BIM 360 for EPC Contractors: From
Business Needs to Full Adoption
About the speaker
Marco Mellacqua
Marco is a Plant Information Management Coordinator at Maire
Tecnimont. In the last years he has been strongly involved in the
Company digital transformation process. Actually he is
collaborating in several digital initiatives that aim to integrate
digital technologies into Engineering and Construction business
areas in order to make processes more efficient and effective and
consequently to deliver more value to Clients. On the executive
projects instead, he is taking care of the information management
plan and its deployment ensuring the correct use of tools and
methodologies and collecting feedbacks to implement in the above
mentioned digital initiatives.
About the speaker
Fabio Bitetto
Fabio is a Plant Information Management Coordinator at Maire.
Despite his young age, Fabio made several work experiences in
which he grown his BIM and project management expertise
focusing especially on energy and utilities. He also collaborated
with the City of Milan for the European project “Horizon 2020”,
focused on smart cities and energy efficiency. Fabio started the
development of BIM in Maire Tecnimont, focusing on
Underground Services. In the 2019 he has started a new
experience as Plant Information Management Coordinator,
managing all the Information Management aspects on projects.
Maire Tecnimont:
Who we are
45 COUNTRIES
50 OPERATING
COMPANIES
INDUSTRY
OPERATING
COMPANIES
ORGANIZATION
9,114
professionals
| OIL&GAS REFINING | PETROCHEMICALS | FERTILIZERS | POWER | RENEWABLE & GREEN |
Oil&Gas Refining, Petrochemicals, Fertilizers, Polyolefins, Power Large-scale contracting
Development and licensing of Urea Technology
Refining, Hydrogen&Syngas Production, Sulphur Recovery and Process Heaters
Engineering and contracting in Transportation and Civil Engineering
Green Acceleration Project, Technological initiatives for energy transition
Flexible solutions in Renewable Energy
Downstream Innovative Technologies
~6,114 employees
+3,000 professionals
in Electrical & Instrumentation
MORE THAN
Project development to originate business through early involvement in investment initiatives
01.
02.
03.
04.
05.
Digital transformation: Maire Tecnimont perspective
BIM360: Why?
Business Case Development
Process Assessment
Current Status
06. Conclusions
Agenda
Digital Transformation:
Maire Tecnimont perspective
For Maire Tecnimont 2 main focus areas related to Digital Solutions:
Increase efficiency and effectiveness of
own internal processes
Internal focus
Enhance value proposition towards
owners and operators
External focus
Increase efficiency and effectiveness of
own internal processes
Internal focus
For Maire Tecnimont 2 main focus areas related to Digital Solutions:
Training & Engagement
01
Landscaping and
prioritization
02
Business cases, KPIs
definition and roadmap
03 04
Program management &
definition of scale up approach
Increase efficiency and effectiveness of
own internal processes
Internal focus
For Maire Tecnimont 2 main focus areas related to Digital Solutions:
BIM CENTRIC COLLABORATION
PLATFORM
Maire Tecnimont pain points:
Engineering disciplines design on different models,
with no cross-visibility, leading to inconsistencies
Inefficient approval processes
01
02
Construction has no real-time visibility on
design changes, leading to reworks
Inefficient document collection
EPC info collected not leveraged
03
04
05
BIM360: Why?
Cluster
description
Common BIM based environment where all
the disciplines, partners and vendors can
collaborate supported by custom
functionalities
Inputs BIM Platform
All disciplines,
partners & vendors
model
Possibility to
comment and
approve models
3D & 2D
Output
• Single platform
• Engineering integrated
workflow
• Daily update of 3D
model
• Open platform with
vendors
Real-time platform
for information
sharing across
disciplines
Collaborative
production of
deliverables
Data consistency
Overall Scope Identification
W
H
Y
1 Cloud-based application
2 Model centric approach
3 Out of the box functionality
of collaboration
4 Easily involve third partners
5 Compatibility
6
Customization/extension
through Forge APIs
BIM360: Why?
Business Case
Development
Cost savings for
BIM civil
Adjusted steel structures cost
% reduction adjusted steel
structure tons
Adjusted steel structures cost
reduction in fabrication
Civil Contract baseline
Reduction in average extra work
Civil contract extra works
cost reduction in site
Average number of revisions
Total cost per extra revision
Number of deliverables
Reduction of extra revisions
Average projects
-20%
-30%
Key drivers: Civil Use Case
Cost savings for
BIM civil
Adjusted steel structures cost
reduction in fabrication
Civil contract extra works
cost reduction in site
Average number of revisions
Assumptions: Civil Use Case
Cost savings for
BIM civil
Adjusted steel structures cost
% reduction adjusted steel
structure tons
Adjusted steel structures cost
reduction in fabrication
Civil Contract baseline
Reduction in average extra work
Civil contract extra works
cost reduction in site
Average number of revisions
Total cost per extra revision
Number of deliverables
Reduction of extra revisions
Average projects
-20%
-30%
-50%
Only 50%
achievable
without chain
integration
with other
disciplines
Expected Benefits: Civil Use Case
Process assessment
Civil Engineering Workflow: AS-WAS
Civil Engineering Workflow: TO-BE
Digitized Processes:
Document Management Structure
Design Collaboration (Internal/Vendor)
Approval Workflow (Deliverable review)
Design Review
Forge Development/Customization
1
2
3
4
5
Document Management Structure
Discipline’s Folder:
> Library - to host BIM content
> WIP (Work In Progress) - to host “live” sub-
discipline models
> Consumed - to host consumed shared models
> Shared – to host published models
Design Review Folder:
> Published – to host Plant Navisworks session
> FeasibilityApp – to host models for Forge
Feasibility App
> Sub-discipline – to host interoperable formats
> Design – to host internal design files
