Durham Essay Competition
1. Step
To get started, you must first create an account on site HelpWriting.net.
The registration process is quick and simple, taking just a few moments.
During this process, you will need to provide a password and a valid
email address.
2. Step
In order to create a "Write My Paper For Me" request, simply complete
the 10-minute order form. Provide the necessary instructions, preferred
sources, and deadline. If you want the writer to imitate your writing
style, attach a sample of your previous work.
3. Step
When seeking assignment writing help fromHelpWriting.net, our
platform utilizes a bidding system. Review bids from our writers for
your request, choose one of them based on qualifications, order history,
and feedback, then place a deposit to start the assignment writing.
4. Step
After receiving your paper, take a few moments to ensure it meets your
expectations. If you're pleased with the result, authorize payment for the
writer. Don't forget that we provide free revisions for our writing
services.
5. Step
When you opt to write an assignment online with us, you can request
multiple revisions to ensure your satisfaction. We stand by our promise to
provide original, high-quality content - if plagiarized, we offer a full
refund. Choose us confidently, knowing that your needs will be fully
met.
Durham Essay Competition Durham Essay Competition
Slide 2 Summary
Slide 1 Summary Slide one is my introduction slide it discusses both the positive and negative
results that the development of new technology has presented in the workplace. In this slide the
viewer will see the positive effects of technology in the workplace from increased productivity to
higher levels of employee engagement. My original slide had too much information and it could be
overwhelming for the audience to comprehend. The revised slide is much cleaner and illustrates the
positive and negative connotations in a much cleaner manner. Slide 2 Summary Slide two
introduces the audience to the whys behind the behavior of some companies. In other words, slide
two provides a good outline detailing reasons why organizations feel the need to monitor employee
email and internet usage. Some of the information provided in this slide are: firms can investigate
complaints... Show more content on Helpwriting.net ...
This slide provides a definition of what is considered internet abuse in the workplace. Also, the
slide also goes on further to outline a list of specific acts of abuse. Violations include
inappropriate jokes, downloading music, and frequenting social networking sites. My first slide
provided pertinent information on the topic but I decide to take off all of the detailed
information and highlight the most visited places the associates visit during business hours.
Slide 4 Summary The purpose of this slide is to pose the question if monitoring employee
internet usage is really worth it in the workplace. This slide is informational and provides details
like how many companies are actually monitoring employee internet usage and the financial cost
associated to these behaviors. My first slide, just had too much information on it for the audience
to follow. However, on my revised slide I decided to have some fun using a baby monitor and the
illustration of a yes or no buzzer to convey my message. Slide 5
... Get more on HelpWriting.net ...
Analysis Of The Story Going Back Home
As people journey through life, they discover many qualities they hold that make them unique and
interesting. These qualities differentiate them from others, and help form their identity. In the
stories we have read in class, such as Going Back Home , written by Toyomi Igus and Michele
Wood, Nei Um Lung, Ma? by May Yee, and The Jade Peony by Wayson Choy, the characters
hobbies, beliefs, and familyroots make them unique and interesting. Due to many factors, including
different experiences in life, an individual develops many aspects in their identity that are different
from others.
Hobbies, which are adopted and changed throughout one s life, express who an individual is.
There are many different reasons as to why people adopt hobbies. It may be a way to pass the
time, to express their likes and dislikes, or a way for them to channel their emotions. In the story
Going Back Home , the narrator explains how the painter, Michelle Wood, expressed her life and
her ancestors lives through her art. She created self portraits to show different aspects of her life,
her grandparents lives, and a blue musician s life, utilizing the colours, patterns, and objects to
depict their hardships, culture, and opportunities. The house and fence represent the foundations of
my past. The boards are my life lessons the crooked ones are the tragedies and the hardships. I am
holding a hen, which is a link to my rural southern heritage. This excerpt from the story explains
exactly how
... Get more on HelpWriting.net ...
Oil And Gas Maintain A Critical Role For Uae Industry And...
Oil and gas maintain a critical role for UAE industry and daily life for locals. However, the
government has put forth major efforts to increase their renewable energy capacity. They have also
focused on diversifying their economy so they aren t reliant on exporting oil and natural gas for
income. With the various complex construction projects in Dubai such as the Palm Islands or the
Burj Khalifa, the tallest skyscraper in the world, engineering and real estate have become major
industries in the country. UAE efforts to shift toward renewable energy, mostly constrained to the
emirate Abu Dhabi, have gained international attention. Recently, they hosted a meeting in Abu
Dhabi of over one thousand delegates from around the world to construct... Show more content on
Helpwriting.net ...
It is similarly structured to the Cabinet of the United States with different departments such as the
Ministry of Energy, Ministry of Labor, etc. In order to choose the head of this branch, which is the
prime minister, the president appoints someone who is then approved by the Supreme Council;
once chosen, the prime minister then proposes the Cabinet, which the president must approve and
ratify. Additionally, there is the Federal National Council. This body of government is somewhat
similar to Congress where they represent a voice for the citizens and create laws which the Supreme
Council authorizes or rejects. Political disputes, not only in the host country, but also in
neighboring countries can greatly affect the success of business. So when discussing political
disputes and risks you must consider a wide variety of events. The nuclear crisis in Iran is an event
that must be considered when assessing the environment around the UAE. Recently, the Joint
Comprehensive Plan of Action has been signed by the representatives from the P5+1 (the five
permanent powers of the UN Security Council and Germany) powers and Iran, which requires Iran
to remove large numbers of centrifuges from different nuclear sites. Even though steps have been
taken in the right direction to ease tensions on this issue, there is always the chance that something
similar to this could arise again. Another thing that
... Get more on HelpWriting.net ...
The Myth of Psyche
THE MYTH OF PSYCHE
(excerpted from http://www.mythicjourneys.org/newsletter_jul05_transitions_bolen.html )
As most of you know, psyche is the Greek word for soul. It s also the Greek word for butterfly. If
you have a protagonist in a story whose name is Psyche, you might expect that she will go
through a major transition and crisis. Will she survive it? Will she come through and be
transformed, or will she die? That s one way of looking at the
Psyche myth. Those of you who heard Robert Bly s White Bear story on the first day of this
conference heard a variation of the Eros and Psyche myth.
The form that Psyche broke was the understanding with her unseen lover who came every night.
The piece of the story I want to focus on is what happens ... Show more content on Helpwriting.net
...
What good is knowing that you are in a very dysfunctional relationship, if you haven t the
capacity...that is the symbol of the knife...to draw a boundary, to discriminate, to cut it off, to end
the relationship if it turns out that what you see really is negative?
In this part of the story, Psyche takes both symbols in her hand. As you know, when she raises the
lamp and sees her unseen lover, her unknown bridegroom, he turns out to be the immature god of
love, Eros. Immature in that he was carrying on this secret affair. He had promised his mother, the
goddess Aphrodite, that he would punish Psyche who was so identified with the goddess
because of her beauty that the goddess s shrines were ignored. People were worshipping a human
girl as if she was a goddess, and the goddess plotted revenge for what psychologically is true. If
you identify with an archetype, you lose your humanity, your individuality. You get inflated by it.
You get taken over by it. You do get Aphrodite s revenge.
In this case Aphrodite had told her son Eros to aim his arrows at Psyche in punishment so that
she would fall in love with the vilest of men. This is the negative power of Aphrodite and Eros:
to have Psyche fall in love with someone who would really be vile for her and her development.
Instead Eros sees Psyche and falls in love with her himself. He decides to keep all that from
Mother, and so he s been having this clandestine, hidden affair
... Get more on HelpWriting.net ...
Analyzing The Movie Terminator By James Cameron
The movie Terminator is a 1991 American science action movie which was produced, directed
and written by James Cameron. James Cameron also directed the blockbuster movies aliens of
1986 and the Abyss of 1989. The movie stars Arnold Schwarzenegger, Robert Patrick, Edward
Furlong, and Linda Hamilton. The movie follows after eleven years after Sarah Connordestroyed the
original Terminator that was programmed to kill her when she was pregnant for John. In the
Movie Terminator 2, a new and more advanced Terminator called T 1000
(Robert Patrick) was programmed to kill John Connor since the first terminator T 800 failed to kill
her. T 1000 is sent to kill John Connor to prevent him from becoming the leader of the human race
to victory against ... Show more content on Helpwriting.net ...
The production company A Pacific Western Production is named and also a non diegetic music
in the background. It then cuts out to a playground where children laugh whiles swinging and
also shows people everyday s lives. The camera also foci on a particular girl wearing a red top
swinging back and forth. The camera shows the girl enjoying herself because she is laughing.
The non diegetic music still plays at the background with the girl swinging. The non diegetic
music stopped and there was complete silence until a cranky sound.The camera then focuses on a
skeleton body in a car. The skeleton signifies that this is a thriller movie between machines and
humans. The place was dark and camera begins to show the whole skeleton. The skeleton had
weapons in its hands and camera continues to move closer to show that the skeleton has more
power over humans. Also, there were more explosion at the background. Again, the camera focuses
on the machines to show how powerful the machines are. A man was actually having flashback.
Arnold schwarzenegger s name was shown on the screen with an explosive background. Then, the
movie title and Linda Hamilton was display with a non diegetic music. The scene closes with a
stare from a
... Get more on HelpWriting.net ...
Greek And Hellenistic Influence
This man was grandson of the painter, cayo pictor Fabio. He is one of the few Roman historians
and historians. Being the 1st representative of the old analytics. Intervened in the Gallic War
dated in 225 BC. It was also after the Roman victory in Cannas dated in 216 BC, Roman
ambassador in the oracle of Delphi. Being a mission of great political conflict, this happened
because he, acting in favor of the Greeks in the battle against Carthage. His work as a historian
meets the Greek or Hellenistic tradition of the history of the polis, which he wrote in Greek.
Leaving very little information of this work, although it consists of seven books. We know that the
first, it is about the foundation of the city around 748 BC, thus resorting to the Trojan hero Aeneas,
in order to unite Greece with Rome as destinations. On the other hand, books II, III and IV; Ranging
from the foundation of the city until the 3rd century. And the rest of the books (V, VI and VII);
They dealt with contemporary facts.... Show more content on Helpwriting.net ...
Characterizing this literary work as a literary and political objective that gave way to the
establishment of the bases of the senatorial historiography, where resorted to the tradition of the
pontifical analyst with a high artistic level. It is believed that this work was later translated into
Latin. As a continuation of what had previously been said to Fabio PictГіr: We do not know exactly
what they contained or at what date they were published, we only know what Cato left us as
... Get more on HelpWriting.net ...
Learning Disability Scenarios
Children go through a wide range of constant setbacks but in order to provide them with the best
possible recourse it is important that parents display a great deal of support. Last week, I had the
opportunity to interview a couple who has a child with a learning disability. Although they did not
find out until middle school they did suspect that there was a potential problem early on. One
reason being was that the childhad a hard time grasping certain concepts such as reading
comprehension and certain knowledge regarding math concepts. Also, homework was extremely
difficult and they were constantly completing the homework assignments for her. For them this post
a potential problem early on but like most parents they chose to ignore it and... Show more content
on Helpwriting.net ...
After careful observation/testing from teachers and counselors and being ridiculed by other
students it was clear that their daughter was in need of possible help. Later the parents were
notified to attend a meeting with the teachers, counselors and the principal so that they could find
the best possible alternative to improve their daughters math and reading skills . Their diagnoses
after testing suggested that there were several learning debilities and that learning accommodations
would have to be made due to poor reading comprehension scores and poor math scores throughout
the testing.
One accommodation was that the student was to attend both a special educational class for
reading and a supportive class for her math course. Her main accommodation was that she was to
receive additional help such as having someone read the questions aloud to her if needed and was
able to leave the room to be in a more secluded area. When I asked about how they felt about her
accommodations they said that they were a little apprehensive because they felt that this would lead
to their child feeling more inferior and lead to additional confrontations amongst other
... Get more on HelpWriting.net ...
Order and Chaos
Order and chaos are related to and dependent on each other. The clear cut distinction between
them is man made and an illusion. Society uses order to regulate all aspects of the world from
nature to personal lives, while chaos allows for open mindedness and also provides an explanation
for certain aspects of the world. This can be seen in science, theology, music, language, and
imaginative play. Science is rational, logical, and orderly. It has the ability to break apart complex
systems into simpler ones described by theories ad equations. This is seen in the description of the
planets orbits, evolution, and Newton s laws. Scientists have a thirst for knowledge and seek
understanding about the world around them. Their methods... Show more content on
Helpwriting.net ...
Anthropology, fossils, and other material evidence provide proof of evolution by similarities
between organisms of the past and present ,including the controversial belief that humans evolved
from apes. All these discoveries discredit the belief that humans were created to posses dominion
over the world, and all that was created has existed from the beginning. The five percent of
fundamentalists that are radical and use violence and other unusual means to support their views
have made fundamentalism seem extreme and crazy. They discriminate against other Christians,
who do not have their same views, and deem them not real Christians. They are also completely
intolerant of other religions, offering no salvation outside their faith. Throughout the ages these
two groups have clashed as seen in the trial of Galileo. The common denominator in Galileo s
trial ,and other controversies between the ideologies is each group s stubbornness and intolerance
of other views. One view can not exist without the other ,and they are both impractical and
incomplete. The joining of the two is essential for a human being and the world as a whole. This
point is clearly illustrated in the Library of Babel where all was known ,yet chaos was rampant
because no faith could exist.
