Eduardo Parisca has over 40 years of experience managing engineering and construction projects in Venezuela and abroad, including managing the construction of an ethanol production plant and maintenance of oil facilities. He has held various roles such as project manager, plant manager, and director overseeing the design, cost estimation, construction, and commissioning of industrial plants, pipelines, storage tanks, and other infrastructure projects in the oil, power, and real estate industries. Parisca has a master's degree in welding engineering and bachelor's degree in industrial engineering, and is fluent in English, Spanish, and French.
Quality-focused, 28 year professional with strong hands-on expertise in managing critical QA/QC processes that support construction of high-volume power/ generation plants, FPSO conversions, and processes specific to Oil & Gas Industry including DNV Offshore Standards for Submarine Pipeline Systems, Subsea/Umbilical’s/Risers/Flowlines. Monitoring civil work on Gas Gathering Pipeline Stations, stringent trenching-post padding-backfill and compaction requirements.
Summary of experience:
Design, engineering, construction, operation, maintenance and integrity of onshore/offshore pipeline systems (crude oil, refinery products, natural gas and water) and their components (stations, terminals and tank farms) within the scope of different projects (see details below) including Feasibility and Conceptual Design, FEED (Front End Engineering Design), EPC (Engineering, Procurement and Construction), PMC (Project Management Consultancy) and O&M (Operation and Maintenance) services.
Skills (Pipelines):
- Feasibility Studies;
- Conceptual Engineering Design & Management Support;
- Basic Engineering Design & Management Support;
- Front End Engineering Design (FEED) & Management Support;
- Detailed Engineering Design & Management Support;
- Engineering & Management Support for Procurement;
- Engineering & Management Support for Construction & Mechanical Completion;
- Engineering & Management Support for Pre-commissioning, Commissioning and Operational Start-up (Project Completion);
- Engineering & Management Support for Performance Testing, Operation and Maintenance;
- Project Management;
- Project Controlling;
- Project Engineering;
- Project Tendering;
- Tender (ITT) Preparation and Tender Evaluation.
Quality-focused, 28 year professional with strong hands-on expertise in managing critical QA/QC processes that support construction of high-volume power/ generation plants, FPSO conversions, and processes specific to Oil & Gas Industry including DNV Offshore Standards for Submarine Pipeline Systems, Subsea/Umbilical’s/Risers/Flowlines. Monitoring civil work on Gas Gathering Pipeline Stations, stringent trenching-post padding-backfill and compaction requirements.
Summary of experience:
Design, engineering, construction, operation, maintenance and integrity of onshore/offshore pipeline systems (crude oil, refinery products, natural gas and water) and their components (stations, terminals and tank farms) within the scope of different projects (see details below) including Feasibility and Conceptual Design, FEED (Front End Engineering Design), EPC (Engineering, Procurement and Construction), PMC (Project Management Consultancy) and O&M (Operation and Maintenance) services.
Skills (Pipelines):
- Feasibility Studies;
- Conceptual Engineering Design & Management Support;
- Basic Engineering Design & Management Support;
- Front End Engineering Design (FEED) & Management Support;
- Detailed Engineering Design & Management Support;
- Engineering & Management Support for Procurement;
- Engineering & Management Support for Construction & Mechanical Completion;
- Engineering & Management Support for Pre-commissioning, Commissioning and Operational Start-up (Project Completion);
- Engineering & Management Support for Performance Testing, Operation and Maintenance;
- Project Management;
- Project Controlling;
- Project Engineering;
- Project Tendering;
- Tender (ITT) Preparation and Tender Evaluation.
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERSveerababupersonal22
It consists of cw radar and fmcw radar ,range measurement,if amplifier and fmcw altimeterThe CW radar operates using continuous wave transmission, while the FMCW radar employs frequency-modulated continuous wave technology. Range measurement is a crucial aspect of radar systems, providing information about the distance to a target. The IF amplifier plays a key role in signal processing, amplifying intermediate frequency signals for further analysis. The FMCW altimeter utilizes frequency-modulated continuous wave technology to accurately measure altitude above a reference point.
Final project report on grocery store management system..pdfKamal Acharya
In today’s fast-changing business environment, it’s extremely important to be able to respond to client needs in the most effective and timely manner. If your customers wish to see your business online and have instant access to your products or services.
Online Grocery Store is an e-commerce website, which retails various grocery products. This project allows viewing various products available enables registered users to purchase desired products instantly using Paytm, UPI payment processor (Instant Pay) and also can place order by using Cash on Delivery (Pay Later) option. This project provides an easy access to Administrators and Managers to view orders placed using Pay Later and Instant Pay options.
