SlideShare a Scribd company logo
1 of 1
Mathew J. Schmitz
2 0 6 A r d u s Dr , Ne w b e r g , OR 9 7 1 3 2 ▪ ma t s c h mit z @ a o l. c o m ▪ 5 0 3 - 6 8 7 - 6 1 7 5
Accomplishments – Yield &Cost ImprovementProjects at Qorvo
 Implemented and administered KaiNexus HVCPI project including contractnegotiations,setup and delivery
for 500 users across several international teams (Oregon Operations,Hillsboro Q&R,Philippines
Operations,SupplyChain,and Global Assy & Test). (Extra Mile Award, Certificate of Excellence,Oregon
Operations Factory Award.)
 Led WIP Cart vibration reduction efforts: implemented spring loaded casters in Fab;developed dual spring
loaded casters;developed anti-vibration pad;developed acoustical vibration analysis method for
characterizing and quantifying vibration reduction efforts.
 Led the workstation improvementprojectfor Fab that reduced LY scrap costs by $86k/qtr
 Developed a polymerized scanner trigger bootfor Cu Bump that reduced scanner costs by$10k/yr and
removed a possible source ofwetstation contamination atPLS
 Developed,sourced,and implemented the modular style Bosch workstations thatreduced workstation table
costs by 40% and reduced lead times by 8-12 weeks making workstation tables a non-issue for rapid/ramp
expansions.
 Developed the vacuum cord tie blocks that improved workstation trip safety and reduced losses due to
tangled lines and dropped wafers
 Sourced the Bluetooth wireless wetstation scanner upgrades in Photo and instructed PE on how to
program and install them allowing for tool recipe downloads
Professional Experience
Production Supervisor, IE Tech, Project Management –Qorvo, Hillsboro, OR – 7 years
 Managed 3 production teams on 1 of 4 shifts.
 New equipmentworkstation installation
 Ramp,layout, and capacity planning support
 Collaborate across teams and shifts on workstation improvements
 Workstation related yield, cost, and safety improvementprojects
 Workstation & MST sustaining
 HV CPI project support
 KaiNexus administration and training
SR. Team Manager–Stream International, Beaverton, OR – 5 years
 Managed 200+ agents across 5 technical supportteams
 Developed a multi-team parttime work force methodologythatimproved profitability, productivity & quality
metrics,reduced training times,and improved agentmorale and retention
Annex Manager–National Customer Support Center, USPS, Memphis, TN – 3 years
 Managed a mainframe computer printcenter annex
 Project manager to develop,design and build a 100% robotics bulk mail printcenter capable of printing
100,000 custom addressed mail pieces
 Part of a three man team to develop an advertising model to fully pay for the annex operation ($6.5 million
annual budget)
Sr. Manufacturing Engineer-Intel, San Jose, CA – 5 years
 Diffusion area equipment/operations manager supporting area sustaining
 Diffusion and LPCVD area equipmentand process improvements using DoE,SPC,Ishikawa,Pareto etc.
 Process owner – Field Ox, Drive Ox, Pad Ox, Gates
 Developed the firstcantilevered diffusion furnace atIntel improving Diffusion related yields by 5%
Education
Double BA - Applied Physics & Mathematics– Linfield College,McMinnville, OR – 3.6 GPA
AA – Computer Science,Chemeketa CommunityCollege, Salem,OR – 3.99 GPA

More Related Content

What's hot (6)

Resume rahul iyer jan 2014 international
Resume rahul iyer jan 2014 internationalResume rahul iyer jan 2014 international
Resume rahul iyer jan 2014 international
 
PSR_Success_Story
PSR_Success_StoryPSR_Success_Story
PSR_Success_Story
 
ALFRED PINkARD RESUME 6-16-16
ALFRED PINkARD RESUME 6-16-16ALFRED PINkARD RESUME 6-16-16
ALFRED PINkARD RESUME 6-16-16
 
Cloud Technology Manager1a
Cloud Technology Manager1aCloud Technology Manager1a
Cloud Technology Manager1a
 
DC Resume v2021
DC Resume v2021DC Resume v2021
DC Resume v2021
 
Ryan Knight's Resume
Ryan Knight's Resume Ryan Knight's Resume
Ryan Knight's Resume
 

