 6 years of experience as mechanical, piping engineer for projects related to Oil & Gas, Petrochemicals,
Water and Steels of esteemed organizations like Enppi/TOYO, Petrojet, Johnson Controls Co.
 Good knowledge of Construction, Lifting , Maintenance ,Testing, Pre- Commissioning and Commissioning
Related to Piping & Static Equipment, Mechanical Structures ,Vessels ,Tanks, Overhead cranes, Hoists,
Load Cell and Truck Scale Calibration …etc.
 Able to work in a team, Team leadership, work under pressure and perform effectively.
 Quick to grasp new concepts and ideas, with ability of development and creativity.
Education
 University: Suez Canal University.
o Faculty: Faculty of Petroleum and Mining Engineering.
o Department: Refining and petrochemical engineering department.
o General grade: Good July 2010
o Project grade : Excellent
 Graduation project: "Refining process" (Catalytic Reforming Process).
Practical Experience
 Summer Training in 2008 & 2009 : in Nubaria Power Station III Project .
 Summer Training in 2007 : in Khalda El_salam Petroleum Company .
 Summer Training in 2006 : in Nubaria Refining Sugar Company .
Profile
Page 2 of 6
Work Experience
As Mechanical construction engineer (Equipment - Static- Rot)
(Main Contractor JV)
From September 2015 - Up till now
OWNER : ETHYDCO
MAIN CONTRACTOR : ENPPI/TOYO
SUB-CONTRACTOR : PETROJET
Project : EGYPTIAN POLYETHYLENE PROJECT
PROJECT DESCRIPTION:
- A Polyethylene Plant produces a total capacity of 400,000 T/Y divided into Linear
Low Density Polyethylene (LLDPE) and High Density Polyethylene (HDPE) through
two trains of 200,000T/Y each using polymer grade of Ethylene as feedstock using
NIVATION License.
As piping construction engineer (Sub-contractor)
From Jun 2014 - September 2015
OWNER : ETHYDCO
MAIN CONTRACTOR : ENPPI/TOYO
SUB-CONTRACTOR : PETROJET
Project : EGYPTIAN ETHYLENE PROJECT
As Piping and Mechanical construction engineer (Sub-contractor)
From Feb 2012 –Jun 2014
MAIN CONTRACTOR : Johnson Controls (Egypt) Limited Formerly Known as York Air
Conditioning & Refrigeration Ltd.
SUB-CONTRACTOR : United Group for Engineering and Contracting.
Projects
o Sabah- Foods : Distillate Water networks – Install chiller room - HVAC System.
o NAPCO for Medical in 10th
of Ramadan City Egypt : HVAC System.
o Multi Care for Medical in Cairo : Firefighting systems- Plumbing network- Drinking water network.
o Kraft – Foods in Borg El_Arab : Distillate Water networks – Install chiller room - HVAC System.
o Kraft – Foods in 10th
of Ramadan City Egypt: Distillate Water networks– HVAC System.
o Egyptian German Porcelain-Alex (Fathi Mahmoud): Firefighting systems.
o "Pharco B" Pharmaceutical in Borg El_Arab : Distillate Water networks.
o Amriya Pharm Ind. : Firefighting systems.
o Arab Company Gelatinous : Distillate Water networks.
o Hilton Alexandria Corniche : Distillate Water networks - Install chiller room - HVAC System.
o LE MERIDIEN PYRAMIDS : Distillate Water networks – Install chiller room - HVAC System.
Page 3 of 6
Duties (Per Project)
I- ENPPI Polyethylene Project
1- Supervision and follow up of the installation, Lifting and maintenance of stationary
equipment (vessels, towers, Heat -exchangers, skids.. etc.).
2- Studying the vendor drawings and preparing drawings for fabrication.
3- Supervising the contractor and giving technical support so they can do the job
according to project specifications and standards.
4- Preparation and checking all equipment’s which ready to install (inspection, packing
list, Material Issue Voucher (MIV), accessories…etc.).
5- Distribute required daily activities on contractor engineers, Mechanical Supervisors,
workers foremen and technicians and determine the priorities and daily/weekly
targets for them.
6- Facilitate all job requirements for workers to do their work (Man lift, Forklift,
Cranes, Welding Machines, Hand Tools.. etc).
