SlideShare a Scribd company logo
SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN
BACHELOR OF QUANTITY SURVEYING (HONOURS)
Assignment 2 : Site research report and presentation board(50%)
Submission Date: 11th
July 2014
Objectives
1. To introduce various types of building materials those are used in current construction
practice.
2. To create an understanding in students of the choices designers make in choosing
building materials based on their properties
Learning Outcomes
Upon successful completion of this subject, students will be able to:
1. Recognise and recall types and properties of materials.
2. Describe the general use of different materials in construction
3. Explain the physical properties of building materials
4. Explain the chemical properties of building materials
5. Explain the effect of building materials on construction and structural qualities
TASK
This assignment is to be carried out in group of 4-5 students per group.
- Each group is required to find a specific building/area/space as your research
subject in this particular assignment.
- Students are required to analyse the chosen building/area and submit a report.
- Students are required to identify the function of the building and then study about
the existing types of materials in the building.
- The research should cover all of the building elements of the space which are the:
 Wall
 Floor
 Doors and windows
 Ceiling
 Staircase
 Structure – Column and Beam
- Then compare and contrast with TWO (2) other materials and recommend an
alternative material to replace the existing material.
- You need to study the usage of materials in the building. The materials should cover
the exterior and interior part of the building/area whichever relevant.
- The list of materials are as follows:
Timber/timber based products
Cements and concrete
Metals
Bricks
Plastics
Plasters and Gypsum
Paints
Glass
Stone
Rubber
Ceramic
Basically, the assignment is divided into THREE (3) parts.
Part 1
Identify the purpose/function of the building/area.
Introduction of the building/are i.e location, area of space etc.
Part 2
Explain the existing type of materials.
Should covers exterior and interior materials whichever relevant. Should cover all building
element as explained above.
Part 3
Compare and contrast with TWO (2) other materials and recommend an alternative to
replace the existing material. Give you own rational and critical thinking discussion about
your justification regarding the alternative to replace the existing material.
(REPORT) – 30%
The topics in the report should include the listed below (but not limited to) :
- Appropriate Usage/Application
- Physical and chemical properties
- Advantages and disadvantages
- Suitability/Sustainability
- Aesthetical value
- Performance / Behaviour
- Maintenance
- List of references
You are encouraged to include any relevant examples captured from your research
resources.
What you need to do
2
• You can initially do your research to get the information of the range of materials
assigned to you by its specifications.
• You might find that it is also beneficial to get few contact lists of
suppliers/manufacturers for the materials. You can contact them if necessary in
order to obtain further information and you may even request some samples,
brochures and catalogues which contains much information especially regarding the
technical specifications.
• You will need to name the materials. Find out the cost of the materials (whichever
necessary) and justify their classification base on their difference i.e
usage/application, properties and characteristics, aesthetic, maintenance etc.
• Analyze, investigate and document all of these selected materials information such
as characteristic, properties, advantages and disadvantages, specifications, strength
etc.
• Collect examples of where your materials are used (pictures).
• Collect samples of your materials whichever relevant and if necessary.
• Detail the benefits of your selected materials on the environment and building itself.
• Compare the value with other characteristics such as aesthetic value, quality,
chemical strength, sustainability and durability between the selected materials. Ask
yourself why is this material is expensive compare to the other, what make it
different etc.
SUBMISSION REQUIREMENT
FINAL SUBMISSION DATE : 11th
July 2014
• A4 size bound report attached with soft copy of the assignment. The content of your
submission report should be a documentation of all your finding and analysis as
explained in the task column above in a presentable manner. Suggested format of
Report : min 20pages max 30pages
• Cover page : name and students number
• Table of Content
• Introduction of materials : General information, properties for the materials by
categories.: with images of materials can be scanned image of material samples
collected.
• Contents of topics and subtopic
• Referencing (MUST)
• Font Arial 12
• Spacing 1 ½
ASSESSMENT CRITERIA
Quality of work shall be assessed on the following criteria :
3
• Understanding of effects of building materials on building and environment
• Clarity in communicating your ideas, proposals and analysis
• Depth of research and finding information, sample of materials, technical
specifications, catalogues and data collected.
• Content of your submission
4