In order to develop an e-commerce website, a number of Technologies must be studied and understood. These include multi-tiered architecture, server and client-side scripting techniques, implementation technologies, programming language (such as PHP, HTML, CSS, JavaScript) and MySQL relational databases. This is a project with the objective to develop a basic website where a consumer is provided with a shopping cart website and also to know about the technologies used to develop such a website.
This document will discuss each of the underlying technologies to create and implement an e- commerce website.
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...ssuser7dcef0
Power plants release a large amount of water vapor into the
atmosphere through the stack. The flue gas can be a potential
source for obtaining much needed cooling water for a power
plant. If a power plant could recover and reuse a portion of this
moisture, it could reduce its total cooling water intake
requirement. One of the most practical way to recover water
from flue gas is to use a condensing heat exchanger. The power
plant could also recover latent heat due to condensation as well
as sensible heat due to lowering the flue gas exit temperature.
Additionally, harmful acids released from the stack can be
reduced in a condensing heat exchanger by acid condensation. reduced in a condensing heat exchanger by acid condensation.
Condensation of vapors in flue gas is a complicated
phenomenon since heat and mass transfer of water vapor and
various acids simultaneously occur in the presence of noncondensable
gases such as nitrogen and oxygen. Design of a
condenser depends on the knowledge and understanding of the
heat and mass transfer processes. A computer program for
numerical simulations of water (H2O) and sulfuric acid (H2SO4)
condensation in a flue gas condensing heat exchanger was
developed using MATLAB. Governing equations based on
mass and energy balances for the system were derived to
predict variables such as flue gas exit temperature, cooling
water outlet temperature, mole fraction and condensation rates
of water and sulfuric acid vapors. The equations were solved
using an iterative solution technique with calculations of heat
and mass transfer coefficients and physical properties.
Student information management system project report ii.pdfKamal Acharya
Our project explains about the student management. This project mainly explains the various actions related to student details. This project shows some ease in adding, editing and deleting the student details. It also provides a less time consuming process for viewing, adding, editing and deleting the marks of the students.
About
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
Technical Specifications
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
Key Features
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface
• Compatible with MAFI CCR system
• Copatiable with IDM8000 CCR
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
Application
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
Immunizing Image Classifiers Against Localized Adversary Attacksgerogepatton
This paper addresses the vulnerability of deep learning models, particularly convolutional neural networks
(CNN)s, to adversarial attacks and presents a proactive training technique designed to counter them. We
introduce a novel volumization algorithm, which transforms 2D images into 3D volumetric representations.
When combined with 3D convolution and deep curriculum learning optimization (CLO), itsignificantly improves
the immunity of models against localized universal attacks by up to 40%. We evaluate our proposed approach
using contemporary CNN architectures and the modified Canadian Institute for Advanced Research (CIFAR-10
and CIFAR-100) and ImageNet Large Scale Visual Recognition Challenge (ILSVRC12) datasets, showcasing
accuracy improvements over previous techniques. The results indicate that the combination of the volumetric
input and curriculum learning holds significant promise for mitigating adversarial attacks without necessitating
adversary training.
Saudi Arabia stands as a titan in the global energy landscape, renowned for its abundant oil and gas resources. It's the largest exporter of petroleum and holds some of the world's most significant reserves. Let's delve into the top 10 oil and gas projects shaping Saudi Arabia's energy future in 2024.
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Eduardo parisca resume (rev 07tier)
1. EDUARDO PARISCA
pariscaeduardo@gmail.com 2329 S. Corning St., Apt 25. (510) 850-4299
Los Angeles California 90034
EXPERIENCE
Petroleos de Venezuela, PDVSA Agricola - VEPICA, Portuguesa, Venezuela
Project General Manager, November 2012 – October 2018
• Planned, procured, and managed the construction of the “Argimiro Gabaldón” sugar cane ethanol
production complex.
Van Dam Metallurgical Industries C.A., Jose PDVSA PETROZUATA Industrial Complex, Anzoategui,
Venezuela
Plant Shutdown Manager, October 2011 – June 2012
• Managed the maintenance of Train 1 sulfur reduction heavy crude oil improver plant.
• Managed, Planned and executed the maintenance shut-down of Train 2 of the sulfur reduction plant.
Habitecnica, Merida, Venezuela
Project Manager, March 2010 – June 2011
• Estimated costs, devised construction plan, and conducted engineering design review for the construction of
civil projects for a 115-230 KV Electrical Sub-Station.