> Vendor – to host SubCo design files
Document Management Structure
> To each folder the permission are set based on
standardized roles (e.g. BIM Modeler, BIM Coordinator,
etc.), defined in a “Permission Matrix”
Role
Plans
Project Files
DesignReview_3DModels Library Shared WorkInProgress
Discipline Others Discipline Others Discipline Others Discipline Others Discipline Others
PIM Coordinator 1 1 1 1 1 1 1 1 1 1
Piping 3D Administrator 8 8 3 6 8 8 8 8 8 8
Civil Project Leader 6 6 7 7 8 8 8 8 8 8
Civil Concrete Specialist 6 6 6 6 8 8 8 8 7 8
Civil Concrete BIM Coordinator 4 6 3 6 2 6 7 7 2 7
Civil Concrete BIM Modeler 4 6 4 6 6 8 7 7 3 8
Civil Steel Specialist 6 6 6 6 8 8 8 8 7 8
Civil Steel BIM Coordinator 4 6 3 6 2 6 7 7 2 7
Civil Steel BIM Modeler 4 6 4 6 6 8 7 7 3 8
Civil Underground Specialist 6 6 6 6 8 8 8 8 7 8
Civil Underground BIM Coordinator 4 6 3 6 2 6 7 7 2 7
Civil Underground BIM Modeler 4 6 4 6 6 8 7 7 3 8
Permission
Code Permission Description
1 Project Admin
2 Folder Control
3 View + Download + Upload + Edit
4 View + Download + Upload
5 Upload Only
6 View + Download
7 View Only
8 Access Denied
Deliverable Review Folder
> Document Status – to host deliverables as per their
status (e.g. Work In Progress, Ready For Squad Check,
Ready For Final Review, Ready To Be Issued)
Design Collaboration (Internal/Vendor)
Teams sharing design
packages
Standardized Naming
convention to identify
sets and related content
(.rvt, .ifc, .pdf, etc.)
Design Collaboration (Internal/Vendor)
Explore package and compare with previous version
(added/removed/modified objects) before consuming
Approval Workflow (Deliverable review)
Standard Pre-defined Approval Workflow based on:
- Discipline (Reinforced Concrete, Underground, etc)
- Reason of Issuing (Issue for Review, Issue for
Construction, etc)
- Type of Structure (Basin, Pipe Rack, etc)
AA-ReadyForFinalReview-Basin
Approval Workflow (Deliverable review)
For each Approval Workflow has been defined:
- Initiator Role
- Custom Review Step with pre-defined roles
and time allowed
- Custom Status values
- Standard destination folder for approved
documents
Approval Workflow (Deliverable review)
Approval Workflow (Deliverable review)
Approval Workflow Standard Name
Document included in the review Approval Status with Destination folder
Markup included in the reviewed
document
Review cycle history
Design Review
Multidisciplinary Navisworks
session updated on weekly basis
Design Review
Forge Development/Customization
Project dashboard to manage and
visualize all the civil engineering data
Features
▪ Visualize Engineering Status
▪ Hold Management
▪ Design Quality Monitoring
▪ Key Quantities Monitoring
Forge Development/Customization
Plant 3D Model loaded
from
DesignReview_3DModels
00_Published
Civil Database connected
with Revit Models loaded
in WorkInProgress folder
Forge Development/Customization
Project dashboard to manage and visualize
the steel structures erection feasibility
Features
▪ Feasibility analysis of steel structures
and pipe components
▪ Model query
▪ Dynamic reports
▪ Review of data quality
Forge Development/Customization
Plant 3D Model loaded from
DesignReview_3DModels
00_Published
00_FeasibilityApp
Dynamic Reports
Material
Management Data
SWOT Analysis
W
S
O
T
Strength Opportunity
Threat
•Centralize models and
deliverables in a single,
cloud-based platform
•Real time collaboration
during design development
•Reduce project errors and
minimize confusion when
determining what is the latest
set of project files
•Integrated review from
anywhere
•Possibility to include vendor and
partners to collaborate on the
platform
•Collaboration across disciplines
with comments and issues track
record
•Create Package/ Publish/
Consume logics
•Low flexibility in the approval
workflow definition
Weakness
•Design collaboration cannot
be extended to typical Plant
design formats (.vue, .rvm,
etc.)
•Design Collaboration module
performances
Design collaboration do not support huge number of models per single team
Main Criticalities & Workaround
Split the team in sub-teams with a maximum of 100 sets to be managed
Approval workflow settings not duplicable among projects
Need to duplicate manually from project to project
Approval workflow settings not enough flexible
Need to work on several workflow leveraging document mgmt folder
structure. The workflow results a bit affected by such rigidity
No APIs to interact with approval workflow
N/A
Current Status
One Pilot Project on board
34 Users
Before COVID-19
Actual Status
10 Projects On Board
Standard for all incoming projects
253 Users
(Milan + Mumbai)
4 Companies of Maire
Tecnimont Group
Further development
Extend the use of the platform to
other discipline (Piping, Process, etc.)
Evaluation of the latest released
modules (Asset, Build, etc.)
Evaluation of ACC Connect to integrate
third part apps (e.g. Office 365)
Conclusions
DISCIPLINE LEADER
“In BIM 360 project latest data are
available to the whole team with just one
click, the communication between
stakeholders is strongly enhanced and
people are focused to value-added
activities”
PROJECT MANAGER
“The implementation of BIM 360
platform helped us in reducing
bottlenecks and streamline overall
project delivery“
BUSINESS MANAGER
“Digital transformation can strongly
contribute to business empowerment and the
implementation of such collaborative platform is a great
proof of this attitude”
PIM COORDINATOR
“From information management
point of view BIM 360 platform
represents a disruptive tool that
help us to minimize inconsistencies
and reworks”
Thanks & Enjoy AU2020
Autodesk and the Autodesk logo are registered trademarks or trademarks of Autodesk, Inc., and/or its subsidiaries and/or affiliates in the USA and/or other countries. All other brand names, product names, or trademarks
belong to their respective holders. Autodesk reserves the right to alter product and services offerings, and specifications and pricing at any time without notice, and is not responsible for typographical or graphical errors that
may appear in this document.
© 2020 Autodesk. All rights reserved.