7- Supervision and follow up of the installation, Lifting and maintenance in
accordance of project mechanical DWG of the following :
 Overhead cranes, Hoists and chain blocks.
 Load Cell for Vessels, Silos and purge bin.
 Internal parts, mish for trays and grating for purification vessels.
 Hydraulic snubbers for product chamber.
 Sanitary tank.
 Agitator pump.
 Air volume skid.
 Catalyst feeder.
 Cylinder roller machine.
 ICA buffer tank.
 Loading arm.
 Chemical skid.
 Maxi-conveyor.
 Pelleting water tank.
 Plower machine.
 Product chamber.
 Dock leveler.
 Truck
8- Supervision and follow up of the load test and Calibration in accordance of project
specifications and standards of the following :
 Overhead cranes, Hoists and chain blocks with 3rd party SGS and the Owner.
 Load Cell for Vessels, Silos and purge bin with their Vendor and the Owner.
 Truck Scale with their Vendor and the Owner.
 Additive Lifts (Elevators) with 3rd party SGS and the Owner.
Page 4 of 6
9- Monitoring the daily construction work activities of contractor and updating
Progress Reports.
10- Making visual inspection for equipment’s and Preparing punch lists.
11- Supervision and follow up the boxing up operation for vessels after clear all punches.
12- Supervision and follow up the leak test operation for vessels after boxing up for all
manholes and nozzle’s.
13- Supervision and follow up the alignment for vessels, tanks and steel structure for
hoists.
14- Supervision and follow up the alignment and balarezm for pumps and compressors.
15- Supervision and follow up the failing of cold box and MS tanks by perlite, dryers
vessels by catalyst and silos by resin.
16- Assisting the pre-commissioning team in clearing all remaining punch items of
equipment’s to obtain Mechanical Completion (MC) by the owner.
17- On systems phase, I start a preliminary punch list then make a walkthrough with the
client rep. to make the official punch list.
18- Once the punch list is made, I distribute it among all disciplines and push them to
finish their punch items.
19- After all punch items are cleared by each discipline, I gather all documents to
complete the system dossier.
20- Excellent knowledge in the development and usage of HSE cases, risk identification
and mitigation techniques.
II- PETROJET Ethylene Project
1- Responsible for supervising an entire area including full study of all piping works and
preparing all relevant documentation (Isometric Drawing, Layout and P&IDs, Plot
Plans, 3D Model, Supports Details.. etc.).
2- Responsible for supervising the Piping erection, Lifting operations and pipe supports
installation in accordance with DWG.
3- Preparation of the team works and guides them to do what’s required according to
project’s specifications and standards.
4- Preparation all material requirements (piping Spools, piping fittings, piping
supports…etc.).
5- Distribute required daily activities on piping foremen, welding foremen, welders and
technicians, and determine the priorities and daily/weekly targets for them.
6- Facilitate all job requirements for workers to do their work (Man lift, Forklift, Cranes,
Welding Machines, Hand Tools.. etc).
7- Performing necessary modifications on site.
8- Excellent knowledge in the development and usage of HSE cases, risk identification and
mitigation techniques.
9- Reporting any problems back to designers to get the appropriate solutions.
10- Arranging with management in case the area requires more manpower to achieve daily
targets based on the open work front.
Page 5 of 6
11- Making productivity daily reports to analyze manpower performances.
12- Monitoring the daily work activities of contractor and updating Progress Reports.
13- Distribute the test packages among piping foremen according to priorities.
14- Following up with and clearing pre-hydro test punch lists (bunch A) to introduce to
ready for hydro test (RHT) .
15- Following up with and clearing the bunch B and to introduce to ready for Reinstatement.
16- Reinstatement for test packages after finishing commissioning activities then making the
walkthrough with the client on piping systems.
17- Finally, closing out all systems punch items.
III- United Group’s All Projects:
1- Responsible for studying the electro-mechanical projects including full study of
tender and drawings.
2- Follow up of the pre-fabrication and erection of all type of piping operations and
pipe supports in accordance of project specifications.
3- Follow up of Installation, Lifting, Erecting ,Commissioning and Maintenance of
the following :
 Chillers – Pumps - Cooling towers - Air handling units.
 Pump room for Fire Fighting system.
 Expansion tanks - Condensate tanks - Blow down tanks.
 Heat exchangers - Air ducts in all sizes.
4- Responsible for supervising the Mechanical works for (Plumbing – HVAC - Fire
Fighting).
