This document contains the resume of Shameer K.C., who is seeking a new opportunity. He has 4 years of experience as a Manufacturing Engineer in cable and wire harnessing. He has a technical background and certifications in areas like Six Sigma, Lean Manufacturing, and ISO standards. He is looking to leverage his skills and experience in project management, process improvement, design, and production. Contact details, educational qualifications, and references are provided.
1. CURRENT ADDRESS:
MADINAT ZAYED,
BUILDINGNO. 45, NEAR HSBC
ABUDHABI,UAE
VISA Status – UAE Visit Visa.
( Valid up to 20 Jun 2015)
PHONE:
0509250397 (UAE Primary)
0563480580 (UAE Secondary)
E-MAIL:
shamr.325@gmail.com
PASSPORT NO: J488660
TECHNICAL SKILLS:
Six Sigma Yellow Belt
Certification
Microsoft Navision(ERP)
Skills in concept of Lean
Manufacturing, Six
Sigma, Kaizen & 5S
Well technical knowledge
in cable & wire harness
components, Engineering
process planning &
control, Materials
planning with Supply
Chain Management,
Costing, ISO standard
Documentation
Ultrasonic Welding,
FMEA, Control Plan,
PPAP
COMPUTER SKILLS:
Windows 8
Basic knowledge of MS
Word and MS excel
Microsoft PowerPoint
STATEMENT OF PURPOSE
To secure an opportunity to work in a progressive company
which gives ample opportunities to widen my knowledge and helps me
use my acquired skills in a relevant manner towards the growth of the
company.
OVERVIEW
Project Manufacturing Engineer having 4 years experience in Cable
and Wire Harness Division, from India with YellowBelt Certification in Six
Sigma. Well knowledge in different process improvement techniques such as
5S, Kaizen and Lean Manufacturing. Participated 3 days training program at
Gilbarco Veeder Root on the topic “VAVE KAIZEN”.
WORK EXPERIENCE:
Manufacturing Engineer, Cable & Wire Harnessing Division, April
2011 – Present(4 years).
SFO Technologies Pvt. Ltd (NeST Group), Cochin, India (Electronic
Manufacturing Services).
Job Responsibilities:
Handling engineering activities for cable and wire harnessing for
industrial, aerospace and medical applications.
Involved in every step in the design, development and manufacturing
process, including:
RFQ feasibility study.
Customer requirement analysis.
Supporting customer for design of cable assemblies.
Suggesting to customer for alternates / equivalent components
for cost reduction.
Identification of Crimp tools / other tools required.
BOM preparation sending to SCM for getting component quotes.
Preparation of Costed BOM.
Preparation of Quote for the cable assemblies.
Releasing the Purchase orders for the components required for
the proto build.
Navision(Microsoft Navision 2009) Procedures.
Arrange Work order for proto production.
Preparation of First Article reports for Industrial / Medical /
Aerospace cable assemblies.
Documentation as per ISO9001 for Industrial, ISO13485 for
Medical and AS9100 for Aerospace cable assemblies.
Procedure following as per the ISO14001 Environmental
standard, UL Certification and CSA Certification.
Preparation of FLOW CHARTS, BOM,FMEA & PROESS
CONTROL PLAN,CONFIGURATIONMATRIX.
ECN/PCN implementation, control and co-ordination.
Identify & get components for making Testing fixtures.
Release the product to production.
Prepare the finalized Costed BOM & send to SCM / BDGDepts.
Manage obsolescence.
SHAMEER K.C
2. PERSONAL SKILLS:
Quick learner and hard
worker
Excellent communication
skills
Strong analytical and
logical skills
Confident to take up new
challenges and keen to
learn new concepts
Ability to explain
technical issues clearly to
non-technical colleagues
Aptitude for learning and
adhering to existing
standardized policies.
Ability to work
effectively both
independently and as part
of a team
Ability to manage and co-
ordinate a team of 15
PERSONAL DETAILS:
NAME : SHAMEER K.C
DOB : 27.02.1989
SEX : Male
NATIONALITY : Indian
MARITAL STATUS: Single
MOTHER TONGUE: Malayalam
LANGUAGES KNOWN
English
Arabic(Read & Write)
Malayalam
PERMENANT ADDRESS
KOZHIPALLY(H),
CHERUVADI(P.O),
MAVOOR(VIA),CALICUT(DIST)
KERALA,INDIA
673661(PIN)
Major Projects Handled
Stanley Black & Decker, USA
Involved in making design changes, proposing new designs,
alterations in the drawings to meet customer specifications by
conforming to all UL parameters & IPC specs. Main projects are
Battery Module project, LED project, Bluetooth module project.
Introduced a new process, TERMINAL RESISTANCE
WELDING(ULTRASONIC WELDING) and bought two
machines at SFO Technologies for the Stanley battery module
project. Transferred the project to production after getting approval
of Proto and shared the process details to entire team. Conducted the
Design of Experiment test during Proto stage of welding process for
calibration of machines. I have got appreciation mail from my
Organization and also from customer side for the goal completion.
[Work Reference: Mathew Velderman : Mathew.Velderman@sbdinc.com]
Gilbarco Veeder Root Limited
Involved a wide variety of cable assemblies used in petroleum
dispensers for power relay, signal transmission etc.
Involved in making design changes, proposing new designs,
alterations in the drawings to meet customer specifications by
conforming to all UL parameters & IPC specs.
[Work Reference: Parthiban : R.Parthiban.gilbarco.com]
GEHC Healthcare, Bangalore/Sweden
Involved different type of cable assemblies used in healthcare
products like scanner, infant warmer machineries etc.
Involved in making design changes, proposing new designs,
alterations in the drawings to meet customer specifications by
conforming to all UL parameters & IPC specs. Main projects are Life
Science(Bio-Science), SVCT, CORO etc.
[Work Reference: Babu : Babu.N@ge.com]
Larsen Toubro(L&T) Limited, Mysore
Involved in making design changes, proposing new designs,
alterations in the drawings to meet customer specifications by
conforming to all UL parameters & IPC specs.
[Work Reference: Raja Gopalakrishnan : rgopalakrishnan@myw.ltindia.com)
QUALIFICATION: B.Tech in Electronics and Communication
ACADEMICQUALIFICATIONDETAILS
Bachelor of Technology in Electronics and Communication - MES College
of Engineering, University of Calicut (2006-2010)
XII-Std – CMRHS Channamangalloor(2004-2006)
X-Std – PTMHS Kodiyathoor(2004)
REFERENCES
1. Mr. Varghese John 2. Mr. Mohammed Jawhar
Manager, Dept. of Engg. Asst Manager, Dept. of Engg.
SFO Technologies, NeST Group SFO Technologies, NeST Group
Ph: 09947267321. Ph: 09539994721.