More Related Content

Similar to ENR467723

Designing to Enhance Construction Planning & Monitoring
Designing to Enhance Construction Planning & MonitoringDesigning to Enhance Construction Planning & Monitoring
Designing to Enhance Construction Planning & MonitoringCCT International
 
Building information modelling - redefining the role of the project manager: ...
Building information modelling - redefining the role of the project manager: ...Building information modelling - redefining the role of the project manager: ...
Building information modelling - redefining the role of the project manager: ...Association for Project Management
 
Integrating Advanced Analytics with Autodesk Solutions
Integrating Advanced Analytics with Autodesk SolutionsIntegrating Advanced Analytics with Autodesk Solutions
Integrating Advanced Analytics with Autodesk SolutionsRich Hanapole
 
Digital Transformation of the Construction Industry
Digital Transformation of the Construction IndustryDigital Transformation of the Construction Industry
Digital Transformation of the Construction IndustryCCT International
 
IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...
IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...
IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...IRJET Journal
 
BIM for Local Government - Presentation by John Lorimer, Local Government BIM...
BIM for Local Government - Presentation by John Lorimer, Local Government BIM...BIM for Local Government - Presentation by John Lorimer, Local Government BIM...
BIM for Local Government - Presentation by John Lorimer, Local Government BIM...Clarkson Alliance
 
Recent developments in BIM in geotechnics
Recent developments in BIM in geotechnics Recent developments in BIM in geotechnics
Recent developments in BIM in geotechnics Rob Madill
 
Recent developments in BIM in geotechnics
Recent developments in BIM  in geotechnicsRecent developments in BIM  in geotechnics
Recent developments in BIM in geotechnicsRob Madill
 
A Critical Review of Building Information Modelling
A Critical Review of Building Information ModellingA Critical Review of Building Information Modelling
A Critical Review of Building Information ModellingSiddhartha Kamat
 
From 3D to 6D Managing the Information Labyrinth of BIM.pdf
From 3D to 6D Managing the Information Labyrinth of BIM.pdfFrom 3D to 6D Managing the Information Labyrinth of BIM.pdf
From 3D to 6D Managing the Information Labyrinth of BIM.pdfVincentPoon15
 
How BIM Can Improve Decisions and Reduce Errors - Webinar, December 2, 2015
How BIM Can Improve Decisions and Reduce Errors - Webinar, December 2, 2015How BIM Can Improve Decisions and Reduce Errors - Webinar, December 2, 2015
How BIM Can Improve Decisions and Reduce Errors - Webinar, December 2, 2015Aconex
 
#FiaComit Inside a digital asset
#FiaComit Inside a digital asset#FiaComit Inside a digital asset
#FiaComit Inside a digital assetComit Projects Ltd
 
Salah Yousif, module 1, introduction to bim and the business case of bim
Salah Yousif, module 1, introduction to bim and the business case of bimSalah Yousif, module 1, introduction to bim and the business case of bim
Salah Yousif, module 1, introduction to bim and the business case of bimSalah Yousif
 
