Core Material
1. Introduction
– BCM and EEP Lifecycles
2. Similarities to BCM
3. Terminology
– Concepts and Techniques
4. Evacuation Time
– Mathematical Formula
– Exodus Software
5. Strategies & Options
– Alternative Solutions
6. Evacuation Process
Optional Extras
1. Practical Considerations
– Plans & Tools
2. “EEP for Your Workplace”
– Academic Textbook
3. Interesting Solutions
– Escape Chutes
4. Better Fire Drills
5. Counselling
– “Coping with Crisis (1998)”
6. Examples
– What Can Happen
Terminology Evac.TimeBCM/EEP StrategyIntroduction Process Fire DrillsChutes etc. Counselling ExamplesTool Kit EEPBook
One Positive Outcome
Since then the Business Continuity Life
Cycle and Principles have been
adapted to develop:-
• Emergency Evacuation Planning (EEP)
i.e.
• How to make sure you can get people
out of your premises and direct them
towards a place of safety
Understand
the
Organisation
BCM
Programme
Agree
Strategy
Develop
Procedures
Exercise
&
Maintain
From:- Burtles, J. (2013). Emergency Evacuation Planning for Your Workplace. Rothstein Associates, USA
Exercise
and
Maintain
Agree
the
Strategy
Explore and
Assess
Plans and
Procedures
Set Up
Program
• Business Impact
Analysis (BIA)
– Used to determine key
factors such as
MTPD and RTO
• Continuity
Requirements
Analysis (CRA)
– Used to aggregate the
requirements for a
successful recovery
• Emergency Impact
Analysis (EIA)
– Used to determine
key factors such as
MTPE and ATO
• Evacuation
Requirements
Analysis (ERA)
– Used to aggregate
requirements for a
safe evacuation
• RTO
o Recovery Time
Objective
• RPO
o Recovery Point
Objective
• MTDL
o Maximum Tolerable
Data Loss
• MTPD
o Maximum Tolerable
Period of Disruption
• ATO
o Assembly Time
Objective
• AAR
o Assembly Area
Requirements
• MTMP
o Maximum Tolerable
Missing Persons
• MTPE
o Maximum Tolerable
Period of Exposure
Terminology Evac.TimeBCM/EEP StrategyIntroduction Process Fire DrillsChutes etc. Counselling ExamplesTool Kit EEPBook
Emergency Evacuation Terminology
Assembly Area
Exit Route leads from place
of work to Exit Point
Muster
Point
Building
Exit Point
Exit Route
Escape Route
Escape Route leads from
Exit Point to Assembly Area
Escape Routes and Assembly Areas
• Emergency Escape Routes
– Alternate Exit Points
• Front, rear and side entrances
– Alternate Escape Routes
• To avoid crowds, obstacles or dangers
– Avoid straight line routes
• Corners provide protection
• Emergency Assembly Areas
– Open spaces
• Away from falling debris
– Avoid ‘Line of sight’ from targets
• Away from flying debris
Target
Building
Open Square
Route 1
Route 2
Route 2a
M P
Target
Building
Open Square
Route 1
Route 2
Route 2a
M P
Route 3
Route 4
M P
M P
Refuges or Bunkers
• Internal evacuation or ‘Invacuation’
– Limited capacity
– Pre-allocate to key players
• Those who are
– Most needed
– Last to Leave
– Hampered
– Away from windows
• Solid walls
• Safe doors
• Basements may become traps
– Consider exit status after the event
Escape Route Considerations
Escape routes must be safe
– Often this is a relative term
Beware of
– Bottle necks and dead ends
– Gates, doors and obstructions
– Falling or flying debris
– Over crowding
– People getting lost
– Steep or slippery slopes or stairs
– Power dependent devices
Target
Building
E A A




Terminology Evac.TimeBCM/EEP StrategyIntroduction Process Fire DrillsChutes etc. Counselling ExamplesTool Kit EEPBook
Best choice is governed by Blast Zones

