 SCOPE: These instruction cover test
requirement and procedure for obtaining
desire parameters for electrical equipment in
the locomotive. Before producing with test
secure the proper schematic diagram for
specific locomotive for guidance during test.
 CAUTION: Before making a high performing
test, the insulation resistance should be
cheeked with a 500V meager. Do not conduct
high potential test on a circuit with a meager
reading of less than 1 mega ohm as the
circuit may be demand.
 Have multi conductor plugs attached to the
governor and tachometer generator.
 Open the battery switch ,BS.
 Open ground cut-switch GRCO1 & GRCO2.
 Disconnect the battery lead in the battery in
the battery component the close the battery
switch-BS.
 Close all switch and circuit breakers in the
component and on the control stand ,
 Move engine control switch ECS to “RUN”
position .
 Move reveres handle to forward or reveres
position. Breaking switch must be in
“motoring”. Move main handle to 6th Notch
position.
 Remove EXCP, TRP PANEL CARDS. Tie all high-
voltage terminal point together on the
excitation panel. These points are 34B, 34,
34T, 34A, 34C, 34E, 34G, 34F, 34R, 23 and
40V.
 In power circuit of rectifier unit, short AC
terminals(R,Y & B) and DC terminals (GA1 &
GA2). Put jumpers between AC and DC
terminal(R & GA 11).
 Measure insulation power resistance between
blower motor terminal R-28 and locomotive
frame .
 Tie a jumper from braided shut of CK-1 to
braided shunt of CK-2 & CK-3.
 Measure insulation power resistance between
control circuit and locomotive frame.
Connect megger to a CK contactor and
ground.
 Measure insulation power resistance between
power circuit and locomotive frame.
 Measure insulation power resistance between
power and control circuit to be sure that
they are not tied togther.
 Ground control circuit to locomotive frame.
Short out load ammeter with hi-pot wire.
 Attach one terminal of high-potential
transformer to locomotive frame and other
side to any convenient point in the traction
motor such as main contact of a “P” or “S”
contactor.
 Apply high potential:
a. New locomotive: apply 2000V for 1 min
b. Locomotive in service: apply 1500 for 1 min
 Repeat insulation test
 Check wiring and terminal board. Correct
loss connection and faulty insulation .
 Close all switches and insulation.
 Remove temporary ground.
 Short out the battery charging ammeter with
high potential.
 Attach underground side of high-potential
transformer to main moveable contact of CK
contactor.
 Apply high potential of 680V for 1 min.
 Open all switches. Set main handle and
engine control switch (ECS) to “idle”. Close
ground cutout switch GRCO 1 & 2. remove all
ties on control voltage terminal point and
insert back EXCP TRP & VRP panel card .
Remove all shorting/jumpers.
 Reconnect battery lead. Make sure that leads
or connected correctly with respect to
battery polarity .
Loco teast shop(lts)

More Related Content

What's hot

Railway training
Railway trainingRailway training
Railway training
Kumar Saurabh
 
60015688 ashish-loco-summer (1)
60015688 ashish-loco-summer (1)60015688 ashish-loco-summer (1)
60015688 ashish-loco-summer (1)
99sunilkumar
 
J D J
J D JJ D J
J D J
jjinesh
 
Chittaranjan locomotives works
Chittaranjan locomotives worksChittaranjan locomotives works
Chittaranjan locomotives works
Kanhaiya Kumar
 
Railway loco ppt
Railway loco ppt Railway loco ppt
Railway loco ppt
Anand Dwivedi
 
Indian Railway
Indian Railway Indian Railway
Indian Railway
Vinayak Prabhutendolkar
 
Vocational Training Report ( Sealdah Power House)
Vocational Training Report ( Sealdah Power House)Vocational Training Report ( Sealdah Power House)
Vocational Training Report ( Sealdah Power House)
shovandey07
 
J DJ
J DJJ DJ
J DJ
jjinesh
 
Ppt on Kharagpur railway
Ppt on Kharagpur railwayPpt on Kharagpur railway
Ppt on Kharagpur railway
SURAJBHAKTA4
 
Kulekhani I hydropower ,Nepal
Kulekhani I hydropower ,NepalKulekhani I hydropower ,Nepal
Kulekhani I hydropower ,Nepal
Bishal Rimal
 