Music can sometimes sound random, chaotic, and spontaneous but all music has a certain structure
and fundamental
... Get more on HelpWriting.net ...
Ethics, Intellectual Property, And Piracy
Personal and business ethics in an ever expanding technological world are challenged in many
different ways. Multiple communication methods and the availability of the Internet have made a
large world much smaller in the context of information sharing, so the importance of understanding
and utilizing measures to protect intellectual propertyand copyrights is vital to business success,
ethical understanding and acceptance. In the following, I will specifically discuss the concepts of
copyright, intellectual property, and piracy. Copyrights are a form of intellectual property, and the
concepts of piracy and plagiarism threatens the viability and integrity of both. Understanding these
concepts helps shape individual and business codes of ethics.
Copyright and Intellectual Property Copyrights are defined by the United States Copyright office
as original works of authorship including literary, dramatic, musical, artistic, and certain other
intellectual works (Copyright Basics, n.d.). The laws protect these works whether they are
published or not. Copyright laws protect these works from their time of inception and are not
required to be registered, though registration assists notifying the public about the work and makes
it easier for original owners to lay claim to the copyright if it has been infringed upon.
Copyright laws can be traced all the way back to the early 1700 s when the first laws were enacted
to protect the works of individuals. According to the Intellectual
... Get more on HelpWriting.net ...
Cold Landscaping
In order to plant shade tolerant flowers you need to do some research so that you know for sure
which plants may grow without too much light from the sun. Shade landscaping is the perfect
solution for a dim yard that has areas that don t receive much sun. One of the most common
problem with plants is that most of them die because they usually can t handle too much shade.
Therefore, if the place where you want to grow your garden doesn t get too much sun light, you
have to consider planting shade loving flowers. Let s see in the article below which are the most
beautiful shade tolerant flowers that can enhance your garden. Forget me not This beautiful floweris
very popular and when it s planted in the perfect place and it can grow without having to spend to
much time taking care of it. Besides the fact that forget me not flower loves shady areas, it will also
reaper year after year and will... Show more content on Helpwriting.net ...
This flower is best known for its medicinal and culinary purposes, so if you like, you can add it in
your meals such as stews, salads and so on. Another great thing about them is that they resist in
cold weather conditions and their beautiful yellow and orange flowers last for a very long time.
Begonias You will love these flowers because they grow very quickly and they fill in the empty
spaces that usually appear in any garden. In order to take care of them you just have to plant them in
shaded places and be sure that the soil is always moist. Their beautiful flowers come in various
colors such as pink, white or red and they are perfect for those who want to diversify their gardens.
If you want to know which are the most beautiful shade tolerant flowers, you may want to read our
article and find out how you can grow a very attractive garden. You will see that this information
will help you a lot in creating the best shaded
... Get more on HelpWriting.net ...
Question Of Questionnaire For Unguka Bank
QUESTIONNAIRE FOR INDIVIDUAL CUSTOMERS ONLY
Dear Sir/Madam,
I am a student from the Faculty of Computer Science and Information Technology in Kampala
International University. You are kindly requested to participate in answering the following
questions, which will be used in establishing the adoption process of Internet banking in Unguka
bank. Any information provided will be used for academic purposes only. Please feel free to
express your thoughts.
Thank you in advance,
Yours faithfully,
Rutarindwa Jean Pierre
Tick the answer that reflects your level of agreement with the statement in the question items, and
put down your opinion and idea about the question above.
A.PROFILE OF RESPONDENTS AND THEIR TECHNOLOGY USES
Table 1. Profile of respondents ... Show more content on Helpwriting.net ...
.......................................................................................................
9. Do you trust in the technology an Internet Banking is using? : Yes: No:
Please briefly explain your answer................................................................
.......................................................................................................
10. Using Internet banking is financially secure? : Yes: No:
Please briefly explain your answer................................................................
.......................................................................................................
11. Internet Banking is compatible with your lifestyle? : Yes: No:
Please briefly explain your answer................................................................
.......................................................................................................
12.Internet Banking provides convenience since it is available 24 hours ?
Yes: No:
Please briefly explain how................................................................
.......................................................................................................
13.Third party may be able to access financial details on the internet? :
Yes: No:
Please briefly explain how................................................................
.......................................................................................................
14.Face to face interaction is important for bank services? Yes: No:
Please briefly explain how................................................................
................................................................................................
15.Your decision to adopt Internet banking is influenced by your colleagues and peers? : Yes:
... Get more on HelpWriting.net ...
Advantages And Disadvantages Of Geriatric Care In Malaysia
Upgradation of geriatric care over 5 years in Malaysia
Introduction
What is geriatric care?
Geriatric care is derived from the Greek geron which means old man and iatreia which means the
treatment of disease .
According to UN World Assembly on ageing in 1982, Vienna, in Malaysia, older persons are
defined as those who are 60 years and above. Ageing nation are defined as a nation where more
than 10% of the population is aged more than 60 years old and by 2020, Malaysia will be defined
as an ageing nation (9.9%)
Ther eare many phases in life and elder age is considered quite a sensitive phase. This is because
old people need attention and care to have a healthy and quality life. In this era, many countries
including Malaysia, are now facing the problem of an ageing population. However we should start
preparing for future ageing problem in our country and implies strategies such as applying geriatric
care professionals to help other states in Malaysia that do not have such services. ... Show more
content on Helpwriting.net ...
According to Prof Dr Philip Poi Jun Hua from the Malaysian Society of Geriatric Medicine
(MSGM), who pioneered and now leads the Geriatrics Division of University Malaya Medical
Centre (UMMC), Kuala Lumpur said that the biggest issue for health professionals is to be able
to persevere in providing good services for older adults in Malaysia because they themselves will
grow old, and if they don t think about it now, when they get old, it is too late for
... Get more on HelpWriting.net ...
Thanksgiving Persuasive Techniques
This recipe can be found on a webpage, which means that the sides are filled with advertisements
for other great dishes to cook. Most of the suggestions are holiday themed, since Thanksgiving has
just passed, and cranberry sauce is associated with Thanksgiving in America. The structure is
simple, looking like something out of a Western cookbook. On the top, there is a depiction of what
the cranberrysauce should look like, the amount of time it takes to prepare and cook the sauce,
and how many people it serves. Underneath that, there is a sentence exclaiming that the dish is
delicious and the last recipe you will ever try. Next, they list the ingredients, and give the
instructions. This is easily followed, and simple for this ritualized dish. The techniques in this
recipe are extremely simple, requiring only a pot, a heat source, preferably a stove, and a cooling
area. Water and sugar are brought to a boil. Once they are boiling, the cranberries are added, and
heated until they explode. Then, they are cooled to form a gelatinized dish. Although it takes three
hours to make, the process itself is not difficult.... Show more content on Helpwriting.net ...
of cranberries, 2 cups of water, and 2 cups of sugar. Cranberries are native to the northeastern United
States, which is why they are important during the Thanksgiving Feast. Thanksgiving is meant to
commemorate the first feast between pilgrims and natives (before we killed them all brutally, but
that s another story). For this reason, the foods served are supposed to represent what was served
during the first Thanksgiving. Since cranberries are native to the region, many believe that they
were present during the first Thanksgiving. However, I highly doubt that they were sweetened by
sugar, which was brought to this region through trade. It is probable that this tradition came to be
through time and legend, since Thanksgiving did not become a national holiday until
... Get more on HelpWriting.net ...
Character Analysis Of Louis Zamperini In Laura...
Louis Zamperini, the main character of Laura Hillenbrand s biography Unbroken, led a
promising running career in his life prior to his military service and captivity. In 1931, Louis
was encouraged to join the Torrance High School track team by his older brother, Pete. Running
came easily to Louis, and became a force to be reckoned with rapidly in the racing world,
dropping his mile time to just under five minutes by 1933. He gave some of the fastest men in the
country a scare at the 1936 Olympic Trials when he nearly beat Don Lash, America s fastest runner
of the 5,000 meter race, and proceeded to compete in the 1936 Berlin Olympics. Aside from the
resounding fame that his running career provided him, it also instilled discipline, dedication, and
astounding willpower that followed him through his life.... Show more content on Helpwriting.net ...
Many accounts of his activities involve him engaging in physical violence with one of his peers
or, in one particular instance, lobbing tomatoes at police officers. He was constantly being
hounded by his family and the police of Torrance, California, to end his mischievous ways and be
more like his brother, Pete Zamperini, who was believed to be an upstanding citizen. However,
according to a family account from Sylvia Zamperini, Pete and Louis were often engaged in
similar activities with the major difference being that Louie always got caught (Unbroken, page 8).
Shortly before he attended Torrance High School, Louis was caught allowing people into basketball
games through a rear entrance for free admission. This particular event earned him a ban from
sports participation at Torrance High
... Get more on HelpWriting.net ...
Vice President Of Business Development
Vice President of Business Development
Developing networks and identify new clients or resources for promoting business development.
Co ordinate with the company members to assure the client of quality service experience
throughout the project cycle through delivery and follow up.
Work towards achieving the financial goals of the company.
Create outreach program to attract new client base.
Vice President of Operations
Make sure that the project objectives and company policies are followed with respect to the
procedures and performance standards of all field personnel.
Monitor the construction project through the Project Management Team and collaborate with the
project site Superintendent to check the project schedule and budget.
Be the ... Show more content on Helpwriting.net ...
Plan, manage and invest in IT related services within the company to maintain the electronically
shared database.
Monitor all the departments within the company and maintain efficient workflow within.
Business Associate
Identify, build and develop new client business continuously to pursue business opportunities with
strategic analysis.
Evaluate the markets to identify potential opportunities through direct networking.
Provide client specific opportunity assessment, market evaluation and research along with financial
evaluation throughout the delivery process of the project.
Partner the marketing team to create effective marketing strategies.
Motivates and lead the team to accomplish goals without direct authority over team members.
Manage resources to make sure they are within budget to comply with the ethical corporate
governance guidelines.
Demonstrate and represent company s mission, vision and value statements throughout the
marketplace.
Project Manager:
Schedule the project to meet deadlines and manage the budget restrictions.
Determine labor requirements and assign work responsibilities.
Inspect and review projects and supervise the compliance with building and safety codes.
Interpret and explain plans and contract terms to working staff and the construction team.
Prepare contracts and negotiate revisions and change orders.
Obtain all necessary permits and licenses
Estimator:
Preparation of construction budget by studying plans and
... Get more on HelpWriting.net ...
Four Tiers When Driving Research Paper
Driving is exciting, you feel like you just want to jump in the car and start accelerating, but that
s not the way to go. If you have ever watched a plane being prepared for taking off, you ll have seen
the crew go through a whole series of safety checks, they can t afford for anything to go wrong,
and it s the same when drivinga car. Before driving, one must be certain that the vehicleis in a good
condition before heading out on a road. There are many things to check, but the most important
ones are the tiers, signal indicators and mirrors.
First of all, check all four tiers and make sure they are correctly inflated and that they have at least
1.5mm of tread. Look for The Tread Wear Indicator, if it s exposed, the tire is not legal for
... Get more on HelpWriting.net ...
Summary Of A Novel By Aldo Leopold
In this novel written by Aldo Leopold, he brings in a dreamy imagery ridden writing that entices the
reader. Along with photographs that go along with his journey and conservation. The book goes in
order of months starting with January and once it hits December, instead of months they are
replaced with locations. Leopold takes his stance to talk about conservation, but not only that he
goes on to make the point of the importance of trying to maintain harmony through what Leopold
termed as land ethics. Leopold takes a different route of explain things that are constructed in this
novel, in every observation he so vividly describes for the reader. Leopold takes his love and
respect for land and heartfully writes this novel to inform others about the beauty of land as well.
Although, Leopold s novel was in three sections, each serving its own purpose. Nevertheless, each
still all came together to connect with the same theme, which was to have harmony between nature
and humanity.
In the beginning of the novel Leopold begins by giving the reader the census of changing of
ecosystems, exploring the interactions among animals as well as plants and the impact of
interactions through the seasons. He widens the field, giving the reader a realistic idea of
landscapes. Leopold also goes on to share in the second section his journey to various farms and
places throughout the United States, not holding anything back. Leopold addresses the important
issues such as declining natural
... Get more on HelpWriting.net ...
The Roots Of The Enlightenment
Between the years of 1685 1815 the focus of European thought had drastically shifted as a result of
what is known as the Age of Reason era, or more commonly known as the Enlightenment. The roots
of the enlightenment sprang about during the time of the Renaissance. Enlightenment thinkers such
as David Hume, Voltaire, and Jean Jacques Rousseau questioned the traditional ways of authority,
and looked to improve mankind with logical changes. The American Revolution, was partially due
to members of the enlightened sect, Benjamin Franklin and Thomas Jefferson. The Enlightment
roots started in the early 17th century where contributors sought to shed light on human intellect as
well as culture after what is known as the dark middle ages. The notion
... Get more on HelpWriting.net ...
Campbell Soup Company Analysis
The name of the company that I am researching is Campbell Soup Company. Campbell Soup
Company is a food processing industry that sells a range of high quality canned soups, simple
meals, beverages, snacks, and packaged fresh foods. As a part of the company s broad portfolio
of brands, Campbell also makes many other products such as SpaghettiOs canned pasta, Pace
Picante sauce, V8 beverages, Arnott s biscuits, and Pepperidge Farm baked goods. It is
headquartered in Camden, New Jersey. According to the Campbell Soup Company2017 Annual
report, Campbell SoupCompany recorded sales of $7,890,000,000. Under the company s
Consolidated Balance Sheets, the company recorded $7,726,000 of total assets. Campbell Soup
Company has a total of 16,500 employees.... Show more content on Helpwriting.net ...
