing & evaluation criteria
Energy Efficiency financing & evaluation criteria
 
Phoenix Energy Performance Contracting Presentation
Phoenix   Energy Performance Contracting PresentationPhoenix   Energy Performance Contracting Presentation
Phoenix Energy Performance Contracting Presentation
 
Funding and project development strategies for energy improvement
Funding and project development strategies for energy improvementFunding and project development strategies for energy improvement
Funding and project development strategies for energy improvement
 
Fact Sheet: Commercial PACE Financing
Fact Sheet: Commercial PACE FinancingFact Sheet: Commercial PACE Financing
Fact Sheet: Commercial PACE Financing
 
Driving Change by Dan Janosec
Driving Change by Dan JanosecDriving Change by Dan Janosec
Driving Change by Dan Janosec
 
Successful Small Business Energy Efficiency Program Practices
Successful Small Business Energy Efficiency Program PracticesSuccessful Small Business Energy Efficiency Program Practices
Successful Small Business Energy Efficiency Program Practices
 
Models for Financing Clean Energy- SWEEP 2009
Models for Financing Clean Energy- SWEEP 2009Models for Financing Clean Energy- SWEEP 2009
Models for Financing Clean Energy- SWEEP 2009
 
business-models.pdf
business-models.pdfbusiness-models.pdf
business-models.pdf
 
Overview: MN Guaranteed Energy Savings Program
Overview: MN Guaranteed Energy Savings ProgramOverview: MN Guaranteed Energy Savings Program
Overview: MN Guaranteed Energy Savings Program
 
Shared re modelruleswebinar
Shared re modelruleswebinarShared re modelruleswebinar
Shared re modelruleswebinar
 
Course on Regulation and Sustainable Energy in Developing Countries - Session...
Course on Regulation and Sustainable Energy in Developing Countries - Session...Course on Regulation and Sustainable Energy in Developing Countries - Session...
Course on Regulation and Sustainable Energy in Developing Countries - Session...
 
Dominion Energy Efficiency Collaborative Presentation
Dominion Energy Efficiency Collaborative PresentationDominion Energy Efficiency Collaborative Presentation
Dominion Energy Efficiency Collaborative Presentation
 
Self Guide Es Finance
Self Guide Es FinanceSelf Guide Es Finance
Self Guide Es Finance
 

Recently uploaded

zkStudyClub - LatticeFold: A Lattice-based Folding Scheme and its Application...
zkStudyClub - LatticeFold: A Lattice-based Folding Scheme and its Application...zkStudyClub - LatticeFold: A Lattice-based Folding Scheme and its Application...
zkStudyClub - LatticeFold: A Lattice-based Folding Scheme and its Application...
Alex Pruden
 
Mutation Testing for Task-Oriented Chatbots
Mutation Testing for Task-Oriented ChatbotsMutation Testing for Task-Oriented Chatbots
Mutation Testing for Task-Oriented Chatbots
Pablo Gómez Abajo
 
Apps Break Data
Apps Break DataApps Break Data
Apps Break Data
Ivo Velitchkov
 
Nordic Marketo Engage User Group_June 13_ 2024.pptx
Nordic Marketo Engage User Group_June 13_ 2024.pptxNordic Marketo Engage User Group_June 13_ 2024.pptx
Nordic Marketo Engage User Group_June 13_ 2024.pptx
MichaelKnudsen27
 
A Deep Dive into ScyllaDB's Architecture
A Deep Dive into ScyllaDB's ArchitectureA Deep Dive into ScyllaDB's Architecture
A Deep Dive into ScyllaDB's Architecture
ScyllaDB
 
Leveraging the Graph for Clinical Trials and Standards
Leveraging the Graph for Clinical Trials and StandardsLeveraging the Graph for Clinical Trials and Standards
Leveraging the Graph for Clinical Trials and Standards
Neo4j
 
Must Know Postgres Extension for DBA and Developer during Migration
Must Know Postgres Extension for DBA and Developer during MigrationMust Know Postgres Extension for DBA and Developer during Migration
Must Know Postgres Extension for DBA and Developer during Migration
Mydbops
 
Northern Engraving | Nameplate Manufacturing Process - 2024
Northern Engraving | Nameplate Manufacturing Process - 2024Northern Engraving | Nameplate Manufacturing Process - 2024
Northern Engraving | Nameplate Manufacturing Process - 2024
Northern Engraving
 
