MEDIA 1.0  VS.  MEDIA 2.0  EHU-SUNY COLLABORATIVE PROJECT
MEDIA 1.0  VS.  MEDIA 2.0  EHU-SUNY ULSTER  COLLABORATIVE PROJECT
SUNY Ulster  Richard Cattabiani    Director of International Programs    English Faculty Hope Windle    Instructional Design   European Humanities University Victoria Minina    Lecturer of English Alesia Krupenikava   Lecturer of English Tatsiana Senina    Lecturer   of English Globalization 101  Rebecca Smolar     Project Director
COURSE TIME SCHEDULE  Mid October  to Mid December, 2009  Duration 10 weeks.  Beginning of Nov to Beginning of December, 2010  Duration 5 weeks. Offered in English.
CREDIT INFORMATION EHU  Independent value added for EFL students  Two credit course  Ulster Integrated into Contemporary World Literature Three credit course
COURSE  GOALS To design a safe space for international collaboration   To articulate the difference between people driven media versus corporate or state driven media To broaden students and faculty appreciation of other cultures and politics     
KEEPING IN TOUCH Before  A SKYPE chat every two weeks starting a semester in advance to establish the relationship of professors to develop the course content During  A one-hour SKYPE chat every week during the course to assess how things were going.
COURSE DEVELOPMENT   choosing a methodology for online teaching developing detail instructions for working in the course developing a syllabus and week by week assignments integrating EHU teaching standards into SUNY educational environment
Grading criteria & rubrics S haring of responsibilities Engaging and selecting  students COURSE DEVELOPMENT
STUDENTS The EHU students  – advanced EFL course for ToEFL preparation (40 - 17). The Ulster students  – a 200 level English course:  Contemporary World Literature  (11).
STUDENT EVALUATION  Each student was graded only by his / her own instructor All students were expected to contribute to the discussion   Final course grades were determined by the instructor on the following basis:  Assignments: 50%  Active participation in discussion: 50%
DEVELOPING A  RUBRIC   Activity  Interpretation  Grading criteria  Answers all Questions  State a position and include responses to six [6] other posts. This could include the Professors’  Excellent / A (Ulster students)   10-9 (EHU students)  The comment is accurate, original, relevant, and is well written. This comment adds substantial presence to the course and stimulates additional thought about the issues under discussion.  Answer all Questions  State a position and include responses to four [4] other posts. This could include the Professors’  Above Average / B (Ulster students)  8-7 (EHU students)  The comment lacks at least one of the above values but is above average in quality. The comment makes a significant contribution to our understanding of the issue being discussed.  Answer Questions  State a position and include responses to two [2] other posts. This could include the Professors’  Average / C (Ulster students)  6-5 (EHU students)  The comment lacks two or three of the required responses. The comment makes no significant contribution to our understanding of the issue being discussed.  Answer Some Questions  Interacts once a week  Ideas are not well-developed, do not add to discussion  D  (Ulster students)    4 (EHU students)  Answer No Questions  No discussion or interaction with the class  F  (Ulster students)  3 (EHU students)
LANGUAGE No problems.
 
COURSE CONTENT The 2009 &  2010  modules were divided into 3 sections:  an introductory 3 week ( 1 week  ) unit about Media 1.0 vs. 2.0  designed by Richard Cattabiani and Hope Windle  with Rebecca Smolar, Globalization 101  reshaped by the EHU instructors 5 week  (2 weeks)  unit focusing on the book  Persepolis  by Marjane Satrapi, initially designed by Richard Cattabiani but reshaped by all 2 week  (2 weeks)  creative project based on the graphic novel format.
LMS Moodle course space.  
 
 
 
 
 
 
 
 
 
 
 
 
 
v v v
 
 
 
 
Creating a cross-cultural media project worthy of publication
 
 
 
 
 
HOW CAN YOU PREPARE FOR THIS PARTNERSHIP?    Passion to teach and learn about the world outside the USA Willingness to teach online  Develop a relationship with your instructional designer   Familiarity with the languages involved
STRATEGIES TO FACILITATE THIS PARTNERSHIP Develop simple outcomes Make time Agree upon start and end date Agree upon content Agree upon format Agree upon Learning Management System (LMS)
WHAT IT TAKES  Start early Select your students very carefully Use student-centered methodology Use many visuals (e.g. photos, pictures, videos, etc) Provide clear instructions for each assignment Provide weekly feedback Be ready to work hard
Persepolis. I loved the story, and I thought it was clever to use a graphic novel to surpass any language barriers between the two groups. WHAT STUDENTS SAY American students really have explicit freedom of speech!!!!!!!! And due to this course we had an opportunity to appreciate it and express our ideas and then discussed them!!! Wonderful!!!!!!!! It seems that US media is a little more democratic than Belarusian. But it was interesting to know that sometimes the Americans didn't trust the news as well as Belarusian people. I think I got good information about US media in this project.
Any Questions?  Victoria Minina  [email_address] Hope Windle  [email_address] Richard Cattabiani  [email_address]