1 - Select an Emergency Assembly Area
2 - Consider Emergency Escape Routes
Estimating Evacuation Time
In many venues and some circumstances,
it may not be practical to conduct full scale
exercises to determine
–Evacuation Time
• E.g. Stadiums, Arenas, Theatres,
Conference Centres, Shopping Malls
& Supermarkets
–No permanent population
• Hospitals & Care Centres
–Fragile population
EXIT
Venue
Evacuation Software
• Software can also be used to predict crowd
behaviour and estimate evacuation times.
– EXODUS was developed by the Fire Safety
Engineering Group at Greenwich University
and has produced accurate results
– There are several others available, e.g.
• Oak Ridge Evacuation Modelling System (OREMS)
– Oak Ridge National Laboratory (US Dept. of Energy)
• STEPS by Mott McDonald
• PathFinder by Thunderhead Engineering
• MapleSim by Maplesoft
Plan Elevation
EXIT
EXIT
Terminology Evac.TimeBCM/EEP StrategyIntroduction Process Fire DrillsChutes etc. Counselling ExamplesTool Kit EEPBook
Internal Refuges
An internal refuge is an alternative to escaping
to an outside assembly area
– It is quicker to reach
– Exclusive to occupants
However there are disadvantages
– Limited capacity
• Prioritisation and usage?
– Danger of imprisonment
– Difficulty of finding a safe cage
Roll Calls
How can you be sure everyone is safe?
– A daily roster will tell us who was there before
the event
• Each manager can do a roll call using the latest staff
list for their unit
– Hierarchical reporting
• Everyone reports to their team leader who reports
to the unit manager etc.
– A reporting point at the assembly area can be
used to check against the roster
– Tagging systems will track people
When is it Safe to Return?
• The Emergency Services will decide
– They will err on the side of caution
– They may allow site visiting
• But assume otherwise
• Your role is to
– Keep your people out of the way
– Organise the return
• Establish relationships now
– Share your ideas and concerns with them
Escape for Disabled People
• Some provisions exist
– Health & Safety and Fire regulations
• In addition you might consider
– The airline approach
• First on – Near the door
• Last off – Except in an emergency
– A buddy system
– Escape slides
– The ground floor rule
– Sledge system
– Invacuation
– Using the lifts (where possible)
Testing the Regime
• You need to test the whole regime
–Practical?
–Timings?
• Involve ALL interested parties
–Neighbours
–Tenants
–Police
• via Crime Prevention Officer (CPO)
–Fire and Rescue
• via Fire Prevention Officer (FPO)
–Emergency Planning Officer
• County Hall or City Hall (EPO)
Terminology Evac.TimeBCM/EEP StrategyIntroduction Process Fire DrillsChutes etc. Counselling ExamplesTool Kit EEPBook
Emergency Evacuation Process (1)
• A series of steps that must be taken in
quick succession
– No allowances for hesitation
• Based on the following assumptions
– Evacuation Window of up to 20 minutes
• From first alarm to incident occurrence
– Emergency Assembly areas will be at least
500 metres away
• Within 5 minutes walking distance
– Exit Time is 4 minutes
• I.e. Time taken to get out of the building
Emergency Evacuation Process (2)
• Alert Received ET Zero
• Security Advised ET +2
• Staff Warning ET +4
• Verification ET +4
• Confirmation & Invocation ET +5
• Assembly Area & Escape Route Selected ET +6
• Evacuation Announced ET +8
• Building Clear ET +12
• Staff Assembled ET +18
Emergency Time (ET) is expressed in minutes
Warning goes out
Security goes into
EEP routineExecutive
Emergency Evacuation
Switchboard
Reception
Security
Staff
Emergency
Services
The Key Players
in an Emergency
Alert The Message
goes to Security
without delay
Verification
Warning
Update
Invocation
Confirmation
Selection
Assembly
Area
Advise
Evacuation
Message
Evacuation CommencesExit Proceed Assemble
Principal reference source; ‘Bombs - Protecting People and Property’, published by the Home Office (UK)
Evacuation Route
Internal Alarm
Executive
Major Emergency
Reception
Staff
Emergency
ServicesMessage
direct from
Emergency
Services
Security
invokes
EEP
Invocation
Selection
Assembly
Area
Switchboard
Evacuation
Message
Evacuation CommencesExit Proceed Assemble
AlertSecurity
Verification
Confirmation
Evacuation Route
Advise
Guidance
• Remember to K I S S
–Keep It Safe and Simple
• Try to use ‘baby’ language
‘Follow the Path’
Not
‘Adhere at All Times to the
Indicated Pedestrian Pathway’
Terminology Evac.TimeBCM/EEP StrategyIntroduction Process Fire DrillsChutes etc. Counselling ExamplesTool Kit EEPBook
Tools and Techniques for
Evacuation Planning in
Your Workplace
Emergency Evacuation Checklist
• Glossary of Terms
– Special meanings
– New terms
• 4 main sections
– Exit Routes & Exit Points
– Escape Routes & Dangers
– Assembly Areas & Muster Points
– Internal Refuges & Allocation
A Useful Planning Tool
http://bcilondonforum.org
You will be able to
download this checklist
from the
BCI London website
?Think
Ahead
An
Emergency Evacuation
Planning Tool
From
Author: Jim Burtles, FBCI, KLJ, CMLJ
© Total Continuity – June 2015
Types of Plan
Unlike Business Continuity Plans, Evacuation Plans
are not used by a team in a command &
control centre but as personal guides
• PEEPS
– Are personalised for specific individuals or groups
• Handy Plans
– One can go in everybody's pocket or handbag
• Marshalling Plans
– Guidance for those who organise or assist
• Visitors’ Plans
– Safety information for relative strangers
• Poster Plans
– Displayed prominently throughout the premises
• Personal Emergency
Evacuation Plan
– Tailored for Individual
Needs and Use
– Convenient Sized
• Tri-fold format
– Or similar
– Personalised by the User
• Or their Carer
Handy Plans
Emergency Evacuation Plans should be
– Available to everyone
– Simple to follow
– Up to date
– Inexpensive
– Replaceable
– Convenient to carry
• E.g. Trifold, C-Fold or Z-Cards
A Poster Plan
Evacuation Procedure
1. Alert or Alarm
Alert – Intermittent fire alarm.
Remain alert; no new tasks
Alarm – Continuous alarm.
Leave without delay
2. Listen
Listen for directions
3. Check
Check that everyone heard got the message
4. Close
Close down, take your handbag, grab your
coat and leave
Close the doors if you are the last to leave
5. Proceed
Follow the signs to the nearest fire exit.
6. Exit
Leave the building via the fire exit
7. Escape
Follow the signs to the assembly area
8. Assemble
Gather at the assembly area
9. Report
Report to the Fire Marshal
10. Wait
Await further instructions
Emergency Plan
Exit 1Exit3
Exit2
Exit 4
Kings
Arms
Assembly
Area
King Street
QueenStreet
Duke Street
PrinceStreet
Evacuation Check Card
6
Evacuation Check Board






