This document provides an overview and status update of the Al Qasr Mall project in Saudi Arabia. It summarizes that the project is 99.6% complete, with construction of core packages finished and critical milestones like energizing transformer rooms achieved. It also lists potential additional works and notes 44.18% of the mall's leasable area is fitted out and ready for tenants. Key pre-opening tasks are still needed before the mall can open.
3. Al Qasr Shopping Centre
Lead Architect: Albert Speer & Partners
Lead Consultant: Saudi Diyar
Main Contractor: Saudi Constructioneers
67,500 m² Land Area
215,000 m² of BUA
76,489.6 m² of Leasable Area
368 Shop/Store
1756 Parking Capacity
Construction Start: May 2008
Expected completion: 31st
Jan 2012
4. Current Status of Packages
Pkg 6A: SAUDICO- Structural Works
Work In Place 100%
Forecast Completion Date 17-Dec-09
Pkg 6B: SAUDICO- Finishes & MEP Works
Work In Place 98.8%
Forecast Completion Date 15-Feb-12
Pkg 6C: Al Ojaimi- Substation & Cable Works
Work In Place 100%
Forecast Completion Date 30-Oct-11
Project Total of completion all packages: 99.6%
5. Critical Milestones to Achieve
Completion Date
All Construction Works Completed on or before- 15 Feb 2012
Energize Transformer Rooms- 30 Oct 2011 ( Done)
Telephone Cables and Cabinet- all material delivered & partially installed.
Way finding mock up approval : 04.01.12, 45days for installation after
releasing LOI.
Balance of the interior design packages in Process
Electrical Panel Boards Delivery- 100 % delivered.
Execution of the STC Contract Agreement- awaiting Signature
Finalizing Al Shaya requirements
Finalizing the A/C requirements for the Stores
Finalizing The Food Court Requirement (GAS)
Epoxy Paint- Ground Floor painting
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17. PROJECT: AL QASR MALL
LIST OF POTENTIAL ADDITIONAL WORKS
SN Description Rough Estimated Cost Duration Remarks
1 Fun Zone (Part A) - Waterproofing Awaiting SCE Cost
2 Drop Off area
Awaiting SCE Cost from conceptual drawing
provided by SDC
3 Additional Parking Areas (at North East) Awaiting SCE Cost
4 LPG Central Tank & Services 649,982.00 2 months
SR 649,982 - cost from Supplier/contractor
(AL ROWAFED Est), Excluding Civil works
which still awaiting from SCE
5 Additional HVAC works for Tenant (AL SHAYAH) 6,000,000.00 9 months As proposed by SCE
6 Water and Drainage for 17 shops 590,150.00 10 weeks (2.5 month) As proposed by SCE
7 Additional 4 nos. Panoramic Elevator 12 Months
* includes 1month design period of SDC
* SDC awaiting DAAR's instruction to provide
the design.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
38.
39.
40.
41.
42.
43.
44.
45.
46.
47.
48.
49.
50.
51.
52.
53.
54. Floor
Total
(1)
In Process of
Handing Over
(2)
Total HO To
DAAR-PM (or
skipped)
(3)
Handed Over to
DAAR-PM with
No
Tenant Action
(4)
Handed
Over to
Tenant with
No Further
Action
(5)
Tenant Submitted
Fit Out Design
Drawings
for DAAR Approval
but Did Not Start Fit-
Out Works
(6)
Fit-Out
Works
Started
(7)
Ground Floor 54 2 52 44 2 1 5
First Floor 79 2 77 22 8 0 47
Second Floor 91 1 90 66 4 0 20
Third Floor 140 84 56 38 8 1 9
TOTAL 364 89 275 170 22 2 81
Area of Fit out on board
M2
Total Leasable Area M2 Percentage achieved
33793 76489.6 44.18%