List of shop visited during 1 month training:-
 Colony
A.C Plant
M.R.S
Tel. exchange
A.C plant in D.L.W consists of centralized
air conditioning system manufactured by
blue star and another one by voltas.
This plant supply chilled air to the staff
rooms and halls of workshop where diesel
engines are being manufactured
A.C plant.
• MAIN COMPONENT OF A.C PLANT
ARE AS FOLLOWS:-
• *C.T fan.
• *Condenser.
• *Chiller.
• *Compressor.
• *A.H.U
WORKING:-
• (1.) C.T fan:-
It is
situated over cooling
tower .Heated water from
condenser when passes
across it then it takes
heat from water and in
the form of vapor it
release heat energy to
atmosphere and cooled
air through fins gets
stored in cooling tower
tank .
(2.) Compressor:-
Floron 22 gas from
cylinder is passed though compressor
where pressure of gas is increased to 220-
270 psi. This high pressure gas passes to
condenser where it gets liquefied this
liquefied gas passes through chiller where
it cools water and then this low pressure
gas of 50-65 psi again enters to
compressor and this circulation kept on
going till cooling process is done
• (3.) Condenser:-
In the condenser, the
temperature of the superheated
vapour has to be brought down, before
it can be condensed into a liquid. In
the condenser, once the
• vapour has been cooled, it begins to
condense.The high pressure gases get
converted into liquid here and this
liquid go to chiller tank.
• There are three types
condensers viz.
• i) Air-Cooled ii)Water-Cooled iii)
Evaporative. Water cooled condensers
are used in Central AC Plants.
• (4.) Chiller:-
In chiller water is passed
through water line and liquefied Floron
gas passes through tank and the water
passing in water line of chiller gets
cooled and this water is transferred to
A.H.U.
• (6.) A.H.U (Air Handling Unit):-
In this section chilled air
is pass through water line which cools
air surrounding this water line and this
air through duct passes to the area
which required cooling and the
exhaust air from cooling area is again
brought back to a.h.u through duct and
this air again cooled and sent back to
cooling area.
(5.) Cooling tower:-
The cooling towers is used in conjunction
with the water cooled condenser. Water in passing through the
condenser water tubes only gets warmed up but does not get
contaminated. It can therefore be used again, after
cooling. The cooling tower cools the warm water for recirculating it
in the condenser. It is thus a water conservation equipment. The
heat removed by the
refrigeration system from the space or product to be
cooled is ultimately thrown to the atmosphere through
the cooling tower in a water-cooled condenser system.
Thus the cooling tower should function efficiently for
the refrigeration system to perform well
• ADVANTAGE OF
CENTRALISED AC PLANT:-
advantage of this
system is that the processing
of air is centrally controlled and
therefore a high standard of
efficiency can be maintained.
DISADVANTAGE OF THIS
SYSTEM:-
* Adjustment of
individual room temperature as
required from time to time is
not possible. Therefore the
system is definitely wrong from
buildings which are split up
into a number of small rooms,
offices.
 * It permits mixing of air,
cigarette smoke, bacteria and
odor between different areas
of offices.
• * The ducting occupies an
appreciable space.
COLONY
Main component of substation no.3 are:-
• Transformer of 750kva
• H.T and L.T panel
• Capacitor bank
AREA OF SUPPLY:-
• Hospital
• Colony of DLW
• Markets
• Water pump
• Rating of transformer:-
• Company name:-AREVA
• Type of cooling:-ONAN (Oil Natural Air Natural)
• KVA rating:-750KVA
• H.T:-11kV, 39.4A
• L.T:-415v, 1043.4A
• Tfr winding:-DY11
• MEANING OF DY11:
• D:-Delta
• Y:-Star
• 11:-Phase displacement
Oil Used In Transformer:-
*Light Napthelic Distillate
• Earthing:-
• It implies connection of non-current carrying parts
to ground like metallic enclosures.
• Grounding:-
• Grounding implies connection of current carrying
parts to ground.
• Ring System:-
•
• More than one path available between the points.
• Radial System:-
• Only one path is available between two points.
• Substation no.3 is based on ring system .
132kv is supply to 2 and 6 no. substations
Other 7 are connected as shown in below figure
• Buchholz relay
• In the field of electric power distribution
and transmission, a Buchholz relay is a
safety device mounted on some oil-filled
power transformers and reactors,
equipped with an external overhead oil
reservoir called a "conservator". The
Buchholz relay is used as a protective
device sensitive to the effects of dielectric
failure inside the equipment.
Main Receiving Substation(MRS)
• MRS receives main supply from UPPCL (Uttar
Pradesh Power Corporation Limited,)
• This is step down with 7.5MVA transformer. The
33kv feeder is transformed is two 11kv feeder with a
bus coupler in between.
• The MRS follows ring type distribution system for
supplying power to D.L.W.The advantage of ring
type system is that each substation is fed from two
sides. If in case one line is faulted then the substation
is fed from other line. But major disadvantages of
ring type system are that it is too costly.
Main component of MRS:-
Transformer.
Control panel.
Bus Coupler.
Relays.
Circuit Breaker.
Capacitor Bank.
DISTRIBUTION CHART:-
CIRCUIT BREAKER:-
• It is an automatic
operated switch
designed to protect
an electrical circuit
from damage caused
by overload or short
circuit.
• There are three D.G (Diesel Generator)
sets in Mrs.:-
• (1.) 2600 H.P
• (2.) 1200 H.P
• (3.) 3500 H.P
RELAYS:-
• Relays are used for protection of the power
system from different faults which are occurring
in the power system. A relay is a simple
electromechanical switch made up of an
electromagnets and a set of contacts. Relays
are found hidden in all sorts of device.
• TWO TYPES OS RELAYS USED IN MRS
ARE:-
• >Definite relay
• >Inverse relay
CONTROL PANEL:-
• Control panel is a flat,
often vertical area
where control or
monitoring
instruments are
displayed.
CAPACITOR BANK:-
• In the electrical system the power factor
play a important role because by
improving the power factor one can
reduce losses .Generally power factor
should not be brought below 0.8 for
industrial loads. To improve power factor,
capacitor bank are placed in parallel with
the power supply. In DLW, 600KVAR
capacitor bank is used for the
improvement of power factor.
Capacitor bank contd………..
• REASON FOR
IMPROVEMENT OF
POWER FACTOR:-
• *Reduced losses.
• *Reactive power
decreased active
power increases.
• *Efficiency of machine
increases.