Railway workshop jodhpur
Railway workshop jodhpurRailway workshop jodhpur
Railway workshop jodhpur
MAHESH SONI
 
Train lighting system
Train lighting systemTrain lighting system
Train lighting system
siddhartha shukla
 
1302580505523 train lighting book
1302580505523 train lighting book1302580505523 train lighting book
1302580505523 train lighting book
firoj shaik
 
Vocational Training Report (Rajdhani Express)
Vocational Training Report (Rajdhani Express)Vocational Training Report (Rajdhani Express)
Vocational Training Report (Rajdhani Express)
shovandey07
 
Dlw report for electronic communication engineering
Dlw report for electronic communication engineeringDlw report for electronic communication engineering
Dlw report for electronic communication engineering
Vaibhav Kumar
 
Chittaranjan locomotive works (Summer Training Report)
Chittaranjan locomotive works (Summer Training Report)Chittaranjan locomotive works (Summer Training Report)
Chittaranjan locomotive works (Summer Training Report)Deo Nath Jha
 
Indian Railway locomotive ppt
Indian Railway locomotive pptIndian Railway locomotive ppt
Indian Railway locomotive ppt
Shrey Sandiman
 
Internship Report
Internship Report Internship Report
Internship Report
Muhammad Usman Rafiq
 
Summer Training at Electrical LOCO shed, Ghaziabad
Summer Training at Electrical LOCO shed, GhaziabadSummer Training at Electrical LOCO shed, Ghaziabad
Summer Training at Electrical LOCO shed, Ghaziabad
Vishal Dubey
 
Summer Training Report of WCR Kota(EE)
Summer Training Report of WCR Kota(EE)Summer Training Report of WCR Kota(EE)
Summer Training Report of WCR Kota(EE)
Chirag Jain
 

What's hot (20)

Railway training
Railway trainingRailway training
Railway training
 
60015688 ashish-loco-summer (1)
60015688 ashish-loco-summer (1)60015688 ashish-loco-summer (1)
60015688 ashish-loco-summer (1)
 
J D J
J D JJ D J
J D J
 
Chittaranjan locomotives works
Chittaranjan locomotives worksChittaranjan locomotives works
Chittaranjan locomotives works
 
Railway loco ppt
Railway loco ppt Railway loco ppt
Railway loco ppt
 
Indian Railway
Indian Railway Indian Railway
Indian Railway
 
Vocational Training Report ( Sealdah Power House)
Vocational Training Report ( Sealdah Power House)Vocational Training Report ( Sealdah Power House)
Vocational Training Report ( Sealdah Power House)
 
J DJ
J DJJ DJ
J DJ
 
Ppt on Kharagpur railway
Ppt on Kharagpur railwayPpt on Kharagpur railway
Ppt on Kharagpur railway
 
Kulekhani I hydropower ,Nepal
Kulekhani I hydropower ,NepalKulekhani I hydropower ,Nepal
Kulekhani I hydropower ,Nepal
 
Railway workshop jodhpur
Railway workshop jodhpurRailway workshop jodhpur
Railway workshop jodhpur
 
Train lighting system
Train lighting systemTrain lighting system
Train lighting system
 
1302580505523 train lighting book
1302580505523 train lighting book1302580505523 train lighting book
1302580505523 train lighting book
 
Vocational Training Report (Rajdhani Express)
Vocational Training Report (Rajdhani Express)Vocational Training Report (Rajdhani Express)
Vocational Training Report (Rajdhani Express)
 
Dlw report for electronic communication engineering
Dlw report for electronic communication engineeringDlw report for electronic communication engineering
Dlw report for electronic communication engineering
 
Chittaranjan locomotive works (Summer Training Report)
Chittaranjan locomotive works (Summer Training Report)Chittaranjan locomotive works (Summer Training Report)
Chittaranjan locomotive works (Summer Training Report)
 
Indian Railway locomotive ppt
Indian Railway locomotive pptIndian Railway locomotive ppt
Indian Railway locomotive ppt
 