More Related Content

What's hot

Seismic retrofitting techniques & rehabilitation
Seismic retrofitting techniques & rehabilitationSeismic retrofitting techniques & rehabilitation
Seismic retrofitting techniques & rehabilitation
Shuvam Sarkar
 
Advanced Material for Construction
Advanced Material for ConstructionAdvanced Material for Construction
Advanced Material for Construction
Rushikesh Mate
 
Glass fiber reinforced concrete
Glass fiber reinforced concreteGlass fiber reinforced concrete
Glass fiber reinforced concrete
bhavin shah
 
JBA Company profile
JBA Company profileJBA Company profile
JBA Company profile
JBA Concrete Solutions Pvt Ld
 
Recyled aggregates (Concrete Technology and Building Materials)
Recyled aggregates (Concrete Technology and Building Materials)Recyled aggregates (Concrete Technology and Building Materials)
Recyled aggregates (Concrete Technology and Building Materials)
'Animesh Khare'
 
LIGHT TRANSMITTING CONCRETE
LIGHT TRANSMITTING CONCRETELIGHT TRANSMITTING CONCRETE
LIGHT TRANSMITTING CONCRETE
Vamsi krishna reddy
 
High Performance Concrete Pdf
High Performance Concrete Pdf High Performance Concrete Pdf
High Performance Concrete Pdf
Sanket Jain
 
Development of Low Carbon Cement
Development of Low Carbon CementDevelopment of Low Carbon Cement
Development of Low Carbon Cement
Climate Action Network South Asia
 
Development of unfired bricks using industrial waste
Development of unfired bricks using industrial waste Development of unfired bricks using industrial waste
Development of unfired bricks using industrial waste
Sandeep Jain
 
Mivan
MivanMivan
MODERN CONSTRUCTION METHODS
MODERN CONSTRUCTION METHODSMODERN CONSTRUCTION METHODS
MODERN CONSTRUCTION METHODS
Shourya Puri
 
A Case Study based on FIDIC and PAM Form 2006
A Case Study based on FIDIC and PAM Form 2006A Case Study based on FIDIC and PAM Form 2006
A Case Study based on FIDIC and PAM Form 2006
Melvin Lim
 
Geopolymer concrete
Geopolymer concreteGeopolymer concrete
Geopolymer concrete
gayathrysatheesan1
 
Assignmenr for pp2 final account
Assignmenr for pp2 final accountAssignmenr for pp2 final account
Assignmenr for pp2 final account
ahmong4
 
Light Transmitting concrete
Light Transmitting concreteLight Transmitting concrete
Light Transmitting concrete
Mithilesh Mandal
 
ppt on sustainable buildings
ppt on sustainable buildingsppt on sustainable buildings
ppt on sustainable buildings
navyavani kola
 
Light transmitting concrete
Light transmitting concreteLight transmitting concrete
Light transmitting concrete
Sahla Fathima
 
Light Transmitting Concrete or Transparent Concrete
Light Transmitting Concrete or Transparent ConcreteLight Transmitting Concrete or Transparent Concrete
Light Transmitting Concrete or Transparent Concrete
Sahla Fathima
 
Professional Practice 1 Group Assignment
Professional Practice 1 Group AssignmentProfessional Practice 1 Group Assignment
Professional Practice 1 Group Assignment
Haziq1511
 
Preliminary estimate
Preliminary estimatePreliminary estimate
Preliminary estimate
norrizah abd wahab
 

What's hot (20)

Seismic retrofitting techniques & rehabilitation
Seismic retrofitting techniques & rehabilitationSeismic retrofitting techniques & rehabilitation
Seismic retrofitting techniques & rehabilitation
 
Advanced Material for Construction
Advanced Material for ConstructionAdvanced Material for Construction
Advanced Material for Construction
 
Glass fiber reinforced concrete
Glass fiber reinforced concreteGlass fiber reinforced concrete
Glass fiber reinforced concrete
 
JBA Company profile
JBA Company profileJBA Company profile
JBA Company profile
 
Recyled aggregates (Concrete Technology and Building Materials)
Recyled aggregates (Concrete Technology and Building Materials)Recyled aggregates (Concrete Technology and Building Materials)
Recyled aggregates (Concrete Technology and Building Materials)
 