More Related Content

What's hot

Railway summer training report electrical engineering
Railway summer training report electrical engineeringRailway summer training report electrical engineering
Railway summer training report electrical engineering
Yogesh Jadoun
 
BHARAT HEAVY ELECTRICALS LIMITED.JHANSI LOCOMOTIVE PPT
BHARAT HEAVY ELECTRICALS LIMITED.JHANSI LOCOMOTIVE PPTBHARAT HEAVY ELECTRICALS LIMITED.JHANSI LOCOMOTIVE PPT
BHARAT HEAVY ELECTRICALS LIMITED.JHANSI LOCOMOTIVE PPT
Ravindra Rawat
 
Railway loco ppt
Railway loco ppt Railway loco ppt
Railway loco ppt
Anand Dwivedi
 
Training report on NWR,jaipur
Training report on NWR,jaipurTraining report on NWR,jaipur
Training report on NWR,jaipur
Lokesh Judani
 
Chittaranjan locomotives works
Chittaranjan locomotives worksChittaranjan locomotives works
Chittaranjan locomotives works
Kanhaiya Kumar
 
Presentaion on BHEL- Diesel Locomotive
Presentaion on BHEL- Diesel LocomotivePresentaion on BHEL- Diesel Locomotive
Presentaion on BHEL- Diesel LocomotiveAbhishek Agarwal
 