Internship Report
Internship Report Internship Report
Internship Report
 
Summer Training at Electrical LOCO shed, Ghaziabad
Summer Training at Electrical LOCO shed, GhaziabadSummer Training at Electrical LOCO shed, Ghaziabad
Summer Training at Electrical LOCO shed, Ghaziabad
 
Summer Training Report of WCR Kota(EE)
Summer Training Report of WCR Kota(EE)Summer Training Report of WCR Kota(EE)
Summer Training Report of WCR Kota(EE)
 

Similar to Loco teast shop(lts)

Presentation OutDoorSwithGear(AIS) .pptx
Presentation OutDoorSwithGear(AIS) .pptxPresentation OutDoorSwithGear(AIS) .pptx
Presentation OutDoorSwithGear(AIS) .pptx
RAJKIRANR3
 
Final report of 220kv gss working model
Final report of 220kv gss working modelFinal report of 220kv gss working model
Final report of 220kv gss working model
giriraj bairwa
 
Gss ppt by kanhaiya
Gss ppt  by kanhaiyaGss ppt  by kanhaiya
Gss ppt by kanhaiya
imkanhaiyalal
 
INSTALLATION OF 500MVA TRANSFORMER AT PGCIL
INSTALLATION OF 500MVA TRANSFORMER AT PGCIL INSTALLATION OF 500MVA TRANSFORMER AT PGCIL
INSTALLATION OF 500MVA TRANSFORMER AT PGCIL
Rahul Akinapelli
 
IRJET - Three-Phase Single Switch PWM Controlled Induction Motor Drive
IRJET - Three-Phase Single Switch PWM Controlled Induction Motor DriveIRJET - Three-Phase Single Switch PWM Controlled Induction Motor Drive
IRJET - Three-Phase Single Switch PWM Controlled Induction Motor Drive
IRJET Journal
 
220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance
Himansu Pradhan
 
Presentation 2014
Presentation 2014Presentation 2014
Presentation 2014
pinki199319
 
Mech EE6365 EE lab_manual
Mech EE6365 EE lab_manualMech EE6365 EE lab_manual
High Voltage Gas Insulted Switchgear (GIS) Field Testing According to IEEE C3...
High Voltage Gas Insulted Switchgear (GIS) Field Testing According to IEEE C3...High Voltage Gas Insulted Switchgear (GIS) Field Testing According to IEEE C3...
High Voltage Gas Insulted Switchgear (GIS) Field Testing According to IEEE C3...
Ali Sepehri
 
finalseminar.docx
finalseminar.docxfinalseminar.docx
finalseminar.docx
SNEHAKANWAR1
 
DC MOTOR
DC MOTORDC MOTOR
Chapter 4 electrical-auxiliary_systems
Chapter 4 electrical-auxiliary_systemsChapter 4 electrical-auxiliary_systems
Chapter 4 electrical-auxiliary_systems
Jothimanikkam Somasundaram
 
Original Power Supply IC LNK616PG LNK616P LNK616 DIP-7 New
Original Power Supply IC LNK616PG LNK616P LNK616 DIP-7 NewOriginal Power Supply IC LNK616PG LNK616P LNK616 DIP-7 New
Original Power Supply IC LNK616PG LNK616P LNK616 DIP-7 New
AUTHELECTRONIC
 
ELECHTRICAL COMMISSIONING TECHNICIAN 2201622
ELECHTRICAL   COMMISSIONING  TECHNICIAN   2201622ELECHTRICAL   COMMISSIONING  TECHNICIAN   2201622
ELECHTRICAL COMMISSIONING TECHNICIAN 2201622MOHAMMAD KHALID MUSTAFA
 
NTDC 220kV Transmission gird station Internship report
NTDC 220kV Transmission gird station Internship reportNTDC 220kV Transmission gird station Internship report
NTDC 220kV Transmission gird station Internship report
Aneel-k Suthar
 
Original Power Supply IC LNK632DG LNK632 632 SOP-7 New
Original Power Supply IC LNK632DG LNK632 632 SOP-7 NewOriginal Power Supply IC LNK632DG LNK632 632 SOP-7 New
Original Power Supply IC LNK632DG LNK632 632 SOP-7 New
AUTHELECTRONIC
 
Electrical machine lab
Electrical machine labElectrical machine lab
Electrical machine lab
DHEERAJ DHAKAR
 
