SlideShare a Scribd company logo
1 of 1
Download to read offline
G1
Extreme Pita
Oxmoor Mall
Drawing Index:
D1 Demolition Plan and General Notes
A-1 Floor Plan, Details, and General Notes
EQ-1 Equipment and Furniture Plan
EQ-2 Equipment Schedule
A-2 Wall and Floor Finish
A-3 Interior Elevations
A-4 Millwork Details
A-5 Restroom Plan and Details per KY ADA Code
A-6 Graphics and interior Dining Elevations
A-7 Reflected Ceiling Plan, Notes
M-1 Mechanical Plan and Specifications
P-1 Plumbing (water and Waste) Plan Fixtures and Schedules
E-1 Electrical Power and Lighting Plans and Schedules
Mechanical Hood drawings by CaptiveAire. See Separate Submittal
CODE SUMMARY:
CODE:
- 2013 Kentucky Building Code (KBC) Based on the 2012 International Building Code.
- Accessible and Usable Buildings and Facilities, ICC/ANSI A117.1
Misc. Info.
- This project consists of a tenant finish-out in an existing mall lease space.
The mall lease space is 100% sprinkled.
OCCUPANCY CLASSIFICATION (Chapter 3, IBC):
A-2 Assembly
Occupancy Load: Area (S.F.) SF/Ocload
Dining / Waiting = 316 S.F. 1 / 15 21
Service / Backroom = 520 S.F. 1 / 200 3
Restroom / Hall = 151 S.F. 0 0
Total = 987 S.F. 24
OCCUPANT LOAD: 24
Project:
G1
Extreme Pita
7900 Shelbyville Road
Louisville, KY 40222
Owner:
General Growth Properties
7900 Shelbyville Rd.
Louisville, KY 40222
ON-SITE LOCATION
MAP
VICINITY MAP
H
ABC
D E F
Dick's
Macy's
Sears
Von
Maur
GJ
E
Lower Level
W
estport Rd.
New
LaGrange Rd.
Wipps Mill Rd.
Shelbyville Rd.
SITE
Taylorsville Rd.
BrownsLn.
BowlingBlvd.
Kresge Way
BrekenridgeLn.
N
HubbardsLn.
Westport Rd.
Shelbyville Rd.
Taylorsville Rd.
I264
I264
I64
I64
N
Suite
G1
eat good.
feel good.

More Related Content

Viewers also liked

Boca Town Center Mall Presentation
Boca Town Center Mall PresentationBoca Town Center Mall Presentation
Boca Town Center Mall Presentation
Natalie Pierre-Louis
 
The Explosure Hartono mall
The Explosure Hartono mallThe Explosure Hartono mall
The Explosure Hartono mall
HERMAN FHERRO
 
Al Qasr Mall presentation
Al Qasr Mall presentationAl Qasr Mall presentation
Al Qasr Mall presentation
Mamdouh Attia
 
Site analysis-example
Site analysis-exampleSite analysis-example
Site analysis-example
Anu PA
 

Viewers also liked (18)

pln9 presentation mall
pln9 presentation mallpln9 presentation mall
pln9 presentation mall
 
Boca Town Center Mall Presentation
Boca Town Center Mall PresentationBoca Town Center Mall Presentation
Boca Town Center Mall Presentation
 
The Celebration Mall Udaipur
The Celebration Mall Udaipur The Celebration Mall Udaipur
The Celebration Mall Udaipur
 
The Explosure Hartono mall
The Explosure Hartono mallThe Explosure Hartono mall
The Explosure Hartono mall
 
Al Qasr Mall presentation
Al Qasr Mall presentationAl Qasr Mall presentation
Al Qasr Mall presentation
 
Maxim mall presentation minimized
Maxim mall presentation minimizedMaxim mall presentation minimized
Maxim mall presentation minimized
 
My Community Mall Presentation
My Community Mall PresentationMy Community Mall Presentation
My Community Mall Presentation
 
Porto cairo mall presentation
Porto cairo mall presentationPorto cairo mall presentation
Porto cairo mall presentation
 