Software Application Presentation Slide
Software Application Presentation SlideSoftware Application Presentation Slide
Software Application Presentation SlideLee Pei Gie
 
Software Applications
Software ApplicationsSoftware Applications
Software ApplicationsXinYee Khoo
 
Ibrahim Naeem BIM Projects Portfolio
Ibrahim Naeem BIM Projects Portfolio Ibrahim Naeem BIM Projects Portfolio
Ibrahim Naeem BIM Projects Portfolio Ibrahem Naeem
 
ETDP 2015 D2 Next Generation Bim - InEight
ETDP 2015 D2 Next Generation Bim - InEightETDP 2015 D2 Next Generation Bim - InEight
ETDP 2015 D2 Next Generation Bim - InEightComit Projects Ltd
 

Similar to ENR467723 (20)

Designing to Enhance Construction Planning & Monitoring
Designing to Enhance Construction Planning & MonitoringDesigning to Enhance Construction Planning & Monitoring
Designing to Enhance Construction Planning & Monitoring
 
Building information modelling - redefining the role of the project manager: ...
Building information modelling - redefining the role of the project manager: ...Building information modelling - redefining the role of the project manager: ...
Building information modelling - redefining the role of the project manager: ...
 
Integrating Advanced Analytics with Autodesk Solutions
Integrating Advanced Analytics with Autodesk SolutionsIntegrating Advanced Analytics with Autodesk Solutions
Integrating Advanced Analytics with Autodesk Solutions
 
Digital Transformation of the Construction Industry
Digital Transformation of the Construction IndustryDigital Transformation of the Construction Industry
Digital Transformation of the Construction Industry
 
IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...
IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...
IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...
 
BIM for Local Government - Presentation by John Lorimer, Local Government BIM...
BIM for Local Government - Presentation by John Lorimer, Local Government BIM...BIM for Local Government - Presentation by John Lorimer, Local Government BIM...
BIM for Local Government - Presentation by John Lorimer, Local Government BIM...
 
Recent developments in BIM in geotechnics
Recent developments in BIM in geotechnics Recent developments in BIM in geotechnics
Recent developments in BIM in geotechnics
 
Recent developments in BIM in geotechnics
Recent developments in BIM  in geotechnicsRecent developments in BIM  in geotechnics
Recent developments in BIM in geotechnics
 
A Critical Review of Building Information Modelling
A Critical Review of Building Information ModellingA Critical Review of Building Information Modelling
A Critical Review of Building Information Modelling
 
MelBIM 190619
MelBIM 190619MelBIM 190619
MelBIM 190619
 
From 3D to 6D Managing the Information Labyrinth of BIM.pdf
From 3D to 6D Managing the Information Labyrinth of BIM.pdfFrom 3D to 6D Managing the Information Labyrinth of BIM.pdf
From 3D to 6D Managing the Information Labyrinth of BIM.pdf
 
How BIM Can Improve Decisions and Reduce Errors - Webinar, December 2, 2015
How BIM Can Improve Decisions and Reduce Errors - Webinar, December 2, 2015How BIM Can Improve Decisions and Reduce Errors - Webinar, December 2, 2015
How BIM Can Improve Decisions and Reduce Errors - Webinar, December 2, 2015
 
#FiaComit Inside a digital asset
#FiaComit Inside a digital asset#FiaComit Inside a digital asset
#FiaComit Inside a digital asset
 
Salah Yousif, module 1, introduction to bim and the business case of bim
Salah Yousif, module 1, introduction to bim and the business case of bimSalah Yousif, module 1, introduction to bim and the business case of bim
Salah Yousif, module 1, introduction to bim and the business case of bim
 
Software Application Presentation Slide
Software Application Presentation SlideSoftware Application Presentation Slide
Software Application Presentation Slide
 
Software Applications
Software ApplicationsSoftware Applications
Software Applications
 
Ibrahim Naeem BIM Projects Portfolio
Ibrahim Naeem BIM Projects Portfolio Ibrahim Naeem BIM Projects Portfolio
Ibrahim Naeem BIM Projects Portfolio
 
Bim its applications
Bim   its applicationsBim   its applications
Bim its applications
 
ETDP 2015 D2 Next Generation Bim - InEight
ETDP 2015 D2 Next Generation Bim - InEightETDP 2015 D2 Next Generation Bim - InEight
ETDP 2015 D2 Next Generation Bim - InEight
 
Synergis University 2014-BIM for Construction
Synergis University 2014-BIM for ConstructionSynergis University 2014-BIM for Construction
Synergis University 2014-BIM for Construction
 

More from Arief Rahman

eBook for Operating Facilities.pdf
eBook for Operating Facilities.pdfeBook for Operating Facilities.pdf
eBook for Operating Facilities.pdfArief Rahman
 
