Project Aims and Objectives:
To provide the in-house Car Manufacture Division with two detailed Pre –
Acquisition and fully costed Reports on two industrial premises. Total foot print
of both premises was 125,000 square feet.
Consultant Services Included:
• Defined the Clients brief and agreed Consultancy fees
• Managed Health & Safety
• Undertook internal and external condition survey
• Production of a Pre – acquisition report which formed part of the Lease
• Estimated landlord remedial costs and in-house strip out & fit out costs
• Identified and defined local law on business acquisitions, including costs
Accomplishments:
Successfully undertook two surveys and produced acquisition reports of car
manufacturing facilities, outside the UK. This was achieved by researching the
local market, applying European standards and working with diverse teams.
Building A1 Facility in Valencia
Building A2 Facility in Valencia
Consultancy Case Study
Acquisition Reports of Two Car
Manufacturing Facilities,
Valencia, Spain
Project Aims and Objectives:
To provide the in-house Car Manufacture Division with a detailed Pre –
Acquisition and fully costed Report on 130,000 square feet of vandalised
and medium term vacant industrial premises.
Consultant Services Included:
• Defined the Clients brief and agreed Consultancy fees
• Procured and managed a M&E Consultant
• Managed Health & Safety
• Undertook internal and external condition survey
• Production of a Pre - acquisition report which formed part of the Lease
• Estimated landlord remedial costs and in-house strip out & fit out costs
Accomplishments:
Due to poor management during the construction works, an additional
authoritative remit was granted. I speedily completed the following: -
1. Awarding Practical Completion to the Contractor
2. Establishing the defects liability period
3. Leading the Contractor to gaining Building Licence, from the Council
4. Ensuring the H&S File was produced
5. Gaining Landlords Consent to alter the premises
6. Providing additional information for the Lease
• Producing drawings of the Clients demise and operations.
• Scheduling alterations
• Negotiations and agreeing with the Owners Agents the reinstatement of
the premises at Lease End, including costs.
Site Overview
Roof Condition Internals Condition Elevation Condition
Consultancy Case Study
Acquisition Report & Landlords Approval
of a Car Manufacturing Facility,
Cheshire, UK.
Project Aim and Objectives:
To provide fully costed fire insurance valuations to a security
company
Consultant Services:
• Defined the Clients brief and agreed Consultancy fees
• Managed Health & Safety
• Undertook internal and external condition survey
• Production of valuation reports
• Estimated the cost to rebuild each premises based on their
construction and internal fit out
Accomplishments:
Accurately determining the costs of replacement of commercial
premises, should the existing premises burn down.
Consultancy Case Study
Fire Insurance Valuations, of
Commercial Premises, London.

More Related Content

What's hot

New York City Department of Buildings Filing rep course_103
New York City Department of Buildings Filing rep course_103New York City Department of Buildings Filing rep course_103
New York City Department of Buildings Filing rep course_103Safe Rise
 
TD PM Process Map rev1 07.02.09
TD PM Process Map rev1 07.02.09TD PM Process Map rev1 07.02.09
TD PM Process Map rev1 07.02.093MikeRyan
 
61T01411 - PEP for Valeo Fosha New Facility - rev 0.0 -draft
61T01411 - PEP for Valeo Fosha New Facility - rev 0.0 -draft61T01411 - PEP for Valeo Fosha New Facility - rev 0.0 -draft
61T01411 - PEP for Valeo Fosha New Facility - rev 0.0 -draftJames Zhang (Chi, Zhang)
 
New York City Department of Buildings Filing rep course_105
New York City Department of Buildings Filing rep course_105New York City Department of Buildings Filing rep course_105
New York City Department of Buildings Filing rep course_105Safe Rise
 
TES_Brochure_Trifold_2015_back
TES_Brochure_Trifold_2015_backTES_Brochure_Trifold_2015_back
TES_Brochure_Trifold_2015_backDave Simon
 
Role of HVAC Engineer
Role of HVAC EngineerRole of HVAC Engineer
Role of HVAC EngineerAshutosh
 
Managing The Risk Of Financing Renewable Energy Projects
Managing The Risk Of Financing Renewable Energy ProjectsManaging The Risk Of Financing Renewable Energy Projects
Managing The Risk Of Financing Renewable Energy Projectsmtingle
 
Guc arct 702 legislations lecture 7 - fees 2 9-11-2017
Guc arct 702 legislations   lecture 7 - fees 2 9-11-2017Guc arct 702 legislations   lecture 7 - fees 2 9-11-2017
Guc arct 702 legislations lecture 7 - fees 2 9-11-2017Galala University
 
