SlideShare a Scribd company logo
1 of 4
Download to read offline
Eli Rodríguez Casillas
Industrial & System Engineer
Cellphone: 844 122 7661
Personnel Email: eli.rdz.c@gmail.com
EDUCATION
Industrial & System Engineer. Instituto Tecnológico de Estudios Superiores de Monterrey Campus Saltillo (ITESM)
LANGUAGE
English 100% (Write/Read/Speak) TOEFL Certification
Spanish 100% (Native Language)
PROFESSIONAL EXPIRIENCE
John Deere (IJD)
2013 – Current
John Deere Industries. Ramos Components Operation, Ramos Arizpe Coah. Mex.
Position: Weld Manufacturing Engineer Sr. & Factory Master Plan Coordinator
Department: Manufacturing & SAP Area
Leader for SAP Implementation for Ramos Arizpe John Deere.
o Expert on Production Planning & Manufacturing Execution System modules for SAP.
Capacitation
Parts Setup & Parameters
Project Coordinator
SAP stabilization
o SAP Flow Material Specialist
Warehouse management
Serialized Frames Production Control
Material Replenishment Strategy
Factory Master Plan Coordinator
o Long term planning (5 years) for factory
New products, CI´s, Labor, Machine resource calculation, Infrastructure Factory
Growth & Well Being
Material Flow Expert: Increased from 75% to 95% of reliability of material
o Plan for every part defined per station, working with Kanban pull system
o SAP set up for parts in working process and warehouse
o Point of use material presentation
o Define of kanbans based on history and demand products
o Systematic Layout Planning
Welding Manufacturing Engineer Senior
o Front & Rear Axles, Cotton Picker & Hood Guards Weldments
Layout, OMS, SOES, CI Projects, Tool Design, Quality and delivery’s achievement,
Ergonomics, safety, imbalances, process improvement, products structure and
routes administrator
Manufacturing Line Design
o Labor Calculation
o Flow Material (kanban & material presentation)
o Kanban System (Triggering System)
o Mix Model Lines
Cost Reduction Leader at Components Ramos Arizpe
o Cost Reduction Strategy
Farm-in
Make vs Buy Analysis
Design for Manufacturing
Material Yield
New Product Projects
o Layout, OMS, SOES, CI Projects, Tool Design, Quality and delivery’s achievement ,
Ergonomics, safety, imbalances, process improvement, products structure and routes
administrator. Projects implemented:
Rolling Baskets Miami & Valley City Program
Merit Mounting Frames Loaders Factory – Beta Factory
Hood Guards X40 & X25
CI´s for Cotton Picker Frames Weldment
Continuous Improvement
o Kaizen Material Replenishment (Primaries, Welding & Assembly Area) (Material flow)
Trigger material at point of use with Kanban concept, elimination of shutdowns for material
availability for welding and assembly areas (this problem was top of shutdowns at Factory)
Electronic Kanban board implemented, communication between SAP & shop floor
o Serialized Frames Inventory Control
Special tag with e-coat resistance implementation for Cab Frames identification, increase of
material inventory accuracy of 40%
Savings of 700K USD for low accuracy inventory
o Kanban calculator
Tool for calculation of Kanban based on customer requirements
Reduction of replenishment material times, increased of resource utilization
Real time Control & Analysis from SAP
o Support of Continuous Improvement Board for Welding Area
Around 500 projects attended at year
John Deere (IJD)
2012 – 2013
John Deere Industries. Saltillo Components Operation, Saltillo Coah. Mex.
Position: Weld Manufacturing Engineer
Department: Manufacturing
Welding Manufacturing Engineer
o Blades & Main Frame Weldments
Layout, OMS, SOES, CI Projects, Tool Design, Quality and delivery’s achievement,
Ergonomics, safety, imbalances, process improvement, products structure and
routes administrator
New Product Projects
o Main Frame for Crawlers 750 & 850 FT4
o FT4 Blades
Weld Process Tracking (GMAW)
o Automation of manual welding
o Tracking of sequence of events for welding operations
o Mistake proofing for omission welds
Capacity Increase
o Design for Manufacturing
Reduction of 20% of labor for new design propose
1ton tooling weight eliminated.
Reduction of 10% of NVA
Savings of 250K USD
Coordinator of Engineering Changes for Saltillo Components(Benchmark)
o ECM´s control
o Obsolete parts control
o Physical builds control
Continuous Improvement
o 20% of NVA reduction from blades welding process (Project Winner in CI Expo John Deere,
Innovation)
Savings of 250K USD
Design for manufacturing, LEGO Concept
Productivity increased from 75% to 90%
o Support of Continuous Improvement Board for Welding Area
Around 500 projects attended
John Deere (IJD)
2011 – 2012
John Deere Industries. Saltillo Components Operation, Saltillo Coah. Mex.
Position: Thermal Treatment Manufacturing Engineer
Department: Manufacturing
Manufacturing Engineer for Tillage Products (Foundry Process)
o Sweep, Shovels & Brackets
Layout, OMS, SOES, CI Projects, Tool Design, Quality and delivery’s achievement,
Ergonomics, safety, imbalances, process improvement, products structure and
routes administrator
o SMED Project (Single-Minute Exchange of Die)
5% Direct Productivity Increased
15% Reduction of Setup Time
New Product Projects
o VTech
Continuous Improvement (Project presented at CI Expo John Deere, 4th place)
o SMED Project,
5% Direct Productivity Increased
15% Reduction of Setup Time
SPECIAL TRAINING
Certified on SAP Production Planning & Manufacturing Execution System modules
Certified on Welding & Materials at COMIMSA
Material Mechanical Properties
GMAW, FCAW, Brazing, SMAW
Welding Process Quality Control
o Visual Inspection
o Liquid Penetrant
o Magnetic Particle
o Ultrasonic
Formats for Control Welding Process
o WPS
o PQR
GMAW Engineer Welding Certification (MetWeld)
GMAW Robot Welding Certification (Motoman)
GD&T Certification for Manufacturing Process
IT & Skills
High Knowledge Microsoft Word, Excel, Power Point y Projects
High Knowledge SAP (Module: Manufacturing Engineer, production control & PDM)
High Knowledge on Manual Welding Process (GMAW)
High Knowledge Auto CAD 2D y 3D
High Knowledge Pro-Engineer
Medium Knowledge on Statistical Process
PERSONAL SKILLS & ACHIEVEMENTS
Pushing for Sustainable Results
Rigorous Analysis
Made Tough Decisions
Leadership
Responsible
Teamwork
Honest
Achievements
CI Expo, Best Innovate Project: LEGO Blades Concept
CI Expo, SMED
3 times winner of Achievement Exceptional
Leadership Gold Lamb at Tecnologico de Monterrey
References
Luis Gabriel Colunga, Engineering Leader at John Deere Ramos Components
(colungaluisgabriel@johndeere.com)
Cesar Loaiza, Factory Manager at John Deere Ramos Components (loaizacesar@johndeere.com)
Valentin Aguilar, Superintendent of Production at John Deere Saltillo Components
(aguilarvalentingerardo@johndeere.com)