The company is financially not doing well right now and the company has recorded a Net
Operating loss for three years now. I think the company is not financially secure because of how
unstable US economy can become. During the last American recession in 2007, which did not
end for a few years ago. large amounts of jobs were cut worldwide and those individuals
remained unemployed for long periods of time. Recession decreases people s purchasing power.
If consumers income is down, their demand will decrease which will lead to a decrease in
company s profits. Since Campbell cannot control the economy, recession, the global market,
worldwide cuts in jobs, a decrease in demand, and people purchasing power are all major threat to
profits and net sales. In addition, consumer loyalty and the attraction of new consumers are also
threat to the Campbell Brand. From doing previous research, Campbell Soup Company s core
consumers are the baby boom generation. This is problematic because the company is doing a
poor job at targeting Millennials. According to Forbes s Jenna Goudreau, the company is struggling
to maintain relevance with Millennials. Business experts predict that if Campbell Soup Company
fails to increase sales with the Millennial group, Campbell s
... Get more on HelpWriting.net ...
Peer Leadership In Remember The Titans
In April of 1971, the United States Supreme Court issued a decision that finished all state forced
segregation in government funded schools. This was that year that T. C. Williams High School
situated in Alexander Virginia was incorporated. This is the setting for the film Remember the
Titans, gazing Denzel Washington who portraits Herman Boonethe head coach of the Titans.
Herman Boone is acquired as a colleague coach to join the all white coaching staff. At the point
when Herman Boone is named head coach over a wining white mentor he is hesitant to
acknowledge because similar things had transpired when a white mentor had been named over him
in South Carolina. He at long last acknowledges the head coach position when he sees that the dark
occupants consider him to be an image of pride and regard that is inadequate in their group.
The motion picture begins with a riot after a white storeowner slaughters a dark young person. This
episode underscores the ... Show more content on Helpwriting.net ...
They fall into this position due to their physicality, individual feelings, and need to ensure their
siblings . Gerry Bertier at last progresses toward becoming group leader by figuring out how to set
aside his bias and concentrate on the group paying little mind to shading. The relationship that
creates amongst Bertier and Campbell lead the path for the clear majority of the group to meet up.
Peer Leadership . Sometimes a manager asks a subordinate to share in performing certain leadership
function and sometimes subordinates perform these functions on their own initiative.
Furthermore, in the film Remember the Titans I could find the purpose of this assignment to
demonstrate my knowledge and applying some leadership theories such as Peer Leadership,
Participative Leadership, and Initiating Structure leadership. With this leadership styles, I show
how are they used in the movies and how they were
... Get more on HelpWriting.net ...
The Character Analysis Of Rihanna s Music Video
Music videos bring songs to life through its storylines and captivating visuals. They illustrate the
song`s lyrics and can sometimes introduce a new perception to the meaning of the song. In this
short film like music video, the storyline overpowers the song and intensifies its theme and tone.
The suspense and bold images made it impossible to look away from the screen. Its characters
demonstrated that people seek revenge for the things they find valuable to maintain or gain power.
The title and the most repeated phrase in the song does not directly correspond to the song`s
message. Rihanna used the scenario of someone owing her money to signify power and revenge.
As one can see from all of the insane scenes in the video, that it is about going after what you want
no matter what. The main characterwas completely focused on getting her money back so much
that everything else was irrelevant. The steps she took including kidnapping and torturing the
banker s wife were solely for revenge on the banker, because the wife is not involved in the
situation. Her actions were dangerous, however in Rihanna`s character`s perspective, these steps
were trivial because taking back what was her was more important. If we take away the actual
context of the plot, this music videois about a womantaking control over a difficult situation.
Through the entire video, Rihanna is portrayed as someone with power and authority. This boss
like persona is shown through her having two sidekicks, and
... Get more on HelpWriting.net ...
King Arthur Chivalry
King Arthur is one of the most famous leaders in our world s history. No one knows whether or not
King Arthur ever existed. Either way, he still was very impactful on our world and continues to
influence our world today. Nick Bettis states, That future generations turned him into legend... That
is the real significance of King Arthur. We invented him because we have an inherent need for
what he represents. He symbolizes our ideals, which makes the most authentic part of us invested
in his legacy. King Arthur invented the idea of chivalry. Chivalry was a code used by the Knights
of the Roundtable that included various qualities that were to be expected in an ideal knight such as
wisdom, courage, temperance, and justice. All of the knights lived and died by this code. Many
different texts written about King... Show more content on Helpwriting.net ...
Within this text, King Arthur and his army fight the army of his son, Sir Mordred. At the end of
the battle, King Arthur and Sir Mordred are tasked to fight each other. In the end, they kill each
other, and Arthur s sword, Excalibur, is returned to the Lady of the Lake. It would be very hard
for a man to fight his own son no matter how evil the son was. King Arthur believed it was his
duty to face off with his son. Arthur states, No, tide me death, tide me life. Now I see him yonder
alone, he shall never escape mine hands. For at a better avail shall I never have him. Arthur was
determined to fight Sir Mordred despite the fact that Mordred was his son. Arthur did the right and
just thing when he fought his son. Amy Farrell points out, The chivalric virtues of wisdom, faith,
charity, and justice were among the many ideals of the Knights Code of Chivalry in the Middle
Ages. So Arthur was very chivalrous when he fought his son. King Arthur knew it was he duty to
fight his son, but it was also the just thing to do. For this reason, Arthur was very chivalric in this
... Get more on HelpWriting.net ...
Understand The Importance Of Resilience
combine new ideas, data and options enables us to reflect, assimilate, plan and imagine the future.
When we do not take this time, we make quick decisions that may not be to our best improvement.
These quick decisions can change us and affect our career, our fulfilment, and, ultimately, our
resilience.
At the same time, the organizational demands are constantly changing based on available
resources and global impacts. Today s organizations ask us to define ourselves with a role. We
need to understand our skills and figure out what we need to learn to remain current and build for
the future. When we graduated from high school, we had a vision of what life would be like. As a
leader, I understand the need to be resilient and manage one s career.... Show more content on
Helpwriting.net ...
What story do we want to be told about us when we are no longer present? This will be our
reputation and our legacy, which we leave behind as we depart each company we work for or
after we complete a phase of a project. Every individual needs to learn the skills necessary for the
next opportunities which are another critical factor for career resilience. Development plans are
intended to guide our learning and experiences to enable us all to reach our next opportunities.
These opportunities may be internal, a lateral or upward movement, or external to the
... Get more on HelpWriting.net ...
Essay On Intracranial Pial Arteriovenous Fistula
INTRODUCTION:
Intracranial pial arteriovenous fistula (PAVF) is a rare vascular malformation accounting for 1.6
% of all intracranial vascular malformations [1]. Approximately 170 cases of pial arteriovenous
fistulae have been reported since 1970. It consists of one or more arterial feeders and usually a
single venous channel [2]. The direct arteriovenous shunt results in high venous blood flow and
varix formation with the subsequent risk of haemorrhage. PAVF can be congenital or result from
iatrogenic or traumatic injury [2]. However, the exact cause remains elusive. PAVF may present
with a wide range of neurologic symptoms including an asymptomatic state, head ache, seizures,
focal neurologic deficit to potentially catastrophic ... Show more content on Helpwriting.net ...
All patients had a diagnostic angiogram prior to the embolization procedure. Fourteen patients were
treated endovascularly.
Onyx alone was used in seven patients, coils alone in two patients, coils with onyx in two
patients, NBCA alone in one patient, coils with NBCA was used in two patients. Balloon
assistance was taken in a case reduce the flow while injecting glue. Onyx 18 in 6 cases onyx 34
was used in one case. We used Marathon microcatheter (ev3) for injection of NBCA and onyx,
Echelon microcatheter for coiling. The microcatheter was positioned just proximal to the fistulous
site from where the onyx or NBCA was injected.
The procedures were performed on Siemens Artis Zee (Siemens, Germany) Biplane digital
subtraction angiography machine.
Patients were followed up, mRS at 3 months was assessed. After that patients were followed up at
one year. Outcome were categorized as neurologically excellent without any symptoms (modified
Rankin Scale 0), good (modified Rankin Scale 1 or 2) and poor (modified Rankin Scale score 2).
RESULTS
Fourteen patients were treated with endovascular means. One patient showed spontaneous
obliteration of the fistula just prior to interventional procedure. Of these nine patients (60%)
were male patients and six were female. The mean age of the treated patients was 12.5 with a range
of 3 to 32 years. The mean age of all the patients was years 14 with a range of 3 to 37 years.
In our cohort majority of the patients
... Get more on HelpWriting.net ...
Quasi Contracts
INTRODUCTION AND RATIONALE OF QUASI CONTRACTS:
Under the general heading of the Quasi contract there has been grouped a number of cases which
have little or no affinity with contract. A simple illustration is afforded by the action to recover
money paid by mistake. If the plaintiff on an erroneous interpretation of the facts, pays to the
defendant a sum of money which he does not really owe, law, no less than justice, will require he
defendant to restore it. But his obligation is manifestly not based upon the consent, even in the
extended meaning borne by the word in the English law, and its description as a quasi contractual
liability serves only to emphasize its remoteness from any genuine conception of contract.
This shows that there ... Show more content on Helpwriting.net ...
But Lord MANSFIELD preferred the latter theory that the bases for quasi contracts are for the
purpose of prevention of unjust enrichment. THEORY OF IMPLIED IN FACT CONTRACT:
The gist of this kind of action is that the defendant, upon the circumstances of the case, is obliged
by the ties of natural justice and equity to refund the money. But apart from this it should be
observed that did not use the word equity to denote the jurisdiction of chancery but the synonym
for jus naturale . Nor, while he based the obligations of quasi contract upon the duty of restoring
benefits unjustly obtained, did he assert that in every such case an action would lie. As he declared
in Weston v. Downes, I am a great friend to the action for money had and received, and therefore I
am not stretching, lest I should endanger it thus the principle of unjust benefit explained the cases
falling within the scope of quasi contracts: it did not automatically invoke the remedy.
Subject to these qualifications the rationalization of the quasi contract upon the basis of unjust
benefit was accepted for over a hundred years. But when, in the course of the nineteenth century,
the form of the action was replaced by the dichotomy of tort and contract, Lord Mansfield s views
were challenged. According to Lord SUMNER in Sinclair v. Brougham in 1914 the various actions
grouped under the title of quasi contract were clearly not tortious; if the new antithesis of the
common law were inevitable
... Get more on HelpWriting.net ...
Positive And Negative Impacts Of Daily Moods
Hypothesis In their study, Yao Zheng, Robert Plomin, and Sophie von Stumm measured the
positive and negative affect, or essentially one s mood over time; the three professors postulated
that daily moods can be affected by both nature and nurture, with a degree of separation between
positive and negative. To test their hypothesis, they conducted twin studies through a daily, 10 item
online questionnaire over the course of one month (30 days). Twins were chosen through an earlier
Twins Early Development Study(TEDS) conducted by Plomin and others, who had previously
affirmed the status of the twins and had sufficient prior data on the sample subjects. The results,
after some correction, were separated based on sex and degree of relation... Show more content on
Helpwriting.net ...
The official start of the study took place over a 1 week period when participants were instructed
to begin daily surveying; any who failed to do so during the time limit was excluded from any
data analysis. Those whose first language was any other than English, and those with significant
medical conditions preventing reliable reporting were excluded as well. For 40 days twins
completed the online survey after school, a time period considered to be from 3 p.m. to 2 a.m., at
about the same time each day. As a final precaution against spurious findings, only those who
answered the survey for 30+ days with genuine answers were considered in the final analyses.
15,000 total questionnaires were gathered from these efforts (Zheng et al, 2016, 1612 1613).
Positive and negative affects results were quarantined for computation, which began with simple
mean and standard deviation calculations for the sample. The results were used to create a score
for specific means and deviations for each participant. A standard twin model ACE , which
decompose[s] the variance of a trait into additive genetic, shared environmental and non shared
environmental components, was the basis of most following correlational measurements (Purcell,
2007). The program OpenMx was used to model: structural equations at 95 percent confidence
intervals, goodness of fit at negative 2 times the log likelihood, and chi square tests to
... Get more on HelpWriting.net ...
Essay on Women in the Second Industrial Revolution
Women in the Second Industrial Revolution The Second Industrial Revolution had a major impact
on women s lives. After being controlled fro so long women were experiencing what it was like to
live an independent life. In the late nineteenth century women were participating in a variety of
experiences, such as social disabilities confronted by all women, new employment patterns, and
working class poverty and prostitution. These experiences will show how women were perceived in
the Second Industrial Revolution. Women were confronted by many social obligation in the late
nineteenth century. Women were living lives that reflected their social rank. They were expected to
be economically dependent and legally inferior. No... Show more content on Helpwriting.net ...
Also, women generally socialized with one another, it was unheard of for a woman and a man
to socialize unless her husband was with her. The nineteenth century brought about a change in
women s education. Common schools were established in the 1820 s, which started to close the
educational gap between men and women. Eventually, women were able to take over teaching
jobs because it dealt with child nurturing, which was considered to be a female job. On woman
who made a difference in women s rights during the nineteenth century was Susan B. Anthony.