?
? 5
4
3
2
1
11
10
9










19
18
17
16
Terminology Evac.TimeBCM/EEP StrategyIntroduction Process Fire DrillsChutes etc. Counselling ExamplesTool Kit EEPBook
Further Information
For an in-depth study of the
subject see:
“Emergency Evacuation
Planning for Your
Workplace”
- Regulations
- Standards
- Emergency Signage
- Dealing with the
Disabled
- Testing and Exercising
- Tools and Templates
Rothstein Associates
ISBN 978-1-931332-56-9
Terminology Evac.TimeBCM/EEP StrategyIntroduction Process Fire DrillsChutes etc. Counselling ExamplesTool Kit EEPBook
January 29th 1999
Arizona
Escape Chutes
There is a wide choice
• Access Methods
– Single Entry Point
– Multiple Entry Points
• Location
– Internal
– External
• Deployment
– Fixed
– Portable
A simple
three storey
building
Let’s take a look inside
Adding a Multi-entry Escape Chute
Add an
Escape
Tower
Like a
stair well
Put in an
Escape
Chute
for each
floor
Adding a Multi-entry Escape Chute
These Principles Can Be Applied
To Any Number Of Stories
Terminology Evac.TimeBCM/EEP StrategyIntroduction Process Fire DrillsChutes etc. Counselling ExamplesTool Kit EEPBook
Fire Drills
Regular fire drills are an established
activity in every business
Expensive exercises that bear no fruit
– We simply establish that
• Everybody can hear the alarm
• They can get out of the building
– Under routine circumstances
Then everybody goes back to work
Improved Fire Drills
We could learn a lot more from these
exercises without increasing the cost
and inconvenience
We could also be more forward thinking
about the evacuation procedure itself
On the Way Out
‘Take personal possessions like keys,
jackets and handbags, PROVIDING
you are at, or near, your desk’
The benefits are
– People will be less inclined to rush or panic
– They will be prepared for what comes next
• ‘Back to work’, ‘Stay there’ or ‘Go home’.
– Standing around with no jacket can be unpleasant.
– Going home with no keys or money can be difficult.
Whilst they are Out
Try to deliver a message or instruction to
your staff at the assembly area
– You might need to do this in a real emergency
All managers should be able to direct their
staff to carry out a simple task
– I suspect that many would fail
Once they are Back
Ask them to make a ‘Fire Exposure List’
– What would (or might) have been lost in the
event of a real fire
• Everything that was left exposed
Combine the lists to see how vulnerable you
are to loss of work in progress
– It might highlight the need for better protection or
more precaution
Feedback and Support
Post-Event Debriefing is essential
• We need to
– Know, agree, record and report what happened
– Learn and apply any lessons
– Gain recognition
• They need to
– Get it off their chest, say what they think they saw
– Deal with their demons, say how they feel
– Realise that it is a safe place
– Regain their confidence
Feedback and Support
• Debriefing, reporting and counselling are an
integral part of any real-life emergency
• Therefore they should be an integral part of
any test or exercise
– “Practice makes Perfect”
– Be thorough in your practice
– Try to make the whole thing realistic
– Stay within the bounds of credibility
Terminology Evac.TimeBCM/EEP StrategyIntroduction Process Fire DrillsChutes etc. Counselling ExamplesTool Kit EEPBook
Counselling
• Emergencies can traumatise
those who are involved
• They need to talk about it to
get some relief
– A good debriefing will help
most of them
– Others may need counselling
See:
“Coping with Crisis”
Loving Healing Press
ISBN 978-1-932690-41-5
Terminology Evac.TimeBCM/EEP StrategyIntroduction Process Fire DrillsChutes etc. Counselling ExamplesTool Kit EEPBook
Examples
Short Notice Events
• Hurricanes
– Andrew, Rita etc.
• Floods
• Fire
• War Zone
• Tsunami
• Pollution
Sudden Events
• Earthquakes
– Nepal
• Lightning
• Tornadoes
• Explosions
• Riots
• Plane Crash
Terminology Evac.TimeBCM/EEP StrategyIntroduction Process Fire DrillsChutes etc. Counselling ExamplesTool Kit EEPBook
Thank
You

More Related Content

What's hot

Emergency Response Teams
Emergency Response TeamsEmergency Response Teams
Emergency Response Teams
The Mead Group Inc.
 
Emergency Response Planning Training
Emergency Response Planning Training Emergency Response Planning Training
Emergency Response Planning Training
Laura Lee
 
Emergency Evacuation Planning by NCDC
Emergency Evacuation Planning by NCDCEmergency Evacuation Planning by NCDC
Emergency Evacuation Planning by NCDC
Atlantic Training, LLC.
 
Fire safety awareness sections 7 11
Fire safety awareness sections 7 11Fire safety awareness sections 7 11
Fire safety awareness sections 7 11fireawareness
 
Emergency response osha 2012
Emergency response osha 2012Emergency response osha 2012
Emergency response osha 2012
Charles Brawley
 
Emergency response
Emergency responseEmergency response
Emergency responseTeh Beng
 
Fire warden training
Fire warden trainingFire warden training
Fire warden training
Gemstone Fire and Safety
 
EMERGENCY RESPONSE PLAN
EMERGENCY RESPONSE PLANEMERGENCY RESPONSE PLAN
EMERGENCY RESPONSE PLAN
ashutoshgupta1102
 
Introduction to Safety
Introduction to SafetyIntroduction to Safety
Introduction to Safety
Mohannad Hany
 
HSE Risk Register | Gaurav Singh Rajput
HSE Risk Register | Gaurav Singh RajputHSE Risk Register | Gaurav Singh Rajput
HSE Risk Register | Gaurav Singh Rajput
Gaurav Singh Rajput
 
Presentation risk assessment training
Presentation risk assessment trainingPresentation risk assessment training
Presentation risk assessment training
Brian Larkin
 
fire drill check list - FEPR.pdf
fire drill check list - FEPR.pdffire drill check list - FEPR.pdf
fire drill check list - FEPR.pdf
PrinceNwaiwu
 
LIST OF TRAINING TOPICS
LIST OF TRAINING TOPICSLIST OF TRAINING TOPICS
LIST OF TRAINING TOPICSJohn Cariglio
 
25 Demolition of existing concrete structures Risk Assessment Templates.docx
25 Demolition of existing concrete structures Risk Assessment Templates.docx25 Demolition of existing concrete structures Risk Assessment Templates.docx
25 Demolition of existing concrete structures Risk Assessment Templates.docx
Dwarika Bhushan Sharma
 
Emergency response planning and implementation
Emergency response planning and implementationEmergency response planning and implementation
Emergency response planning and implementationNik Ronaidi
 