5- It provides thermal insulation for all kind of pipes, ducts, tanks and heat exchangers.
6- Air balance, water balance and hydro test for HVAC systems.
7- Preparing the shop drawing, Submittal materials, contracts, cost estimation and cash
flow plan.
8- Responsible for supervising the contractor and giving technical support so they can
do the job according to project specifications.
9- Arranging with management in case the site requires more manpower to achieve
daily targets based on the open work front.
10- Preparation of the team works and guides them to do what’s required according to
project’s specifications and standards.
11- Preparation all material requirements (pipes, fittings, steel structure…etc.).
12- Facilitate all job requirements for workers to do their work (Man lift, Forklift,
Cranes, trucks, Welding Machines, Hand Tools.. etc).
13- Distribute required daily activities on piping foremen, mechanical foremen, welding
foremen, welders and technicians, and determine the priorities and daily/weekly
targets for them.
14- Making the daily report with photo evidence and keeping track performance and
productivity.
Page 6 of 6
15- Performing necessary modifications on site.
16- Reporting any problems back to consultant to get the appropriate solutions.
17- Follow-up implementation of Safety instructions on site.
Courses & Certificates
 Fundamental of Petroleum Industry Simulation Calculation "Hysys" .
 International Computer driving License (ICDL) Syllabus 4.
 Summer Training (16/7/2009)to (30/7/2009) in Alameria for petroleum refining company.
 Summer Training (1/7/2009) to (15/7/2009) in Alexandria for petroleum refining company.
 Summer Training (1/7/2008) to (29/7/2008) in Alameria for petroleum refining company.
Skills
Computer Skills:
 Professional with using windows (All versions).
 Excellent with using Microsoft Office (Word – Excel -Power point and Access).
 Designing programs (Auto cad, Hysys , Photo shop).
Languages:
 Arabic: Mother tongue.
 English: Very good (Writing and Reading) ‫؛‬ good (speaking and listening).
References are furnished upon request

Eng Ahmed Afifi final CV

  • 1.
    Page 1 of6 Ahmed Afifi Mahmoud Rezk Mechanical and Piping construction engineer Address : El_berka - Abu-Homs - El Behera - Egypt Phone : (002) 045 2530571 Mobile : (002) 012 27725171– 011 20241119 Email : Ah.Afifi17@gmail.com : Pet_Eng_Ahmed_Afifi@yahoo.com Postal code: 22738 Personal Data  Date of Birth: March17, 1986  Place of Birth : El_Behera , Egypt  Marital-status: Married  Military status: Finished  Nationality : Egyptian  Religion : Moslem  6 years of experience as mechanical, piping engineer for projects related to Oil & Gas, Petrochemicals, Water and Steels of esteemed organizations like Enppi/TOYO, Petrojet, Johnson Controls Co.  Good knowledge of Construction, Lifting , Maintenance ,Testing, Pre- Commissioning and Commissioning Related to Piping & Static Equipment, Mechanical Structures ,Vessels ,Tanks, Overhead cranes, Hoists, Load Cell and Truck Scale Calibration …etc.  Able to work in a team, Team leadership, work under pressure and perform effectively.  Quick to grasp new concepts and ideas, with ability of development and creativity. Education  University: Suez Canal University. o Faculty: Faculty of Petroleum and Mining Engineering. o Department: Refining and petrochemical engineering department. o General grade: Good July 2010 o Project grade : Excellent  Graduation project: "Refining process" (Catalytic Reforming Process). Practical Experience  Summer Training in 2008 & 2009 : in Nubaria Power Station III Project .  Summer Training in 2007 : in Khalda El_salam Petroleum Company .  Summer Training in 2006 : in Nubaria Refining Sugar Company . Profile
  • 2.