Sanjeev inds
Sanjeev indsSanjeev inds
Sanjeev inds
sanjeev kumar shah
 
J DJ
J DJJ DJ
J DJ
jjinesh
 
1302580505523 train lighting book
1302580505523 train lighting book1302580505523 train lighting book
1302580505523 train lighting book
firoj shaik
 
J D J
J D JJ D J
J D J
jjinesh
 
Railway locomotive
Railway locomotiveRailway locomotive
Railway locomotiveRinku Sharma
 
Diesel locomotive technology
Diesel locomotive technologyDiesel locomotive technology
Diesel locomotive technologyRajneesh Budania
 
Dauleshupadhyay
DauleshupadhyayDauleshupadhyay
Dauleshupadhyay
Daulesh Upadhyay
 
60015688 ashish-loco-summer (1)
60015688 ashish-loco-summer (1)60015688 ashish-loco-summer (1)
60015688 ashish-loco-summer (1)
99sunilkumar
 
Indian railway kota presentation
Indian railway kota presentationIndian railway kota presentation
Indian railway kota presentation
AnuragKumar528
 
Railway workshop jodhpur
Railway workshop jodhpurRailway workshop jodhpur
Railway workshop jodhpur
MAHESH SONI
 
Train lighting system
Train lighting systemTrain lighting system
Train lighting system
siddhartha shukla
 
railway workshop jodhpur
railway workshop jodhpurrailway workshop jodhpur
railway workshop jodhpur
kalumutha
 
Ppt on Kharagpur railway
Ppt on Kharagpur railwayPpt on Kharagpur railway
Ppt on Kharagpur railway
SURAJBHAKTA4
 

What's hot (20)

Railway summer training report electrical engineering
Railway summer training report electrical engineeringRailway summer training report electrical engineering
Railway summer training report electrical engineering
 
BHARAT HEAVY ELECTRICALS LIMITED.JHANSI LOCOMOTIVE PPT
BHARAT HEAVY ELECTRICALS LIMITED.JHANSI LOCOMOTIVE PPTBHARAT HEAVY ELECTRICALS LIMITED.JHANSI LOCOMOTIVE PPT
BHARAT HEAVY ELECTRICALS LIMITED.JHANSI LOCOMOTIVE PPT
 
Railway loco ppt
Railway loco ppt Railway loco ppt
Railway loco ppt
 
Training report on NWR,jaipur
Training report on NWR,jaipurTraining report on NWR,jaipur
Training report on NWR,jaipur
 
Chittaranjan locomotives works
Chittaranjan locomotives worksChittaranjan locomotives works
Chittaranjan locomotives works
 
Presentaion on BHEL- Diesel Locomotive
Presentaion on BHEL- Diesel LocomotivePresentaion on BHEL- Diesel Locomotive
Presentaion on BHEL- Diesel Locomotive
 
Sanjeev inds
Sanjeev indsSanjeev inds
Sanjeev inds
 
J DJ
J DJJ DJ
J DJ
 
1302580505523 train lighting book
1302580505523 train lighting book1302580505523 train lighting book
1302580505523 train lighting book
 
J D J
J D JJ D J
J D J
 
Railway locomotive
Railway locomotiveRailway locomotive
Railway locomotive
 
Diesel locomotive technology
Diesel locomotive technologyDiesel locomotive technology
Diesel locomotive technology
 
Dauleshupadhyay
DauleshupadhyayDauleshupadhyay
Dauleshupadhyay
 
60015688 ashish-loco-summer (1)
60015688 ashish-loco-summer (1)60015688 ashish-loco-summer (1)
60015688 ashish-loco-summer (1)
 
Railway Training ppt
Railway Training pptRailway Training ppt
Railway Training ppt
 
Indian railway kota presentation
Indian railway kota presentationIndian railway kota presentation
Indian railway kota presentation
 
Railway workshop jodhpur
Railway workshop jodhpurRailway workshop jodhpur
Railway workshop jodhpur
 
Train lighting system
Train lighting systemTrain lighting system
Train lighting system
 
railway workshop jodhpur
railway workshop jodhpurrailway workshop jodhpur
railway workshop jodhpur
 