Mock drill
Mock drillMock drill
Mock drill
Rayon Johnson
 
Emergency planning
Emergency planningEmergency planning
Emergency planning
Dr. Felicia Chinwe Mogo
 
Training confined space entry holewatch man [compatibility mode]
Training confined space entry holewatch man [compatibility mode]Training confined space entry holewatch man [compatibility mode]
Training confined space entry holewatch man [compatibility mode]
Azmeel Contracting Company
 

What's hot (20)

Emergency Response Teams
Emergency Response TeamsEmergency Response Teams
Emergency Response Teams
 
Emergency Response Planning Training
Emergency Response Planning Training Emergency Response Planning Training
Emergency Response Planning Training
 
Emergency Evacuation Planning by NCDC
Emergency Evacuation Planning by NCDCEmergency Evacuation Planning by NCDC
Emergency Evacuation Planning by NCDC
 
Fire safety awareness sections 7 11
Fire safety awareness sections 7 11Fire safety awareness sections 7 11
Fire safety awareness sections 7 11
 
Emergency response osha 2012
Emergency response osha 2012Emergency response osha 2012
Emergency response osha 2012
 
Emergency response planning
Emergency response planningEmergency response planning
Emergency response planning
 
Emergency response
Emergency responseEmergency response
Emergency response
 
Fire warden training
Fire warden trainingFire warden training
Fire warden training
 
EMERGENCY RESPONSE PLAN
EMERGENCY RESPONSE PLANEMERGENCY RESPONSE PLAN
EMERGENCY RESPONSE PLAN
 
Introduction to Safety
Introduction to SafetyIntroduction to Safety
Introduction to Safety
 
HSE Risk Register | Gaurav Singh Rajput
HSE Risk Register | Gaurav Singh RajputHSE Risk Register | Gaurav Singh Rajput
HSE Risk Register | Gaurav Singh Rajput
 
Presentation risk assessment training
Presentation risk assessment trainingPresentation risk assessment training
Presentation risk assessment training
 
fire drill check list - FEPR.pdf
fire drill check list - FEPR.pdffire drill check list - FEPR.pdf
fire drill check list - FEPR.pdf
 
FIRE MOCK DRILL PPT
FIRE MOCK DRILL PPTFIRE MOCK DRILL PPT
FIRE MOCK DRILL PPT
 
LIST OF TRAINING TOPICS
LIST OF TRAINING TOPICSLIST OF TRAINING TOPICS
LIST OF TRAINING TOPICS
 
25 Demolition of existing concrete structures Risk Assessment Templates.docx
25 Demolition of existing concrete structures Risk Assessment Templates.docx25 Demolition of existing concrete structures Risk Assessment Templates.docx
25 Demolition of existing concrete structures Risk Assessment Templates.docx
 
Emergency response planning and implementation
Emergency response planning and implementationEmergency response planning and implementation
Emergency response planning and implementation
 
Mock drill
Mock drillMock drill
Mock drill
 
Emergency planning
Emergency planningEmergency planning
Emergency planning
 
Training confined space entry holewatch man [compatibility mode]
Training confined space entry holewatch man [compatibility mode]Training confined space entry holewatch man [compatibility mode]
Training confined space entry holewatch man [compatibility mode]
 

Viewers also liked

Emergency Evacuation Checklist Jim Burtles
Emergency Evacuation Checklist Jim BurtlesEmergency Evacuation Checklist Jim Burtles
Emergency Evacuation Checklist Jim Burtles
bcilondonforum
 
Witt O Briens: A route through the Panama Panal
Witt O Briens: A route through the Panama PanalWitt O Briens: A route through the Panama Panal
Witt O Briens: A route through the Panama Panal
bcilondonforum
 
bci london forum holding
bci london forum holdingbci london forum holding
bci london forum holding
Miles Glover
 
BCI - Rise of the Machines
 BCI - Rise of the Machines BCI - Rise of the Machines
BCI - Rise of the Machines
Miles Glover
 
Agenci: The good the bad and the ugly of cyber space
Agenci: The good the bad and the ugly of cyber spaceAgenci: The good the bad and the ugly of cyber space
Agenci: The good the bad and the ugly of cyber space
bcilondonforum
 
What to do in case of fire
What to do in case of fireWhat to do in case of fire
What to do in case of fire
Jaffar Mohammed
 
bci london forum invacuation
bci london forum invacuationbci london forum invacuation
bci london forum invacuation
Miles Glover
 
ATOS: Preparing your business to manage cyber incidents
ATOS: Preparing your business to manage cyber incidentsATOS: Preparing your business to manage cyber incidents
ATOS: Preparing your business to manage cyber incidents
bcilondonforum
 
Crisis Management & Evacuation Planning
Crisis Management & Evacuation Planning Crisis Management & Evacuation Planning
Crisis Management & Evacuation Planning
bcilondonforum
 
OSHA Emergency Response Plan
OSHA Emergency Response PlanOSHA Emergency Response Plan
OSHA Emergency Response Plan
uk29652
 
Victim Evacuation Techniques
Victim Evacuation TechniquesVictim Evacuation Techniques
Victim Evacuation TechniquesAbdullah Sachwani
 
General Safety Presentation
General Safety PresentationGeneral Safety Presentation
General Safety Presentation
gtwaddell
 

Viewers also liked (13)

Evacuation Plan
Evacuation PlanEvacuation Plan
Evacuation Plan
 
Emergency Evacuation Checklist Jim Burtles
Emergency Evacuation Checklist Jim BurtlesEmergency Evacuation Checklist Jim Burtles
Emergency Evacuation Checklist Jim Burtles
 
Witt O Briens: A route through the Panama Panal
Witt O Briens: A route through the Panama PanalWitt O Briens: A route through the Panama Panal
Witt O Briens: A route through the Panama Panal
 
bci london forum holding
bci london forum holdingbci london forum holding
bci london forum holding
 