In 1872, she felt that women perceived the government as having no just powers. The Second
Industrial Revolution saw an expansion in the variety of jobs available to women. There was a
movement that consisted of women getting jobs as office clerks and administrative positions
while the law still saw them as inferior to their husdands and fathers. The League of German
Women s Associations, was a group of German women that gave support to all the women in
their new careers. The wartime jobs produced lasting careers and life style changes for women.
Some of the jobs they did were telephone operators, factory workers, seamstresses, and physicians.
Most of the women that were hired for these jobs were young and unmarried because they had
fewer obligations to attend. This meant, they could work long hours with little pay since they did
not have a family to provide for. It was
... Get more on HelpWriting.net ...
The Eureka Hunt Summary
The article, The Eureka Hunt, introduces us with the story of a firefighter,Wag Dodge and his
survival during an out of control fire in the Mann Gulch, in Montana. The fire was spreading faster
and heading toward the direction of the firefighters. Dodge, in a moment of insight, had an escape
plan; he stopped running, igniting the ground in front of him with a match, drenched his hanker
chef with water, and laid down on the smoldering embers, as the fire past him. His quick decision is
a mere example which psychologist and neuroscientists use to determine the insight experience.
Mark Jung Beeman, a cognitive neuroscientist at Northwestern University, has spent fifteen years
trying to figure out what happens inside the brain when people have an insight.... Show more
content on Helpwriting.net ...
In doing so, he conducted experimental word puzzles to see if it could be solved by insight or
by analysis. He teamed up with John Kounios, a neuroscientist at Drexel University, who both
share the same interest in insight. With both their ideas, they combined EEG and fMRI testings
to scan people s brain while they solved the puzzles to see if it can construct a precise map, both
in time and space, of the insight process. The resulting studies, published in 2004 and 2006, found
that people who solved puzzles with insight were using a portion of the cortical areas. According
to Jung Beeman and Kounios, a small fold of tissue on the surface of the right hemisphere, the
anterior superior temporal gyrus (aSTG) becomes active first before insight occurs. Once the brain
is focused on the problem, the cortex needs to relax, in order for the right hemisphere to provide
insight. But as Jung Beeman and Kounios concluded, by trying to force insight can actually prevent
insight; the brain must focus on the task but at the same time it has to be accidental. Earl Miller, a
neuroscientist at M.I.T., spent years studying the prefrontal
... Get more on HelpWriting.net ...
Determination Of An Unknown Amino Acid From Titration Essay
Determination of An Unknown Amino Acid From Titration
Abstract
Experiment 11 used a titration curve to determine the identity of an unknown amino acid. The
initial pH of the solution was 1.96, and the pKa s found experimentally were 2.0, 4.0, and 9.85.
The accepted pKa values were found to be 2.10, 4.07, and 9.47. The molecular weight was
calculated to be
176.3 while the accepted value was found to be 183.5. The identity of the unknown amino acid was
established to be glutamic acid, hydrochloride.
Introduction
Amino acids are simple monomers which are strung together to form polymers
(also called proteins). These monomers are characterized by the general structure shown in figure 1.
Fig. 1
Although ... Show more content on Helpwriting.net ...
This is due to the fact that at the equivalence point the number of moles of titrant equals the
number of moles of acid or base originally present (dependent on if the amino acid is in an acidic
or basic salt form). Another point of interest on a titration curve is the half equivalence point. The
half equivalence point corresponds to the point in which the concentration of weak acid is equal to
the concentration of its conjugate base. The region near the half equivalence point also establishes
a buffer region (Jicha, et al., 1991). (see figure 4).
Fig. 4
The half equivalence point easily allows for the finding of the pKa values of an amino acid. A set
pKa values can be extremely helpful in identifying an amino acid. Through a manipulation of the
Henderson Hasselbalch equation, the pH at the half equivalence point equals the pKa. This is
reasoned because at the half equivalence point the concentration of the conjugate base and the acid
are equal. Therefore the pH equals the pKa at the half equivalence point (see figure 5.)
Fig. 5 [base]
pKa= pH log
... Get more on HelpWriting.net ...
Essay on ATMO 336 Exam 2 Study Guide
In this document, I jotted down some notes while putting together the reading material. These notes
point out some of the reading content to pay particular attention to. The notes are divided into
section headings based on the reading material. This is not meant to be a complete list of
everything that you need to know from the reading Water in Atmosphere You should know what is
meant by phases of water and phase changes of water. Water vaporis extremely important in the
atmosphere for many reasons. A few of those reasons include Water vapor transforms into both
liquid and solid cloud particles that grow and fall to Earth as precipitation. When water vapor
condenses in the formation of clouds, large amounts of heatcalledlatent heatis... Show more content
on Helpwriting.net ...
Definition of rate of evaporation. How it changes as temperature changes. Therate of
evaporationcan be defined as the number of water molecules that change phase from liquid to gas
each second. The rate of evaporation is mainly set by the temperature of the liquid water.The
higher the temperature of the liquid water, the faster the rate of evaporation. Definition of rate of
condensation. How it changes as vapor pressure (a measure the amount of the gas water vapor
above the liquid surface) changes. Therate of condensationcan be defined as the number of water
vapor molecules that change phase from gas to liquid each second. The rate of condensation
depends mainly on the vapor pressure in the space above the liquid surface. Thus, the higher the
concentration of water vapor molecules above the liquid surface, the faster the rate of condensation.
What is meant by saturation Why will a closed system like this always move toward saturation with
respect to water vapor You may take saturation to mean the capacity or maximum amount of water
vapor that will can exist in the air at a particular temperature. It is important to understand that
saturation vapor pressure (or the maximum amount of water vapor that can be in the air) increases
exponentially as temperature
... Get more on HelpWriting.net ...
The Business Internet. The Internet Is Constantly Developing.
The Business Internet
The Internet is constantly developing. From four computers back in the early 70 s to an
uncountable number today, the Internet has extreme power and has changed the world. In recent
years, Internet growth has been expanding more rapidly than the government can understand. The
laws and regulations of a month ago are no longer useful today. The government either has to move
quicker in deciding outcomes pertaining to the Internet or has to give up control entirely. Businesses
are making large technological advances that involve the Internet and are being held up by
government decisions. Commercialization of the Internet brings in new technologies that are
essential to growth.
The original Internet was not called the ... Show more content on Helpwriting.net ...
Their savior was found in the ARPAnet, which now encompassed ALOHAnet and SATnet. The
military and the ARPAnet, however, did not agree with what type of protocol to use. Instead of
them sitting down and figuring out which protocol to use, the military forced ARPAnet to change
and to use the IP protocol (Abbate 133 134).
All of these developments in the field of computing continued to grow. As the Personal Computer
was born, regular old people started to find the Internet useful to them. Online services such as
America Online, Prodigy, and CompuServe started to control Internet services to the home user
(Abbate 203). As Internet needs continued to grow, more ISPs, Internet Service Providers, popped
up. Currently there are a countless number of ISPs, but people want more (Brown 2).
In order to meet these needs, different types of Internet services were born. Some services,
called Bulletin Board Services, are not directly connected to the Internet. These servers are just
local computers in the area that just require a phone call in order to be used. Ways to use
Bulletin Board Services are endless as long as the software on the server supports it. Typically
they are just used to transfer small files and to use Internet e mail while the user is not directly
connected. Generally, these are free services, but the better ones can
... Get more on HelpWriting.net ...
Anime In America Research Paper
Everyone knows each project has a process no matter how long or short it may be, with that said
this will be a deep analysis on my project: Anime in America. I chose a topic revolving around
anime mainly because I watch it and I wanted to do my project on something I found interesting.
Another reason for my choice in topics is because I already knew about some of the things
revolving around my thesis, my thesis being how America s encounter resulted in a sanitized, non
stereotyped and easily accessible form of media. Even though I had background information on
my topic, researching it gave me material I could build upon and use to support the reasons behind
my thesis. Now that you know the topic that this project is based on, it would probably be
important for you to know where most of my information was derived from. Most the information
used in this project came from my own background knowledge and the internet. Background
knowledge on this topic was especially useful since it helped with figuring out what to focus on
and building ideas. The format I chose for presenting my topic was the performance format due to
the well executed examples I ve seen. Another reason for my choice in format was an Animewhere
at the end of each episode had a comedic... Show more content on Helpwriting.net ...
Plenty of shows today are heavily influenced by anime and have done extremely well. Not only
that but with the internet accessing anime is a lot easier, and finding subtitled versions is some
peoples preferred way of watching it. Moving away from the act watching anime, there is plenty of
merchandise with recognizable characters from anime on it, and are even conventions where
people dress as their favorite characters (cosplay) the largest one being Anime Expo. To conclude
anime has definitely impacted America and its pop culture
... Get more on HelpWriting.net ...
Holistic Core Values Of Holistic Nursing
Holistic Core Values Holistic nursing care involves treating the patient mind and body, as well as
providing comfort through prayer. The overall ideal goal of providing holistic care is treating the
patient as a whole. There are certain standards and guideline designed by the American Holistic
Nursing Association in which establish the core values of holistic nursing (Frisch, 2001, p. 1). This
paper will discuss the core value number three: holistic communication, therapeutic environment
and cultural diversity. Second, an interview was conducted with two co workers Ms. C.D. and Ms.
N.S. and Mrs. T.R., a family member concerning the selected core value. Their opinion concerning
the selected core value will be further discussed in this paper. Third, the concept of healing and cure
will be discussed, including the difference between the two terms. Fourth, a clinical experience will
be discussed in there was no cure but healing demonstrated within the patient. Finally, there will be
details of the healing process identified by the patient, family and nurse. The purpose of this paper
is to discuss significance of core value number three: holistic communication, therapeutic
environment and cultural diversity as it pertains to providing holistic nursing care.
Core Value The core value number three: holistic communication, therapeutic environment and
cultural diversity considers the patient current health and therapeutic interventions in order to
provide holistic nursing care. The
... Get more on HelpWriting.net ...
Examples Of Instinctive Judgment
Instinctive judgment is the motivation of an action in response to external stimuli based on either
behaviour, innateness, or impulsion without involving reason (Encyclopædia Britannica, 2014).
Although instinct is often associated with intuition, they are separate concepts because instinct is
inherent while intuition is acquired; instinct is the inherent inclination to react to a situation due to
an inherited configuration of thought while intuition is the ability to acquire knowledge without
thought. Therefore, to make an instinctive judgment is to make a decision based on your instinct.
There are as many meanings to check as there are for instinctive judgment , but in this essay check
means to verify as to correctness by stopping... Show more content on Helpwriting.net ...
Shared knowledge doesn t amplify instinctive judgments as reason checks these judgments.
Shared knowledge is public knowledge acquired over time and communicated from various
sources. In 2009, a group of researchers under the British government sent about 3000 job
applications under false identities, using a mixture of names associated with minority groups and
White sounding names, to uncover racial discrimination among employers against potential
employees. The results showed that applicants who appeared to be White would only have to
send nine applications to receive one positive response while minority applicants would have to
send sixteen applications for the same response (Goodley, 2014). A shared piece of knowledge
among these employers is the stereotype that minorities don t (or aren t) good at speaking English
compared to native English speakers. The stereotype is formed when people associate minorities
with bad English due to personal experiences. Through the combination of emotion, perception,
and reason, their instinctive judgment is to not hire them. However, if these employers used
reason more effectively, they wouldn t base their judgment on the race of the applicant, but the
applicant s skills. This means that the best candidate will get the job and the overall company
will be better off. In fact, Professor Robin Ely of Harvard Business School argues that the racial
diversity of workers does benefit the company (Lagace, 2004). Thus, instinctive judgments aren t
amplified by shared knowledge because they are checked by
... Get more on HelpWriting.net ...
Comparing The Characters Of Charles Portis Novel True Grit
A Journey in Courage: Characters of True Grit Very few people have unyielding courage in the
face of hardship or danger (Merriam Webster). Charles Portis uses this concept of grit to create
interesting characters that influence events his novel True Grit. Mattie Ross, LaBeouf, and Rooster
Cogburn are a few characters that display true courage through their actions and dialogue. Mattie s
assertive and stubborn personality contribute to her grit, which creates new challenges she
overcomes. In the novel, she discusses debatable ideas with other characters and appears convincing
through her confidence and certainty. Mattie s exchange with Stonehill well reveals her unyielding
courage despite her opponent s anger and persistence towards her. When the businessman declares
Mattie impudent, she replies I do not wish to be, sir, but I will not be pushed about when I am in
the right (Portis 32). Mattie s determination to sell her father s ponies brings her to Stonehill even
though the businessman was reluctant to pay. Her efforts and courage eventually convinces him to
give in to her demands. Throughout True Grit, Mattie was constantly... Show more content on
Helpwriting.net ...
Rangers like him need to have courage and determination in order to bring lawbreakers to
justice. LaBoeuf searched for Chaney for four months and captures him with Mattie s and
Rooster s aid. Suddenly I heard a familiar voice, and the words were hard with authority. Hands
up, Chelmsford! Move quickly! It is all up with you! Have a care with that pistol! It was LaBoeuf
the Texan! (Portis 190). Mattie s injury and capture by Tom Chaney creates difficult conditions for
Chaney s justice. Despite this setback, LaBeouf bravely perseveres and recovers her. In the end,
Tom Chaney dies and Mattie returns to her mother because of LaBeouf s brave actions. The Texan s
continuous courageous acts through dangers and setbacks display his strong
... Get more on HelpWriting.net ...
The Function Of James And Musculoskeletal System
Case Introduction
James Walsh, a 55 year old male presented symptoms including weakness inferiorly in his right
lower limb and difficulty performing simple tasks such as walking or tying his shoelace. He also
had some difficulties swallowing and often experiences unpredictable movements due to lack of
control. As a result, he primarily uses a wheelchair and requires careful assistance when performing
everyday activities.