Presentation_P5_4560310_ISO_19650_inWebGIS.pdf
Presentation_P5_4560310_ISO_19650_inWebGIS.pdfPresentation_P5_4560310_ISO_19650_inWebGIS.pdf
Presentation_P5_4560310_ISO_19650_inWebGIS.pdfArief Rahman
 
BIM project-management-guide_2.pdf
BIM project-management-guide_2.pdfBIM project-management-guide_2.pdf
BIM project-management-guide_2.pdfArief Rahman
 
WIKA QUICK WIN INITIATIVES.pdf
WIKA QUICK WIN INITIATIVES.pdfWIKA QUICK WIN INITIATIVES.pdf
WIKA QUICK WIN INITIATIVES.pdfArief Rahman
 
CUSTOMER EXPERIENCE (1).pdf
CUSTOMER EXPERIENCE (1).pdfCUSTOMER EXPERIENCE (1).pdf
CUSTOMER EXPERIENCE (1).pdfArief Rahman
 
BIM Workshop CDE 2023 ADSK - ARM-Public.pdf
BIM Workshop CDE 2023 ADSK - ARM-Public.pdfBIM Workshop CDE 2023 ADSK - ARM-Public.pdf
BIM Workshop CDE 2023 ADSK - ARM-Public.pdfArief Rahman
 
PREFABRIKASI DFMA BANGUNAN GEDUNG BERTINGKAT.pdf
PREFABRIKASI DFMA BANGUNAN GEDUNG BERTINGKAT.pdfPREFABRIKASI DFMA BANGUNAN GEDUNG BERTINGKAT.pdf
PREFABRIKASI DFMA BANGUNAN GEDUNG BERTINGKAT.pdfArief Rahman
 
LAYOUT STOP KONTAK.pdf
LAYOUT STOP KONTAK.pdfLAYOUT STOP KONTAK.pdf
LAYOUT STOP KONTAK.pdfArief Rahman
 
0. Megatrend 2030.pdf
0. Megatrend 2030.pdf0. Megatrend 2030.pdf
0. Megatrend 2030.pdfArief Rahman
 
BUMN Startup Day Jakarta - CONFERENCE.pdf
BUMN Startup Day Jakarta - CONFERENCE.pdfBUMN Startup Day Jakarta - CONFERENCE.pdf
BUMN Startup Day Jakarta - CONFERENCE.pdfArief Rahman
 

More from Arief Rahman (11)

eBook for Operating Facilities.pdf
eBook for Operating Facilities.pdfeBook for Operating Facilities.pdf
eBook for Operating Facilities.pdf
 
Presentation_P5_4560310_ISO_19650_inWebGIS.pdf
Presentation_P5_4560310_ISO_19650_inWebGIS.pdfPresentation_P5_4560310_ISO_19650_inWebGIS.pdf
Presentation_P5_4560310_ISO_19650_inWebGIS.pdf
 
BIM project-management-guide_2.pdf
BIM project-management-guide_2.pdfBIM project-management-guide_2.pdf
BIM project-management-guide_2.pdf
 
WIKA QUICK WIN INITIATIVES.pdf
WIKA QUICK WIN INITIATIVES.pdfWIKA QUICK WIN INITIATIVES.pdf
WIKA QUICK WIN INITIATIVES.pdf
 
CUSTOMER EXPERIENCE (1).pdf
CUSTOMER EXPERIENCE (1).pdfCUSTOMER EXPERIENCE (1).pdf
CUSTOMER EXPERIENCE (1).pdf
 
BIM Workshop CDE 2023 ADSK - ARM-Public.pdf
BIM Workshop CDE 2023 ADSK - ARM-Public.pdfBIM Workshop CDE 2023 ADSK - ARM-Public.pdf
BIM Workshop CDE 2023 ADSK - ARM-Public.pdf
 
PREFABRIKASI DFMA BANGUNAN GEDUNG BERTINGKAT.pdf
PREFABRIKASI DFMA BANGUNAN GEDUNG BERTINGKAT.pdfPREFABRIKASI DFMA BANGUNAN GEDUNG BERTINGKAT.pdf
PREFABRIKASI DFMA BANGUNAN GEDUNG BERTINGKAT.pdf
 
LAYOUT STOP KONTAK.pdf
LAYOUT STOP KONTAK.pdfLAYOUT STOP KONTAK.pdf
LAYOUT STOP KONTAK.pdf
 
0. Megatrend 2030.pdf
0. Megatrend 2030.pdf0. Megatrend 2030.pdf
0. Megatrend 2030.pdf
 
BUMN Startup Day Jakarta - CONFERENCE.pdf
BUMN Startup Day Jakarta - CONFERENCE.pdfBUMN Startup Day Jakarta - CONFERENCE.pdf
BUMN Startup Day Jakarta - CONFERENCE.pdf
 
sepaku1.pdf
sepaku1.pdfsepaku1.pdf
sepaku1.pdf
 

Recently uploaded

fluid mechanics gate notes . gate all pyqs answer
fluid mechanics gate notes . gate all pyqs answerfluid mechanics gate notes . gate all pyqs answer
fluid mechanics gate notes . gate all pyqs answerapareshmondalnita
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdfKamal Acharya
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industriesMuhammadTufail242431
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationRobbie Edward Sayers
 