Similar to Resume-2015

Carl Arens Resume 8_15 Revised
Carl Arens Resume 8_15 RevisedCarl Arens Resume 8_15 Revised
Carl Arens Resume 8_15 RevisedCarl Arens
 
Resume of bruce bennett
Resume of bruce bennettResume of bruce bennett
Resume of bruce bennettBruceBennett43
 
Resume of bruce bennett 2018 - baseline - stripped
Resume of bruce bennett   2018 - baseline - strippedResume of bruce bennett   2018 - baseline - stripped
Resume of bruce bennett 2018 - baseline - strippedBruceBennett43
 
Resume, as of 4/2
Resume, as of 4/2Resume, as of 4/2
Resume, as of 4/2Jim Davis
 
Wayne Thomas Resume
Wayne Thomas ResumeWayne Thomas Resume
Wayne Thomas ResumeWayne Thomas
 
Craig Smith resume
Craig Smith resumeCraig Smith resume
Craig Smith resumeCraig Smith
 
Jesus Gerardo Lopez Update CV
Jesus Gerardo Lopez Update CVJesus Gerardo Lopez Update CV
Jesus Gerardo Lopez Update CVJesus Lopez
 
Kevin Resume 3-12-2016
Kevin Resume 3-12-2016Kevin Resume 3-12-2016
Kevin Resume 3-12-2016Kevin Logeais
 
RAB resume 09 01 2016
RAB resume    09 01 2016RAB resume    09 01 2016
RAB resume 09 01 2016Rich Bellino
 
Briana Owens Resume
Briana Owens ResumeBriana Owens Resume
Briana Owens ResumeBriana Owens
 
Angela Gallegos - Sept 2015 v1
Angela Gallegos - Sept 2015 v1Angela Gallegos - Sept 2015 v1
Angela Gallegos - Sept 2015 v1Angela H. Gallegos
 
Bw resume 2013 share
Bw resume 2013 shareBw resume 2013 share
Bw resume 2013 shareBrian Wilson
 
Luis Leyva-Flores Plastics
Luis Leyva-Flores PlasticsLuis Leyva-Flores Plastics
Luis Leyva-Flores PlasticsLuis LeyvaFlores
 
WATSON VP OP EX and L6S expert
WATSON VP OP EX and L6S expertWATSON VP OP EX and L6S expert
WATSON VP OP EX and L6S expertJay Watson
 

Similar to Resume-2015 (20)

Carl Arens Resume 8_15 Revised
Carl Arens Resume 8_15 RevisedCarl Arens Resume 8_15 Revised
Carl Arens Resume 8_15 Revised
 
Resume_Santosh
Resume_SantoshResume_Santosh
Resume_Santosh
 
Resume_Santosh
Resume_SantoshResume_Santosh
Resume_Santosh
 
Resume of bruce bennett
Resume of bruce bennettResume of bruce bennett
Resume of bruce bennett
 
Resume of bruce bennett 2018 - baseline - stripped
Resume of bruce bennett   2018 - baseline - strippedResume of bruce bennett   2018 - baseline - stripped
Resume of bruce bennett 2018 - baseline - stripped
 
Graham White
Graham WhiteGraham White
Graham White
 
sandeep sisodia rspl cv
sandeep sisodia rspl cvsandeep sisodia rspl cv
sandeep sisodia rspl cv
 
KY Fung Resume_me
KY Fung Resume_meKY Fung Resume_me
KY Fung Resume_me
 
Resume, as of 4/2
Resume, as of 4/2Resume, as of 4/2
Resume, as of 4/2
 
Wayne Thomas Resume
Wayne Thomas ResumeWayne Thomas Resume
Wayne Thomas Resume
 
Craig Smith resume
Craig Smith resumeCraig Smith resume
Craig Smith resume
 
Jesus Gerardo Lopez Update CV
Jesus Gerardo Lopez Update CVJesus Gerardo Lopez Update CV
Jesus Gerardo Lopez Update CV
 
Resume 2016_
Resume 2016_Resume 2016_
Resume 2016_
 
Kevin Resume 3-12-2016
Kevin Resume 3-12-2016Kevin Resume 3-12-2016
Kevin Resume 3-12-2016
 