Astute Business Solutions | Oracle Cloud Partner |
Astute Business Solutions | Oracle Cloud Partner |Astute Business Solutions | Oracle Cloud Partner |
Astute Business Solutions | Oracle Cloud Partner |
AstuteBusiness
 
Christine's Supplier Sourcing Presentaion.pptx
Christine's Supplier Sourcing Presentaion.pptxChristine's Supplier Sourcing Presentaion.pptx
Christine's Supplier Sourcing Presentaion.pptx
christinelarrosa
 
Dandelion Hashtable: beyond billion requests per second on a commodity server
Dandelion Hashtable: beyond billion requests per second on a commodity serverDandelion Hashtable: beyond billion requests per second on a commodity server
Dandelion Hashtable: beyond billion requests per second on a commodity server
Antonios Katsarakis
 
LF Energy Webinar: Carbon Data Specifications: Mechanisms to Improve Data Acc...
LF Energy Webinar: Carbon Data Specifications: Mechanisms to Improve Data Acc...LF Energy Webinar: Carbon Data Specifications: Mechanisms to Improve Data Acc...
LF Energy Webinar: Carbon Data Specifications: Mechanisms to Improve Data Acc...
DanBrown980551
 
inQuba Webinar Mastering Customer Journey Management with Dr Graham Hill
inQuba Webinar Mastering Customer Journey Management with Dr Graham HillinQuba Webinar Mastering Customer Journey Management with Dr Graham Hill
inQuba Webinar Mastering Customer Journey Management with Dr Graham Hill
LizaNolte
 
9 CEO's who hit $100m ARR Share Their Top Growth Tactics Nathan Latka, Founde...
9 CEO's who hit $100m ARR Share Their Top Growth Tactics Nathan Latka, Founde...9 CEO's who hit $100m ARR Share Their Top Growth Tactics Nathan Latka, Founde...
9 CEO's who hit $100m ARR Share Their Top Growth Tactics Nathan Latka, Founde...
saastr
 
Biomedical Knowledge Graphs for Data Scientists and Bioinformaticians
Biomedical Knowledge Graphs for Data Scientists and BioinformaticiansBiomedical Knowledge Graphs for Data Scientists and Bioinformaticians
Biomedical Knowledge Graphs for Data Scientists and Bioinformaticians
Neo4j
 
Christine's Product Research Presentation.pptx
Christine's Product Research Presentation.pptxChristine's Product Research Presentation.pptx
Christine's Product Research Presentation.pptx
christinelarrosa
 
Freshworks Rethinks NoSQL for Rapid Scaling & Cost-Efficiency
Freshworks Rethinks NoSQL for Rapid Scaling & Cost-EfficiencyFreshworks Rethinks NoSQL for Rapid Scaling & Cost-Efficiency
Freshworks Rethinks NoSQL for Rapid Scaling & Cost-Efficiency
ScyllaDB
 
PRODUCT LISTING OPTIMIZATION PRESENTATION.pptx
PRODUCT LISTING OPTIMIZATION PRESENTATION.pptxPRODUCT LISTING OPTIMIZATION PRESENTATION.pptx
PRODUCT LISTING OPTIMIZATION PRESENTATION.pptx
christinelarrosa
 
[OReilly Superstream] Occupy the Space: A grassroots guide to engineering (an...
[OReilly Superstream] Occupy the Space: A grassroots guide to engineering (an...[OReilly Superstream] Occupy the Space: A grassroots guide to engineering (an...
[OReilly Superstream] Occupy the Space: A grassroots guide to engineering (an...
Jason Yip
 
What is an RPA CoE? Session 1 – CoE Vision
What is an RPA CoE?  Session 1 – CoE VisionWhat is an RPA CoE?  Session 1 – CoE Vision
What is an RPA CoE? Session 1 – CoE Vision
DianaGray10
 

Recently uploaded (20)

zkStudyClub - LatticeFold: A Lattice-based Folding Scheme and its Application...
zkStudyClub - LatticeFold: A Lattice-based Folding Scheme and its Application...zkStudyClub - LatticeFold: A Lattice-based Folding Scheme and its Application...
zkStudyClub - LatticeFold: A Lattice-based Folding Scheme and its Application...
 