Explosives Industry manufacturing process.pdf
Explosives Industry manufacturing process.pdfExplosives Industry manufacturing process.pdf
Explosives Industry manufacturing process.pdf884710SadaqatAli
 
Arduino based vehicle speed tracker project
Arduino based vehicle speed tracker projectArduino based vehicle speed tracker project
Arduino based vehicle speed tracker projectRased Khan
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacksgerogepatton
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxViniHema
 
Fruit shop management system project report.pdf
Fruit shop management system project report.pdfFruit shop management system project report.pdf
Fruit shop management system project report.pdfKamal Acharya
 
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-5 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical EngineeringC Sai Kiran
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwoodseandesed
 
Online resume builder management system project report.pdf
Online resume builder management system project report.pdfOnline resume builder management system project report.pdf
Online resume builder management system project report.pdfKamal Acharya
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdfAhmedHussein950959
 
Construction method of steel structure space frame .pptx
Construction method of steel structure space frame .pptxConstruction method of steel structure space frame .pptx
Construction method of steel structure space frame .pptxwendy cai
 
Toll tax management system project report..pdf
Toll tax management system project report..pdfToll tax management system project report..pdf
Toll tax management system project report..pdfKamal Acharya
 
RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical SolutionsRS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical SolutionsAtif Razi
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdfPratik Pawar
 
Scaling in conventional MOSFET for constant electric field and constant voltage
Scaling in conventional MOSFET for constant electric field and constant voltageScaling in conventional MOSFET for constant electric field and constant voltage
Scaling in conventional MOSFET for constant electric field and constant voltageRCC Institute of Information Technology
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdfKamal Acharya
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdfKamal Acharya
 

Recently uploaded (20)

fluid mechanics gate notes . gate all pyqs answer
fluid mechanics gate notes . gate all pyqs answerfluid mechanics gate notes . gate all pyqs answer
fluid mechanics gate notes . gate all pyqs answer
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
Explosives Industry manufacturing process.pdf
Explosives Industry manufacturing process.pdfExplosives Industry manufacturing process.pdf
Explosives Industry manufacturing process.pdf
 
Arduino based vehicle speed tracker project
Arduino based vehicle speed tracker projectArduino based vehicle speed tracker project
Arduino based vehicle speed tracker project
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
Fruit shop management system project report.pdf
Fruit shop management system project report.pdfFruit shop management system project report.pdf
Fruit shop management system project report.pdf
 
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-5 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical Engineering
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
Online resume builder management system project report.pdf
Online resume builder management system project report.pdfOnline resume builder management system project report.pdf
Online resume builder management system project report.pdf
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
Construction method of steel structure space frame .pptx
Construction method of steel structure space frame .pptxConstruction method of steel structure space frame .pptx
Construction method of steel structure space frame .pptx
 
Toll tax management system project report..pdf
Toll tax management system project report..pdfToll tax management system project report..pdf
Toll tax management system project report..pdf
 
RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical SolutionsRS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
Scaling in conventional MOSFET for constant electric field and constant voltage
Scaling in conventional MOSFET for constant electric field and constant voltageScaling in conventional MOSFET for constant electric field and constant voltage
Scaling in conventional MOSFET for constant electric field and constant voltage
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 