Iii eie ii sem cs lab manual(ee332)
Iii eie ii sem cs lab manual(ee332)Iii eie ii sem cs lab manual(ee332)
Iii eie ii sem cs lab manual(ee332)
Prakash Chandran C
 
VEHICLE-TO-GRID TECHNOLOGY EMPLOYING DC FAST CHARGING SYSTEM IN MICROGRID
VEHICLE-TO-GRID TECHNOLOGY EMPLOYING DC FAST CHARGING SYSTEM IN MICROGRIDVEHICLE-TO-GRID TECHNOLOGY EMPLOYING DC FAST CHARGING SYSTEM IN MICROGRID
VEHICLE-TO-GRID TECHNOLOGY EMPLOYING DC FAST CHARGING SYSTEM IN MICROGRID
IRJET Journal
 
Shashikdoc
ShashikdocShashikdoc
Shashikdoc
Shashik132
 

Similar to Loco teast shop(lts) (20)

Presentation OutDoorSwithGear(AIS) .pptx
Presentation OutDoorSwithGear(AIS) .pptxPresentation OutDoorSwithGear(AIS) .pptx
Presentation OutDoorSwithGear(AIS) .pptx
 
Final report of 220kv gss working model
Final report of 220kv gss working modelFinal report of 220kv gss working model
Final report of 220kv gss working model
 
Gss ppt by kanhaiya
Gss ppt  by kanhaiyaGss ppt  by kanhaiya
Gss ppt by kanhaiya
 
INSTALLATION OF 500MVA TRANSFORMER AT PGCIL
INSTALLATION OF 500MVA TRANSFORMER AT PGCIL INSTALLATION OF 500MVA TRANSFORMER AT PGCIL
INSTALLATION OF 500MVA TRANSFORMER AT PGCIL
 
IRJET - Three-Phase Single Switch PWM Controlled Induction Motor Drive
IRJET - Three-Phase Single Switch PWM Controlled Induction Motor DriveIRJET - Three-Phase Single Switch PWM Controlled Induction Motor Drive
IRJET - Three-Phase Single Switch PWM Controlled Induction Motor Drive
 
220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance
 
Presentation 2014
Presentation 2014Presentation 2014
Presentation 2014
 
Mech EE6365 EE lab_manual
Mech EE6365 EE lab_manualMech EE6365 EE lab_manual
Mech EE6365 EE lab_manual
 
High Voltage Gas Insulted Switchgear (GIS) Field Testing According to IEEE C3...
High Voltage Gas Insulted Switchgear (GIS) Field Testing According to IEEE C3...High Voltage Gas Insulted Switchgear (GIS) Field Testing According to IEEE C3...
High Voltage Gas Insulted Switchgear (GIS) Field Testing According to IEEE C3...
 
finalseminar.docx
finalseminar.docxfinalseminar.docx
finalseminar.docx
 
DC MOTOR
DC MOTORDC MOTOR
DC MOTOR
 
Chapter 4 electrical-auxiliary_systems
Chapter 4 electrical-auxiliary_systemsChapter 4 electrical-auxiliary_systems
Chapter 4 electrical-auxiliary_systems
 
Original Power Supply IC LNK616PG LNK616P LNK616 DIP-7 New
Original Power Supply IC LNK616PG LNK616P LNK616 DIP-7 NewOriginal Power Supply IC LNK616PG LNK616P LNK616 DIP-7 New
Original Power Supply IC LNK616PG LNK616P LNK616 DIP-7 New
 
ELECHTRICAL COMMISSIONING TECHNICIAN 2201622
ELECHTRICAL   COMMISSIONING  TECHNICIAN   2201622ELECHTRICAL   COMMISSIONING  TECHNICIAN   2201622
ELECHTRICAL COMMISSIONING TECHNICIAN 2201622
 
NTDC 220kV Transmission gird station Internship report
NTDC 220kV Transmission gird station Internship reportNTDC 220kV Transmission gird station Internship report
NTDC 220kV Transmission gird station Internship report
 
Original Power Supply IC LNK632DG LNK632 632 SOP-7 New
Original Power Supply IC LNK632DG LNK632 632 SOP-7 NewOriginal Power Supply IC LNK632DG LNK632 632 SOP-7 New
Original Power Supply IC LNK632DG LNK632 632 SOP-7 New
 