David McCarthy CV Rev 4
David McCarthy CV Rev 4David McCarthy CV Rev 4
David McCarthy CV Rev 4David McCarthy
 
New York City Department of Buildings Filing rep course_206
New York City Department of Buildings Filing rep course_206New York City Department of Buildings Filing rep course_206
New York City Department of Buildings Filing rep course_206Safe Rise
 
Unit 7-Project management(Edexel)-Lesson 1
Unit 7-Project management(Edexel)-Lesson 1 Unit 7-Project management(Edexel)-Lesson 1
Unit 7-Project management(Edexel)-Lesson 1 roshankr92
 
New York City Department of Buildings Filing rep course_102
 New York City Department of Buildings Filing rep course_102 New York City Department of Buildings Filing rep course_102
New York City Department of Buildings Filing rep course_102Safe Rise
 
E2E - ERP integrated planning for Pay costs
E2E - ERP integrated planning for Pay costsE2E - ERP integrated planning for Pay costs
E2E - ERP integrated planning for Pay costsAnatoly Ryabukha
 

What's hot (18)

New York City Department of Buildings Filing rep course_103
New York City Department of Buildings Filing rep course_103New York City Department of Buildings Filing rep course_103
New York City Department of Buildings Filing rep course_103
 
TD PM Process Map rev1 07.02.09
TD PM Process Map rev1 07.02.09TD PM Process Map rev1 07.02.09
TD PM Process Map rev1 07.02.09
 
Project Files Completion
Project Files CompletionProject Files Completion
Project Files Completion
 
61T01411 - PEP for Valeo Fosha New Facility - rev 0.0 -draft
61T01411 - PEP for Valeo Fosha New Facility - rev 0.0 -draft61T01411 - PEP for Valeo Fosha New Facility - rev 0.0 -draft
61T01411 - PEP for Valeo Fosha New Facility - rev 0.0 -draft
 
New York City Department of Buildings Filing rep course_105
New York City Department of Buildings Filing rep course_105New York City Department of Buildings Filing rep course_105
New York City Department of Buildings Filing rep course_105
 
TES_Brochure_Trifold_2015_back
TES_Brochure_Trifold_2015_backTES_Brochure_Trifold_2015_back
TES_Brochure_Trifold_2015_back
 
Role of HVAC Engineer
Role of HVAC EngineerRole of HVAC Engineer
Role of HVAC Engineer
 
Managing The Risk Of Financing Renewable Energy Projects
Managing The Risk Of Financing Renewable Energy ProjectsManaging The Risk Of Financing Renewable Energy Projects
Managing The Risk Of Financing Renewable Energy Projects
 
Guc arct 702 legislations lecture 7 - fees 2 9-11-2017
Guc arct 702 legislations   lecture 7 - fees 2 9-11-2017Guc arct 702 legislations   lecture 7 - fees 2 9-11-2017
Guc arct 702 legislations lecture 7 - fees 2 9-11-2017
 
Documentation
Documentation Documentation
Documentation
 
David McCarthy CV Rev 4
David McCarthy CV Rev 4David McCarthy CV Rev 4
David McCarthy CV Rev 4
 
mtb resume
mtb resumemtb resume
mtb resume
 
New York City Department of Buildings Filing rep course_206
New York City Department of Buildings Filing rep course_206New York City Department of Buildings Filing rep course_206
New York City Department of Buildings Filing rep course_206
 
Mohannad Al Twait-CV1
Mohannad Al Twait-CV1Mohannad Al Twait-CV1
Mohannad Al Twait-CV1
 
Unit 7-Project management(Edexel)-Lesson 1
Unit 7-Project management(Edexel)-Lesson 1 Unit 7-Project management(Edexel)-Lesson 1
Unit 7-Project management(Edexel)-Lesson 1
 
New York City Department of Buildings Filing rep course_102
 New York City Department of Buildings Filing rep course_102 New York City Department of Buildings Filing rep course_102
New York City Department of Buildings Filing rep course_102
 
Proposed Elevations (South & North)
Proposed Elevations (South & North)Proposed Elevations (South & North)
Proposed Elevations (South & North)
 
E2E - ERP integrated planning for Pay costs
E2E - ERP integrated planning for Pay costsE2E - ERP integrated planning for Pay costs
E2E - ERP integrated planning for Pay costs
 

Viewers also liked

Presidentes johnson controls
Presidentes johnson controlsPresidentes johnson controls
Presidentes johnson controlsponcho50
 