More Related Content

What's hot

Resume2016CAD-Sep
Resume2016CAD-SepResume2016CAD-Sep
Resume2016CAD-SepDan Sawodny
 
Resume - Manufacturing Engineer
Resume - Manufacturing EngineerResume - Manufacturing Engineer
Resume - Manufacturing EngineerShameer KC
 
William Maschinot-Resume-Process Engineer
William Maschinot-Resume-Process EngineerWilliam Maschinot-Resume-Process Engineer
William Maschinot-Resume-Process EngineerWilliam Maschinot
 
Resume__GARY_SHELTON
Resume__GARY_SHELTONResume__GARY_SHELTON
Resume__GARY_SHELTONGary Shelton
 
Engineer cum drafter designer eduria anjhoe
Engineer cum drafter designer eduria anjhoeEngineer cum drafter designer eduria anjhoe
Engineer cum drafter designer eduria anjhoeAnjhoe Eduria
 
Edison Site Visit Presentation
Edison Site Visit PresentationEdison Site Visit Presentation
Edison Site Visit PresentationBrian Keenan
 
Dufour,Don E Resume C
Dufour,Don E Resume CDufour,Don E Resume C
Dufour,Don E Resume CDon Dufour
 
Thermographic quality assurance at Aarsleff Pipe Technologies
Thermographic quality assurance at Aarsleff Pipe TechnologiesThermographic quality assurance at Aarsleff Pipe Technologies
Thermographic quality assurance at Aarsleff Pipe TechnologiesJacob Hovad
 