Ppt on Kharagpur railway
Ppt on Kharagpur railwayPpt on Kharagpur railway
Ppt on Kharagpur railway
 

Viewers also liked

Dr Darin Gunesekera Social REIT - our journey in Affordable Housing
Dr Darin Gunesekera Social REIT - our journey in Affordable HousingDr Darin Gunesekera Social REIT - our journey in Affordable Housing
Dr Darin Gunesekera Social REIT - our journey in Affordable Housing
Capital Markets for the Marginalized
 
Dlw varanasi
Dlw varanasiDlw varanasi
Dlw varanasi
Ishant Gautam.
 
DLW, VARANASI training report for LNCT college indore
DLW, VARANASI training report for LNCT college indoreDLW, VARANASI training report for LNCT college indore
DLW, VARANASI training report for LNCT college indore
SANJEET KUMAR
 
Summer training at dlw varanasi
Summer training at dlw varanasi Summer training at dlw varanasi
Summer training at dlw varanasi
ravi jaiswal
 
A project report on dlw export procedure to non railway customer by anand kum...
A project report on dlw export procedure to non railway customer by anand kum...A project report on dlw export procedure to non railway customer by anand kum...
A project report on dlw export procedure to non railway customer by anand kum...
Anand Kumar Tiwari
 
Diesel Locomotive Works (DLW)
 Diesel Locomotive Works (DLW) Diesel Locomotive Works (DLW)
Diesel Locomotive Works (DLW)
Neha Gethe
 
Indian Railway locomotive ppt
Indian Railway locomotive pptIndian Railway locomotive ppt
Indian Railway locomotive ppt
Shrey Sandiman
 

Viewers also liked (7)

Dr Darin Gunesekera Social REIT - our journey in Affordable Housing
Dr Darin Gunesekera Social REIT - our journey in Affordable HousingDr Darin Gunesekera Social REIT - our journey in Affordable Housing
Dr Darin Gunesekera Social REIT - our journey in Affordable Housing
 
Dlw varanasi
Dlw varanasiDlw varanasi
Dlw varanasi
 
DLW, VARANASI training report for LNCT college indore
DLW, VARANASI training report for LNCT college indoreDLW, VARANASI training report for LNCT college indore
DLW, VARANASI training report for LNCT college indore
 
Summer training at dlw varanasi
Summer training at dlw varanasi Summer training at dlw varanasi
Summer training at dlw varanasi
 
A project report on dlw export procedure to non railway customer by anand kum...
A project report on dlw export procedure to non railway customer by anand kum...A project report on dlw export procedure to non railway customer by anand kum...
A project report on dlw export procedure to non railway customer by anand kum...
 
Diesel Locomotive Works (DLW)
 Diesel Locomotive Works (DLW) Diesel Locomotive Works (DLW)
Diesel Locomotive Works (DLW)
 
Indian Railway locomotive ppt
Indian Railway locomotive pptIndian Railway locomotive ppt
Indian Railway locomotive ppt
 

Similar to E.E D.l.W training report BY Ankit Kumar EN 2 year

ppt on nspcl rourkela odisha
ppt on nspcl rourkela odishappt on nspcl rourkela odisha
ppt on nspcl rourkela odisha
Ankitesh Maithil
 
tps 180150109049 180150109078.pptx
tps 180150109049 180150109078.pptxtps 180150109049 180150109078.pptx
tps 180150109049 180150109078.pptx
AnandNakum
 
Three phase transformers
Three phase transformersThree phase transformers
Three phase transformers
Slides Hub
 
Htps
HtpsHtps
Htps
VSRAGHU
 
Air conditioning in indian railways PEE
Air conditioning in indian railways PEEAir conditioning in indian railways PEE
Air conditioning in indian railways PEE
irkportal
 
Ramendra summer training presentation
Ramendra summer training presentationRamendra summer training presentation
Ramendra summer training presentationRamendra Dhiman
 