Mutation Testing for Task-Oriented Chatbots
Mutation Testing for Task-Oriented ChatbotsMutation Testing for Task-Oriented Chatbots
Mutation Testing for Task-Oriented Chatbots
 
Apps Break Data
Apps Break DataApps Break Data
Apps Break Data
 
Nordic Marketo Engage User Group_June 13_ 2024.pptx
Nordic Marketo Engage User Group_June 13_ 2024.pptxNordic Marketo Engage User Group_June 13_ 2024.pptx
Nordic Marketo Engage User Group_June 13_ 2024.pptx
 
A Deep Dive into ScyllaDB's Architecture
A Deep Dive into ScyllaDB's ArchitectureA Deep Dive into ScyllaDB's Architecture
A Deep Dive into ScyllaDB's Architecture
 
Leveraging the Graph for Clinical Trials and Standards
Leveraging the Graph for Clinical Trials and StandardsLeveraging the Graph for Clinical Trials and Standards
Leveraging the Graph for Clinical Trials and Standards
 
Must Know Postgres Extension for DBA and Developer during Migration
Must Know Postgres Extension for DBA and Developer during MigrationMust Know Postgres Extension for DBA and Developer during Migration
Must Know Postgres Extension for DBA and Developer during Migration
 
Northern Engraving | Nameplate Manufacturing Process - 2024
Northern Engraving | Nameplate Manufacturing Process - 2024Northern Engraving | Nameplate Manufacturing Process - 2024
Northern Engraving | Nameplate Manufacturing Process - 2024
 
Astute Business Solutions | Oracle Cloud Partner |
Astute Business Solutions | Oracle Cloud Partner |Astute Business Solutions | Oracle Cloud Partner |
Astute Business Solutions | Oracle Cloud Partner |
 
Christine's Supplier Sourcing Presentaion.pptx
Christine's Supplier Sourcing Presentaion.pptxChristine's Supplier Sourcing Presentaion.pptx
Christine's Supplier Sourcing Presentaion.pptx
 
Dandelion Hashtable: beyond billion requests per second on a commodity server
Dandelion Hashtable: beyond billion requests per second on a commodity serverDandelion Hashtable: beyond billion requests per second on a commodity server
Dandelion Hashtable: beyond billion requests per second on a commodity server
 
LF Energy Webinar: Carbon Data Specifications: Mechanisms to Improve Data Acc...
LF Energy Webinar: Carbon Data Specifications: Mechanisms to Improve Data Acc...LF Energy Webinar: Carbon Data Specifications: Mechanisms to Improve Data Acc...
LF Energy Webinar: Carbon Data Specifications: Mechanisms to Improve Data Acc...
 
inQuba Webinar Mastering Customer Journey Management with Dr Graham Hill
inQuba Webinar Mastering Customer Journey Management with Dr Graham HillinQuba Webinar Mastering Customer Journey Management with Dr Graham Hill
inQuba Webinar Mastering Customer Journey Management with Dr Graham Hill
 
9 CEO's who hit $100m ARR Share Their Top Growth Tactics Nathan Latka, Founde...
9 CEO's who hit $100m ARR Share Their Top Growth Tactics Nathan Latka, Founde...9 CEO's who hit $100m ARR Share Their Top Growth Tactics Nathan Latka, Founde...
9 CEO's who hit $100m ARR Share Their Top Growth Tactics Nathan Latka, Founde...
 
Biomedical Knowledge Graphs for Data Scientists and Bioinformaticians
Biomedical Knowledge Graphs for Data Scientists and BioinformaticiansBiomedical Knowledge Graphs for Data Scientists and Bioinformaticians
Biomedical Knowledge Graphs for Data Scientists and Bioinformaticians
 
Christine's Product Research Presentation.pptx
Christine's Product Research Presentation.pptxChristine's Product Research Presentation.pptx
Christine's Product Research Presentation.pptx
 
Freshworks Rethinks NoSQL for Rapid Scaling & Cost-Efficiency
Freshworks Rethinks NoSQL for Rapid Scaling & Cost-EfficiencyFreshworks Rethinks NoSQL for Rapid Scaling & Cost-Efficiency
Freshworks Rethinks NoSQL for Rapid Scaling & Cost-Efficiency
 
PRODUCT LISTING OPTIMIZATION PRESENTATION.pptx
PRODUCT LISTING OPTIMIZATION PRESENTATION.pptxPRODUCT LISTING OPTIMIZATION PRESENTATION.pptx
PRODUCT LISTING OPTIMIZATION PRESENTATION.pptx
 
[OReilly Superstream] Occupy the Space: A grassroots guide to engineering (an...
[OReilly Superstream] Occupy the Space: A grassroots guide to engineering (an...[OReilly Superstream] Occupy the Space: A grassroots guide to engineering (an...
[OReilly Superstream] Occupy the Space: A grassroots guide to engineering (an...
 