Jeff Orsak Resume
Jeff Orsak ResumeJeff Orsak Resume
Jeff Orsak ResumeJeff Orsak
 
Purchasing Phillip Speer RES 4
Purchasing Phillip Speer RES 4Purchasing Phillip Speer RES 4
Purchasing Phillip Speer RES 4Phil Speer
 
Hoaglan_ME_Resume_Linkedin
Hoaglan_ME_Resume_LinkedinHoaglan_ME_Resume_Linkedin
Hoaglan_ME_Resume_LinkedinMarshall Hoaglan
 
Sai Kumar Erukulla--Mechanical Engineer
Sai Kumar Erukulla--Mechanical EngineerSai Kumar Erukulla--Mechanical Engineer
Sai Kumar Erukulla--Mechanical Engineersai kumar
 
SUBIN_SINGH_STEEL_STRUCTURAL_ENGINEER.PDF
SUBIN_SINGH_STEEL_STRUCTURAL_ENGINEER.PDFSUBIN_SINGH_STEEL_STRUCTURAL_ENGINEER.PDF
SUBIN_SINGH_STEEL_STRUCTURAL_ENGINEER.PDFSubin Singh
 

What's hot (20)

Resume2016CAD-Sep
Resume2016CAD-SepResume2016CAD-Sep
Resume2016CAD-Sep
 
Resume - Manufacturing Engineer
Resume - Manufacturing EngineerResume - Manufacturing Engineer
Resume - Manufacturing Engineer
 
William Maschinot-Resume-Process Engineer
William Maschinot-Resume-Process EngineerWilliam Maschinot-Resume-Process Engineer
William Maschinot-Resume-Process Engineer
 
Resume__GARY_SHELTON
Resume__GARY_SHELTONResume__GARY_SHELTON
Resume__GARY_SHELTON
 
Engineer cum drafter designer eduria anjhoe
Engineer cum drafter designer eduria anjhoeEngineer cum drafter designer eduria anjhoe
Engineer cum drafter designer eduria anjhoe
 
Edison Site Visit Presentation
Edison Site Visit PresentationEdison Site Visit Presentation
Edison Site Visit Presentation
 
Pyatt APR15
Pyatt APR15Pyatt APR15
Pyatt APR15
 
BJD_20160625
BJD_20160625BJD_20160625
BJD_20160625
 
RESUME David Aldridge
RESUME David AldridgeRESUME David Aldridge
RESUME David Aldridge
 
Dufour,Don E Resume C
Dufour,Don E Resume CDufour,Don E Resume C
Dufour,Don E Resume C
 
Thermographic quality assurance at Aarsleff Pipe Technologies
Thermographic quality assurance at Aarsleff Pipe TechnologiesThermographic quality assurance at Aarsleff Pipe Technologies
Thermographic quality assurance at Aarsleff Pipe Technologies
 
Jeff Orsak Resume
Jeff Orsak ResumeJeff Orsak Resume
Jeff Orsak Resume
 
Resume rahul iyer jan 2014 international
Resume rahul iyer jan 2014 internationalResume rahul iyer jan 2014 international
Resume rahul iyer jan 2014 international
 
Purchasing Phillip Speer RES 4
Purchasing Phillip Speer RES 4Purchasing Phillip Speer RES 4
Purchasing Phillip Speer RES 4
 
Resume-2015
Resume-2015Resume-2015
Resume-2015
 
Hoaglan_ME_Resume_Linkedin
Hoaglan_ME_Resume_LinkedinHoaglan_ME_Resume_Linkedin
Hoaglan_ME_Resume_Linkedin
 
Sai Kumar Erukulla--Mechanical Engineer
Sai Kumar Erukulla--Mechanical EngineerSai Kumar Erukulla--Mechanical Engineer
Sai Kumar Erukulla--Mechanical Engineer
 
Profile Susheel 2016
Profile Susheel 2016Profile Susheel 2016
Profile Susheel 2016
 
CV
CVCV
CV
 
SUBIN_SINGH_STEEL_STRUCTURAL_ENGINEER.PDF
SUBIN_SINGH_STEEL_STRUCTURAL_ENGINEER.PDFSUBIN_SINGH_STEEL_STRUCTURAL_ENGINEER.PDF
SUBIN_SINGH_STEEL_STRUCTURAL_ENGINEER.PDF
 