Ehu ulster coilnyc_final

  • 1.
    MEDIA 1.0 VS. MEDIA 2.0 EHU-SUNY COLLABORATIVE PROJECT
  • 2.
    MEDIA 1.0 VS. MEDIA 2.0 EHU-SUNY ULSTER COLLABORATIVE PROJECT
  • 3.
    SUNY Ulster Richard Cattabiani  Director of International Programs  English Faculty Hope Windle  Instructional Design  European Humanities University Victoria Minina  Lecturer of English Alesia Krupenikava  Lecturer of English Tatsiana Senina  Lecturer of English Globalization 101 Rebecca Smolar  Project Director
  • 4.
    COURSE TIME SCHEDULE Mid October to Mid December, 2009 Duration 10 weeks. Beginning of Nov to Beginning of December, 2010 Duration 5 weeks. Offered in English.
  • 5.
    CREDIT INFORMATION EHU Independent value added for EFL students Two credit course Ulster Integrated into Contemporary World Literature Three credit course
  • 6.
    COURSE GOALSTo design a safe space for international collaboration To articulate the difference between people driven media versus corporate or state driven media To broaden students and faculty appreciation of other cultures and politics     
  • 7.
    KEEPING IN TOUCHBefore A SKYPE chat every two weeks starting a semester in advance to establish the relationship of professors to develop the course content During A one-hour SKYPE chat every week during the course to assess how things were going.
  • 8.
    COURSE DEVELOPMENT choosing a methodology for online teaching developing detail instructions for working in the course developing a syllabus and week by week assignments integrating EHU teaching standards into SUNY educational environment
  • 9.
    Grading criteria &rubrics S haring of responsibilities Engaging and selecting students COURSE DEVELOPMENT
  • 10.
    STUDENTS The EHUstudents – advanced EFL course for ToEFL preparation (40 - 17). The Ulster students – a 200 level English course: Contemporary World Literature (11).
  • 11.
    STUDENT EVALUATION Each student was graded only by his / her own instructor All students were expected to contribute to the discussion Final course grades were determined by the instructor on the following basis: Assignments: 50% Active participation in discussion: 50%
  • 12.
    DEVELOPING A RUBRIC Activity Interpretation Grading criteria Answers all Questions State a position and include responses to six [6] other posts. This could include the Professors’ Excellent / A (Ulster students) 10-9 (EHU students) The comment is accurate, original, relevant, and is well written. This comment adds substantial presence to the course and stimulates additional thought about the issues under discussion. Answer all Questions State a position and include responses to four [4] other posts. This could include the Professors’ Above Average / B (Ulster students) 8-7 (EHU students) The comment lacks at least one of the above values but is above average in quality. The comment makes a significant contribution to our understanding of the issue being discussed. Answer Questions State a position and include responses to two [2] other posts. This could include the Professors’ Average / C (Ulster students) 6-5 (EHU students) The comment lacks two or three of the required responses. The comment makes no significant contribution to our understanding of the issue being discussed. Answer Some Questions Interacts once a week Ideas are not well-developed, do not add to discussion D (Ulster students)   4 (EHU students) Answer No Questions No discussion or interaction with the class F (Ulster students) 3 (EHU students)
  • 13.
  • 14.
  • 15.
    COURSE CONTENT The2009 & 2010 modules were divided into 3 sections: an introductory 3 week ( 1 week ) unit about Media 1.0 vs. 2.0 designed by Richard Cattabiani and Hope Windle with Rebecca Smolar, Globalization 101 reshaped by the EHU instructors 5 week (2 weeks) unit focusing on the book Persepolis by Marjane Satrapi, initially designed by Richard Cattabiani but reshaped by all 2 week (2 weeks) creative project based on the graphic novel format.
  • 16.
  • 17.
  • 18.
  • 19.
  • 20.
  • 21.
  • 22.
  • 23.
  • 24.
  • 25.
  • 26.
  • 27.
  • 28.
  • 29.
  • 30.
  • 31.
  • 32.
  • 33.
  • 34.
  • 35.
    Creating a cross-culturalmedia project worthy of publication
  • 36.
  • 37.
  • 38.
  • 39.
  • 40.
  • 41.
    HOW CAN YOUPREPARE FOR THIS PARTNERSHIP?   Passion to teach and learn about the world outside the USA Willingness to teach online Develop a relationship with your instructional designer   Familiarity with the languages involved
  • 42.
    STRATEGIES TO FACILITATETHIS PARTNERSHIP Develop simple outcomes Make time Agree upon start and end date Agree upon content Agree upon format Agree upon Learning Management System (LMS)
  • 43.
    WHAT IT TAKES Start early Select your students very carefully Use student-centered methodology Use many visuals (e.g. photos, pictures, videos, etc) Provide clear instructions for each assignment Provide weekly feedback Be ready to work hard
  • 44.
    Persepolis. I lovedthe story, and I thought it was clever to use a graphic novel to surpass any language barriers between the two groups. WHAT STUDENTS SAY American students really have explicit freedom of speech!!!!!!!! And due to this course we had an opportunity to appreciate it and express our ideas and then discussed them!!! Wonderful!!!!!!!! It seems that US media is a little more democratic than Belarusian. But it was interesting to know that sometimes the Americans didn't trust the news as well as Belarusian people. I think I got good information about US media in this project.
  • 45.
    Any Questions? Victoria Minina [email_address] Hope Windle [email_address] Richard Cattabiani [email_address]