ENR467723

  • 1. Mellacqua Marco Plant Information Management Coordinator Bitetto Fabio Plant Information Management Coordinator BIM 360 for EPC Contractors: From Business Needs to Full Adoption
  • 2. About the speaker Marco Mellacqua Marco is a Plant Information Management Coordinator at Maire Tecnimont. In the last years he has been strongly involved in the Company digital transformation process. Actually he is collaborating in several digital initiatives that aim to integrate digital technologies into Engineering and Construction business areas in order to make processes more efficient and effective and consequently to deliver more value to Clients. On the executive projects instead, he is taking care of the information management plan and its deployment ensuring the correct use of tools and methodologies and collecting feedbacks to implement in the above mentioned digital initiatives.
  • 3. About the speaker Fabio Bitetto Fabio is a Plant Information Management Coordinator at Maire. Despite his young age, Fabio made several work experiences in which he grown his BIM and project management expertise focusing especially on energy and utilities. He also collaborated with the City of Milan for the European project “Horizon 2020”, focused on smart cities and energy efficiency. Fabio started the development of BIM in Maire Tecnimont, focusing on Underground Services. In the 2019 he has started a new experience as Plant Information Management Coordinator, managing all the Information Management aspects on projects.
  • 5. 45 COUNTRIES 50 OPERATING COMPANIES INDUSTRY OPERATING COMPANIES ORGANIZATION 9,114 professionals | OIL&GAS REFINING | PETROCHEMICALS | FERTILIZERS | POWER | RENEWABLE & GREEN | Oil&Gas Refining, Petrochemicals, Fertilizers, Polyolefins, Power Large-scale contracting Development and licensing of Urea Technology Refining, Hydrogen&Syngas Production, Sulphur Recovery and Process Heaters Engineering and contracting in Transportation and Civil Engineering Green Acceleration Project, Technological initiatives for energy transition Flexible solutions in Renewable Energy Downstream Innovative Technologies ~6,114 employees +3,000 professionals in Electrical & Instrumentation MORE THAN Project development to originate business through early involvement in investment initiatives
  • 6.
  • 7.
  • 8. 01. 02. 03. 04. 05. Digital transformation: Maire Tecnimont perspective BIM360: Why? Business Case Development Process Assessment Current Status 06. Conclusions Agenda
  • 10. For Maire Tecnimont 2 main focus areas related to Digital Solutions: Increase efficiency and effectiveness of own internal processes Internal focus Enhance value proposition towards owners and operators External focus
  • 11. Increase efficiency and effectiveness of own internal processes Internal focus For Maire Tecnimont 2 main focus areas related to Digital Solutions: Training & Engagement 01 Landscaping and prioritization 02 Business cases, KPIs definition and roadmap 03 04 Program management & definition of scale up approach
  • 12. Increase efficiency and effectiveness of own internal processes Internal focus For Maire Tecnimont 2 main focus areas related to Digital Solutions: BIM CENTRIC COLLABORATION PLATFORM
  • 13. Maire Tecnimont pain points: Engineering disciplines design on different models, with no cross-visibility, leading to inconsistencies Inefficient approval processes 01 02 Construction has no real-time visibility on design changes, leading to reworks Inefficient document collection EPC info collected not leveraged 03 04 05
  • 15. Cluster description Common BIM based environment where all the disciplines, partners and vendors can collaborate supported by custom functionalities Inputs BIM Platform All disciplines, partners & vendors model Possibility to comment and approve models 3D & 2D Output • Single platform • Engineering integrated workflow • Daily update of 3D model • Open platform with vendors Real-time platform for information sharing across disciplines Collaborative production of deliverables Data consistency Overall Scope Identification
  • 16. W H Y 1 Cloud-based application 2 Model centric approach 3 Out of the box functionality of collaboration 4 Easily involve third partners 5 Compatibility 6 Customization/extension through Forge APIs BIM360: Why?
  • 18. Cost savings for BIM civil Adjusted steel structures cost % reduction adjusted steel structure tons Adjusted steel structures cost reduction in fabrication Civil Contract baseline Reduction in average extra work Civil contract extra works cost reduction in site Average number of revisions Total cost per extra revision Number of deliverables Reduction of extra revisions Average projects -20% -30% Key drivers: Civil Use Case
  • 19. Cost savings for BIM civil Adjusted steel structures cost reduction in fabrication Civil contract extra works cost reduction in site Average number of revisions Assumptions: Civil Use Case
  • 20. Cost savings for BIM civil Adjusted steel structures cost % reduction adjusted steel structure tons Adjusted steel structures cost reduction in fabrication Civil Contract baseline Reduction in average extra work Civil contract extra works cost reduction in site Average number of revisions Total cost per extra revision Number of deliverables Reduction of extra revisions Average projects -20% -30% -50% Only 50% achievable without chain integration with other disciplines Expected Benefits: Civil Use Case
  • 24. Digitized Processes: Document Management Structure Design Collaboration (Internal/Vendor) Approval Workflow (Deliverable review) Design Review Forge Development/Customization 1 2 3 4 5
  • 25. Document Management Structure Discipline’s Folder: > Library - to host BIM content > WIP (Work In Progress) - to host “live” sub- discipline models > Consumed - to host consumed shared models > Shared – to host published models Design Review Folder: > Published – to host Plant Navisworks session > FeasibilityApp – to host models for Forge Feasibility App > Sub-discipline – to host interoperable formats > Design – to host internal design files > Vendor – to host SubCo design files