IPGCL/PPCL Training presentation
IPGCL/PPCL Training presentationIPGCL/PPCL Training presentation
IPGCL/PPCL Training presentation
Shubhra Dhyani
 
500MW presentation - 11102006.PPT
500MW presentation - 11102006.PPT500MW presentation - 11102006.PPT
500MW presentation - 11102006.PPTMahadev Kovalli
 
Summer Training presentation on 132/33 KV sub-station Minto park, Allahabad
Summer Training presentation on 132/33 KV sub-station Minto park, AllahabadSummer Training presentation on 132/33 KV sub-station Minto park, Allahabad
Summer Training presentation on 132/33 KV sub-station Minto park, Allahabad
Sudhir Cement Industries Pvt. Ltd. Meerut
 
Three major inputs of ptps
Three major inputs of ptpsThree major inputs of ptps
Three major inputs of ptps
4067HimanshuEE5
 
Presentation training
Presentation trainingPresentation training
Presentation trainingSrajan Raj
 
Ppt on 132 kv gss by ashok khoja
Ppt on  132 kv gss  by ashok khojaPpt on  132 kv gss  by ashok khoja
Ppt on 132 kv gss by ashok khojaASHOK KHOJA
 
Vocational training at mejia thermal power plant
Vocational training at mejia thermal power plantVocational training at mejia thermal power plant
Vocational training at mejia thermal power plant
Nipak Banerjee
 
132 gss ppt
132 gss ppt132 gss ppt
132 gss ppt
hunk143
 
Seminar presentation on cooling tower
Seminar presentation on cooling towerSeminar presentation on cooling tower
Seminar presentation on cooling tower
SAQUIBMANSOORKHAN
 
Air cooler using peltier module
Air cooler using peltier module Air cooler using peltier module
Air cooler using peltier module
Akhil K J
 
THERMAL POWER PLANT (COAL TO POWER)
THERMAL POWER PLANT (COAL TO POWER)THERMAL POWER PLANT (COAL TO POWER)
THERMAL POWER PLANT (COAL TO POWER)
Baibhav Saha
 
kstps training report
kstps training reportkstps training report
kstps training report
Omprakash Choudhary
 
Heat Pipe Seminar Presentation PPT
Heat Pipe Seminar Presentation PPTHeat Pipe Seminar Presentation PPT
Heat Pipe Seminar Presentation PPT
Syam S Nair
 

Similar to E.E D.l.W training report BY Ankit Kumar EN 2 year (20)

ppt on nspcl rourkela odisha
ppt on nspcl rourkela odishappt on nspcl rourkela odisha
ppt on nspcl rourkela odisha
 
tps 180150109049 180150109078.pptx
tps 180150109049 180150109078.pptxtps 180150109049 180150109078.pptx
tps 180150109049 180150109078.pptx
 
Three phase transformers
Three phase transformersThree phase transformers
Three phase transformers
 
Htps
HtpsHtps
Htps
 
Air conditioning in indian railways PEE
Air conditioning in indian railways PEEAir conditioning in indian railways PEE
Air conditioning in indian railways PEE
 
Ramendra summer training presentation
Ramendra summer training presentationRamendra summer training presentation
Ramendra summer training presentation
 
IPGCL/PPCL Training presentation
IPGCL/PPCL Training presentationIPGCL/PPCL Training presentation
IPGCL/PPCL Training presentation
 
500MW presentation - 11102006.PPT
500MW presentation - 11102006.PPT500MW presentation - 11102006.PPT
500MW presentation - 11102006.PPT
 
Summer Training presentation on 132/33 KV sub-station Minto park, Allahabad
Summer Training presentation on 132/33 KV sub-station Minto park, AllahabadSummer Training presentation on 132/33 KV sub-station Minto park, Allahabad
Summer Training presentation on 132/33 KV sub-station Minto park, Allahabad
 
Three major inputs of ptps
Three major inputs of ptpsThree major inputs of ptps
Three major inputs of ptps
 