BCI - Rise of the Machines
 BCI - Rise of the Machines BCI - Rise of the Machines
BCI - Rise of the Machines
 
Agenci: The good the bad and the ugly of cyber space
Agenci: The good the bad and the ugly of cyber spaceAgenci: The good the bad and the ugly of cyber space
Agenci: The good the bad and the ugly of cyber space
 
What to do in case of fire
What to do in case of fireWhat to do in case of fire
What to do in case of fire
 
bci london forum invacuation
bci london forum invacuationbci london forum invacuation
bci london forum invacuation
 
ATOS: Preparing your business to manage cyber incidents
ATOS: Preparing your business to manage cyber incidentsATOS: Preparing your business to manage cyber incidents
ATOS: Preparing your business to manage cyber incidents
 
Crisis Management & Evacuation Planning
Crisis Management & Evacuation Planning Crisis Management & Evacuation Planning
Crisis Management & Evacuation Planning
 
OSHA Emergency Response Plan
OSHA Emergency Response PlanOSHA Emergency Response Plan
OSHA Emergency Response Plan
 
Victim Evacuation Techniques
Victim Evacuation TechniquesVictim Evacuation Techniques
Victim Evacuation Techniques
 
General Safety Presentation
General Safety PresentationGeneral Safety Presentation
General Safety Presentation
 

Similar to Emergency Evacuation Planning Jim Burtles

SiteFM Interim Life Safety Measures Webinar
SiteFM Interim Life Safety Measures WebinarSiteFM Interim Life Safety Measures Webinar
SiteFM Interim Life Safety Measures Webinar
Michele Thompson
 
Structural collapse awareness hmm
Structural collapse awareness hmmStructural collapse awareness hmm
Structural collapse awareness hmm
Dr. H.M.A. Mahzuz
 
Queensland - evacuation coordination instructions
Queensland - evacuation coordination instructionsQueensland - evacuation coordination instructions
Queensland - evacuation coordination instructions
JomToledo
 
Safe Work procedures .pptx
Safe Work procedures .pptxSafe Work procedures .pptx
Safe Work procedures .pptx
SteveBuckley30
 
Building evacuations & emergencies
Building evacuations & emergenciesBuilding evacuations & emergencies
Building evacuations & emergencies
Terry Masse
 
Depopulation and disposal: training presentation
Depopulation and disposal: training presentationDepopulation and disposal: training presentation
Depopulation and disposal: training presentation
Harm Kiezebrink
 
Fire prevention 2017
Fire prevention 2017Fire prevention 2017
Fire prevention 2017
Orrville Area Safety Council
 
Institutional DM Plan pptasdasdasdasdasd.pptx
Institutional DM Plan pptasdasdasdasdasd.pptxInstitutional DM Plan pptasdasdasdasdasd.pptx
Institutional DM Plan pptasdasdasdasdasd.pptx
Madhukar Sanap
 
Crash Vehicle Extrication and Rescue Training.ppt
Crash Vehicle Extrication and Rescue Training.pptCrash Vehicle Extrication and Rescue Training.ppt
Crash Vehicle Extrication and Rescue Training.ppt
VlademirGebDubouzet1
 
Fire and safety management
Fire and safety managementFire and safety management
Fire and safety management
PrashikZodge1
 
Safety Training on fire risk assessment Presentation.pptx
Safety Training on fire risk assessment Presentation.pptxSafety Training on fire risk assessment Presentation.pptx
Safety Training on fire risk assessment Presentation.pptx
BrownEmmanuel2
 
III.C-Instructor-Guide-Evacuation-Procedures.ppt
III.C-Instructor-Guide-Evacuation-Procedures.pptIII.C-Instructor-Guide-Evacuation-Procedures.ppt
III.C-Instructor-Guide-Evacuation-Procedures.ppt
NivinAreekode
 
Workshop 1 - Hans Schmitz
Workshop 1 - Hans SchmitzWorkshop 1 - Hans Schmitz
Workshop 1 - Hans Schmitz
Soil and Water Conservation Society
 
6725743.ppt
6725743.ppt6725743.ppt
6725743.ppt
Ronald Aranha
 
Emergency Planning Safety
Emergency Planning SafetyEmergency Planning Safety
Emergency Planning Safety
Tamara Parris @TamaraParrisEHS
 
Fire Life Safety- Evacuation Drills- By Richard Garrity 2015
Fire Life Safety- Evacuation Drills- By Richard Garrity 2015Fire Life Safety- Evacuation Drills- By Richard Garrity 2015
Fire Life Safety- Evacuation Drills- By Richard Garrity 2015
Richard Garrity
 
Patrolling
PatrollingPatrolling
Unit3
Unit3Unit3

Similar to Emergency Evacuation Planning Jim Burtles (20)

SiteFM Interim Life Safety Measures Webinar
SiteFM Interim Life Safety Measures WebinarSiteFM Interim Life Safety Measures Webinar
SiteFM Interim Life Safety Measures Webinar
 
Structural collapse awareness hmm
Structural collapse awareness hmmStructural collapse awareness hmm
Structural collapse awareness hmm
 
Queensland - evacuation coordination instructions
Queensland - evacuation coordination instructionsQueensland - evacuation coordination instructions
Queensland - evacuation coordination instructions
 
Safe Work procedures .pptx
Safe Work procedures .pptxSafe Work procedures .pptx
Safe Work procedures .pptx
 
Building evacuations & emergencies
Building evacuations & emergenciesBuilding evacuations & emergencies
Building evacuations & emergencies
 
Depopulation and disposal: training presentation
Depopulation and disposal: training presentationDepopulation and disposal: training presentation
Depopulation and disposal: training presentation
 
Fire prevention 2017
Fire prevention 2017Fire prevention 2017
Fire prevention 2017
 