What is an RPA CoE? Session 1 – CoE Vision
What is an RPA CoE?  Session 1 – CoE VisionWhat is an RPA CoE?  Session 1 – CoE Vision
What is an RPA CoE? Session 1 – CoE Vision
 

Financing energy upgrades for k 12 schools - u.s. dept. of energy

  • 1. 1 | Energy Efficiency and Renewable Energy eere.energy.gov New U.S. Department of Energy – Lawrence Berkeley National Laboratory Guide: Financing Energy Upgrades for K-12 Schools June 26th, 2013 Memphis & Shelby County Sustainability Summit
  • 2. 2 DOE’s State & Local Technical Assistance Program • Strategic Energy Planning • Program & Policy Design and Implementation • Financing Strategies • Data Management and EM&V • EE & RE Technologies Priority Areas •General Education (e.g., fact sheets, 101s) • Case Studies •Tools for Decision-Making • Protocols (e.g., how-to guides, model documents) Resources • Webinars •Conferences & in-person trainings • Better Buildings Project Teams Peer Exchange & Trainings •Level of effort will vary •In-depth efforts will be focused on: •High impact efforts •Opportunities for replicability •Filling gaps in the technical assistance marketplace One-on- One
  • 3. 3 • Resources  Guide to Financing Energy Upgrades for K-12 Schools available on the Solution Center  Also featured: page dedicated to Energy Savings Performance Contracting (ESPC) & other finance resources  Guide to Performance-Based Contracting for K-12 Schools and improved Solution Center portal for finance resources live later this year • Peer exchange & trainings  April webinar on the finance guide available on the Solution Center  Join the Better Buildings Alliance and participate in Project Teams for Financing Strategies or Energy Savings Performance Contracting, kicking off this summer • Apply for one-on-one assistance and peer matching Priority Area: Financing Strategies
  • 4. 4 Significant Benefits for Schools 4 K-12 schools spend around $6 billion on energy annually – more money than is spent on textbooks and computers combined. There are significant benefits to making clean energy upgrades, including: • Lower energy bills • Modernized infrastructure and reduced facility maintenance costs • Improved comfort, health, and safety • Environmental benefits • Educational opportunities Financing guide & case studies: http://www.eere.energy.gov/wip/solutio ncenter/pdfs/financing_energy_upgrade s_k-12.pdf
  • 5. 5 Key Principles 5 Principle 1. Start with Clear Project Objectives Principle 2. Pursue Comprehensive Projects Whenever Possible Principle 3. Focus on Life-Cycle Cost Analysis GETTING TO “YES” In addition to making the financial case, successful projects require a strong team of champions, and a clear understanding of key hurdles and how to make the case to a variety of audiences. For an in-depth treatment of these topics, see Getting to “YES”: A Guide to Developing a Persuasive Business Case for Energy Efficiency : http://energy.maryland.gov/Business /businesscaseguide/
  • 6. 6 Financing Options for Schools 6 • Internal Cash • Grants & Incentives • Bonds • Leasing Arrangements • Other Clean Energy- Specific Financing
  • 7. 7 Internal Cash 7 • Simplest, most flexible and most direct way to pay for energy-related improvements • Projects paid directly with cash from the operating or capital budgets • School retains all energy savings and often speeds project implementation time by avoiding transaction delays • However, the availability of internal funds is constrained by budget limitations and competing operating and capital investment needs Internal Cash Monies from existing school district budgets Pros Cons  Extremely flexible capital  Not debt, so no interest or obligation to repay  Significant competing needs for these flexible funds  Most school districts lack sufficient cash to fund all (or any) EE/RE needs
  • 8. 8 Grants & Incentives 8 • Grants are external sources of capital that neither schools nor their taxpayers need to re-pay • Grants can help to lower the overall cost of project • However, accepting a grant obligates the school to perform actions specified in the grant agreement Find Incentives in Your State Check out the Database of State Incentives for Renewables and Efficiency (DSIRE) at www.dsireusa.org. Click on your state, and then scroll down the list of incentives. Schools are usually included under the “business” incentives. Grants Monies from third parties such as Federal and State governments, utility ratepayers, or foundations that cover all or part of the costs of energy improvements Pros Cons  Best source of funds – reduces total project cost  Not debt, so no interest or obligation for school district or taxpayers to repay  Limited availability  Restricted uses  Often covers only part of project costs  Philanthropic and government grants require planning and often a detailed proposal