The function of James musculoskeletal system is primarily to facilitate movement as the
contraction of his muscles pull on bone to carry out an action. It also contributes to heat production
for enzymes to function, stability by resisting unwanted movement and maintains his posture
(Saladin, K S., 2007). This is important ... Show more content on Helpwriting.net ...
However, James case of spastic cerebral palsy alters the interaction between the musculoskeletal and
nervous system in some areas which are affected.
Case Examination
James condition of spastic cerebral palsy impacts the regulation of muscle tone due to the effect of
spinal reflexes when muscles are slightly contracted (Ballard, F., 2016). Muscle tone is dependent
on the release of alpha motor neurons in the spinal cord (Albright, A.L., 1995). This is regulated
when there is a balance between excitatory impulses and inhibitory impulses. James condition of
cerebral palsy indicates that there is an imbalance between excitatory impulses and inhibitory
impulses. The imbalance between these impulses causes a lack in regulation of muscle tone due to
the insufficient release of alpha motor neurons in the spinal cord (Albright, A.L., 1995). James
excess production of excitatory impulses originates in the golgi tendons of organs and muscle
spindle, a specialised sensory receptor in the muscle (Albright, A.L., 1995). The impulse then
passes through afferent nerves into the spinal cord and releases excitatory neurotransmitters. In
contrast, the lack of ability to generate inhibitory impulses suggest that the regions of the brain
responsible for the generation of inhibitory impulses including the basal ganglia, brain stem and
cerebellum may be damaged (Albright, A.L., 1995). Consequently, the excess of excitatory
impulses may result in
... Get more on HelpWriting.net ...
The Pros And Cons Of Reproduction Of Art
Reproduction
Reproduction of art is something that has been done throughout history. As technology advances,
so does the way that people reproduce art. From early ages to current times the reproduction of
art has had a varying opinion as to whether it should or should not be done. Some groups believe
that art should be kept in a small elite community. They are the ones who believe art should not be
reproduced and spread throughout the world. On the other hand, there are those who believe art is
meant to be seen by everyone. This group believes art should be reproduced so that the masses
have an equal opportunity. Time has improved technology, which has aided the ability to reproduce
art.
Art has been recreated in many ways over the ages. In the past, the main means of recreating
would have been to be in front of the original and then to attempt to make an identical copy. The
downside is that there would always be some flaw or difference. On the positive side, this would
still allow far more people to view it. Overtime as technology advanced we have developed new
ways to reproduce art. The next major jump in technology lead us to the invention of the camera.
The camera allowed someone to take a picture of the original, which was far more accurate version
of reproduction. The camera also allowed people to create multiple prints of the photo, meaning a
greater amount of people could to view the image. Berger did not care for what the camera has
done for art as he suggests The uniqueness of every painting was once part of the uniqueness of
the place where it resided. (Berger,114) Technology has advanced even further since John wrote
this literature, but I believe he would be even more disgusted by digital media. With digital
media, we are capable of spreading an image across the world in seconds, and anyone can view it.
John Berger makes a numerous amount of remarks in Ways of Seeing towards what the
reproduction of art has done to the art community. As Berger expresses his opinion in his essay, he
states What the modern means of reproduction have done is to destroy the authority of art and to
remove it. (Berger, page 126) This makes it clear that Berger is against the reproduction of art. This
connects him
... Get more on HelpWriting.net ...
The Monarch Butterfly Annual Migration
Introduction
The monarch butterfly annual migration is a visually spectacular feat, in terms of the number of
butterflies flying to their overwintering sites and as well as the masses that congregates at the
overwintering sites in Mexico. The idea that monarch butterflies exhibited migratory behavior was
once controversial, it was not until Fred Urquhart and his colleagues pioneered a tagging work with
the eastern North American population for decades that revealed the long distance of the monarch
migration. The tagging efforts that began in 1937 lead to the discovery of their overwintering sites
in Mexico in 1975. With its long distance traveled and the nature of the predictable and the
repetitive nature of its annual migration. The ... Show more content on Helpwriting.net ...
Environmental factors such as the decrease in day length, cooler temperature and aging milkweed
trigger the monarch to begin its migration, although the precise environmental trigger that initiates
migration is not well understood. When spring arrives, they become reproductively active, mate
and leave Mexico to re migrate north. During the remigration northward the females lay fertilized
eggs on newly emerged milkweeds in the southern parts of the United States (Reppert and others
2010). Their offspring s will also continue the migration up northward to repopulate the northern
section of the monarch habitat range. Even though the monarch migration is repetitive and cyclic in
nature, their migration cycle is multigenerational. It takes about two generations of spring and
summer butterflies that are following the progressive northward emergence of milkweeds to
repopulate the entire range and therefore completing the migration cycle (Reppert and others 2010).
Time Compensated Sun Compass (The Navigational process)
The Monarch butterfly uses a map and a compass like other long distance migrants. The map sense
is needed to determine which direction they are to fly and to stop. The compass sense is utilized so
that the migrants can orient in the southern direction throughout the course of their migration. It
has been shown that the monarch may not have a true map sense, although the monarch
... Get more on HelpWriting.net ...
Frederick Research
March 16, 2014 English 104 Frederick Douglass Article Analysis
In the reading by Frederick Douglass, Learning to Read, he talks about how he learned how to
read. He grew up in Maryland and he talks about how his mistress, his slave owners wife, taught
him the alphabet and how to read. Eventually she stopped, due to him being a slave he wasn t
suppose to know how to read, and Douglass had to continue to learn how to read by himself. One
thing Frederick Douglass could have done was to put some details about his family. He never
mentioned his mom, dad, siblings or if he had any. If he did it would have interesting to know what
they did or felt about him learning to read and write. It would have also ... Show more content on
Helpwriting.net ...
How did he get away with gathering the books and finding the time to copy the words? Douglass
could have used some details in describing the scene when he was able to find the time to do
such things and how often was he able to do these things? These are just some thoughts that
aroused in my head while reading this article. The overall article was well written but if
Frederick Douglass would have incorporated some details about his family, like their
whereabouts and their feeling or if they were being taught how to read as well, would have
made the article a little more interesting. Also if Frederick Douglass would have added more
details to his story in certain areas would have made the article fuller and gave the readers a
more vivid picture of how he was being taught how to read and when he found the time to sneak
books and copy the words to learn how to write. These are just a couple things that could have
made the article easier to read and understand because when someone is writing a paper the author
needs to make sure that the audience can understand what the message is clearly and be able to
create an image of what is being said.
WORKS CITED PAGE
Douglass, Frederick. Learning to Read Reading the World Ideas that Matter. Ed. Michael Austin.
New York
... Get more on HelpWriting.net ...
Rfid Door Lock Description
PR25
RFID Door Lock
Version 1.0
October 2009
Cytron Technologies Sdn. Bhd.
Information contained in this publication regarding device applications and the like is intended
through suggestion only and may be superseded by updates. It is your responsibility to ensure that
your application meets with your specifications. No representation or warranty is given and no
liability is assumed by Cytron Technologies Incorporated with respect to the accuracy or use of
such information or infringement of patents or other intellectual property rights arising from such
use or otherwise. Use of Cytron Technologies s products as critical components in life support
systems is not authorized except with express written approval by Cytron ... Show more content on
Helpwriting.net ...
Unfortunately, the word is used carelessly and can lead to unnecessary confusion. Here are the
basics. Wiegand is: 1. 2. 3. 4. 5. 6. A specific reader to card interface A specific binary reader to
controller interface An electronic signal carrying data The standard 26 bitbinary card data format
An electromagnetic effect A card technology
Figure 4 One I/O pin is needed for one push button as input of PIC microcontroller. The connection
of the push button to the I/O pin is shown in Figure 3. The I/O pin should be pull up to 5V using
a resistor (with value range 1K10K) and this configuration will result an active low input. When
the button is being pressed, reading of I/O pin will be in logic 0, while when the button is not
pressed, reading of that I/O pin will be logic 1.
For more information on how RFID work, please refer to Cytron s DIY project PR8 at
www.cytron.co.my
Power supply for the circuit
ICSP for microcontroller
programming
PIC
Figure 3 User can choose either AC to DC adaptor (not included in the DIY project set) or 9V
12V battery (not included in the DIY project set) to power up the circuit. Higher input voltage
will produce more heat at LM7805 voltage regulator. Typical voltage is 12V. Anyhow, LM7805
will still generate some heat at 12V. There are two type of power
... Get more on HelpWriting.net ...
Planned Parenthoods
October 20th, 2015 the U.S House voted to end taxpayer funding of Planned Parenthood due to
their harvesting of body parts of aborted babies and fetal tissue, among other parts for scientific
research and selling to third party companies to distribute. The companies they sold to used the
parts as they wished for research and supposedly for ingredients in cosmetic wear. Center for
Medical Progress, an anti abortiongroup, released the videos of them secretly meeting with director
of Texas Planned Parenthoods who teaches the methods for abortions for the state, whom explained
that they perform abortions to gather intact fetal specimens. Many types of people claim that such
an issue is so morally corrupt that the company should be defunded federally,... Show more content
on Helpwriting.net ...
Even on the patient consent form, patients at Planned Parenthood sign a form that says I agree
to give my blood and/or the tissue from the abortion as a gift to be used for education, research
or treatment. for scientic research on diabetes, Parkinson s disease, Alzheimer s disease, cancer
and AIDS. A professor of University of Wisconsin Madison s law, medicine and public health,
explains that it makes sense that money is involved in the procurement of tissue and organs,
even if that involves fetal specimen. The professor, R. Alta Charo says, It s been going on for 50
or 60 years; it s ordinary practice, she says. There is good reason for it. We want to help the
people who are living or may be living in the future. But according to Eric Ferrero, vice president of
communications at Planned Parenthood Federation of America, says the research has advanced
vaccines, treatments for life threatening diseases, and goes toward finding cures for specific
maternal and infant health conditions. The National Institutes of Health Revitalization Act even
allows for reasonable payments associated with transportation, implantation, processing,
preservation, quality control, or storage of human fetal issue. This law doesn t define reasonable
payments , so violations can be difficut to prove. Most Planned Parenthood facilities and any
abortion provider don t have control over how fetal tissue is ultimately used and many women
(patients) are uninformed of the possibilities of how their donation is used in the consent forms.
Research to develop skin cosmetics and anti aging products has also benefitted from the collecting
of fetal tissue (non medical) and there isn t a standing law that prevents
... Get more on HelpWriting.net ...
Rabbit Proof Fence Film Techniques
The picture Rabbit Proof Fence directed by Phillip Noyce is the true tale about three aboriginal
girls called Molly, Daisy and Gracie who get taken from their mother to soon return back over a
long journey. This film represents the past of how the aboriginals in the stolen generations were
treated and taken from their parent so that they could be purified into a more white generation.
During this picture various audio and visual effects are given to display the feelings and emotions
of the characters contained in the film. Phillip Noyce positions the audience into a position to feel
empathy and sympathy for the girls using various background sounds/music and camera techniques
which helps incorporate the message and tragedy about what happened... Show more content on
Helpwriting.net ...
Sound effects are essential to this film as its sets the scene of the outback desert of Australia. When
the main characters Molly, Daisy and Gracie are traveling across Western Australia to get o
Moore River there isn t any music but there are many sound effects such as trains going along
the tracks and a car traveling across dirt roads. Music has also made you in this movie feel the
emotions of Molly, Daisy and Gracie when they are being taken into their dormitory at the Moore
River Training Camp. During the girls stay at the Moore River Training Camp there wasn t much
background music but it is replaced with a lot of various needed sound effects. Speaking by the
host of the Moore River workers/nuns is the most common sound effects throughout this scene. To
show the expectations the girls are spoken to many times especially when they are at breakfast as
the nuns lead the prairies and the children follow this shows how much the children are being
pushed into the British colonist way of life. Thus, Phillip Noyce has effectively used sound and
musical elements to transfer his characters emotions to the
... Get more on HelpWriting.net ...
Summary Of The Skinny On Salt By Jeremy Likeness
Christopher. Hello, Perhaps the reason why salt is not discussed earlier in the chapter is that
humans require the nutrient of salt intake. Per author Jeremy Likeness in the article, the The skinny
on salt at bodybuiliding.com informs that body needs the nutrient of sodium and chloride that
cannot produce in the body. Furthermore, Likeness believes that it is not the sodiumamount that is
important rather the sodium in the diet is the ratio of sodium to potassium(Likeness). As sodium
potassium effects, fluid balance in the body. As a result, if there is too little sodium it will cause
the body to retain water. Unbeknownst to me, I did not realize how important it is to get the right
amount of sodium into my diet. Perhaps Bushman wanted all readers to gain a basic understanding
of physical activity and diet before... Show more content on Helpwriting.net ...
Education is important to keep the body in top conditioning. A person could workout everyday,
but if they are not customizing their workout to their body s condition, then their outcome will
not be as favorable. Perhaps a high cholesterol awareness week that could offer several fitness
classes highlighting exercises that reduce cholesterol levels. Another method to get the message
out regarding high cholesterol is print and publication. Thus, a flyer or poster could also include a
few great cholesterol factoids, Yet I researched the question and discovered another perspective at
webmd.com. Writer Patrick McBride, MD, MPH, director of the preventive cardiology program
and the cholesterol clinic at the University of Wisconsin School of Medicine and Public Health
enlightens readers. Mr. McBride provides researched based evidence that resistance training has
powerful effects on lowering cholesterol. Thus, it is recommended that exercisers mix up their
workout to include strength, aerobic and stretch exercises (qtd. in
... Get more on HelpWriting.net ...