Institutional DM Plan pptasdasdasdasdasd.pptx
Institutional DM Plan pptasdasdasdasdasd.pptxInstitutional DM Plan pptasdasdasdasdasd.pptx
Institutional DM Plan pptasdasdasdasdasd.pptx
 
Crash Vehicle Extrication and Rescue Training.ppt
Crash Vehicle Extrication and Rescue Training.pptCrash Vehicle Extrication and Rescue Training.ppt
Crash Vehicle Extrication and Rescue Training.ppt
 
Hm Scene Safety
Hm Scene SafetyHm Scene Safety
Hm Scene Safety
 
Fire and safety management
Fire and safety managementFire and safety management
Fire and safety management
 
Safety Training on fire risk assessment Presentation.pptx
Safety Training on fire risk assessment Presentation.pptxSafety Training on fire risk assessment Presentation.pptx
Safety Training on fire risk assessment Presentation.pptx
 
Chapter 6
Chapter 6Chapter 6
Chapter 6
 
III.C-Instructor-Guide-Evacuation-Procedures.ppt
III.C-Instructor-Guide-Evacuation-Procedures.pptIII.C-Instructor-Guide-Evacuation-Procedures.ppt
III.C-Instructor-Guide-Evacuation-Procedures.ppt
 
Workshop 1 - Hans Schmitz
Workshop 1 - Hans SchmitzWorkshop 1 - Hans Schmitz
Workshop 1 - Hans Schmitz
 
6725743.ppt
6725743.ppt6725743.ppt
6725743.ppt
 
Emergency Planning Safety
Emergency Planning SafetyEmergency Planning Safety
Emergency Planning Safety
 
Fire Life Safety- Evacuation Drills- By Richard Garrity 2015
Fire Life Safety- Evacuation Drills- By Richard Garrity 2015Fire Life Safety- Evacuation Drills- By Richard Garrity 2015
Fire Life Safety- Evacuation Drills- By Richard Garrity 2015
 
Patrolling
PatrollingPatrolling
Patrolling
 
Unit3
Unit3Unit3
Unit3
 

Recently uploaded

amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
marketing317746
 
Memorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.pptMemorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.ppt
seri bangash
 
What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
seoforlegalpillers
 
Unveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdfUnveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdf
Sam H
 
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).pptENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
zechu97
 
Premium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern BusinessesPremium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern Businesses
SynapseIndia
 
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n PrintAffordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Navpack & Print
 
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdfModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
fisherameliaisabella
 
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
BBPMedia1
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
LR1709MUSIC
 
Skye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto AirportSkye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto Airport
marketingjdass
 
3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx
tanyjahb
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
Lital Barkan
 
What are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdfWhat are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdf
HumanResourceDimensi1
 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
dylandmeas
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
creerey
 
Improving profitability for small business
Improving profitability for small businessImproving profitability for small business
Improving profitability for small business
Ben Wann
 
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
taqyed
 
Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111
zoyaansari11365
 
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-indiafalcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
Falcon Invoice Discounting
 

Recently uploaded (20)

amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
 
Memorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.pptMemorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.ppt
 
What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
 
Unveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdfUnveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdf
 
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).pptENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
 
Premium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern BusinessesPremium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern Businesses
 
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n PrintAffordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n Print
 
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdfModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
 
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
 
Skye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto AirportSkye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto Airport
 
3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
 
What are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdfWhat are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdf
 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
 
Improving profitability for small business
Improving profitability for small businessImproving profitability for small business
Improving profitability for small business
 
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
 
Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111
 
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-indiafalcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
 