Volvo johnson controls
Volvo johnson controlsVolvo johnson controls
Volvo johnson controlsDominiek Frees
 
Case Study: Johnson Controls Drives Global Continuous
Case Study: Johnson Controls Drives Global ContinuousCase Study: Johnson Controls Drives Global Continuous
Case Study: Johnson Controls Drives Global ContinuousActuate Corporation
 
Sinodales tkd moo duk kwan
Sinodales tkd moo duk kwanSinodales tkd moo duk kwan
Sinodales tkd moo duk kwanponcho50
 
Johnson Controls - Building Efficiency Fact Sheet
Johnson Controls - Building Efficiency Fact SheetJohnson Controls - Building Efficiency Fact Sheet
Johnson Controls - Building Efficiency Fact SheetJohnsonControls
 
Johnson controls case study
Johnson controls case studyJohnson controls case study
Johnson controls case studyRam K
 
Johnson Controls: How we empower our executives to tell the brand's story, pr...
Johnson Controls: How we empower our executives to tell the brand's story, pr...Johnson Controls: How we empower our executives to tell the brand's story, pr...
Johnson Controls: How we empower our executives to tell the brand's story, pr...SocialMedia.org
 

Viewers also liked (9)

Presidentes johnson controls
Presidentes johnson controlsPresidentes johnson controls
Presidentes johnson controls
 
Volvo johnson controls
Volvo johnson controlsVolvo johnson controls
Volvo johnson controls
 
Taj landsend, mumbai
Taj landsend, mumbaiTaj landsend, mumbai
Taj landsend, mumbai
 
Case Study: Johnson Controls Drives Global Continuous
Case Study: Johnson Controls Drives Global ContinuousCase Study: Johnson Controls Drives Global Continuous
Case Study: Johnson Controls Drives Global Continuous
 
Johnson Controls Inc.
Johnson Controls Inc. Johnson Controls Inc.
Johnson Controls Inc.
 
Sinodales tkd moo duk kwan
Sinodales tkd moo duk kwanSinodales tkd moo duk kwan
Sinodales tkd moo duk kwan
 
Johnson Controls - Building Efficiency Fact Sheet
Johnson Controls - Building Efficiency Fact SheetJohnson Controls - Building Efficiency Fact Sheet
Johnson Controls - Building Efficiency Fact Sheet
 
Johnson controls case study
Johnson controls case studyJohnson controls case study
Johnson controls case study
 
Johnson Controls: How we empower our executives to tell the brand's story, pr...
Johnson Controls: How we empower our executives to tell the brand's story, pr...Johnson Controls: How we empower our executives to tell the brand's story, pr...
Johnson Controls: How we empower our executives to tell the brand's story, pr...
 

Similar to Johnson controls case study consultancy

Property Development Finance Case Study-Blueray Capital.pdf
Property Development Finance Case Study-Blueray Capital.pdfProperty Development Finance Case Study-Blueray Capital.pdf
Property Development Finance Case Study-Blueray Capital.pdfBlueray Capital
 
Sanjeewa_CV updated on 23.02.2016
Sanjeewa_CV  updated on 23.02.2016Sanjeewa_CV  updated on 23.02.2016
Sanjeewa_CV updated on 23.02.2016Sanjeewa Mahawedage
 
Surrey education case study
Surrey education case studySurrey education case study
Surrey education case studyFreelancelanders
 
Owner's engineer services - statement of capabilities
Owner's engineer services - statement of capabilitiesOwner's engineer services - statement of capabilities
Owner's engineer services - statement of capabilitiesGensol Engineering Limited
 
Gensolownersengineerservices 140323094758-phpapp02
Gensolownersengineerservices 140323094758-phpapp02Gensolownersengineerservices 140323094758-phpapp02
Gensolownersengineerservices 140323094758-phpapp02jitendra kumar biswas
 
Sample wind apartment ins val rep
Sample wind apartment ins val repSample wind apartment ins val rep
Sample wind apartment ins val repIndependentgroup
 
CURRICULUM_VITAE 2
CURRICULUM_VITAE 2CURRICULUM_VITAE 2
CURRICULUM_VITAE 2Jason Lloyd
 
New brochure 240311
New brochure 240311New brochure 240311
New brochure 240311weydon23
 
CV Clive V2 180612 A
CV Clive V2 180612 ACV Clive V2 180612 A
CV Clive V2 180612 AClive Price
 