Term Limit Analysis
Term Limits Needed The Supreme Court has been left without a majority vote and is
dysfunctional. The current fiasco that is happening in Washington with the court being weakened
by other branches of the government is an example of the Supreme Court being diminished by
political battling. Therefore, term limits are necessary because they would reduce political
fighting, younger judges are more in touch and terms will allow more diversity on the court.
Term limits can affect political feuding in a positive way minimizing political arguments. Since
the Supreme Court job is a lifetime job so when it comes to appointing a new judge the
discussions go over the roof debating on whether he or she should be a republican or democrat.
Term limits will not only stable power between the political parties but also allow new
perspectives. In fact, in 2015 two thirds of Americans supported 10 year... Show more content on
Helpwriting.net ...
Having variety in women and men with different ethnic backgrounds will help the view cases in
a better way. It matters that there s diversity on the court. I think it makes for better lawmaking,
because you have people with more diverse range of judgement and who are going to make a
better decision on the law ( Rachel Maddow 2014). A woman may relate to a case more than a
man which is why diversity is needed. For example, the Roe Vs. Wade trial on abortion that was
all decided by men. It is more likely that if the case had a women involved there would have been
better understanding of the situation. Term limits will have a major impact on the supreme court
because they would decrease political tense, younger judges are more mentally and physically in
touch with current society and terms will allow more diversity on the court. A sharper mentality
will allow a better understanding as well as diversity on the court. Not only will term limits control
the power but will reduce political
... Get more on HelpWriting.net ...
The Hallmarks Of A Stem Cell
The hallmarks of a stem cell are its ability to self renew as well as its ability to differentiate and
assume almost any cell fate if given the appropriate cues known as pluripotency (ref). The
differentiation of stem cells requires large and rapid changes in gene expression. miRNAs are well
suited to carry out this task through their ability to simultaneously inhibit the translation of several
target genes allowing for coordinated control of cellular processes{Bartel:2009fh}. Furthermore,
miRNAs have been shown to regulate embryonic development in addition to their role in regulating
stem cellfate{Stefani:2008bw}. Evidence for this comes from experimental studies where the
overall function of the miRNA biogenesis pathway was evaluated through genetic deletion of the
miRNA processing enzymes DICER, DGCR8, Drosha, and AGO2. DICER knockout mice die at
early stages of embryogenesis and fail to express the stem cell marker Oct4 and primitive streak
marker T (brachyury), which respectively indicate a loss of stem cells and arrested development
during gastrulation{Bernstein:2003dp}. Furthermore, DICER deficient mouse ES cells are viable
but incapable of differentiation, showing severe proliferation defects{Kanellopoulou:2005kf,
Murchison:2005fa}. Similarly, DGCR8 knockout mice arrest early in development{Wang:2007gb}.
DGCR8 deficient mouse ES cells also exhibit a proliferation defect and cannot efficiently silence
the ES cell program, although these defects are not as
... Get more on HelpWriting.net ...
Pepsi Vs Cola Wars Research Paper
PepsiCo and the Coca Cola Company have competed with each other for as long as most people
could remember. Pepsi and Coca Cola are the original sodas that the companies have produced.
The two products are similar, but there are minuscule differences that are the deal breaker for
many individuals. When looking at the popular choice of soft drinks between Pepsi and Coke,
Coca Colawould be considered the winner due to its well known enterprise, taste, and nutritional
value.
Coca Cola is a popular soft drink and one of the top American brands sold across numerous
countries. Coca Cola was sold thirteen years before Pepsi Cola. About a million gallons of Coke
per year had already been sold by the time Pepsi was introduced to the world (Bahsin, Coke Vs.
Pepsi: The Amazing Story Behind the Cola Wars ). Coke has been in the lead of the United States
carbonated drinks market with a 42.8 percent of the market share, compared to Pepsi s 31.1
percent. According to Business Insider, most people can easily recognize the brand s logo and the ...
Show more content on Helpwriting.net ...
A twelve ounce can of Pepsi is one hundred and fifty calories, while a can of Coca Cola is one
hundred and forty calories. Pepsi contains forty one grams of sugar and thirty eight milligrams of
caffeine. Coca Cola has thirty nine grams of sugar and thirty four milligrams of caffeine. The
ingredients that go into the two carbonated drinks are fairly similar. Both drinks are made with
carbonated water, high fructose corn syrup, caramel coloring, sugar, phosphoric acid, and natural
flavors. The only difference in their ingredients is that Pepsi contains citric acid, which explains
its faint citrusy taste, whereas Coke does not ( 12 Fl Oz Official Site for PepsiCo Beverage
Information ; Coca Cola Ingredients and Nutritional Information ). Numerous people are quite fond
of Coke s flavor, though, and prefer it to the taste of Pepsi
... Get more on HelpWriting.net ...
Essay about Work Within a Legal and Ethical Framework
Work within a legal and ethical framework Task A Question 1 Why is important for a worker in
the csi to follow their job description? It is important for a worker in the community service
industry to follow their job description as it is important that they give a professional standard
of the service. It is also due to confidentiality. Community service workers have duty of care to
their clients. Also it is important they follow their job description because different services may
have different policy and procedures and guidelines that need to be followed accurately so that
duty of care is upheld to each client. Question 2 Define the term policy. A policy is a course of
action or guidelines to be followed. Question 3 Define the... Show more content on Helpwriting.net
...
Ask Julie if she would like to be referred to AA and counselling to help her with her alcohol abuse
and the domestic violence she experienced whilst she was with bill 2. At the request of the client
act as an advocate and or support for clients accessing referral services and other agencies Call
other services to see which services can help Julie with the support and assistance she and her
family need. 3. Provide outreach services as required Organize for Julie to call St Vincent de
Paul and other organisations that deal with helping people with financial aid so she can get help
wit food vouchers, rent, and power bills (etc.) Question 4 As the worker identify and discuss 2
ethical dilemmas in this case study. 1. Heavy drinking: with evidence of heavy drinking it
automatically puts the kids at risk of harm especially when Julie is intoxicated who is there to
look after the children 2. Domestic violence: Julie has already left bill ounce for domestic
violence and she is now planning to take bill back which puts the kids at risk of harm with the
fighting and violence that bill brings into the home Question 5 What principles would you need
to be aware of when dealing with the ethical dilemmas in this case study? * Be very clear on the
guidelines of your particular profession * Be familiar with and guided by all relevant standards
which further define how legislation is applied. I am a family
... Get more on HelpWriting.net ...
Simon Bolivar
SIMON BOLIVAR
ONE COUNTRY, ONE BROKEN DREAM.
Herbert Maduro
Columbia Southern University
SIMON BOLIVAR
ONE COUNTRY, ONE BROKEN DREAM.
Herbert Maduro
Columbia Southern University
Simon Bolivar has been considered by many historians as the liberator of the Americas, he lead an
army that liberated Venezuela, Colombia, Peru, Ecuador and Bolivia from the Spanish rule. Bolivar
dreamed in having these countries unified as one big country called The Gran Colombia . These
countries would have shared a centralized government and would have had the city of Bogota as its
capital.
In this article I want to explore the reasons why he could not achieve this dream of unifying these
countries and if he had what economic and social ... Show more content on Helpwriting.net ...
With magnanimous sincerity, San Martin offered to place himself and his soldiers under
Bolivar s command if he would send the full Colombian army to drive the Spanish out of Peru.
Unfortunately for the patriot cause, Bolivar apparently regarded San Martin as a rival and an
antagonist rather than as a comrade in arms, an obstacle to be removed before his own fame and
glory were compromised by sharing them with another. Bolivar refused the incredibly selfless
offer, saying that his delicacy would not allow him to command San Martin, and that the
Colombian Congress would not permit him to leave Colombia to pursue the war in Peru. San
Martin also indicated in an interview that he San Martin, a keen reader of men, immediately
perceived the arrogance and raw ambition that lay behind the mask of courtly civility and empty
excuses. Years later, in 1840, while living in voluntary exile in France, the general confided his
candid assessment of Bolivar s character to a visitor, Captain Lafond de Lurcy of the French navy:
At first sight his personal appearance prejudiced me against him. He appeared to have much pride,
which was in contrast to his habit of never looking in the face of the person he was addressing
unless the latter was
... Get more on HelpWriting.net ...
The Iran-Iraq War Essay
The Iran Iraq War
While the Iran Iraq War during the 1980 s may have permanently altered the course of progress in
Iran and Iraq, the war also altered the resulting permanent involvement of the rest of the world in
the middle east. The rich and complicated history in Iraq has established numerous cultural and
ethnic traditions that all play a part in where the country is today. The Iran Iraq War brought into
focus some of those traditions and how they conflicted, while also bringing Iraq and its economic
situation into the spotlight. Being on top of some of the most mineral rich soil in the world makes
Iraq a major contributor to the world s economy through petroleum and crude oil exports. This,
among other reasons, ties nations ... Show more content on Helpwriting.net ...
The Safavids were the first the first to declare Shia Islam the official religion of Iran, and their
interest in Iraq lay in the Shia holy places in central Iraq, and also the fact that Baghdad held
significant symbolic value as the seat of the ancient Abbasid Empire. The Ottoman Empire on the
other hand was afraid that Shia Islam would spread to Asia Minor, and thus looked to control Iraq
as a Sunni dominated buffer state. During the Ottoman period, the Sunnis were placed in political
positions, while the Shias were then shut out of the political process. This divide between the
Sunnis and the Shias continued to be more and more of an important element in the Iraqi social
structure, and remains an issue even today. It was also during this time period that the Kurdish
Baban Dynasty emerged and began to organize resistance to the Ottoman rule in Northern Iraq.
Then came the First World War and with it the defeat of the German army and their allies,
including Turkey. As a result in 1919, Iraq, as well as Palestine, came under the control of Great
Britain who proceeded to draw out the borders and establish a government that would best suit
them. The years which followed were filled with revolutions, jihad, and unrest, as the British sought
to maintain control of a nation with which they knew very little about.
... Get more on HelpWriting.net ...
The Disadvantages Faced by Catholics in Northern Ireland...
The Disadvantages Faced by Catholics in Northern Ireland in the Mid 1960 s
Since the partition of 1921 the Catholics and Protestants in Northern Ireland had been unable to
live on equal terms together. The North became Northern Ireland and the south the Republic of
Ireland. It was not really an event, for decades Britain had resisted Home rule but by 1919 the
attitudes were altering. A majority of Northern Irelandwere Protestants, the Catholics only made up
33% of the population, and the 66% left were Protestants. The Protestants wanted to remain a part
of Britain but the Catholics wanted to become independent and separate form Ireland. This
abhorrence between Catholics and Protestants resulted in ... Show more content on Helpwriting.net
...
Then possibly the most important election was the Council Election where you could only vote if
your property was worth over ВЈ10(most Catholics didn t have that money) or if you were a tenant
of a public authority houses you were allowed to vote but 2/3 of Protestants lived in these public
authority houses or if you owned a business or a company you were entitled to a second vote but
most companies were owned by Protestants. This was important because any Catholic representing
party would have some power in the Stormont Election and the General Elections, which would
mean Catholics, had some say in the way the area was run. Because the Council Elections were so
important the government used a deceiving tactic called Gerrymandering. When there were more
Catholics than Protestants in one council election area, the government would move the borders so
that the Protestants would be elected because they would then outnumber the Catholics. We can see
that this happened in Londonderry (Derry) where there was 36,049 Catholics and only 17,695
Protestants. After the voting regulations had been applied 14,325 Catholics were entitled to a vote
against only 9,235 Protestants. From the numbers given it should have been the Catholics who won
control but because of the moving borders the Protestants got into power in that area and most other
areas.
... Get more on HelpWriting.net ...
Organizational Systems Task 1
Organizational Systems Task 1
Western Governors University
Task 1
A. Nursing sensitive indicators
By understanding nursing sensitive indicators, the nurses in this case could improve the structure,
process, and outcomes of their nursing care. The structure of nursing care is indicated by the
supply of nursing staff and the skill level of the nursing staff. By the nurses having increased
knowledge of the issues hip fracture patients are prone to having, such as decrease mobility,
increase need for surgical intervention, and increase risk of falls, could help improve the quality
of patient care. A patient with decrease mobility is at higher risk for pressure sores. The nurses in
this case may have prevented the one by proper ... Show more content on Helpwriting.net ...
Now, the quality improvement department will need to determine what processes can be modified
to improve outcomes. For example, if they see an increase in pressure sores and prevalence of
restraints. They could use computerized charting and order entry, along with the evidence based
guidelines, to identify specific groups of patients who are vulnerable to developing pressure ulcers
or closely monitoring use of restraints. With early identification, automatic orders for preventive
interventions can be implemented quickly. With the assistance of the automated consults and
orders, the appropriate equipment, the interdisciplinary task force, continuing education, and
monitoring, the hospital system would be able to reduce unnecessary use of restraints and hospital
acquired pressure ulcer prevalence rate (Cherry amp; Jacob, 2010).
Then, they would need to implement core measures and protocols. Continuously track performance
and outcomes. Lastly, they can disseminate results to throughout the hospital to increase quality
improvement (Cherry amp; Jacob, 2010).