LIGHT TRANSMITTING CONCRETE
LIGHT TRANSMITTING CONCRETELIGHT TRANSMITTING CONCRETE
LIGHT TRANSMITTING CONCRETE
 
High Performance Concrete Pdf
High Performance Concrete Pdf High Performance Concrete Pdf
High Performance Concrete Pdf
 
Development of Low Carbon Cement
Development of Low Carbon CementDevelopment of Low Carbon Cement
Development of Low Carbon Cement
 
Development of unfired bricks using industrial waste
Development of unfired bricks using industrial waste Development of unfired bricks using industrial waste
Development of unfired bricks using industrial waste
 
Mivan
MivanMivan
Mivan
 
MODERN CONSTRUCTION METHODS
MODERN CONSTRUCTION METHODSMODERN CONSTRUCTION METHODS
MODERN CONSTRUCTION METHODS
 
A Case Study based on FIDIC and PAM Form 2006
A Case Study based on FIDIC and PAM Form 2006A Case Study based on FIDIC and PAM Form 2006
A Case Study based on FIDIC and PAM Form 2006
 
Geopolymer concrete
Geopolymer concreteGeopolymer concrete
Geopolymer concrete
 
Assignmenr for pp2 final account
Assignmenr for pp2 final accountAssignmenr for pp2 final account
Assignmenr for pp2 final account
 
Light Transmitting concrete
Light Transmitting concreteLight Transmitting concrete
Light Transmitting concrete
 
ppt on sustainable buildings
ppt on sustainable buildingsppt on sustainable buildings
ppt on sustainable buildings
 
Light transmitting concrete
Light transmitting concreteLight transmitting concrete
Light transmitting concrete
 
Light Transmitting Concrete or Transparent Concrete
Light Transmitting Concrete or Transparent ConcreteLight Transmitting Concrete or Transparent Concrete
Light Transmitting Concrete or Transparent Concrete
 
Professional Practice 1 Group Assignment
Professional Practice 1 Group AssignmentProfessional Practice 1 Group Assignment
Professional Practice 1 Group Assignment
 
Preliminary estimate
Preliminary estimatePreliminary estimate
Preliminary estimate
 

Viewers also liked

Seminar acoustic engineering marineindustries
Seminar acoustic engineering marineindustriesSeminar acoustic engineering marineindustries
Seminar acoustic engineering marineindustries
Deniz Yazgaç
 
Assignment 2 edited
Assignment 2 editedAssignment 2 edited
Assignment 2 edited
Jäkê Čhŷį Śêrñ
 
Building materials assignment 2 - Skk paint
Building materials assignment 2 - Skk paintBuilding materials assignment 2 - Skk paint
Building materials assignment 2 - Skk paint
Syafiq Zariful
 
Building Material Assignment 2
Building Material Assignment 2Building Material Assignment 2
Building Material Assignment 2
Haziq1511
 
Ct assignment
Ct assignmentCt assignment
Ct assignment
Darren Loong
 
Let There Be Light! A case study about illumination
Let There Be Light!  A case study about illuminationLet There Be Light!  A case study about illumination
Let There Be Light! A case study about illuminationStephen Studnicka, PMP
 
PICC acoustic system
PICC acoustic systemPICC acoustic system
PICC acoustic system
Gary Yeow
 
Lighting Analysis Project 1
Lighting Analysis Project 1Lighting Analysis Project 1
Lighting Analysis Project 1
J-Sern Phua
 
Building materials
Building materialsBuilding materials
Building materials
lol
 
dBwave.i acoustic engineering presentation
dBwave.i acoustic engineering presentationdBwave.i acoustic engineering presentation
dBwave.i acoustic engineering presentation
dBwave.i - Acoustic Engineering, SA
 
Acoustics(atjd)
Acoustics(atjd)Acoustics(atjd)
Acoustics(atjd)
Akhilesh Kushwaha
 
DEGREE SEM 5 BUILDING SCIENCE PROJECT 01 ACOUSTIC CASE STUDY
DEGREE SEM 5 BUILDING SCIENCE PROJECT 01 ACOUSTIC CASE STUDYDEGREE SEM 5 BUILDING SCIENCE PROJECT 01 ACOUSTIC CASE STUDY
DEGREE SEM 5 BUILDING SCIENCE PROJECT 01 ACOUSTIC CASE STUDY
jolynnTJL
 