An improved, productive, skilled, innovative and efficient sector копия
An improved, productive, skilled, innovative and efficient sector   копияAn improved, productive, skilled, innovative and efficient sector   копия
An improved, productive, skilled, innovative and efficient sector копияLAZOVOY
 
An improved, productive, skilled, innovative and efficient sector
An improved, productive, skilled, innovative and efficient sectorAn improved, productive, skilled, innovative and efficient sector
An improved, productive, skilled, innovative and efficient sectorLAZOVOY
 
dokumen.tips_installation-of-api-610-centrifugal-pumps-to-achieve-a-8-api-686...
dokumen.tips_installation-of-api-610-centrifugal-pumps-to-achieve-a-8-api-686...dokumen.tips_installation-of-api-610-centrifugal-pumps-to-achieve-a-8-api-686...
dokumen.tips_installation-of-api-610-centrifugal-pumps-to-achieve-a-8-api-686...yusuf699644
 
C.V of Project Manager Haider Ahmed Al Dure.PDF
C.V of Project Manager Haider Ahmed Al Dure.PDFC.V of Project Manager Haider Ahmed Al Dure.PDF
C.V of Project Manager Haider Ahmed Al Dure.PDFHaider Salman
 

Similar to Johnson controls case study consultancy (20)

Property Development Finance Case Study-Blueray Capital.pdf
Property Development Finance Case Study-Blueray Capital.pdfProperty Development Finance Case Study-Blueray Capital.pdf
Property Development Finance Case Study-Blueray Capital.pdf
 
Perth metro
Perth metroPerth metro
Perth metro
 
Sanjeewa_CV updated on 23.02.2016
Sanjeewa_CV  updated on 23.02.2016Sanjeewa_CV  updated on 23.02.2016
Sanjeewa_CV updated on 23.02.2016
 
Surrey education case study
Surrey education case studySurrey education case study
Surrey education case study
 
Pp1 seminar
Pp1 seminarPp1 seminar
Pp1 seminar
 
Owner's engineer services - statement of capabilities
Owner's engineer services - statement of capabilitiesOwner's engineer services - statement of capabilities
Owner's engineer services - statement of capabilities
 
Gensolownersengineerservices 140323094758-phpapp02
Gensolownersengineerservices 140323094758-phpapp02Gensolownersengineerservices 140323094758-phpapp02
Gensolownersengineerservices 140323094758-phpapp02
 
CV-Sounder
CV-SounderCV-Sounder
CV-Sounder
 
Sample wind apartment ins val rep
Sample wind apartment ins val repSample wind apartment ins val rep
Sample wind apartment ins val rep
 
Kandil_Sameh_CPMPart 4 _b
Kandil_Sameh_CPMPart 4 _bKandil_Sameh_CPMPart 4 _b
Kandil_Sameh_CPMPart 4 _b
 
sounder
soundersounder
sounder
 
CURRICULUM_VITAE 2
CURRICULUM_VITAE 2CURRICULUM_VITAE 2
CURRICULUM_VITAE 2
 
New brochure 240311
New brochure 240311New brochure 240311
New brochure 240311
 
CV Clive V2 180612 A
CV Clive V2 180612 ACV Clive V2 180612 A
CV Clive V2 180612 A
 
An improved, productive, skilled, innovative and efficient sector копия
An improved, productive, skilled, innovative and efficient sector   копияAn improved, productive, skilled, innovative and efficient sector   копия
An improved, productive, skilled, innovative and efficient sector копия
 
An improved, productive, skilled, innovative and efficient sector
An improved, productive, skilled, innovative and efficient sectorAn improved, productive, skilled, innovative and efficient sector
An improved, productive, skilled, innovative and efficient sector
 
Ateeq cv
Ateeq cv Ateeq cv
Ateeq cv
 
dokumen.tips_installation-of-api-610-centrifugal-pumps-to-achieve-a-8-api-686...
dokumen.tips_installation-of-api-610-centrifugal-pumps-to-achieve-a-8-api-686...dokumen.tips_installation-of-api-610-centrifugal-pumps-to-achieve-a-8-api-686...
dokumen.tips_installation-of-api-610-centrifugal-pumps-to-achieve-a-8-api-686...
 