    Page 2 of6 Work Experience As Mechanical construction engineer (Equipment - Static- Rot) (Main Contractor JV) From September 2015 - Up till now OWNER : ETHYDCO MAIN CONTRACTOR : ENPPI/TOYO SUB-CONTRACTOR : PETROJET Project : EGYPTIAN POLYETHYLENE PROJECT PROJECT DESCRIPTION: - A Polyethylene Plant produces a total capacity of 400,000 T/Y divided into Linear Low Density Polyethylene (LLDPE) and High Density Polyethylene (HDPE) through two trains of 200,000T/Y each using polymer grade of Ethylene as feedstock using NIVATION License. As piping construction engineer (Sub-contractor) From Jun 2014 - September 2015 OWNER : ETHYDCO MAIN CONTRACTOR : ENPPI/TOYO SUB-CONTRACTOR : PETROJET Project : EGYPTIAN ETHYLENE PROJECT As Piping and Mechanical construction engineer (Sub-contractor) From Feb 2012 –Jun 2014 MAIN CONTRACTOR : Johnson Controls (Egypt) Limited Formerly Known as York Air Conditioning & Refrigeration Ltd. SUB-CONTRACTOR : United Group for Engineering and Contracting. Projects o Sabah- Foods : Distillate Water networks – Install chiller room - HVAC System. o NAPCO for Medical in 10th of Ramadan City Egypt : HVAC System. o Multi Care for Medical in Cairo : Firefighting systems- Plumbing network- Drinking water network. o Kraft – Foods in Borg El_Arab : Distillate Water networks – Install chiller room - HVAC System. o Kraft – Foods in 10th of Ramadan City Egypt: Distillate Water networks– HVAC System. o Egyptian German Porcelain-Alex (Fathi Mahmoud): Firefighting systems. o "Pharco B" Pharmaceutical in Borg El_Arab : Distillate Water networks. o Amriya Pharm Ind. : Firefighting systems. o Arab Company Gelatinous : Distillate Water networks. o Hilton Alexandria Corniche : Distillate Water networks - Install chiller room - HVAC System. o LE MERIDIEN PYRAMIDS : Distillate Water networks – Install chiller room - HVAC System.
  • 3.
    Page 3 of6 Duties (Per Project) I- ENPPI Polyethylene Project 1- Supervision and follow up of the installation, Lifting and maintenance of stationary equipment (vessels, towers, Heat -exchangers, skids.. etc.). 2- Studying the vendor drawings and preparing drawings for fabrication. 3- Supervising the contractor and giving technical support so they can do the job according to project specifications and standards. 4- Preparation and checking all equipment’s which ready to install (inspection, packing list, Material Issue Voucher (MIV), accessories…etc.). 5- Distribute required daily activities on contractor engineers, Mechanical Supervisors, workers foremen and technicians and determine the priorities and daily/weekly targets for them. 6- Facilitate all job requirements for workers to do their work (Man lift, Forklift, Cranes, Welding Machines, Hand Tools.. etc). 7- Supervision and follow up of the installation, Lifting and maintenance in accordance of project mechanical DWG of the following :  Overhead cranes, Hoists and chain blocks.  Load Cell for Vessels, Silos and purge bin.  Internal parts, mish for trays and grating for purification vessels.  Hydraulic snubbers for product chamber.  Sanitary tank.  Agitator pump.  Air volume skid.  Catalyst feeder.  Cylinder roller machine.  ICA buffer tank.  Loading arm.  Chemical skid.  Maxi-conveyor.  Pelleting water tank.  Plower machine.  Product chamber.  Dock leveler.  Truck 8- Supervision and follow up of the load test and Calibration in accordance of project specifications and standards of the following :  Overhead cranes, Hoists and chain blocks with 3rd party SGS and the Owner.  Load Cell for Vessels, Silos and purge bin with their Vendor and the Owner.  Truck Scale with their Vendor and the Owner.  Additive Lifts (Elevators) with 3rd party SGS and the Owner.
  • 4.