Daylight providing effective and efficient lighting in industrial facilities
Daylight providing effective and efficient lighting in industrial facilitiesDaylight providing effective and efficient lighting in industrial facilities
Daylight providing effective and efficient lighting in industrial facilities
Zondits
 
Final report
Final report Final report
Final report
Gary Yeow
 
btech ibs
btech ibsbtech ibs
btech ibs
Gary Yeow
 
Building Materials assignment 1 (Concrete)
Building Materials assignment 1 (Concrete)Building Materials assignment 1 (Concrete)
Building Materials assignment 1 (Concrete)
Syafiq Zariful
 
site report
site reportsite report
site report
dhirazain
 
Construction Technology 1 Assignment 1
Construction Technology 1 Assignment 1Construction Technology 1 Assignment 1
Construction Technology 1 Assignment 1
Pang Shuen
 
Csi journal
Csi journalCsi journal
Csi journal
Gary Yeow
 
btech2
btech2 btech2
btech2
Gary Yeow
 

Viewers also liked (20)

Seminar acoustic engineering marineindustries
Seminar acoustic engineering marineindustriesSeminar acoustic engineering marineindustries
Seminar acoustic engineering marineindustries
 
Assignment 2 edited
Assignment 2 editedAssignment 2 edited
Assignment 2 edited
 
Building materials assignment 2 - Skk paint
Building materials assignment 2 - Skk paintBuilding materials assignment 2 - Skk paint
Building materials assignment 2 - Skk paint
 
Building Material Assignment 2
Building Material Assignment 2Building Material Assignment 2
Building Material Assignment 2
 
Ct assignment
Ct assignmentCt assignment
Ct assignment
 
Let There Be Light! A case study about illumination
Let There Be Light!  A case study about illuminationLet There Be Light!  A case study about illumination
Let There Be Light! A case study about illumination
 
PICC acoustic system
PICC acoustic systemPICC acoustic system
PICC acoustic system
 
Lighting Analysis Project 1
Lighting Analysis Project 1Lighting Analysis Project 1
Lighting Analysis Project 1
 
Building materials
Building materialsBuilding materials
Building materials
 
dBwave.i acoustic engineering presentation
dBwave.i acoustic engineering presentationdBwave.i acoustic engineering presentation
dBwave.i acoustic engineering presentation
 
Acoustics(atjd)
Acoustics(atjd)Acoustics(atjd)
Acoustics(atjd)
 
DEGREE SEM 5 BUILDING SCIENCE PROJECT 01 ACOUSTIC CASE STUDY
DEGREE SEM 5 BUILDING SCIENCE PROJECT 01 ACOUSTIC CASE STUDYDEGREE SEM 5 BUILDING SCIENCE PROJECT 01 ACOUSTIC CASE STUDY
DEGREE SEM 5 BUILDING SCIENCE PROJECT 01 ACOUSTIC CASE STUDY
 
Daylight providing effective and efficient lighting in industrial facilities
Daylight providing effective and efficient lighting in industrial facilitiesDaylight providing effective and efficient lighting in industrial facilities
Daylight providing effective and efficient lighting in industrial facilities
 
Final report
Final report Final report
Final report
 
btech ibs
btech ibsbtech ibs
btech ibs
 
Building Materials assignment 1 (Concrete)
Building Materials assignment 1 (Concrete)Building Materials assignment 1 (Concrete)
Building Materials assignment 1 (Concrete)
 
site report
site reportsite report
site report
 
Construction Technology 1 Assignment 1
Construction Technology 1 Assignment 1Construction Technology 1 Assignment 1
Construction Technology 1 Assignment 1
 
Csi journal
Csi journalCsi journal
Csi journal
 
btech2
btech2 btech2
btech2
 

Similar to Building Materials - Final assignment 2 brief

Project 2 brief b materials march 2016
Project 2 brief b materials march 2016Project 2 brief b materials march 2016
Project 2 brief b materials march 2016
Joeylau97
 
Project 2 brief b materials march 2015
Project 2 brief b materials march 2015Project 2 brief b materials march 2015
Project 2 brief b materials march 2015
Arvindhan Balasingam
 
Project 2 brief b materials march 2015 (1)
Project 2 brief b materials march 2015 (1)Project 2 brief b materials march 2015 (1)
Project 2 brief b materials march 2015 (1)
Arvindhan Balasingam
 