By educating staff on nursing sensitive indicators and the issues that need to be addressed, could
advance the quality of patient care throughout the hospital. In this case, educating hospital staff on
ways to prevent restraint use and pressure sore prevention, the staff could have possible prevented
the use of restraints and the pressure sore. Also, by educating staff on how to use restraints would be
... Get more on HelpWriting.net ...
Physical Science
Assignment 1
Energy can be converted from one form into another in three basic ways know as the action of
force. The first one is gravitational forces which is when gravity accelerates a falling object, its
converts its potential energy to kinetic energy. Likewise, when an object is lifted the gravitational
field stores the energy exerted by the lifter as potential energy in the earth object system. The
second one is electric and magnetic force fields which is charged particles, upon which electrical
fields exert forces, possess potential energy in the presence of an electric field in a way similar to
that of an object in a gravitational field. These force fields can accelerate particles, converting a
particle s potential energy into ... Show more content on Helpwriting.net ...
Several different types of oil and gas traps exist. Natural gas is found throughout the world in
reservoirs deep beneath the surface of the earth and floor of the oceans. It forms as pockets of gas
over crude oil deposits or is trapped in porous rock formations. Natural gas can be found in oil
deposits, as associated natural gas, although non associated natural gas is often found without the
presence of oil. Natural gas is considered as a clean fuel because of its environmentally friendly
properties such as being practically sulphur free and it produces virtually no sulphur dioxide or
SO2. (http://environment.about.com/fossilfuels
/Environmental_Issues_Fossil_Fuels_Alternative_Fuels.htm)
Two different energy alternatives that came to mind is wind powerand hydropower. Societies have
taken advantage of wind power for thousands of years. The first known use was in 5000 BC
when people used sails to navigate the Nile River. Persians had already been using windmills for
400 years by 900 AD in order to pump water and grind grain. (www.epa.gov/cleanrgy/energy and
you/affect/non hydro.html)Windmills may have even been developed in China before 1 AD, but
the earliest written documentation comes from 1219. Cretans were using hundreds of sail rotor
windmills to pump water for crops and livestock. Wind power is one of the most promising new
energy sources that can serve as
... Get more on HelpWriting.net ...

Durham Essay Competition

  • 1.
    Durham Essay Competition 1.Step To get started, you must first create an account on site HelpWriting.net. The registration process is quick and simple, taking just a few moments. During this process, you will need to provide a password and a valid email address. 2. Step In order to create a "Write My Paper For Me" request, simply complete the 10-minute order form. Provide the necessary instructions, preferred sources, and deadline. If you want the writer to imitate your writing style, attach a sample of your previous work. 3. Step When seeking assignment writing help fromHelpWriting.net, our platform utilizes a bidding system. Review bids from our writers for your request, choose one of them based on qualifications, order history, and feedback, then place a deposit to start the assignment writing. 4. Step After receiving your paper, take a few moments to ensure it meets your expectations. If you're pleased with the result, authorize payment for the writer. Don't forget that we provide free revisions for our writing services. 5. Step When you opt to write an assignment online with us, you can request multiple revisions to ensure your satisfaction. We stand by our promise to provide original, high-quality content - if plagiarized, we offer a full refund. Choose us confidently, knowing that your needs will be fully met. Durham Essay Competition Durham Essay Competition
  • 2.
    Slide 2 Summary Slide1 Summary Slide one is my introduction slide it discusses both the positive and negative results that the development of new technology has presented in the workplace. In this slide the viewer will see the positive effects of technology in the workplace from increased productivity to higher levels of employee engagement. My original slide had too much information and it could be overwhelming for the audience to comprehend. The revised slide is much cleaner and illustrates the positive and negative connotations in a much cleaner manner. Slide 2 Summary Slide two introduces the audience to the whys behind the behavior of some companies. In other words, slide two provides a good outline detailing reasons why organizations feel the need to monitor employee email and internet usage. Some of the information provided in this slide are: firms can investigate complaints... Show more content on Helpwriting.net ... This slide provides a definition of what is considered internet abuse in the workplace. Also, the slide also goes on further to outline a list of specific acts of abuse. Violations include inappropriate jokes, downloading music, and frequenting social networking sites. My first slide provided pertinent information on the topic but I decide to take off all of the detailed information and highlight the most visited places the associates visit during business hours. Slide 4 Summary The purpose of this slide is to pose the question if monitoring employee internet usage is really worth it in the workplace. This slide is informational and provides details like how many companies are actually monitoring employee internet usage and the financial cost associated to these behaviors. My first slide, just had too much information on it for the audience to follow. However, on my revised slide I decided to have some fun using a baby monitor and the illustration of a yes or no buzzer to convey my message. Slide 5 ... Get more on HelpWriting.net ...
  • 3.
    Analysis Of TheStory Going Back Home As people journey through life, they discover many qualities they hold that make them unique and interesting. These qualities differentiate them from others, and help form their identity. In the stories we have read in class, such as Going Back Home , written by Toyomi Igus and Michele Wood, Nei Um Lung, Ma? by May Yee, and The Jade Peony by Wayson Choy, the characters hobbies, beliefs, and familyroots make them unique and interesting. Due to many factors, including different experiences in life, an individual develops many aspects in their identity that are different from others. Hobbies, which are adopted and changed throughout one s life, express who an individual is. There are many different reasons as to why people adopt hobbies. It may be a way to pass the time, to express their likes and dislikes, or a way for them to channel their emotions. In the story Going Back Home , the narrator explains how the painter, Michelle Wood, expressed her life and her ancestors lives through her art. She created self portraits to show different aspects of her life, her grandparents lives, and a blue musician s life, utilizing the colours, patterns, and objects to depict their hardships, culture, and opportunities. The house and fence represent the foundations of my past. The boards are my life lessons the crooked ones are the tragedies and the hardships. I am holding a hen, which is a link to my rural southern heritage. This excerpt from the story explains exactly how ... Get more on HelpWriting.net ...
  • 4.
    Oil And GasMaintain A Critical Role For Uae Industry And... Oil and gas maintain a critical role for UAE industry and daily life for locals. However, the government has put forth major efforts to increase their renewable energy capacity. They have also focused on diversifying their economy so they aren t reliant on exporting oil and natural gas for income. With the various complex construction projects in Dubai such as the Palm Islands or the Burj Khalifa, the tallest skyscraper in the world, engineering and real estate have become major industries in the country. UAE efforts to shift toward renewable energy, mostly constrained to the emirate Abu Dhabi, have gained international attention. Recently, they hosted a meeting in Abu Dhabi of over one thousand delegates from around the world to construct... Show more content on Helpwriting.net ... It is similarly structured to the Cabinet of the United States with different departments such as the Ministry of Energy, Ministry of Labor, etc. In order to choose the head of this branch, which is the prime minister, the president appoints someone who is then approved by the Supreme Council; once chosen, the prime minister then proposes the Cabinet, which the president must approve and ratify. Additionally, there is the Federal National Council. This body of government is somewhat similar to Congress where they represent a voice for the citizens and create laws which the Supreme Council authorizes or rejects. Political disputes, not only in the host country, but also in neighboring countries can greatly affect the success of business. So when discussing political disputes and risks you must consider a wide variety of events. The nuclear crisis in Iran is an event that must be considered when assessing the environment around the UAE. Recently, the Joint Comprehensive Plan of Action has been signed by the representatives from the P5+1 (the five permanent powers of the UN Security Council and Germany) powers and Iran, which requires Iran to remove large numbers of centrifuges from different nuclear sites. Even though steps have been taken in the right direction to ease tensions on this issue, there is always the chance that something similar to this could arise again. Another thing that ... Get more on HelpWriting.net ...
  • 5.
    The Myth ofPsyche THE MYTH OF PSYCHE (excerpted from http://www.mythicjourneys.org/newsletter_jul05_transitions_bolen.html ) As most of you know, psyche is the Greek word for soul. It s also the Greek word for butterfly. If you have a protagonist in a story whose name is Psyche, you might expect that she will go through a major transition and crisis. Will she survive it? Will she come through and be transformed, or will she die? That s one way of looking at the Psyche myth. Those of you who heard Robert Bly s White Bear story on the first day of this conference heard a variation of the Eros and Psyche myth. The form that Psyche broke was the understanding with her unseen lover who came every night. The piece of the story I want to focus on is what happens ... Show more content on Helpwriting.net ... What good is knowing that you are in a very dysfunctional relationship, if you haven t the capacity...that is the symbol of the knife...to draw a boundary, to discriminate, to cut it off, to end the relationship if it turns out that what you see really is negative? In this part of the story, Psyche takes both symbols in her hand. As you know, when she raises the lamp and sees her unseen lover, her unknown bridegroom, he turns out to be the immature god of love, Eros. Immature in that he was carrying on this secret affair. He had promised his mother, the goddess Aphrodite, that he would punish Psyche who was so identified with the goddess because of her beauty that the goddess s shrines were ignored. People were worshipping a human girl as if she was a goddess, and the goddess plotted revenge for what psychologically is true. If you identify with an archetype, you lose your humanity, your individuality. You get inflated by it. You get taken over by it. You do get Aphrodite s revenge. In this case Aphrodite had told her son Eros to aim his arrows at Psyche in punishment so that she would fall in love with the vilest of men. This is the negative power of Aphrodite and Eros: to have Psyche fall in love with someone who would really be vile for her and her development. Instead Eros sees Psyche and falls in love with her himself. He decides to keep all that from Mother, and so he s been having this clandestine, hidden affair ... Get more on HelpWriting.net ...
  • 6.
    Analyzing The MovieTerminator By James Cameron The movie Terminator is a 1991 American science action movie which was produced, directed and written by James Cameron. James Cameron also directed the blockbuster movies aliens of 1986 and the Abyss of 1989. The movie stars Arnold Schwarzenegger, Robert Patrick, Edward Furlong, and Linda Hamilton. The movie follows after eleven years after Sarah Connordestroyed the original Terminator that was programmed to kill her when she was pregnant for John. In the Movie Terminator 2, a new and more advanced Terminator called T 1000 (Robert Patrick) was programmed to kill John Connor since the first terminator T 800 failed to kill her. T 1000 is sent to kill John Connor to prevent him from becoming the leader of the human race to victory against ... Show more content on Helpwriting.net ... The production company A Pacific Western Production is named and also a non diegetic music in the background. It then cuts out to a playground where children laugh whiles swinging and also shows people everyday s lives. The camera also foci on a particular girl wearing a red top swinging back and forth. The camera shows the girl enjoying herself because she is laughing. The non diegetic music still plays at the background with the girl swinging. The non diegetic music stopped and there was complete silence until a cranky sound.The camera then focuses on a skeleton body in a car. The skeleton signifies that this is a thriller movie between machines and humans. The place was dark and camera begins to show the whole skeleton. The skeleton had weapons in its hands and camera continues to move closer to show that the skeleton has more power over humans. Also, there were more explosion at the background. Again, the camera focuses on the machines to show how powerful the machines are. A man was actually having flashback. Arnold schwarzenegger s name was shown on the screen with an explosive background. Then, the movie title and Linda Hamilton was display with a non diegetic music. The scene closes with a stare from a ... Get more on HelpWriting.net ...
  • 7.
    Greek And HellenisticInfluence This man was grandson of the painter, cayo pictor Fabio. He is one of the few Roman historians and historians. Being the 1st representative of the old analytics. Intervened in the Gallic War dated in 225 BC. It was also after the Roman victory in Cannas dated in 216 BC, Roman ambassador in the oracle of Delphi. Being a mission of great political conflict, this happened because he, acting in favor of the Greeks in the battle against Carthage. His work as a historian meets the Greek or Hellenistic tradition of the history of the polis, which he wrote in Greek. Leaving very little information of this work, although it consists of seven books. We know that the first, it is about the foundation of the city around 748 BC, thus resorting to the Trojan hero Aeneas, in order to unite Greece with Rome as destinations. On the other hand, books II, III and IV; Ranging from the foundation of the city until the 3rd century. And the rest of the books (V, VI and VII); They dealt with contemporary facts.... Show more content on Helpwriting.net ... Characterizing this literary work as a literary and political objective that gave way to the establishment of the bases of the senatorial historiography, where resorted to the tradition of the pontifical analyst with a high artistic level. It is believed that this work was later translated into Latin. As a continuation of what had previously been said to Fabio PictГіr: We do not know exactly what they contained or at what date they were published, we only know what Cato left us as ... Get more on HelpWriting.net ...
  • 8.
    Learning Disability Scenarios Childrengo through a wide range of constant setbacks but in order to provide them with the best possible recourse it is important that parents display a great deal of support. Last week, I had the opportunity to interview a couple who has a child with a learning disability. Although they did not find out until middle school they did suspect that there was a potential problem early on. One reason being was that the childhad a hard time grasping certain concepts such as reading comprehension and certain knowledge regarding math concepts. Also, homework was extremely difficult and they were constantly completing the homework assignments for her. For them this post a potential problem early on but like most parents they chose to ignore it and... Show more content on Helpwriting.net ... After careful observation/testing from teachers and counselors and being ridiculed by other students it was clear that their daughter was in need of possible help. Later the parents were notified to attend a meeting with the teachers, counselors and the principal so that they could find the best possible alternative to improve their daughters math and reading skills . Their diagnoses after testing suggested that there were several learning debilities and that learning accommodations would have to be made due to poor reading comprehension scores and poor math scores throughout the testing. One accommodation was that the student was to attend both a special educational class for reading and a supportive class for her math course. Her main accommodation was that she was to receive additional help such as having someone read the questions aloud to her if needed and was able to leave the room to be in a more secluded area. When I asked about how they felt about her accommodations they said that they were a little apprehensive because they felt that this would lead to their child feeling more inferior and lead to additional confrontations amongst other ... Get more on HelpWriting.net ...