  • 9. 9 Bonds 9 • Bonds are long-term debt obligations, and are commonly issued to finance construction and/or improvements to public infrastructure • General obligation bonds are most common; they often require voter approval and are subject to debt limits • Clean energy projects can be: o Wrapped into a larger bond ballot measure o Offered as a stand-alone project for voter approval (for larger projects) General Obligation Bonds (GO) Debt secured by the obligation to levy and collect property taxes sufficient to pay annual debt service Pros Cons  Flexible capital for funding a range of clean energy projects (often subject to voter approval)  Lowest cost debt due to robust security and tax exempt interest  Increased revenue for school district (in most cases because taxpayers repay debt  Long terms (20-30 yrs)  Voter approval required (in most cases)  Counts against statutory debt limit restrictions  High fixed issuance costs, including obtaining a legal opinion, setting up a trustee, and retaining accounting services  Long development time (~9 months+) to prepare package of funding requests and gain voter support
  • 10. 10 Federally-Subsidized Bonds 10 • Qualified Energy Conservation Bonds (QECBs) can be used for a range of “qualified energy conservation projects” including those that reduce energy consumption in publicly owned buildings. • Qualified Zone Academy Bonds (QZABs) can be used for a range of energy and non-energy facilities renovation projects in disadvantaged communities, but are more complicated to deploy because they require a partnership with a private entity that must make a contribution to the school to improve student education. More info on QECBs: http://www1.eere.energy.gov/wip/solutioncenter/financialproducts/QECB.html More info on QZABs: http://www2.ed.gov/programs/qualifiedzone/faq.html
  • 11. 11 Lease Financing 11 • Leases often have slightly higher rates than bonds and require the school district (instead of the taxpayers) to repay the debt • However, leases are a faster and more flexible tool, and can be set up so that energy savings are greater than debt payments • Methods of procuring lease financing include: o Private-Placement Agreements (or single investor leases) o Certificates of Participation (COPs) In many states, leases are popular because they are often not subject to school district debt limits or voter approval Leasing Arrangements School district leases property from a lessor, the underlying security is the leased equipment or real estate. Pros Cons  Often voter approval not required  Often not subject to debt limitations  Flexible capital for funding a range of EE projects  Tax exemption lowers costs  Flexible terms (5-15 years)  Short development time (3months)  School district (not taxpayers) must repay the debt  Higher interest rates than GO debt  Reserve fund and capitalized interest typically required
  • 12. 12 Other Clean Energy Financing Options 12 • Power Purchase Agreements - A third party owns, operates and maintains a renewable energy system installed on school district property, e.g. rooftop solar photovolatics (PV). The school district pays the third party a pre-negotiated rate for the power generated. • On-utility bill financing (OBF) entails a utility (or third party) lending the up-front capital for energy-related improvements. The school repays this loan through a line item on the utility bill. • Revolving loan funds (RLFs) are pools of capital from which loans are made – as loans are repaid, the capital is then re-lent for another project.
  • 13. 13 Williamson County School District (TN) 13 Organization Size: 42 schools (32,000 students in K-12) Primary Work Completed: Replace cooling towers, boilers, HVAC units, heat exchanger; lighting retrofits; energy management control systems Project Cost: $5.7 million Type of Financing: Lease-purchase agreement, bank note, general obligation bond Simple Payback Period: 6.5 years (net project cost / savings per year) Key Benefits: Lower energy bills, replace aging equipment, improved energy controls, funding for an energy resource manager
  • 14. 14 DOE Better Buildings Initiative & K-12 Schools • Better Buildings Initiative: make municipal, commercial and industrial buildings 20% more efficient by 2020 • Better Buildings Challenge o Partners, including K-12 school districts, make a commitment, take action, and share results o DOE provides recognition, technical assistance, and facilitates connections among energy stakeholders • Better Buildings Alliance o Same general criteria, but not quite as stringent o Project Teams offer long-term opportunities for peer exchange, including finance and ESPC
  • 15. 15 • Visit the Solution Center (Guide is featured on homepage) www.eere.energy.gov/wip/solutioncenter/ • Submit an application for assistance www.eere.energy.gov/wip/solutioncenter/technical_assistance.html • Join the Better Buildings Challenge or Alliance For more information email Crystal McDonald at crystal.mcdonald@ee.doe.gov • Sign up for our mailing list and email us your questions/suggestions TechnicalAssistanceProgram@ee.doe.gov How to Get Engaged with DOE