Electrical machine lab
Electrical machine labElectrical machine lab
Electrical machine lab
 
Iii eie ii sem cs lab manual(ee332)
Iii eie ii sem cs lab manual(ee332)Iii eie ii sem cs lab manual(ee332)
Iii eie ii sem cs lab manual(ee332)
 
VEHICLE-TO-GRID TECHNOLOGY EMPLOYING DC FAST CHARGING SYSTEM IN MICROGRID
VEHICLE-TO-GRID TECHNOLOGY EMPLOYING DC FAST CHARGING SYSTEM IN MICROGRIDVEHICLE-TO-GRID TECHNOLOGY EMPLOYING DC FAST CHARGING SYSTEM IN MICROGRID
VEHICLE-TO-GRID TECHNOLOGY EMPLOYING DC FAST CHARGING SYSTEM IN MICROGRID
 
Shashikdoc
ShashikdocShashikdoc
Shashikdoc
 

Recently uploaded

AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
ydteq
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
WENKENLI1
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
SupreethSP4
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
Kerry Sado
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 

Recently uploaded (20)

AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 

Loco teast shop(lts)

  • 1. COMMISSIONNING TEST REQUIEREMENTS AND PROCEDURE FOR ELECTRICAL EQUIPMENT A Presentation By Mohd Faiz
  • 2.  SCOPE: These instruction cover test requirement and procedure for obtaining desire parameters for electrical equipment in the locomotive. Before producing with test secure the proper schematic diagram for specific locomotive for guidance during test.
  • 3.  CAUTION: Before making a high performing test, the insulation resistance should be cheeked with a 500V meager. Do not conduct high potential test on a circuit with a meager reading of less than 1 mega ohm as the circuit may be demand.
  • 4.  Have multi conductor plugs attached to the governor and tachometer generator.  Open the battery switch ,BS.  Open ground cut-switch GRCO1 & GRCO2.  Disconnect the battery lead in the battery in the battery component the close the battery switch-BS.  Close all switch and circuit breakers in the component and on the control stand ,  Move engine control switch ECS to “RUN” position .
  • 5.  Move reveres handle to forward or reveres position. Breaking switch must be in “motoring”. Move main handle to 6th Notch position.  Remove EXCP, TRP PANEL CARDS. Tie all high- voltage terminal point together on the excitation panel. These points are 34B, 34, 34T, 34A, 34C, 34E, 34G, 34F, 34R, 23 and 40V.  In power circuit of rectifier unit, short AC terminals(R,Y & B) and DC terminals (GA1 & GA2). Put jumpers between AC and DC terminal(R & GA 11).  Measure insulation power resistance between blower motor terminal R-28 and locomotive frame .
  • 6.  Tie a jumper from braided shut of CK-1 to braided shunt of CK-2 & CK-3.  Measure insulation power resistance between control circuit and locomotive frame. Connect megger to a CK contactor and ground.  Measure insulation power resistance between power circuit and locomotive frame.  Measure insulation power resistance between power and control circuit to be sure that they are not tied togther.
  • 7.  Ground control circuit to locomotive frame. Short out load ammeter with hi-pot wire.  Attach one terminal of high-potential transformer to locomotive frame and other side to any convenient point in the traction motor such as main contact of a “P” or “S” contactor.  Apply high potential: a. New locomotive: apply 2000V for 1 min b. Locomotive in service: apply 1500 for 1 min  Repeat insulation test
  • 8.  Check wiring and terminal board. Correct loss connection and faulty insulation .  Close all switches and insulation.  Remove temporary ground.  Short out the battery charging ammeter with high potential.  Attach underground side of high-potential transformer to main moveable contact of CK contactor.  Apply high potential of 680V for 1 min.
  • 9.  Open all switches. Set main handle and engine control switch (ECS) to “idle”. Close ground cutout switch GRCO 1 & 2. remove all ties on control voltage terminal point and insert back EXCP TRP & VRP panel card . Remove all shorting/jumpers.  Reconnect battery lead. Make sure that leads or connected correctly with respect to battery polarity .