Viewers also liked

Viewers also liked (8)

AWS Bad Idea Theatre
AWS Bad Idea TheatreAWS Bad Idea Theatre
AWS Bad Idea Theatre
 
Annotated bibliography schedule
Annotated bibliography scheduleAnnotated bibliography schedule
Annotated bibliography schedule
 
E.showcard
E.showcardE.showcard
E.showcard
 
Xaas fbercegeay mbadmb2017
Xaas fbercegeay mbadmb2017Xaas fbercegeay mbadmb2017
Xaas fbercegeay mbadmb2017
 
Preparation d'une leçon d'art.
Preparation d'une leçon d'art.Preparation d'une leçon d'art.
Preparation d'une leçon d'art.
 
"How The Hell Do You Get More Leads?" at SaaStr Annual 2016
"How The Hell Do You Get More Leads?" at SaaStr Annual 2016"How The Hell Do You Get More Leads?" at SaaStr Annual 2016
"How The Hell Do You Get More Leads?" at SaaStr Annual 2016
 
Neuheiten aus dem NAXOS Deutschland Vertrieb am 27. Januar 2017
Neuheiten aus dem NAXOS Deutschland Vertrieb am 27. Januar 2017Neuheiten aus dem NAXOS Deutschland Vertrieb am 27. Januar 2017
Neuheiten aus dem NAXOS Deutschland Vertrieb am 27. Januar 2017
 
Visup
VisupVisup
Visup
 

Similar to Elí Rdz Resume Jan 18 2017

John Setty Resume Rev2
John Setty Resume Rev2John Setty Resume Rev2
John Setty Resume Rev2John Setty
 
Kevin Resume 3-12-2016
Kevin Resume 3-12-2016Kevin Resume 3-12-2016
Kevin Resume 3-12-2016Kevin Logeais
 
Luis Navarro Resume
Luis Navarro ResumeLuis Navarro Resume
Luis Navarro ResumeLuis Navarro
 
Accelerating Product Development FLOW: Kanban at Jaguar Land Rover
Accelerating Product Development FLOW: Kanban at Jaguar Land RoverAccelerating Product Development FLOW: Kanban at Jaguar Land Rover
Accelerating Product Development FLOW: Kanban at Jaguar Land RoverHamish McMinn
 
Gary giblock resume 2 21-17
Gary giblock resume 2 21-17Gary giblock resume 2 21-17
Gary giblock resume 2 21-17Gary Giblock
 
Resume arvind-manufacturing engineer-california
Resume arvind-manufacturing engineer-californiaResume arvind-manufacturing engineer-california
Resume arvind-manufacturing engineer-californiaarvindblr
 
Chinh Nguyen Resume
Chinh Nguyen ResumeChinh Nguyen Resume
Chinh Nguyen Resumenguyen_ct
 
Jay Portfolio - Engineering Manager
Jay Portfolio - Engineering ManagerJay Portfolio - Engineering Manager
Jay Portfolio - Engineering Managerjaymehta2
 
Luis Leyva-Flores Plastics
Luis Leyva-Flores PlasticsLuis Leyva-Flores Plastics
Luis Leyva-Flores PlasticsLuis LeyvaFlores
 

Similar to Elí Rdz Resume Jan 18 2017 (20)

John Setty Resume Rev2
John Setty Resume Rev2John Setty Resume Rev2
John Setty Resume Rev2
 
MUSTAFA SALEM AL ASTALRESUMEEE (2)
MUSTAFA SALEM AL ASTALRESUMEEE (2)MUSTAFA SALEM AL ASTALRESUMEEE (2)
MUSTAFA SALEM AL ASTALRESUMEEE (2)
 
Kevin Resume 3-12-2016
Kevin Resume 3-12-2016Kevin Resume 3-12-2016
Kevin Resume 3-12-2016
 
Resume Gardner
Resume GardnerResume Gardner
Resume Gardner
 
Resume_Santosh
Resume_SantoshResume_Santosh
Resume_Santosh
 
Resume_Santosh
Resume_SantoshResume_Santosh
Resume_Santosh
 
KARTIK_CV
KARTIK_CVKARTIK_CV
KARTIK_CV
 
Richard Reinoso Vera Resume 2015
Richard Reinoso Vera Resume 2015Richard Reinoso Vera Resume 2015
Richard Reinoso Vera Resume 2015
 