  • 26. Document Management Structure > To each folder the permission are set based on standardized roles (e.g. BIM Modeler, BIM Coordinator, etc.), defined in a “Permission Matrix” Role Plans Project Files DesignReview_3DModels Library Shared WorkInProgress Discipline Others Discipline Others Discipline Others Discipline Others Discipline Others PIM Coordinator 1 1 1 1 1 1 1 1 1 1 Piping 3D Administrator 8 8 3 6 8 8 8 8 8 8 Civil Project Leader 6 6 7 7 8 8 8 8 8 8 Civil Concrete Specialist 6 6 6 6 8 8 8 8 7 8 Civil Concrete BIM Coordinator 4 6 3 6 2 6 7 7 2 7 Civil Concrete BIM Modeler 4 6 4 6 6 8 7 7 3 8 Civil Steel Specialist 6 6 6 6 8 8 8 8 7 8 Civil Steel BIM Coordinator 4 6 3 6 2 6 7 7 2 7 Civil Steel BIM Modeler 4 6 4 6 6 8 7 7 3 8 Civil Underground Specialist 6 6 6 6 8 8 8 8 7 8 Civil Underground BIM Coordinator 4 6 3 6 2 6 7 7 2 7 Civil Underground BIM Modeler 4 6 4 6 6 8 7 7 3 8 Permission Code Permission Description 1 Project Admin 2 Folder Control 3 View + Download + Upload + Edit 4 View + Download + Upload 5 Upload Only 6 View + Download 7 View Only 8 Access Denied Deliverable Review Folder > Document Status – to host deliverables as per their status (e.g. Work In Progress, Ready For Squad Check, Ready For Final Review, Ready To Be Issued)
  • 27. Design Collaboration (Internal/Vendor) Teams sharing design packages Standardized Naming convention to identify sets and related content (.rvt, .ifc, .pdf, etc.)
  • 28. Design Collaboration (Internal/Vendor) Explore package and compare with previous version (added/removed/modified objects) before consuming
  • 29. Approval Workflow (Deliverable review) Standard Pre-defined Approval Workflow based on: - Discipline (Reinforced Concrete, Underground, etc) - Reason of Issuing (Issue for Review, Issue for Construction, etc) - Type of Structure (Basin, Pipe Rack, etc) AA-ReadyForFinalReview-Basin
  • 30. Approval Workflow (Deliverable review) For each Approval Workflow has been defined: - Initiator Role - Custom Review Step with pre-defined roles and time allowed - Custom Status values - Standard destination folder for approved documents
  • 32. Approval Workflow (Deliverable review) Approval Workflow Standard Name Document included in the review Approval Status with Destination folder Markup included in the reviewed document Review cycle history
  • 35. Forge Development/Customization Project dashboard to manage and visualize all the civil engineering data Features ▪ Visualize Engineering Status ▪ Hold Management ▪ Design Quality Monitoring ▪ Key Quantities Monitoring
  • 36. Forge Development/Customization Plant 3D Model loaded from DesignReview_3DModels 00_Published Civil Database connected with Revit Models loaded in WorkInProgress folder
  • 37. Forge Development/Customization Project dashboard to manage and visualize the steel structures erection feasibility Features ▪ Feasibility analysis of steel structures and pipe components ▪ Model query ▪ Dynamic reports ▪ Review of data quality
  • 38. Forge Development/Customization Plant 3D Model loaded from DesignReview_3DModels 00_Published 00_FeasibilityApp Dynamic Reports Material Management Data
  • 39. SWOT Analysis W S O T Strength Opportunity Threat •Centralize models and deliverables in a single, cloud-based platform •Real time collaboration during design development •Reduce project errors and minimize confusion when determining what is the latest set of project files •Integrated review from anywhere •Possibility to include vendor and partners to collaborate on the platform •Collaboration across disciplines with comments and issues track record •Create Package/ Publish/ Consume logics •Low flexibility in the approval workflow definition Weakness •Design collaboration cannot be extended to typical Plant design formats (.vue, .rvm, etc.) •Design Collaboration module performances
  • 40. Design collaboration do not support huge number of models per single team Main Criticalities & Workaround Split the team in sub-teams with a maximum of 100 sets to be managed Approval workflow settings not duplicable among projects Need to duplicate manually from project to project Approval workflow settings not enough flexible Need to work on several workflow leveraging document mgmt folder structure. The workflow results a bit affected by such rigidity No APIs to interact with approval workflow N/A
  • 42. One Pilot Project on board 34 Users Before COVID-19 Actual Status 10 Projects On Board Standard for all incoming projects 253 Users (Milan + Mumbai) 4 Companies of Maire Tecnimont Group
  • 43. Further development Extend the use of the platform to other discipline (Piping, Process, etc.) Evaluation of the latest released modules (Asset, Build, etc.) Evaluation of ACC Connect to integrate third part apps (e.g. Office 365)
  • 45. DISCIPLINE LEADER “In BIM 360 project latest data are available to the whole team with just one click, the communication between stakeholders is strongly enhanced and people are focused to value-added activities” PROJECT MANAGER “The implementation of BIM 360 platform helped us in reducing bottlenecks and streamline overall project delivery“ BUSINESS MANAGER “Digital transformation can strongly contribute to business empowerment and the implementation of such collaborative platform is a great proof of this attitude” PIM COORDINATOR “From information management point of view BIM 360 platform represents a disruptive tool that help us to minimize inconsistencies and reworks”
  • 46. Thanks & Enjoy AU2020
  • 47. Autodesk and the Autodesk logo are registered trademarks or trademarks of Autodesk, Inc., and/or its subsidiaries and/or affiliates in the USA and/or other countries. All other brand names, product names, or trademarks belong to their respective holders. Autodesk reserves the right to alter product and services offerings, and specifications and pricing at any time without notice, and is not responsible for typographical or graphical errors that may appear in this document. © 2020 Autodesk. All rights reserved.