Project 2 brief b materials march 2015
Project 2 brief b materials march 2015Project 2 brief b materials march 2015
Project 2 brief b materials march 2015
aswadtheman
 
Project 2 brief b materials march 2015
Project 2 brief b materials march 2015Project 2 brief b materials march 2015
Project 2 brief b materials march 2015
Chow Hong Da
 
Project 1 brief b materials march 2016
Project 1 brief b materials march 2016Project 1 brief b materials march 2016
Project 1 brief b materials march 2016
Joeylau97
 
Project 2
Project 2Project 2
Project 2
Anthony Chew
 
Project 2
Project 2Project 2
Project 2
Preston Liew
 
Mme 323 materials science week 1 - intro to materials science & engineering
Mme 323 materials science   week 1 - intro to materials science & engineeringMme 323 materials science   week 1 - intro to materials science & engineering
Mme 323 materials science week 1 - intro to materials science & engineering
Adhi Primartomo
 
Project 1 brief b materials march 2015
Project 1 brief b materials march 2015Project 1 brief b materials march 2015
Project 1 brief b materials march 2015
Arvindhan Balasingam
 
Project 1 brief b materials march 2015
Project 1 brief b materials march 2015Project 1 brief b materials march 2015
Project 1 brief b materials march 2015
Chow Hong Da
 
Project 1 brief b materials march 2015
Project 1 brief b materials march 2015Project 1 brief b materials march 2015
Project 1 brief b materials march 2015
Arvindhan Balasingam
 
preparing a Research proposal
preparing a Research proposal preparing a Research proposal
preparing a Research proposal
Gunjan Verma
 
SoPH-Format-for-Research-Proposal-and-Thesis.pdf
SoPH-Format-for-Research-Proposal-and-Thesis.pdfSoPH-Format-for-Research-Proposal-and-Thesis.pdf
SoPH-Format-for-Research-Proposal-and-Thesis.pdf
mebrahten1
 
eng Assignment 2 (research report)
eng Assignment 2 (research report)eng Assignment 2 (research report)
eng Assignment 2 (research report)
Ang Averllen
 
Assignment 2 (research report)
Assignment 2 (research report)Assignment 2 (research report)
Assignment 2 (research report)
Trace96
 
Assignment 2 (research report)
Assignment 2 (research report)Assignment 2 (research report)
Assignment 2 (research report)
Jenny Huoy Miin
 
Assignment 2 (research report)
Assignment 2 (research report)Assignment 2 (research report)
Assignment 2 (research report)
limziahuei
 
Assignment 2 (research report)
Assignment 2 (research report)Assignment 2 (research report)
Assignment 2 (research report)
Lim Zia Huei
 
Assignment 2 (research report)
Assignment 2 (research report)Assignment 2 (research report)
Assignment 2 (research report)
xennechau
 

Similar to Building Materials - Final assignment 2 brief (20)

Project 2 brief b materials march 2016
Project 2 brief b materials march 2016Project 2 brief b materials march 2016
Project 2 brief b materials march 2016
 
Project 2 brief b materials march 2015
Project 2 brief b materials march 2015Project 2 brief b materials march 2015
Project 2 brief b materials march 2015
 
Project 2 brief b materials march 2015 (1)
Project 2 brief b materials march 2015 (1)Project 2 brief b materials march 2015 (1)
Project 2 brief b materials march 2015 (1)
 
Project 2 brief b materials march 2015
Project 2 brief b materials march 2015Project 2 brief b materials march 2015
Project 2 brief b materials march 2015
 
Project 2 brief b materials march 2015
Project 2 brief b materials march 2015Project 2 brief b materials march 2015
Project 2 brief b materials march 2015
 
Project 1 brief b materials march 2016
Project 1 brief b materials march 2016Project 1 brief b materials march 2016
Project 1 brief b materials march 2016
 
Project 2
Project 2Project 2
Project 2
 
Project 2
Project 2Project 2
Project 2
 
Mme 323 materials science week 1 - intro to materials science & engineering
Mme 323 materials science   week 1 - intro to materials science & engineeringMme 323 materials science   week 1 - intro to materials science & engineering
Mme 323 materials science week 1 - intro to materials science & engineering
 