Analysis of suggested Sites for Construction of a Shopping Mall at Banepa,Kavre
Analysis of suggested Sites for Construction of a Shopping Mall at Banepa,KavreAnalysis of suggested Sites for Construction of a Shopping Mall at Banepa,Kavre
Analysis of suggested Sites for Construction of a Shopping Mall at Banepa,Kavre
 
Shopping malls and retail spaces architectural cgi gallery
Shopping malls and retail spaces architectural cgi galleryShopping malls and retail spaces architectural cgi gallery
Shopping malls and retail spaces architectural cgi gallery
 
Research Report On Consumer Buying Behavior In Shopping Mall
Research Report On Consumer Buying Behavior In Shopping MallResearch Report On Consumer Buying Behavior In Shopping Mall
Research Report On Consumer Buying Behavior In Shopping Mall
 
Megamall: A Case Study
Megamall: A Case StudyMegamall: A Case Study
Megamall: A Case Study
 
Arihant.ppt [autosaved]
Arihant.ppt [autosaved]Arihant.ppt [autosaved]
Arihant.ppt [autosaved]
 
Site analysis presentation
Site analysis presentationSite analysis presentation
Site analysis presentation
 
Site analysis-example
Site analysis-exampleSite analysis-example
Site analysis-example
 
Thesis presentation 2013
Thesis presentation 2013Thesis presentation 2013
Thesis presentation 2013
 
Shopping mall.
Shopping mall.Shopping mall.
Shopping mall.
 
Contoh Desain Slide Presentasi Ilmiah Kreatif dan Menarik #4
Contoh Desain Slide Presentasi Ilmiah Kreatif dan Menarik #4Contoh Desain Slide Presentasi Ilmiah Kreatif dan Menarik #4
Contoh Desain Slide Presentasi Ilmiah Kreatif dan Menarik #4
 

Similar to ExtremePita-Cover

PSI-130-30-0002-RC-R1_Agitators.pdf
PSI-130-30-0002-RC-R1_Agitators.pdfPSI-130-30-0002-RC-R1_Agitators.pdf
PSI-130-30-0002-RC-R1_Agitators.pdf
romuloac
 
CV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASATCV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASAT
Rommel Siasat
 
Rajgir Sports Complex_Project Kick Off Presentation.pptx
Rajgir Sports Complex_Project Kick Off Presentation.pptxRajgir Sports Complex_Project Kick Off Presentation.pptx
Rajgir Sports Complex_Project Kick Off Presentation.pptx
syedaliabl2023
 
SB-12 Energy Star Training
SB-12 Energy Star TrainingSB-12 Energy Star Training
SB-12 Energy Star Training
tboyko
 
RESUME Updated - with photo
RESUME Updated - with photoRESUME Updated - with photo
RESUME Updated - with photo
ronnie luneta
 

Similar to ExtremePita-Cover (20)

Biomed realty-emeryville-center-innovation
Biomed realty-emeryville-center-innovationBiomed realty-emeryville-center-innovation
Biomed realty-emeryville-center-innovation
 
Oberoi Hotel
Oberoi HotelOberoi Hotel
Oberoi Hotel
 
PSI-130-30-0002-RC-R1_Agitators.pdf
PSI-130-30-0002-RC-R1_Agitators.pdfPSI-130-30-0002-RC-R1_Agitators.pdf
PSI-130-30-0002-RC-R1_Agitators.pdf
 
CV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASATCV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASAT
 
WPR_02.01.2023 W-114 - Copy (1).pptx
WPR_02.01.2023 W-114 - Copy (1).pptxWPR_02.01.2023 W-114 - Copy (1).pptx
WPR_02.01.2023 W-114 - Copy (1).pptx
 
CONSTRUCTION PRESENTATION
CONSTRUCTION PRESENTATIONCONSTRUCTION PRESENTATION
CONSTRUCTION PRESENTATION
 
Design Status.pptx
Design Status.pptxDesign Status.pptx
Design Status.pptx
 
FLOTROM - Consultancy profile
FLOTROM - Consultancy profileFLOTROM - Consultancy profile
FLOTROM - Consultancy profile
 