Luis Navarro Resume
Luis Navarro ResumeLuis Navarro Resume
Luis Navarro Resume
 
Harshal Resume
Harshal ResumeHarshal Resume
Harshal Resume
 
Accelerating Product Development FLOW: Kanban at Jaguar Land Rover
Accelerating Product Development FLOW: Kanban at Jaguar Land RoverAccelerating Product Development FLOW: Kanban at Jaguar Land Rover
Accelerating Product Development FLOW: Kanban at Jaguar Land Rover
 
Rich Belfiore 2015
Rich Belfiore 2015Rich Belfiore 2015
Rich Belfiore 2015
 
Gary giblock resume 2 21-17
Gary giblock resume 2 21-17Gary giblock resume 2 21-17
Gary giblock resume 2 21-17
 
Resume 2016_
Resume 2016_Resume 2016_
Resume 2016_
 
Resume arvind-manufacturing engineer-california
Resume arvind-manufacturing engineer-californiaResume arvind-manufacturing engineer-california
Resume arvind-manufacturing engineer-california
 
Chinh Nguyen Resume
Chinh Nguyen ResumeChinh Nguyen Resume
Chinh Nguyen Resume
 
IS-Machinist2
IS-Machinist2IS-Machinist2
IS-Machinist2
 
Jay Portfolio - Engineering Manager
Jay Portfolio - Engineering ManagerJay Portfolio - Engineering Manager
Jay Portfolio - Engineering Manager
 
Luis Leyva-Flores Plastics
Luis Leyva-Flores PlasticsLuis Leyva-Flores Plastics
Luis Leyva-Flores Plastics
 