Project 1 brief b materials march 2015
Project 1 brief b materials march 2015Project 1 brief b materials march 2015
Project 1 brief b materials march 2015
 
Project 1 brief b materials march 2015
Project 1 brief b materials march 2015Project 1 brief b materials march 2015
Project 1 brief b materials march 2015
 
Project 1 brief b materials march 2015
Project 1 brief b materials march 2015Project 1 brief b materials march 2015
Project 1 brief b materials march 2015
 
preparing a Research proposal
preparing a Research proposal preparing a Research proposal
preparing a Research proposal
 
SoPH-Format-for-Research-Proposal-and-Thesis.pdf
SoPH-Format-for-Research-Proposal-and-Thesis.pdfSoPH-Format-for-Research-Proposal-and-Thesis.pdf
SoPH-Format-for-Research-Proposal-and-Thesis.pdf
 
eng Assignment 2 (research report)
eng Assignment 2 (research report)eng Assignment 2 (research report)
eng Assignment 2 (research report)
 
Assignment 2 (research report)
Assignment 2 (research report)Assignment 2 (research report)
Assignment 2 (research report)
 
Assignment 2 (research report)
Assignment 2 (research report)Assignment 2 (research report)
Assignment 2 (research report)
 
Assignment 2 (research report)
Assignment 2 (research report)Assignment 2 (research report)
Assignment 2 (research report)
 
Assignment 2 (research report)
Assignment 2 (research report)Assignment 2 (research report)
Assignment 2 (research report)
 
Assignment 2 (research report)
Assignment 2 (research report)Assignment 2 (research report)
Assignment 2 (research report)
 

More from Syafiq Zariful

Conference paper-11-9-2017
Conference paper-11-9-2017Conference paper-11-9-2017
Conference paper-11-9-2017
Syafiq Zariful
 
De assignment compile
De assignment compileDe assignment compile
De assignment compile
Syafiq Zariful
 
Pm group-compileddd
Pm group-compiledddPm group-compileddd
Pm group-compileddd
Syafiq Zariful
 
Finalized dissertation (print 80 gram hardcover)
Finalized dissertation (print 80 gram hardcover)Finalized dissertation (print 80 gram hardcover)
Finalized dissertation (print 80 gram hardcover)
Syafiq Zariful
 
07 cl-assignment-syafiq-qy-macy-huiyong-deric
07 cl-assignment-syafiq-qy-macy-huiyong-deric07 cl-assignment-syafiq-qy-macy-huiyong-deric
07 cl-assignment-syafiq-qy-macy-huiyong-deric
Syafiq Zariful
 
Vm report-most-updated-2
Vm report-most-updated-2Vm report-most-updated-2
Vm report-most-updated-2
Syafiq Zariful
 
Pp2 seminar
Pp2 seminarPp2 seminar
Pp2 seminar
Syafiq Zariful
 
Research proposal final draft
Research proposal final draftResearch proposal final draft
Research proposal final draft
Syafiq Zariful
 
Software assignment
Software assignmentSoftware assignment
Software assignment
Syafiq Zariful
 
Software applications-presentation
Software applications-presentationSoftware applications-presentation
Software applications-presentation
Syafiq Zariful
 
Community service-report-syafiq-2
Community service-report-syafiq-2Community service-report-syafiq-2
Community service-report-syafiq-2
Syafiq Zariful
 
1,2 & 3,4 ratio analysis updated
1,2 & 3,4 ratio analysis updated1,2 & 3,4 ratio analysis updated
1,2 & 3,4 ratio analysis updated
Syafiq Zariful
 
Financial management assignment (f) summarized 4
Financial management assignment (f) summarized 4Financial management assignment (f) summarized 4
Financial management assignment (f) summarized 4
Syafiq Zariful
 
Building economics presentation 3 2
Building economics presentation 3 2Building economics presentation 3 2
Building economics presentation 3 2
Syafiq Zariful
 
Fm presentation final
Fm presentation finalFm presentation final
Fm presentation final
Syafiq Zariful
 
Compiled fm assignment (complete)
Compiled fm assignment (complete)Compiled fm assignment (complete)
Compiled fm assignment (complete)
Syafiq Zariful
 
Estimating presentation
Estimating presentationEstimating presentation
Estimating presentation
Syafiq Zariful
 