RAB resume 09 01 2016
RAB resume    09 01 2016RAB resume    09 01 2016
RAB resume 09 01 2016
 
Briana Owens Resume
Briana Owens ResumeBriana Owens Resume
Briana Owens Resume
 
Angela Gallegos - Sept 2015 v1
Angela Gallegos - Sept 2015 v1Angela Gallegos - Sept 2015 v1
Angela Gallegos - Sept 2015 v1
 
Bw resume 2013 share
Bw resume 2013 shareBw resume 2013 share
Bw resume 2013 share
 
Luis Leyva-Flores Plastics
Luis Leyva-Flores PlasticsLuis Leyva-Flores Plastics
Luis Leyva-Flores Plastics
 
WATSON VP OP EX and L6S expert
WATSON VP OP EX and L6S expertWATSON VP OP EX and L6S expert
WATSON VP OP EX and L6S expert
 

Resume-2015

  • 1. Mathew J. Schmitz 2 0 6 A r d u s Dr , Ne w b e r g , OR 9 7 1 3 2 ▪ ma t s c h mit z @ a o l. c o m ▪ 5 0 3 - 6 8 7 - 6 1 7 5 Accomplishments – Yield &Cost ImprovementProjects at Qorvo  Implemented and administered KaiNexus HVCPI project including contractnegotiations,setup and delivery for 500 users across several international teams (Oregon Operations,Hillsboro Q&R,Philippines Operations,SupplyChain,and Global Assy & Test). (Extra Mile Award, Certificate of Excellence,Oregon Operations Factory Award.)  Led WIP Cart vibration reduction efforts: implemented spring loaded casters in Fab;developed dual spring loaded casters;developed anti-vibration pad;developed acoustical vibration analysis method for characterizing and quantifying vibration reduction efforts.  Led the workstation improvementprojectfor Fab that reduced LY scrap costs by $86k/qtr  Developed a polymerized scanner trigger bootfor Cu Bump that reduced scanner costs by$10k/yr and removed a possible source ofwetstation contamination atPLS  Developed,sourced,and implemented the modular style Bosch workstations thatreduced workstation table costs by 40% and reduced lead times by 8-12 weeks making workstation tables a non-issue for rapid/ramp expansions.  Developed the vacuum cord tie blocks that improved workstation trip safety and reduced losses due to tangled lines and dropped wafers  Sourced the Bluetooth wireless wetstation scanner upgrades in Photo and instructed PE on how to program and install them allowing for tool recipe downloads Professional Experience Production Supervisor, IE Tech, Project Management –Qorvo, Hillsboro, OR – 7 years  Managed 3 production teams on 1 of 4 shifts.  New equipmentworkstation installation  Ramp,layout, and capacity planning support  Collaborate across teams and shifts on workstation improvements  Workstation related yield, cost, and safety improvementprojects  Workstation & MST sustaining  HV CPI project support  KaiNexus administration and training SR. Team Manager–Stream International, Beaverton, OR – 5 years  Managed 200+ agents across 5 technical supportteams  Developed a multi-team parttime work force methodologythatimproved profitability, productivity & quality metrics,reduced training times,and improved agentmorale and retention Annex Manager–National Customer Support Center, USPS, Memphis, TN – 3 years  Managed a mainframe computer printcenter annex  Project manager to develop,design and build a 100% robotics bulk mail printcenter capable of printing 100,000 custom addressed mail pieces  Part of a three man team to develop an advertising model to fully pay for the annex operation ($6.5 million annual budget) Sr. Manufacturing Engineer-Intel, San Jose, CA – 5 years  Diffusion area equipment/operations manager supporting area sustaining  Diffusion and LPCVD area equipmentand process improvements using DoE,SPC,Ishikawa,Pareto etc.  Process owner – Field Ox, Drive Ox, Pad Ox, Gates  Developed the firstcantilevered diffusion furnace atIntel improving Diffusion related yields by 5% Education Double BA - Applied Physics & Mathematics– Linfield College,McMinnville, OR – 3.6 GPA AA – Computer Science,Chemeketa CommunityCollege, Salem,OR – 3.99 GPA