C.V of Project Manager Haider Ahmed Al Dure.PDF
C.V of Project Manager Haider Ahmed Al Dure.PDFC.V of Project Manager Haider Ahmed Al Dure.PDF
C.V of Project Manager Haider Ahmed Al Dure.PDF
 
TURNKEY PROJECT.pptx
TURNKEY PROJECT.pptxTURNKEY PROJECT.pptx
TURNKEY PROJECT.pptx
 

More from grahamelanders

Roof replacement and internal remedial works
Roof replacement and internal remedial worksRoof replacement and internal remedial works
Roof replacement and internal remedial worksgrahamelanders
 
Freelance project management residential
Freelance project management residentialFreelance project management residential
Freelance project management residentialgrahamelanders
 
Freelance project management residential
Freelance project management residentialFreelance project management residential
Freelance project management residentialgrahamelanders
 
Freelance project management case studies - residential
Freelance project management case studies - residentialFreelance project management case studies - residential
Freelance project management case studies - residentialgrahamelanders
 
Freelance project management commercial - Case Study
Freelance project management commercial - Case StudyFreelance project management commercial - Case Study
Freelance project management commercial - Case Studygrahamelanders
 

More from grahamelanders (11)

Roof replacement and internal remedial works
Roof replacement and internal remedial worksRoof replacement and internal remedial works
Roof replacement and internal remedial works
 
program
programprogram
program
 
Surrey education
Surrey educationSurrey education
Surrey education
 
Upload
UploadUpload
Upload
 
Freelance project management residential
Freelance project management residentialFreelance project management residential
Freelance project management residential
 
Freelance project management residential
Freelance project management residentialFreelance project management residential
Freelance project management residential
 
Freelance project management case studies - residential
Freelance project management case studies - residentialFreelance project management case studies - residential
Freelance project management case studies - residential
 
Freelance project management commercial - Case Study
Freelance project management commercial - Case StudyFreelance project management commercial - Case Study
Freelance project management commercial - Case Study
 
Upload
UploadUpload
Upload
 
PerthMetro Case Study
PerthMetro Case StudyPerthMetro Case Study
PerthMetro Case Study
 
PerthMetro case study
PerthMetro case studyPerthMetro case study
PerthMetro case study
 

Johnson controls case study consultancy

  • 1. Project Aims and Objectives: To provide the in-house Car Manufacture Division with two detailed Pre – Acquisition and fully costed Reports on two industrial premises. Total foot print of both premises was 125,000 square feet. Consultant Services Included: • Defined the Clients brief and agreed Consultancy fees • Managed Health & Safety • Undertook internal and external condition survey • Production of a Pre – acquisition report which formed part of the Lease • Estimated landlord remedial costs and in-house strip out & fit out costs • Identified and defined local law on business acquisitions, including costs Accomplishments: Successfully undertook two surveys and produced acquisition reports of car manufacturing facilities, outside the UK. This was achieved by researching the local market, applying European standards and working with diverse teams. Building A1 Facility in Valencia Building A2 Facility in Valencia Consultancy Case Study Acquisition Reports of Two Car Manufacturing Facilities, Valencia, Spain
  • 2. Project Aims and Objectives: To provide the in-house Car Manufacture Division with a detailed Pre – Acquisition and fully costed Report on 130,000 square feet of vandalised and medium term vacant industrial premises. Consultant Services Included: • Defined the Clients brief and agreed Consultancy fees • Procured and managed a M&E Consultant • Managed Health & Safety • Undertook internal and external condition survey • Production of a Pre - acquisition report which formed part of the Lease • Estimated landlord remedial costs and in-house strip out & fit out costs Accomplishments: Due to poor management during the construction works, an additional authoritative remit was granted. I speedily completed the following: - 1. Awarding Practical Completion to the Contractor 2. Establishing the defects liability period 3. Leading the Contractor to gaining Building Licence, from the Council 4. Ensuring the H&S File was produced 5. Gaining Landlords Consent to alter the premises 6. Providing additional information for the Lease • Producing drawings of the Clients demise and operations. • Scheduling alterations • Negotiations and agreeing with the Owners Agents the reinstatement of the premises at Lease End, including costs. Site Overview Roof Condition Internals Condition Elevation Condition Consultancy Case Study Acquisition Report & Landlords Approval of a Car Manufacturing Facility, Cheshire, UK.
  • 3. Project Aim and Objectives: To provide fully costed fire insurance valuations to a security company Consultant Services: • Defined the Clients brief and agreed Consultancy fees • Managed Health & Safety • Undertook internal and external condition survey • Production of valuation reports • Estimated the cost to rebuild each premises based on their construction and internal fit out Accomplishments: Accurately determining the costs of replacement of commercial premises, should the existing premises burn down. Consultancy Case Study Fire Insurance Valuations, of Commercial Premises, London.