Presentation training
Presentation trainingPresentation training
Presentation training
 
Ppt on 132 kv gss by ashok khoja
Ppt on  132 kv gss  by ashok khojaPpt on  132 kv gss  by ashok khoja
Ppt on 132 kv gss by ashok khoja
 
Vocational training at mejia thermal power plant
Vocational training at mejia thermal power plantVocational training at mejia thermal power plant
Vocational training at mejia thermal power plant
 
132 gss ppt
132 gss ppt132 gss ppt
132 gss ppt
 
V.T ppt
V.T pptV.T ppt
V.T ppt
 
Seminar presentation on cooling tower
Seminar presentation on cooling towerSeminar presentation on cooling tower
Seminar presentation on cooling tower
 
Air cooler using peltier module
Air cooler using peltier module Air cooler using peltier module
Air cooler using peltier module
 
THERMAL POWER PLANT (COAL TO POWER)
THERMAL POWER PLANT (COAL TO POWER)THERMAL POWER PLANT (COAL TO POWER)
THERMAL POWER PLANT (COAL TO POWER)
 
kstps training report
kstps training reportkstps training report
kstps training report
 
Heat Pipe Seminar Presentation PPT
Heat Pipe Seminar Presentation PPTHeat Pipe Seminar Presentation PPT
Heat Pipe Seminar Presentation PPT
 

Recently uploaded

AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
BrazilAccount1
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
Jayaprasanna4
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
manasideore6
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
SupreethSP4
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
ongomchris
 

Recently uploaded (20)

AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
 

E.E D.l.W training report BY Ankit Kumar EN 2 year

  • 1. Ankit kumar B.tech/ en/ 2year TRAINING REPORT
  • 2. List of shop visited during 1 month training:-  Colony A.C Plant M.R.S Tel. exchange
  • 3. A.C plant in D.L.W consists of centralized air conditioning system manufactured by blue star and another one by voltas. This plant supply chilled air to the staff rooms and halls of workshop where diesel engines are being manufactured
  • 5. • MAIN COMPONENT OF A.C PLANT ARE AS FOLLOWS:- • *C.T fan. • *Condenser. • *Chiller. • *Compressor. • *A.H.U
  • 6. WORKING:- • (1.) C.T fan:- It is situated over cooling tower .Heated water from condenser when passes across it then it takes heat from water and in the form of vapor it release heat energy to atmosphere and cooled air through fins gets stored in cooling tower tank .
  • 7. (2.) Compressor:- Floron 22 gas from cylinder is passed though compressor where pressure of gas is increased to 220- 270 psi. This high pressure gas passes to condenser where it gets liquefied this liquefied gas passes through chiller where it cools water and then this low pressure gas of 50-65 psi again enters to compressor and this circulation kept on going till cooling process is done
  • 8. • (3.) Condenser:- In the condenser, the temperature of the superheated vapour has to be brought down, before it can be condensed into a liquid. In the condenser, once the • vapour has been cooled, it begins to condense.The high pressure gases get converted into liquid here and this liquid go to chiller tank. • There are three types condensers viz. • i) Air-Cooled ii)Water-Cooled iii) Evaporative. Water cooled condensers are used in Central AC Plants. • (4.) Chiller:- In chiller water is passed through water line and liquefied Floron gas passes through tank and the water passing in water line of chiller gets cooled and this water is transferred to A.H.U. • (6.) A.H.U (Air Handling Unit):- In this section chilled air is pass through water line which cools air surrounding this water line and this air through duct passes to the area which required cooling and the exhaust air from cooling area is again brought back to a.h.u through duct and this air again cooled and sent back to cooling area.
  • 9.
  • 10. (5.) Cooling tower:- The cooling towers is used in conjunction with the water cooled condenser. Water in passing through the condenser water tubes only gets warmed up but does not get contaminated. It can therefore be used again, after cooling. The cooling tower cools the warm water for recirculating it in the condenser. It is thus a water conservation equipment. The heat removed by the refrigeration system from the space or product to be cooled is ultimately thrown to the atmosphere through the cooling tower in a water-cooled condenser system. Thus the cooling tower should function efficiently for the refrigeration system to perform well
  • 11. • ADVANTAGE OF CENTRALISED AC PLANT:- advantage of this system is that the processing of air is centrally controlled and therefore a high standard of efficiency can be maintained. DISADVANTAGE OF THIS SYSTEM:- * Adjustment of individual room temperature as required from time to time is not possible. Therefore the system is definitely wrong from buildings which are split up into a number of small rooms, offices.  * It permits mixing of air, cigarette smoke, bacteria and odor between different areas of offices. • * The ducting occupies an appreciable space.
  • 12. COLONY Main component of substation no.3 are:- • Transformer of 750kva • H.T and L.T panel • Capacitor bank AREA OF SUPPLY:- • Hospital • Colony of DLW • Markets • Water pump
  • 13.
  • 14. • Rating of transformer:- • Company name:-AREVA • Type of cooling:-ONAN (Oil Natural Air Natural) • KVA rating:-750KVA • H.T:-11kV, 39.4A • L.T:-415v, 1043.4A • Tfr winding:-DY11 • MEANING OF DY11: • D:-Delta • Y:-Star • 11:-Phase displacement
  • 15. Oil Used In Transformer:- *Light Napthelic Distillate • Earthing:- • It implies connection of non-current carrying parts to ground like metallic enclosures. • Grounding:- • Grounding implies connection of current carrying parts to ground. • Ring System:- • • More than one path available between the points. • Radial System:- • Only one path is available between two points. • Substation no.3 is based on ring system .
  • 16. 132kv is supply to 2 and 6 no. substations Other 7 are connected as shown in below figure
  • 17. • Buchholz relay • In the field of electric power distribution and transmission, a Buchholz relay is a safety device mounted on some oil-filled power transformers and reactors, equipped with an external overhead oil reservoir called a "conservator". The Buchholz relay is used as a protective device sensitive to the effects of dielectric failure inside the equipment.
  • 18. Main Receiving Substation(MRS) • MRS receives main supply from UPPCL (Uttar Pradesh Power Corporation Limited,) • This is step down with 7.5MVA transformer. The 33kv feeder is transformed is two 11kv feeder with a bus coupler in between. • The MRS follows ring type distribution system for supplying power to D.L.W.The advantage of ring type system is that each substation is fed from two sides. If in case one line is faulted then the substation is fed from other line. But major disadvantages of ring type system are that it is too costly.
  • 19. Main component of MRS:- Transformer. Control panel. Bus Coupler. Relays. Circuit Breaker. Capacitor Bank.
  • 21. CIRCUIT BREAKER:- • It is an automatic operated switch designed to protect an electrical circuit from damage caused by overload or short circuit.
  • 22. • There are three D.G (Diesel Generator) sets in Mrs.:- • (1.) 2600 H.P • (2.) 1200 H.P • (3.) 3500 H.P
  • 23. RELAYS:- • Relays are used for protection of the power system from different faults which are occurring in the power system. A relay is a simple electromechanical switch made up of an electromagnets and a set of contacts. Relays are found hidden in all sorts of device. • TWO TYPES OS RELAYS USED IN MRS ARE:- • >Definite relay • >Inverse relay
  • 24. CONTROL PANEL:- • Control panel is a flat, often vertical area where control or monitoring instruments are displayed.
  • 25. CAPACITOR BANK:- • In the electrical system the power factor play a important role because by improving the power factor one can reduce losses .Generally power factor should not be brought below 0.8 for industrial loads. To improve power factor, capacitor bank are placed in parallel with the power supply. In DLW, 600KVAR capacitor bank is used for the improvement of power factor.
  • 26. Capacitor bank contd……….. • REASON FOR IMPROVEMENT OF POWER FACTOR:- • *Reduced losses. • *Reactive power decreased active power increases. • *Efficiency of machine increases.