Software application finalized group report
Software application finalized group reportSoftware application finalized group report
Software application finalized group report
Syafiq Zariful
 
Presentation measurement part 2
Presentation measurement part 2Presentation measurement part 2
Presentation measurement part 2
Syafiq Zariful
 
Bs 2 assignment presentation1
Bs 2 assignment presentation1Bs 2 assignment presentation1
Bs 2 assignment presentation1
Syafiq Zariful
 

More from Syafiq Zariful (20)

Conference paper-11-9-2017
Conference paper-11-9-2017Conference paper-11-9-2017
Conference paper-11-9-2017
 
De assignment compile
De assignment compileDe assignment compile
De assignment compile
 
Pm group-compileddd
Pm group-compiledddPm group-compileddd
Pm group-compileddd
 
Finalized dissertation (print 80 gram hardcover)
Finalized dissertation (print 80 gram hardcover)Finalized dissertation (print 80 gram hardcover)
Finalized dissertation (print 80 gram hardcover)
 
07 cl-assignment-syafiq-qy-macy-huiyong-deric
07 cl-assignment-syafiq-qy-macy-huiyong-deric07 cl-assignment-syafiq-qy-macy-huiyong-deric
07 cl-assignment-syafiq-qy-macy-huiyong-deric
 
Vm report-most-updated-2
Vm report-most-updated-2Vm report-most-updated-2
Vm report-most-updated-2
 
Pp2 seminar
Pp2 seminarPp2 seminar
Pp2 seminar
 
Research proposal final draft
Research proposal final draftResearch proposal final draft
Research proposal final draft
 
Software assignment
Software assignmentSoftware assignment
Software assignment
 
Software applications-presentation
Software applications-presentationSoftware applications-presentation
Software applications-presentation
 
Community service-report-syafiq-2
Community service-report-syafiq-2Community service-report-syafiq-2
Community service-report-syafiq-2
 
1,2 & 3,4 ratio analysis updated
1,2 & 3,4 ratio analysis updated1,2 & 3,4 ratio analysis updated
1,2 & 3,4 ratio analysis updated
 
Financial management assignment (f) summarized 4
Financial management assignment (f) summarized 4Financial management assignment (f) summarized 4
Financial management assignment (f) summarized 4
 
Building economics presentation 3 2
Building economics presentation 3 2Building economics presentation 3 2
Building economics presentation 3 2
 
Fm presentation final
Fm presentation finalFm presentation final
Fm presentation final
 
Compiled fm assignment (complete)
Compiled fm assignment (complete)Compiled fm assignment (complete)
Compiled fm assignment (complete)
 
Estimating presentation
Estimating presentationEstimating presentation
Estimating presentation
 
Software application finalized group report
Software application finalized group reportSoftware application finalized group report
Software application finalized group report
 
Presentation measurement part 2
Presentation measurement part 2Presentation measurement part 2
Presentation measurement part 2
 
Bs 2 assignment presentation1
Bs 2 assignment presentation1Bs 2 assignment presentation1
Bs 2 assignment presentation1
 

Recently uploaded

A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMSA SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
IJNSA Journal
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
Victor Morales
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
insn4465
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
VICTOR MAESTRE RAMIREZ
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
Madan Karki
 
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have oneISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
Las Vegas Warehouse
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
IJECEIAES
 
Computational Engineering IITH Presentation
Computational Engineering IITH PresentationComputational Engineering IITH Presentation
Computational Engineering IITH Presentation
co23btech11018
 
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.pptUnit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
KrishnaveniKrishnara1
 
Casting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdfCasting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdf
zubairahmad848137
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
171ticu
 
CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
rpskprasana
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
IJECEIAES
 
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
ihlasbinance2003
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Christina Lin
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
Madan Karki
 
Heat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation pptHeat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation ppt
mamunhossenbd75
 
International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...
gerogepatton
 
Question paper of renewable energy sources
Question paper of renewable energy sourcesQuestion paper of renewable energy sources
Question paper of renewable energy sources
mahammadsalmanmech
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
jpsjournal1
 

Recently uploaded (20)

A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMSA SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
 
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have oneISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
 
Computational Engineering IITH Presentation
Computational Engineering IITH PresentationComputational Engineering IITH Presentation
Computational Engineering IITH Presentation
 
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.pptUnit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
 
Casting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdfCasting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdf
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
 
CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
 
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
 
Heat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation pptHeat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation ppt
 
International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...
 