Emergency Evacuation Planning Jim Burtles

  • 1. Jim Burtles, Hon. FBCI, KLJ BCI Global Membership Council Principal at Total Continuity
  • 2. EEP Menu Core Material 1. Introduction – BCM and EEP Lifecycles 2. Similarities to BCM 3. Terminology – Concepts and Techniques 4. Evacuation Time – Mathematical Formula – Exodus Software 5. Strategies & Options – Alternative Solutions 6. Evacuation Process Optional Extras 1. Practical Considerations – Plans & Tools 2. “EEP for Your Workplace” – Academic Textbook 3. Interesting Solutions – Escape Chutes 4. Better Fire Drills 5. Counselling – “Coping with Crisis (1998)” 6. Examples – What Can Happen Terminology Evac.TimeBCM/EEP StrategyIntroduction Process Fire DrillsChutes etc. Counselling ExamplesTool Kit EEPBook
  • 3.
  • 4.
  • 5. One Positive Outcome Since then the Business Continuity Life Cycle and Principles have been adapted to develop:- • Emergency Evacuation Planning (EEP) i.e. • How to make sure you can get people out of your premises and direct them towards a place of safety
  • 7. From:- Burtles, J. (2013). Emergency Evacuation Planning for Your Workplace. Rothstein Associates, USA Exercise and Maintain Agree the Strategy Explore and Assess Plans and Procedures Set Up Program
  • 8. • Business Impact Analysis (BIA) – Used to determine key factors such as MTPD and RTO • Continuity Requirements Analysis (CRA) – Used to aggregate the requirements for a successful recovery • Emergency Impact Analysis (EIA) – Used to determine key factors such as MTPE and ATO • Evacuation Requirements Analysis (ERA) – Used to aggregate requirements for a safe evacuation
  • 9. • RTO o Recovery Time Objective • RPO o Recovery Point Objective • MTDL o Maximum Tolerable Data Loss • MTPD o Maximum Tolerable Period of Disruption • ATO o Assembly Time Objective • AAR o Assembly Area Requirements • MTMP o Maximum Tolerable Missing Persons • MTPE o Maximum Tolerable Period of Exposure Terminology Evac.TimeBCM/EEP StrategyIntroduction Process Fire DrillsChutes etc. Counselling ExamplesTool Kit EEPBook
  • 10. Emergency Evacuation Terminology Assembly Area Exit Route leads from place of work to Exit Point Muster Point Building Exit Point Exit Route Escape Route Escape Route leads from Exit Point to Assembly Area
  • 11. Escape Routes and Assembly Areas • Emergency Escape Routes – Alternate Exit Points • Front, rear and side entrances – Alternate Escape Routes • To avoid crowds, obstacles or dangers – Avoid straight line routes • Corners provide protection • Emergency Assembly Areas – Open spaces • Away from falling debris – Avoid ‘Line of sight’ from targets • Away from flying debris
  • 13. Target Building Open Square Route 1 Route 2 Route 2a M P Route 3 Route 4 M P M P
  • 14. Refuges or Bunkers • Internal evacuation or ‘Invacuation’ – Limited capacity – Pre-allocate to key players • Those who are – Most needed – Last to Leave – Hampered – Away from windows • Solid walls • Safe doors • Basements may become traps – Consider exit status after the event
  • 15. Escape Route Considerations Escape routes must be safe – Often this is a relative term Beware of – Bottle necks and dead ends – Gates, doors and obstructions – Falling or flying debris – Over crowding – People getting lost – Steep or slippery slopes or stairs – Power dependent devices
  • 16. Target Building E A A     Terminology Evac.TimeBCM/EEP StrategyIntroduction Process Fire DrillsChutes etc. Counselling ExamplesTool Kit EEPBook Best choice is governed by Blast Zones  1 - Select an Emergency Assembly Area 2 - Consider Emergency Escape Routes
  • 17. Estimating Evacuation Time In many venues and some circumstances, it may not be practical to conduct full scale exercises to determine –Evacuation Time • E.g. Stadiums, Arenas, Theatres, Conference Centres, Shopping Malls & Supermarkets –No permanent population • Hospitals & Care Centres –Fragile population
  • 18.
  • 19.
  • 21. Evacuation Software • Software can also be used to predict crowd behaviour and estimate evacuation times. – EXODUS was developed by the Fire Safety Engineering Group at Greenwich University and has produced accurate results – There are several others available, e.g. • Oak Ridge Evacuation Modelling System (OREMS) – Oak Ridge National Laboratory (US Dept. of Energy) • STEPS by Mott McDonald • PathFinder by Thunderhead Engineering • MapleSim by Maplesoft
  • 22. Plan Elevation EXIT EXIT Terminology Evac.TimeBCM/EEP StrategyIntroduction Process Fire DrillsChutes etc. Counselling ExamplesTool Kit EEPBook
  • 23. Internal Refuges An internal refuge is an alternative to escaping to an outside assembly area – It is quicker to reach – Exclusive to occupants However there are disadvantages – Limited capacity • Prioritisation and usage? – Danger of imprisonment – Difficulty of finding a safe cage
  • 24. Roll Calls How can you be sure everyone is safe? – A daily roster will tell us who was there before the event • Each manager can do a roll call using the latest staff list for their unit – Hierarchical reporting • Everyone reports to their team leader who reports to the unit manager etc. – A reporting point at the assembly area can be used to check against the roster – Tagging systems will track people
  • 25. When is it Safe to Return? • The Emergency Services will decide – They will err on the side of caution – They may allow site visiting • But assume otherwise • Your role is to – Keep your people out of the way – Organise the return • Establish relationships now – Share your ideas and concerns with them
  • 26. Escape for Disabled People • Some provisions exist – Health & Safety and Fire regulations • In addition you might consider – The airline approach • First on – Near the door • Last off – Except in an emergency – A buddy system – Escape slides – The ground floor rule – Sledge system – Invacuation – Using the lifts (where possible)
  • 27. Testing the Regime • You need to test the whole regime –Practical? –Timings? • Involve ALL interested parties –Neighbours –Tenants –Police • via Crime Prevention Officer (CPO) –Fire and Rescue • via Fire Prevention Officer (FPO) –Emergency Planning Officer • County Hall or City Hall (EPO) Terminology Evac.TimeBCM/EEP StrategyIntroduction Process Fire DrillsChutes etc. Counselling ExamplesTool Kit EEPBook
  • 28. Emergency Evacuation Process (1) • A series of steps that must be taken in quick succession – No allowances for hesitation • Based on the following assumptions – Evacuation Window of up to 20 minutes • From first alarm to incident occurrence – Emergency Assembly areas will be at least 500 metres away • Within 5 minutes walking distance – Exit Time is 4 minutes • I.e. Time taken to get out of the building
  • 29. Emergency Evacuation Process (2) • Alert Received ET Zero • Security Advised ET +2 • Staff Warning ET +4 • Verification ET +4 • Confirmation & Invocation ET +5 • Assembly Area & Escape Route Selected ET +6 • Evacuation Announced ET +8 • Building Clear ET +12 • Staff Assembled ET +18 Emergency Time (ET) is expressed in minutes
