Name: Lim Pui San (Leviss)
Student ID: 0318144
Module: Effective Public
Communication
Session: September 2014
Lecturer: Persis Rodrigues
Oral Presentation (Part 1)
Notre Dame Cathedral, ParisNotre Dame Cathedral, Paris
Location
Map
It is located on
the eastern half
of the Île de la
Cite.
Introduction to Notre Dame Cathedral
“Our Lady of Paris”
Gothic cathedral
A church that contains the "cathedra", or
official chair, of the Archbishop of Paris
Length: 130 meters
Width: 48 meters
Height: 35 meters
Historical Background
Construction Timeline
1160
Maurice de
Sully ordered
the original
cathedral
demolished
1163
Cornerstone
laid for Notre
–Dame de
Paris
1182
Apse and
choir
completed
1200
Work began
on western
facade
1225
Western
facade
completed
1250
Western towers
and north rose
window
completed
1250-1345
Remaining
elements
completed
1182-1190
Construction of the
last three bays in the
nave, the side aisles
and the tribunes
Building Structure
Building Plan
The entranceExterior details
Interior of the cathedral
Ornamentations
Stained-glass windows
South rose window The cloister stained glass windows
Sculpture
Notre Dame de Paris
A Virgin with child dedicated to
“Notre-Dame de Paris”
Bells
Emmanuel bell
Furniture
The crown of light
It was called crowns of
light or wheels when the
lampiers supported a
large number of cups or
wax candles.
It is used for
liturgical
Materials used
Stone Glass
Hard limestone
used to
construct the
exterior of the
building and
also used in
sculpturing.
The cathedral is
largely
composed with
colourful
stained-glass
windows.
Wood
Large amount
of wood used
to construct
roof
framework.
References
1. Building history. (2015, January 27). Retrieved from
http://notredamedeparis.fr/spip.php?article380
2. History. (2015, January 27). Retrieved from
http://www.notredamecathedralparis.com/history
3. Cathedral for art and history. (2015, January 28).
Retrieved from http://www.notredamedeparis.fr/-
Cathedral-for-art-and-history-
4. Notre Dame Cathedral. (2015, January 28). Retrieved
from
http://www.aviewoncities.com/paris/notredame.ht
m
5. [Notre-Dame de Paris] The façade and the portals.
(2015, January 28). Retrieved from
http://notredamedeparis.fr/The-Facade-and-the-
Portals

Epc oral slides 1

  • 1.
    Name: Lim PuiSan (Leviss) Student ID: 0318144 Module: Effective Public Communication Session: September 2014 Lecturer: Persis Rodrigues Oral Presentation (Part 1)
  • 2.
    Notre Dame Cathedral,ParisNotre Dame Cathedral, Paris
  • 3.
    Location Map It is locatedon the eastern half of the Île de la Cite.
  • 4.
    Introduction to NotreDame Cathedral “Our Lady of Paris” Gothic cathedral A church that contains the "cathedra", or official chair, of the Archbishop of Paris Length: 130 meters Width: 48 meters Height: 35 meters
  • 5.
    Historical Background Construction Timeline 1160 Mauricede Sully ordered the original cathedral demolished 1163 Cornerstone laid for Notre –Dame de Paris 1182 Apse and choir completed 1200 Work began on western facade 1225 Western facade completed 1250 Western towers and north rose window completed 1250-1345 Remaining elements completed 1182-1190 Construction of the last three bays in the nave, the side aisles and the tribunes
  • 6.
  • 7.
  • 8.
  • 9.
    Ornamentations Stained-glass windows South rosewindow The cloister stained glass windows
  • 10.
    Sculpture Notre Dame deParis A Virgin with child dedicated to “Notre-Dame de Paris” Bells Emmanuel bell Furniture The crown of light It was called crowns of light or wheels when the lampiers supported a large number of cups or wax candles. It is used for liturgical
  • 11.
    Materials used Stone Glass Hardlimestone used to construct the exterior of the building and also used in sculpturing. The cathedral is largely composed with colourful stained-glass windows. Wood Large amount of wood used to construct roof framework.
  • 12.
    References 1. Building history.(2015, January 27). Retrieved from http://notredamedeparis.fr/spip.php?article380 2. History. (2015, January 27). Retrieved from http://www.notredamecathedralparis.com/history 3. Cathedral for art and history. (2015, January 28). Retrieved from http://www.notredamedeparis.fr/- Cathedral-for-art-and-history- 4. Notre Dame Cathedral. (2015, January 28). Retrieved from http://www.aviewoncities.com/paris/notredame.ht m 5. [Notre-Dame de Paris] The façade and the portals. (2015, January 28). Retrieved from http://notredamedeparis.fr/The-Facade-and-the- Portals