Question paper of renewable energy sources
Question paper of renewable energy sourcesQuestion paper of renewable energy sources
Question paper of renewable energy sources
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
 

Building Materials - Final assignment 2 brief

  • 1. SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN BACHELOR OF QUANTITY SURVEYING (HONOURS) Assignment 2 : Site research report and presentation board(50%) Submission Date: 11th July 2014 Objectives 1. To introduce various types of building materials those are used in current construction practice. 2. To create an understanding in students of the choices designers make in choosing building materials based on their properties Learning Outcomes Upon successful completion of this subject, students will be able to: 1. Recognise and recall types and properties of materials. 2. Describe the general use of different materials in construction 3. Explain the physical properties of building materials 4. Explain the chemical properties of building materials 5. Explain the effect of building materials on construction and structural qualities TASK This assignment is to be carried out in group of 4-5 students per group. - Each group is required to find a specific building/area/space as your research subject in this particular assignment. - Students are required to analyse the chosen building/area and submit a report. - Students are required to identify the function of the building and then study about the existing types of materials in the building. - The research should cover all of the building elements of the space which are the:  Wall  Floor  Doors and windows  Ceiling  Staircase  Structure – Column and Beam - Then compare and contrast with TWO (2) other materials and recommend an alternative material to replace the existing material. - You need to study the usage of materials in the building. The materials should cover the exterior and interior part of the building/area whichever relevant.
  • 2. - The list of materials are as follows: Timber/timber based products Cements and concrete Metals Bricks Plastics Plasters and Gypsum Paints Glass Stone Rubber Ceramic Basically, the assignment is divided into THREE (3) parts. Part 1 Identify the purpose/function of the building/area. Introduction of the building/are i.e location, area of space etc. Part 2 Explain the existing type of materials. Should covers exterior and interior materials whichever relevant. Should cover all building element as explained above. Part 3 Compare and contrast with TWO (2) other materials and recommend an alternative to replace the existing material. Give you own rational and critical thinking discussion about your justification regarding the alternative to replace the existing material. (REPORT) – 30% The topics in the report should include the listed below (but not limited to) : - Appropriate Usage/Application - Physical and chemical properties - Advantages and disadvantages - Suitability/Sustainability - Aesthetical value - Performance / Behaviour - Maintenance - List of references You are encouraged to include any relevant examples captured from your research resources. What you need to do 2
  • 3. • You can initially do your research to get the information of the range of materials assigned to you by its specifications. • You might find that it is also beneficial to get few contact lists of suppliers/manufacturers for the materials. You can contact them if necessary in order to obtain further information and you may even request some samples, brochures and catalogues which contains much information especially regarding the technical specifications. • You will need to name the materials. Find out the cost of the materials (whichever necessary) and justify their classification base on their difference i.e usage/application, properties and characteristics, aesthetic, maintenance etc. • Analyze, investigate and document all of these selected materials information such as characteristic, properties, advantages and disadvantages, specifications, strength etc. • Collect examples of where your materials are used (pictures). • Collect samples of your materials whichever relevant and if necessary. • Detail the benefits of your selected materials on the environment and building itself. • Compare the value with other characteristics such as aesthetic value, quality, chemical strength, sustainability and durability between the selected materials. Ask yourself why is this material is expensive compare to the other, what make it different etc. SUBMISSION REQUIREMENT FINAL SUBMISSION DATE : 11th July 2014 • A4 size bound report attached with soft copy of the assignment. The content of your submission report should be a documentation of all your finding and analysis as explained in the task column above in a presentable manner. Suggested format of Report : min 20pages max 30pages • Cover page : name and students number • Table of Content • Introduction of materials : General information, properties for the materials by categories.: with images of materials can be scanned image of material samples collected. • Contents of topics and subtopic • Referencing (MUST) • Font Arial 12 • Spacing 1 ½ ASSESSMENT CRITERIA Quality of work shall be assessed on the following criteria : 3
  • 4. • Understanding of effects of building materials on building and environment • Clarity in communicating your ideas, proposals and analysis • Depth of research and finding information, sample of materials, technical specifications, catalogues and data collected. • Content of your submission 4