  • 30. Warning goes out Security goes into EEP routineExecutive Emergency Evacuation Switchboard Reception Security Staff Emergency Services The Key Players in an Emergency Alert The Message goes to Security without delay Verification Warning Update Invocation Confirmation Selection Assembly Area Advise Evacuation Message Evacuation CommencesExit Proceed Assemble Principal reference source; ‘Bombs - Protecting People and Property’, published by the Home Office (UK) Evacuation Route Internal Alarm
  • 32. Guidance • Remember to K I S S –Keep It Safe and Simple • Try to use ‘baby’ language ‘Follow the Path’ Not ‘Adhere at All Times to the Indicated Pedestrian Pathway’ Terminology Evac.TimeBCM/EEP StrategyIntroduction Process Fire DrillsChutes etc. Counselling ExamplesTool Kit EEPBook
  • 33. Tools and Techniques for Evacuation Planning in Your Workplace
  • 34. Emergency Evacuation Checklist • Glossary of Terms – Special meanings – New terms • 4 main sections – Exit Routes & Exit Points – Escape Routes & Dangers – Assembly Areas & Muster Points – Internal Refuges & Allocation A Useful Planning Tool http://bcilondonforum.org You will be able to download this checklist from the BCI London website
  • 35. ?Think Ahead An Emergency Evacuation Planning Tool From Author: Jim Burtles, FBCI, KLJ, CMLJ © Total Continuity – June 2015
  • 36. Types of Plan Unlike Business Continuity Plans, Evacuation Plans are not used by a team in a command & control centre but as personal guides • PEEPS – Are personalised for specific individuals or groups • Handy Plans – One can go in everybody's pocket or handbag • Marshalling Plans – Guidance for those who organise or assist • Visitors’ Plans – Safety information for relative strangers • Poster Plans – Displayed prominently throughout the premises
  • 37. • Personal Emergency Evacuation Plan – Tailored for Individual Needs and Use – Convenient Sized • Tri-fold format – Or similar – Personalised by the User • Or their Carer
  • 38. Handy Plans Emergency Evacuation Plans should be – Available to everyone – Simple to follow – Up to date – Inexpensive – Replaceable – Convenient to carry • E.g. Trifold, C-Fold or Z-Cards
  • 39. A Poster Plan Evacuation Procedure 1. Alert or Alarm Alert – Intermittent fire alarm. Remain alert; no new tasks Alarm – Continuous alarm. Leave without delay 2. Listen Listen for directions 3. Check Check that everyone heard got the message 4. Close Close down, take your handbag, grab your coat and leave Close the doors if you are the last to leave 5. Proceed Follow the signs to the nearest fire exit. 6. Exit Leave the building via the fire exit 7. Escape Follow the signs to the assembly area 8. Assemble Gather at the assembly area 9. Report Report to the Fire Marshal 10. Wait Await further instructions Emergency Plan Exit 1Exit3 Exit2 Exit 4 Kings Arms Assembly Area King Street QueenStreet Duke Street PrinceStreet
  • 41. 6 Evacuation Check Board       ? ? 5 4 3 2 1 11 10 9           19 18 17 16 Terminology Evac.TimeBCM/EEP StrategyIntroduction Process Fire DrillsChutes etc. Counselling ExamplesTool Kit EEPBook
  • 42. Further Information For an in-depth study of the subject see: “Emergency Evacuation Planning for Your Workplace” - Regulations - Standards - Emergency Signage - Dealing with the Disabled - Testing and Exercising - Tools and Templates Rothstein Associates ISBN 978-1-931332-56-9 Terminology Evac.TimeBCM/EEP StrategyIntroduction Process Fire DrillsChutes etc. Counselling ExamplesTool Kit EEPBook
  • 44. Escape Chutes There is a wide choice • Access Methods – Single Entry Point – Multiple Entry Points • Location – Internal – External • Deployment – Fixed – Portable
  • 45. A simple three storey building Let’s take a look inside Adding a Multi-entry Escape Chute
  • 46. Add an Escape Tower Like a stair well Put in an Escape Chute for each floor Adding a Multi-entry Escape Chute
  • 47. These Principles Can Be Applied To Any Number Of Stories Terminology Evac.TimeBCM/EEP StrategyIntroduction Process Fire DrillsChutes etc. Counselling ExamplesTool Kit EEPBook
  • 48. Fire Drills Regular fire drills are an established activity in every business Expensive exercises that bear no fruit – We simply establish that • Everybody can hear the alarm • They can get out of the building – Under routine circumstances Then everybody goes back to work
  • 49. Improved Fire Drills We could learn a lot more from these exercises without increasing the cost and inconvenience We could also be more forward thinking about the evacuation procedure itself
  • 50. On the Way Out ‘Take personal possessions like keys, jackets and handbags, PROVIDING you are at, or near, your desk’ The benefits are – People will be less inclined to rush or panic – They will be prepared for what comes next • ‘Back to work’, ‘Stay there’ or ‘Go home’. – Standing around with no jacket can be unpleasant. – Going home with no keys or money can be difficult.
  • 51. Whilst they are Out Try to deliver a message or instruction to your staff at the assembly area – You might need to do this in a real emergency All managers should be able to direct their staff to carry out a simple task – I suspect that many would fail
  • 52. Once they are Back Ask them to make a ‘Fire Exposure List’ – What would (or might) have been lost in the event of a real fire • Everything that was left exposed Combine the lists to see how vulnerable you are to loss of work in progress – It might highlight the need for better protection or more precaution
  • 53. Feedback and Support Post-Event Debriefing is essential • We need to – Know, agree, record and report what happened – Learn and apply any lessons – Gain recognition • They need to – Get it off their chest, say what they think they saw – Deal with their demons, say how they feel – Realise that it is a safe place – Regain their confidence
  • 54. Feedback and Support • Debriefing, reporting and counselling are an integral part of any real-life emergency • Therefore they should be an integral part of any test or exercise – “Practice makes Perfect” – Be thorough in your practice – Try to make the whole thing realistic – Stay within the bounds of credibility Terminology Evac.TimeBCM/EEP StrategyIntroduction Process Fire DrillsChutes etc. Counselling ExamplesTool Kit EEPBook
  • 55. Counselling • Emergencies can traumatise those who are involved • They need to talk about it to get some relief – A good debriefing will help most of them – Others may need counselling See: “Coping with Crisis” Loving Healing Press ISBN 978-1-932690-41-5 Terminology Evac.TimeBCM/EEP StrategyIntroduction Process Fire DrillsChutes etc. Counselling ExamplesTool Kit EEPBook
  • 56. Examples Short Notice Events • Hurricanes – Andrew, Rita etc. • Floods • Fire • War Zone • Tsunami • Pollution Sudden Events • Earthquakes – Nepal • Lightning • Tornadoes • Explosions • Riots • Plane Crash Terminology Evac.TimeBCM/EEP StrategyIntroduction Process Fire DrillsChutes etc. Counselling ExamplesTool Kit EEPBook