    Page 4 of6 9- Monitoring the daily construction work activities of contractor and updating Progress Reports. 10- Making visual inspection for equipment’s and Preparing punch lists. 11- Supervision and follow up the boxing up operation for vessels after clear all punches. 12- Supervision and follow up the leak test operation for vessels after boxing up for all manholes and nozzle’s. 13- Supervision and follow up the alignment for vessels, tanks and steel structure for hoists. 14- Supervision and follow up the alignment and balarezm for pumps and compressors. 15- Supervision and follow up the failing of cold box and MS tanks by perlite, dryers vessels by catalyst and silos by resin. 16- Assisting the pre-commissioning team in clearing all remaining punch items of equipment’s to obtain Mechanical Completion (MC) by the owner. 17- On systems phase, I start a preliminary punch list then make a walkthrough with the client rep. to make the official punch list. 18- Once the punch list is made, I distribute it among all disciplines and push them to finish their punch items. 19- After all punch items are cleared by each discipline, I gather all documents to complete the system dossier. 20- Excellent knowledge in the development and usage of HSE cases, risk identification and mitigation techniques. II- PETROJET Ethylene Project 1- Responsible for supervising an entire area including full study of all piping works and preparing all relevant documentation (Isometric Drawing, Layout and P&IDs, Plot Plans, 3D Model, Supports Details.. etc.). 2- Responsible for supervising the Piping erection, Lifting operations and pipe supports installation in accordance with DWG. 3- Preparation of the team works and guides them to do what’s required according to project’s specifications and standards. 4- Preparation all material requirements (piping Spools, piping fittings, piping supports…etc.). 5- Distribute required daily activities on piping foremen, welding foremen, welders and technicians, and determine the priorities and daily/weekly targets for them. 6- Facilitate all job requirements for workers to do their work (Man lift, Forklift, Cranes, Welding Machines, Hand Tools.. etc). 7- Performing necessary modifications on site. 8- Excellent knowledge in the development and usage of HSE cases, risk identification and mitigation techniques. 9- Reporting any problems back to designers to get the appropriate solutions. 10- Arranging with management in case the area requires more manpower to achieve daily targets based on the open work front.
  • 5.
    Page 5 of6 11- Making productivity daily reports to analyze manpower performances. 12- Monitoring the daily work activities of contractor and updating Progress Reports. 13- Distribute the test packages among piping foremen according to priorities. 14- Following up with and clearing pre-hydro test punch lists (bunch A) to introduce to ready for hydro test (RHT) . 15- Following up with and clearing the bunch B and to introduce to ready for Reinstatement. 16- Reinstatement for test packages after finishing commissioning activities then making the walkthrough with the client on piping systems. 17- Finally, closing out all systems punch items. III- United Group’s All Projects: 1- Responsible for studying the electro-mechanical projects including full study of tender and drawings. 2- Follow up of the pre-fabrication and erection of all type of piping operations and pipe supports in accordance of project specifications. 3- Follow up of Installation, Lifting, Erecting ,Commissioning and Maintenance of the following :  Chillers – Pumps - Cooling towers - Air handling units.  Pump room for Fire Fighting system.  Expansion tanks - Condensate tanks - Blow down tanks.  Heat exchangers - Air ducts in all sizes. 4- Responsible for supervising the Mechanical works for (Plumbing – HVAC - Fire Fighting). 5- It provides thermal insulation for all kind of pipes, ducts, tanks and heat exchangers. 6- Air balance, water balance and hydro test for HVAC systems. 7- Preparing the shop drawing, Submittal materials, contracts, cost estimation and cash flow plan. 8- Responsible for supervising the contractor and giving technical support so they can do the job according to project specifications. 9- Arranging with management in case the site requires more manpower to achieve daily targets based on the open work front. 10- Preparation of the team works and guides them to do what’s required according to project’s specifications and standards. 11- Preparation all material requirements (pipes, fittings, steel structure…etc.). 12- Facilitate all job requirements for workers to do their work (Man lift, Forklift, Cranes, trucks, Welding Machines, Hand Tools.. etc). 13- Distribute required daily activities on piping foremen, mechanical foremen, welding foremen, welders and technicians, and determine the priorities and daily/weekly targets for them. 14- Making the daily report with photo evidence and keeping track performance and productivity.
  • 6.
    Page 6 of6 15- Performing necessary modifications on site. 16- Reporting any problems back to consultant to get the appropriate solutions. 17- Follow-up implementation of Safety instructions on site. Courses & Certificates  Fundamental of Petroleum Industry Simulation Calculation "Hysys" .  International Computer driving License (ICDL) Syllabus 4.  Summer Training (16/7/2009)to (30/7/2009) in Alameria for petroleum refining company.  Summer Training (1/7/2009) to (15/7/2009) in Alexandria for petroleum refining company.  Summer Training (1/7/2008) to (29/7/2008) in Alameria for petroleum refining company. Skills Computer Skills:  Professional with using windows (All versions).  Excellent with using Microsoft Office (Word – Excel -Power point and Access).  Designing programs (Auto cad, Hysys , Photo shop). Languages:  Arabic: Mother tongue.  English: Very good (Writing and Reading) ‫؛‬ good (speaking and listening). References are furnished upon request