Editor's Notes

  • #2 Interdependence of different media
  • #4 RC
  • #9 Vika to speak to this
  • #10 Vika to speak to How it was Promoting
  • #11 VIKa to explain Richard to explain
  • #13 RC proposed to have the rubric
  • #14 RC to speak of the level of language skills of the EHU students, Vika to speak to the sitting up and taking note Hope to speak to seeing the LMS in cyrrillic
  • #16 Hope knew the belarusans were juggling jobs and Alesia and Vika used to teaching fully Templated online courses versus faculty driven development started from scratch
  • #17 Hope felt it was important to be in the country’s LMS that were speaking a foreign langauge the least we could do is play in their sandbox Vika felt it was a big favor to have the course in Moodle
  • #18 RC - Kick off the collaboration Persepolis smuggled in
  • #19 RC
  • #20 RC introduce Rebecca and the Globalization 101 links and video content and analysis briefs and soon to be Human Rights Tool Kit 2.0   Every semester we learn more about how the international collaborations can improve. Presently, we are adopting a meaty introductory component devised with Rebecca Smolar of Globalization 101, SUNY Levin Institute. We will start the students introducing themselves, by investigating cultural differences in relation to the Media and investigating the gathering of "News". Our introductory lesson plan will be on the Globalization 101 website later this year.  
  • #21 RC
  • #22 RC
  • #23 RC > HW
  • #24 HW
  • #25 Hope
  • #26 HW
  • #27 HW
  • #28 HW
  • #29 HW
  • #30 HW
  • #31 RC
  • #32 Vika mentioned Survey monkey
  • #33 RC ……Graphic Novel because of ESL connection but the surprise and re-group was the sophistication in the responses from all
  • #34 RC and Vika opportunity for the EHU students to comment informally in the discussion boards and postings was a nice alternative to Academic or ToeFL focused communication. It helped them to be more frank, more sincere.
  • #35 RC the depth and the scope and the sequence…audio, visual, kinesthetic, all learning styles being used. People exchange different thoughts and visuals better comprehend the story and the context of the story. Great to see the imagery as well as the conversation about the reading
  • #36 HOPE - Pixton online tool to allow the students to collaborate without having artistic or drafting ability but to convey the concepts and thinking about the course and the connections made Web 2.0 tools are plentiful but not necessarily stable. Vika - to speak to how Hope RC to talk to word: PUBLICATION …22 year think of the word in a different light.
  • #37 HW _ example of collessing truly Media Lesson plan and Persepolis and the structure of the graphic novel VIKA
  • #38 HW
  • #39 HW called the CEO with PIXTON to accommodate what we are doing
  • #40 HW to talk to the way the students figured out a work around in a way that each student could add their own strip One of the students from Columbia RC to talk to using Pixton earlier next time we run this collaboration
  • #41 RC One of the students from Columbia, Three Kings Days
  • #42 HW - A past history with the medium: having taught online or an experience using a LMS to communicate with students.   - Familiarity with the languages involved, or some sort of motivation for embarking on a language chosen for discourse.   - An interest in providing students an opportunity to learn about other cultures and other viewpoints to enhance and evolve the course content.   An open mind with flexible planning skills.   - Time to meet with their counterpart at least 3 times by video conference before the interaction begins.   - Time to set up the online course space in advance as a place where the course collaboration can occur.  
  • #43 HW Walk before you run...Skype often operative word is yes Maintaining dignity for our partners
  • #44 HW
  • #46 RC to talk How we got started Transition to Short Term Study Abroad