XZZX Project Technology, Sucre, Venezuela
Counselor, January 2009 – February 2010
• Advised and consulted on the best location for the construction of an oil tankers shipyard for Andrade
Gutierrez, a Brazilian Contractor for PDVSA Marina.
La Ensenada Beach and Condominium Resort, Margarita, Venezuela
Project Manager, March 2007 – December 2008
• Coordinated and managed the process of engineering design and follow-up.
• Ensured that project complied with environmental regulations and local requirements.
• Planning, Program Development and Control.
• Estimated and conducted project construction costs.
• Administered financing applications for banks, helping to secure total project investments of $50 million.
• Inspected the successful construction of 42 town houses.
Newsteeltech C.A. Caracas, Venezuela
Director, February 2006 – February 2007
• High Technology sales promotion for Industrial and Petroleum Industry Projects. Gas Treatment Plants.
Nitrogen and Oxygen Generators.
• Sales promotion of equipment packages for vapor injection, electric power generation, gas and liquids
pumping equipment.
Petrolera Ameriven (Chevron-Texaco), El Tigre, Venezuela
Field Engineering Coordinator EPC Project, October 2001 – January 2005
• Supervised field-engineering design, adjusting and updating design to site conditions.
2. • Supervised and managed the construction of the reconversion from Orimulsion to Heavy –shell-oil of a PTO
pumping plant.
• Pre-commissioning finished plant preparation for start-up and turnover to Ameriven’s Plant Operations
Department (Chevron-PDVSA) for start-up of the Bare De-hydration and Pumping Station.
Investments Auro VG, Caracas, Venezuela
Director and General Manager, 1995 – 2001
• Built and installed piping for urban, high-voltage, underground electrical power lines for the main provider
of energy and power in Venezuela, Electricidad de Caracas.
• Consulted on the handling of hydrocarbon products for Electricidad de Caracas.
• Constructed gas and oily-water separation treatment systems.
• Designed and executed the cleaning of an oil pit of the 36,000 barrels of fuel oil remaining after a mayor fire
in 1983. (1,72 MM $)
• Managed the construction of 20 houses for the Anzoategui state government.
• Built and remodeled warehouses.
• Fabricated and installed metallic wind ducts for Venezuela’s oil company’s cryogenic plant.
• Cut, welded, managed the reorientation of 60” diameter pipes connecting hydrocarbon storage tanks to the
docks, and efficiently managed the project’s investment of $16 million.
Computacion y Servicios Profesionales, Caracas, Venezuela
Mechanical Projects Consultant, 1994 – 1995
• Estimated costs of mechanical and piping projects.
• Consulted for Electricidad de Caracas in contracting, design, costs-estimation and construction of
hydrocarbon-managing projects.
• Supervised the design and construction of a gas reception manifold and 100,000 barrels fuel-oil tank at a
main electrical generation plant from Caracas’ main power service.
Corpoven (PDVSA Oíl Company), Caracas, Venezuela
Engineering and Construction Project Supervisor, 1985 – 1994
• Designed, contracted estimated costs, ensured quality control, and supervised construction of hydrocarbon
handling projects.
• Supervised construction and engineering design of piping construction projects extending up to 800
kilometers.
• Supervised construction of oil and gasoline 100.000 bls. API storage tanks and poly-ducts field piping.
AFCA Acero Fabricantes C.A., Maracaibo, Venezuela
Welding Engineer, Project Manager and Plant Manager, 1981 – 1985
• Designed and constructed ASME Pressure Vessels.
• Pre-fabrication and construction of API Storage Tanks and other metallic structures.
• Prefabrication, of carbon and stainless steel piping spools.
• Conducted post-weld heat treatments on vessels and structural equipment
• Welding Procedures Specifications and Qualifications.
• Devised project plan, ensured cost control, and established quality control procedures.
Institute of Metallurgical Research, Simon Bolivar University. Caracas, Venezuela
Industrial Counseling Projects Coordinator, 1975 – 1977
• Promoted and coordinated consulting projects along with professors and researchers of the Materials
Engineering Department of Simon Bolivar University.
• Conducted quality control to the manufacturing of spiral welded 20” water pipelines.
• Planned and supervised installation of two furnaces for metallurgical training.
3. EDUCATION
Welding – Institute. ESSA Superior School of Autogenous Welding, Paris, France
Master of Welding Engineering, July 1981
University of Paris IX, Paris, France
DEA Diploma of Advanced Studies in Metallurgy. July 1980
University of California, Berkeley, California
Bachelor of Science in Industrial Engineering, June 1974
LANGUAGES