DB resume
DB resumeDB resume
DB resume
 

Elí Rdz Resume Jan 18 2017

  • 1. Eli Rodríguez Casillas Industrial & System Engineer Cellphone: 844 122 7661 Personnel Email: eli.rdz.c@gmail.com EDUCATION Industrial & System Engineer. Instituto Tecnológico de Estudios Superiores de Monterrey Campus Saltillo (ITESM) LANGUAGE English 100% (Write/Read/Speak) TOEFL Certification Spanish 100% (Native Language) PROFESSIONAL EXPIRIENCE John Deere (IJD) 2013 – Current John Deere Industries. Ramos Components Operation, Ramos Arizpe Coah. Mex. Position: Weld Manufacturing Engineer Sr. & Factory Master Plan Coordinator Department: Manufacturing & SAP Area Leader for SAP Implementation for Ramos Arizpe John Deere. o Expert on Production Planning & Manufacturing Execution System modules for SAP. Capacitation Parts Setup & Parameters Project Coordinator SAP stabilization o SAP Flow Material Specialist Warehouse management Serialized Frames Production Control Material Replenishment Strategy Factory Master Plan Coordinator o Long term planning (5 years) for factory New products, CI´s, Labor, Machine resource calculation, Infrastructure Factory Growth & Well Being Material Flow Expert: Increased from 75% to 95% of reliability of material o Plan for every part defined per station, working with Kanban pull system o SAP set up for parts in working process and warehouse o Point of use material presentation o Define of kanbans based on history and demand products o Systematic Layout Planning Welding Manufacturing Engineer Senior o Front & Rear Axles, Cotton Picker & Hood Guards Weldments Layout, OMS, SOES, CI Projects, Tool Design, Quality and delivery’s achievement, Ergonomics, safety, imbalances, process improvement, products structure and routes administrator
  • 2. Manufacturing Line Design o Labor Calculation o Flow Material (kanban & material presentation) o Kanban System (Triggering System) o Mix Model Lines Cost Reduction Leader at Components Ramos Arizpe o Cost Reduction Strategy Farm-in Make vs Buy Analysis Design for Manufacturing Material Yield New Product Projects o Layout, OMS, SOES, CI Projects, Tool Design, Quality and delivery’s achievement , Ergonomics, safety, imbalances, process improvement, products structure and routes administrator. Projects implemented: Rolling Baskets Miami & Valley City Program Merit Mounting Frames Loaders Factory – Beta Factory Hood Guards X40 & X25 CI´s for Cotton Picker Frames Weldment Continuous Improvement o Kaizen Material Replenishment (Primaries, Welding & Assembly Area) (Material flow) Trigger material at point of use with Kanban concept, elimination of shutdowns for material availability for welding and assembly areas (this problem was top of shutdowns at Factory) Electronic Kanban board implemented, communication between SAP & shop floor o Serialized Frames Inventory Control Special tag with e-coat resistance implementation for Cab Frames identification, increase of material inventory accuracy of 40% Savings of 700K USD for low accuracy inventory o Kanban calculator Tool for calculation of Kanban based on customer requirements Reduction of replenishment material times, increased of resource utilization Real time Control & Analysis from SAP o Support of Continuous Improvement Board for Welding Area Around 500 projects attended at year John Deere (IJD) 2012 – 2013 John Deere Industries. Saltillo Components Operation, Saltillo Coah. Mex. Position: Weld Manufacturing Engineer Department: Manufacturing Welding Manufacturing Engineer o Blades & Main Frame Weldments Layout, OMS, SOES, CI Projects, Tool Design, Quality and delivery’s achievement, Ergonomics, safety, imbalances, process improvement, products structure and routes administrator New Product Projects o Main Frame for Crawlers 750 & 850 FT4 o FT4 Blades
  • 3. Weld Process Tracking (GMAW) o Automation of manual welding o Tracking of sequence of events for welding operations o Mistake proofing for omission welds Capacity Increase o Design for Manufacturing Reduction of 20% of labor for new design propose 1ton tooling weight eliminated. Reduction of 10% of NVA Savings of 250K USD Coordinator of Engineering Changes for Saltillo Components(Benchmark) o ECM´s control o Obsolete parts control o Physical builds control Continuous Improvement o 20% of NVA reduction from blades welding process (Project Winner in CI Expo John Deere, Innovation) Savings of 250K USD Design for manufacturing, LEGO Concept Productivity increased from 75% to 90% o Support of Continuous Improvement Board for Welding Area Around 500 projects attended John Deere (IJD) 2011 – 2012 John Deere Industries. Saltillo Components Operation, Saltillo Coah. Mex. Position: Thermal Treatment Manufacturing Engineer Department: Manufacturing Manufacturing Engineer for Tillage Products (Foundry Process) o Sweep, Shovels & Brackets Layout, OMS, SOES, CI Projects, Tool Design, Quality and delivery’s achievement, Ergonomics, safety, imbalances, process improvement, products structure and routes administrator o SMED Project (Single-Minute Exchange of Die) 5% Direct Productivity Increased 15% Reduction of Setup Time New Product Projects o VTech Continuous Improvement (Project presented at CI Expo John Deere, 4th place) o SMED Project, 5% Direct Productivity Increased 15% Reduction of Setup Time
  • 4. SPECIAL TRAINING Certified on SAP Production Planning & Manufacturing Execution System modules Certified on Welding & Materials at COMIMSA Material Mechanical Properties GMAW, FCAW, Brazing, SMAW Welding Process Quality Control o Visual Inspection o Liquid Penetrant o Magnetic Particle o Ultrasonic Formats for Control Welding Process o WPS o PQR GMAW Engineer Welding Certification (MetWeld) GMAW Robot Welding Certification (Motoman) GD&T Certification for Manufacturing Process IT & Skills High Knowledge Microsoft Word, Excel, Power Point y Projects High Knowledge SAP (Module: Manufacturing Engineer, production control & PDM) High Knowledge on Manual Welding Process (GMAW) High Knowledge Auto CAD 2D y 3D High Knowledge Pro-Engineer Medium Knowledge on Statistical Process PERSONAL SKILLS & ACHIEVEMENTS Pushing for Sustainable Results Rigorous Analysis Made Tough Decisions Leadership Responsible Teamwork Honest Achievements CI Expo, Best Innovate Project: LEGO Blades Concept CI Expo, SMED 3 times winner of Achievement Exceptional Leadership Gold Lamb at Tecnologico de Monterrey References Luis Gabriel Colunga, Engineering Leader at John Deere Ramos Components (colungaluisgabriel@johndeere.com) Cesar Loaiza, Factory Manager at John Deere Ramos Components (loaizacesar@johndeere.com) Valentin Aguilar, Superintendent of Production at John Deere Saltillo Components (aguilarvalentingerardo@johndeere.com)