Rajgir Sports Complex_Project Kick Off Presentation.pptx
Rajgir Sports Complex_Project Kick Off Presentation.pptxRajgir Sports Complex_Project Kick Off Presentation.pptx
Rajgir Sports Complex_Project Kick Off Presentation.pptx
 
LGC PP-ABC Int
LGC PP-ABC IntLGC PP-ABC Int
LGC PP-ABC Int
 
CV_AKSHAY RAJPUT
CV_AKSHAY RAJPUTCV_AKSHAY RAJPUT
CV_AKSHAY RAJPUT
 
5. Afghanistan US Army Approval
5. Afghanistan US Army Approval5. Afghanistan US Army Approval
5. Afghanistan US Army Approval
 
SIEMENS HQ
SIEMENS HQSIEMENS HQ
SIEMENS HQ
 
Masters s
Masters sMasters s
Masters s
 
SB-12 Energy Star Training
SB-12 Energy Star TrainingSB-12 Energy Star Training
SB-12 Energy Star Training
 
Mechanical Engineering Seminar 2017_2
Mechanical Engineering Seminar 2017_2Mechanical Engineering Seminar 2017_2
Mechanical Engineering Seminar 2017_2
 
Technical specifications package a vol 1
Technical specifications package a vol 1Technical specifications package a vol 1
Technical specifications package a vol 1
 
Cost estimate presentation (1).pptx
Cost estimate presentation (1).pptxCost estimate presentation (1).pptx
Cost estimate presentation (1).pptx
 
RESUME Updated - with photo
RESUME Updated - with photoRESUME Updated - with photo
RESUME Updated - with photo
 
AGP-13-R
AGP-13-RAGP-13-R
AGP-13-R
 

ExtremePita-Cover

  • 1. G1 Extreme Pita Oxmoor Mall Drawing Index: D1 Demolition Plan and General Notes A-1 Floor Plan, Details, and General Notes EQ-1 Equipment and Furniture Plan EQ-2 Equipment Schedule A-2 Wall and Floor Finish A-3 Interior Elevations A-4 Millwork Details A-5 Restroom Plan and Details per KY ADA Code A-6 Graphics and interior Dining Elevations A-7 Reflected Ceiling Plan, Notes M-1 Mechanical Plan and Specifications P-1 Plumbing (water and Waste) Plan Fixtures and Schedules E-1 Electrical Power and Lighting Plans and Schedules Mechanical Hood drawings by CaptiveAire. See Separate Submittal CODE SUMMARY: CODE: - 2013 Kentucky Building Code (KBC) Based on the 2012 International Building Code. - Accessible and Usable Buildings and Facilities, ICC/ANSI A117.1 Misc. Info. - This project consists of a tenant finish-out in an existing mall lease space. The mall lease space is 100% sprinkled. OCCUPANCY CLASSIFICATION (Chapter 3, IBC): A-2 Assembly Occupancy Load: Area (S.F.) SF/Ocload Dining / Waiting = 316 S.F. 1 / 15 21 Service / Backroom = 520 S.F. 1 / 200 3 Restroom / Hall = 151 S.F. 0 0 Total = 987 S.F. 24 OCCUPANT LOAD: 24 Project: G1 Extreme Pita 7900 Shelbyville Road Louisville, KY 40222 Owner: General Growth Properties 7900 Shelbyville Rd. Louisville, KY 40222 ON-SITE LOCATION MAP VICINITY MAP H ABC D E F Dick's Macy's Sears Von Maur GJ E Lower Level W estport Rd. New LaGrange Rd. Wipps Mill Rd. Shelbyville Rd. SITE Taylorsville Rd. BrownsLn. BowlingBlvd. Kresge Way BrekenridgeLn. N HubbardsLn. Westport Rd. Shelbyville Rd. Taylorsville Rd. I264 I264 I64 I64 N Suite G1 eat good. feel good.