  • 9.
    Order and Chaos Orderand chaos are related to and dependent on each other. The clear cut distinction between them is man made and an illusion. Society uses order to regulate all aspects of the world from nature to personal lives, while chaos allows for open mindedness and also provides an explanation for certain aspects of the world. This can be seen in science, theology, music, language, and imaginative play. Science is rational, logical, and orderly. It has the ability to break apart complex systems into simpler ones described by theories ad equations. This is seen in the description of the planets orbits, evolution, and Newton s laws. Scientists have a thirst for knowledge and seek understanding about the world around them. Their methods... Show more content on Helpwriting.net ... Anthropology, fossils, and other material evidence provide proof of evolution by similarities between organisms of the past and present ,including the controversial belief that humans evolved from apes. All these discoveries discredit the belief that humans were created to posses dominion over the world, and all that was created has existed from the beginning. The five percent of fundamentalists that are radical and use violence and other unusual means to support their views have made fundamentalism seem extreme and crazy. They discriminate against other Christians, who do not have their same views, and deem them not real Christians. They are also completely intolerant of other religions, offering no salvation outside their faith. Throughout the ages these two groups have clashed as seen in the trial of Galileo. The common denominator in Galileo s trial ,and other controversies between the ideologies is each group s stubbornness and intolerance of other views. One view can not exist without the other ,and they are both impractical and incomplete. The joining of the two is essential for a human being and the world as a whole. This point is clearly illustrated in the Library of Babel where all was known ,yet chaos was rampant because no faith could exist. Music can sometimes sound random, chaotic, and spontaneous but all music has a certain structure and fundamental ... Get more on HelpWriting.net ...
  • 10.
    Ethics, Intellectual Property,And Piracy Personal and business ethics in an ever expanding technological world are challenged in many different ways. Multiple communication methods and the availability of the Internet have made a large world much smaller in the context of information sharing, so the importance of understanding and utilizing measures to protect intellectual propertyand copyrights is vital to business success, ethical understanding and acceptance. In the following, I will specifically discuss the concepts of copyright, intellectual property, and piracy. Copyrights are a form of intellectual property, and the concepts of piracy and plagiarism threatens the viability and integrity of both. Understanding these concepts helps shape individual and business codes of ethics. Copyright and Intellectual Property Copyrights are defined by the United States Copyright office as original works of authorship including literary, dramatic, musical, artistic, and certain other intellectual works (Copyright Basics, n.d.). The laws protect these works whether they are published or not. Copyright laws protect these works from their time of inception and are not required to be registered, though registration assists notifying the public about the work and makes it easier for original owners to lay claim to the copyright if it has been infringed upon. Copyright laws can be traced all the way back to the early 1700 s when the first laws were enacted to protect the works of individuals. According to the Intellectual ... Get more on HelpWriting.net ...
  • 11.
    Cold Landscaping In orderto plant shade tolerant flowers you need to do some research so that you know for sure which plants may grow without too much light from the sun. Shade landscaping is the perfect solution for a dim yard that has areas that don t receive much sun. One of the most common problem with plants is that most of them die because they usually can t handle too much shade. Therefore, if the place where you want to grow your garden doesn t get too much sun light, you have to consider planting shade loving flowers. Let s see in the article below which are the most beautiful shade tolerant flowers that can enhance your garden. Forget me not This beautiful floweris very popular and when it s planted in the perfect place and it can grow without having to spend to much time taking care of it. Besides the fact that forget me not flower loves shady areas, it will also reaper year after year and will... Show more content on Helpwriting.net ... This flower is best known for its medicinal and culinary purposes, so if you like, you can add it in your meals such as stews, salads and so on. Another great thing about them is that they resist in cold weather conditions and their beautiful yellow and orange flowers last for a very long time. Begonias You will love these flowers because they grow very quickly and they fill in the empty spaces that usually appear in any garden. In order to take care of them you just have to plant them in shaded places and be sure that the soil is always moist. Their beautiful flowers come in various colors such as pink, white or red and they are perfect for those who want to diversify their gardens. If you want to know which are the most beautiful shade tolerant flowers, you may want to read our article and find out how you can grow a very attractive garden. You will see that this information will help you a lot in creating the best shaded ... Get more on HelpWriting.net ...
  • 12.
    Question Of QuestionnaireFor Unguka Bank QUESTIONNAIRE FOR INDIVIDUAL CUSTOMERS ONLY Dear Sir/Madam, I am a student from the Faculty of Computer Science and Information Technology in Kampala International University. You are kindly requested to participate in answering the following questions, which will be used in establishing the adoption process of Internet banking in Unguka bank. Any information provided will be used for academic purposes only. Please feel free to express your thoughts. Thank you in advance, Yours faithfully, Rutarindwa Jean Pierre Tick the answer that reflects your level of agreement with the statement in the question items, and put down your opinion and idea about the question above. A.PROFILE OF RESPONDENTS AND THEIR TECHNOLOGY USES Table 1. Profile of respondents ... Show more content on Helpwriting.net ... ....................................................................................................... 9. Do you trust in the technology an Internet Banking is using? : Yes: No: Please briefly explain your answer................................................................ ....................................................................................................... 10. Using Internet banking is financially secure? : Yes: No: Please briefly explain your answer................................................................ ....................................................................................................... 11. Internet Banking is compatible with your lifestyle? : Yes: No: Please briefly explain your answer................................................................ ....................................................................................................... 12.Internet Banking provides convenience since it is available 24 hours ? Yes: No: Please briefly explain how................................................................ ....................................................................................................... 13.Third party may be able to access financial details on the internet? : Yes: No: Please briefly explain how................................................................ ....................................................................................................... 14.Face to face interaction is important for bank services? Yes: No: Please briefly explain how................................................................ ................................................................................................ 15.Your decision to adopt Internet banking is influenced by your colleagues and peers? : Yes: ... Get more on HelpWriting.net ...
  • 13.
    Advantages And DisadvantagesOf Geriatric Care In Malaysia Upgradation of geriatric care over 5 years in Malaysia Introduction What is geriatric care? Geriatric care is derived from the Greek geron which means old man and iatreia which means the treatment of disease . According to UN World Assembly on ageing in 1982, Vienna, in Malaysia, older persons are defined as those who are 60 years and above. Ageing nation are defined as a nation where more than 10% of the population is aged more than 60 years old and by 2020, Malaysia will be defined as an ageing nation (9.9%) Ther eare many phases in life and elder age is considered quite a sensitive phase. This is because old people need attention and care to have a healthy and quality life. In this era, many countries including Malaysia, are now facing the problem of an ageing population. However we should start preparing for future ageing problem in our country and implies strategies such as applying geriatric care professionals to help other states in Malaysia that do not have such services. ... Show more content on Helpwriting.net ... According to Prof Dr Philip Poi Jun Hua from the Malaysian Society of Geriatric Medicine (MSGM), who pioneered and now leads the Geriatrics Division of University Malaya Medical Centre (UMMC), Kuala Lumpur said that the biggest issue for health professionals is to be able to persevere in providing good services for older adults in Malaysia because they themselves will grow old, and if they don t think about it now, when they get old, it is too late for ... Get more on HelpWriting.net ...
  • 14.
    Thanksgiving Persuasive Techniques Thisrecipe can be found on a webpage, which means that the sides are filled with advertisements for other great dishes to cook. Most of the suggestions are holiday themed, since Thanksgiving has just passed, and cranberry sauce is associated with Thanksgiving in America. The structure is simple, looking like something out of a Western cookbook. On the top, there is a depiction of what the cranberrysauce should look like, the amount of time it takes to prepare and cook the sauce, and how many people it serves. Underneath that, there is a sentence exclaiming that the dish is delicious and the last recipe you will ever try. Next, they list the ingredients, and give the instructions. This is easily followed, and simple for this ritualized dish. The techniques in this recipe are extremely simple, requiring only a pot, a heat source, preferably a stove, and a cooling area. Water and sugar are brought to a boil. Once they are boiling, the cranberries are added, and heated until they explode. Then, they are cooled to form a gelatinized dish. Although it takes three hours to make, the process itself is not difficult.... Show more content on Helpwriting.net ... of cranberries, 2 cups of water, and 2 cups of sugar. Cranberries are native to the northeastern United States, which is why they are important during the Thanksgiving Feast. Thanksgiving is meant to commemorate the first feast between pilgrims and natives (before we killed them all brutally, but that s another story). For this reason, the foods served are supposed to represent what was served during the first Thanksgiving. Since cranberries are native to the region, many believe that they were present during the first Thanksgiving. However, I highly doubt that they were sweetened by sugar, which was brought to this region through trade. It is probable that this tradition came to be through time and legend, since Thanksgiving did not become a national holiday until ... Get more on HelpWriting.net ...
  • 15.
    Character Analysis OfLouis Zamperini In Laura... Louis Zamperini, the main character of Laura Hillenbrand s biography Unbroken, led a promising running career in his life prior to his military service and captivity. In 1931, Louis was encouraged to join the Torrance High School track team by his older brother, Pete. Running came easily to Louis, and became a force to be reckoned with rapidly in the racing world, dropping his mile time to just under five minutes by 1933. He gave some of the fastest men in the country a scare at the 1936 Olympic Trials when he nearly beat Don Lash, America s fastest runner of the 5,000 meter race, and proceeded to compete in the 1936 Berlin Olympics. Aside from the resounding fame that his running career provided him, it also instilled discipline, dedication, and astounding willpower that followed him through his life.... Show more content on Helpwriting.net ... Many accounts of his activities involve him engaging in physical violence with one of his peers or, in one particular instance, lobbing tomatoes at police officers. He was constantly being hounded by his family and the police of Torrance, California, to end his mischievous ways and be more like his brother, Pete Zamperini, who was believed to be an upstanding citizen. However, according to a family account from Sylvia Zamperini, Pete and Louis were often engaged in similar activities with the major difference being that Louie always got caught (Unbroken, page 8). Shortly before he attended Torrance High School, Louis was caught allowing people into basketball games through a rear entrance for free admission. This particular event earned him a ban from sports participation at Torrance High ... Get more on HelpWriting.net ...
  • 16.
    Vice President OfBusiness Development Vice President of Business Development Developing networks and identify new clients or resources for promoting business development. Co ordinate with the company members to assure the client of quality service experience throughout the project cycle through delivery and follow up. Work towards achieving the financial goals of the company. Create outreach program to attract new client base. Vice President of Operations Make sure that the project objectives and company policies are followed with respect to the procedures and performance standards of all field personnel. Monitor the construction project through the Project Management Team and collaborate with the project site Superintendent to check the project schedule and budget. Be the ... Show more content on Helpwriting.net ... Plan, manage and invest in IT related services within the company to maintain the electronically shared database. Monitor all the departments within the company and maintain efficient workflow within. Business Associate Identify, build and develop new client business continuously to pursue business opportunities with strategic analysis. Evaluate the markets to identify potential opportunities through direct networking. Provide client specific opportunity assessment, market evaluation and research along with financial evaluation throughout the delivery process of the project. Partner the marketing team to create effective marketing strategies. Motivates and lead the team to accomplish goals without direct authority over team members. Manage resources to make sure they are within budget to comply with the ethical corporate governance guidelines. Demonstrate and represent company s mission, vision and value statements throughout the marketplace. Project Manager: Schedule the project to meet deadlines and manage the budget restrictions. Determine labor requirements and assign work responsibilities. Inspect and review projects and supervise the compliance with building and safety codes. Interpret and explain plans and contract terms to working staff and the construction team. Prepare contracts and negotiate revisions and change orders. Obtain all necessary permits and licenses Estimator: Preparation of construction budget by studying plans and
  • 17.
    ... Get moreon HelpWriting.net ...
  • 18.
    Four Tiers WhenDriving Research Paper Driving is exciting, you feel like you just want to jump in the car and start accelerating, but that s not the way to go. If you have ever watched a plane being prepared for taking off, you ll have seen the crew go through a whole series of safety checks, they can t afford for anything to go wrong, and it s the same when drivinga car. Before driving, one must be certain that the vehicleis in a good condition before heading out on a road. There are many things to check, but the most important ones are the tiers, signal indicators and mirrors. First of all, check all four tiers and make sure they are correctly inflated and that they have at least 1.5mm of tread. Look for The Tread Wear Indicator, if it s exposed, the tire is not legal for ... Get more on HelpWriting.net ...
  • 19.
    Summary Of ANovel By Aldo Leopold In this novel written by Aldo Leopold, he brings in a dreamy imagery ridden writing that entices the reader. Along with photographs that go along with his journey and conservation. The book goes in order of months starting with January and once it hits December, instead of months they are replaced with locations. Leopold takes his stance to talk about conservation, but not only that he goes on to make the point of the importance of trying to maintain harmony through what Leopold termed as land ethics. Leopold takes a different route of explain things that are constructed in this novel, in every observation he so vividly describes for the reader. Leopold takes his love and respect for land and heartfully writes this novel to inform others about the beauty of land as well. Although, Leopold s novel was in three sections, each serving its own purpose. Nevertheless, each still all came together to connect with the same theme, which was to have harmony between nature and humanity. In the beginning of the novel Leopold begins by giving the reader the census of changing of ecosystems, exploring the interactions among animals as well as plants and the impact of interactions through the seasons. He widens the field, giving the reader a realistic idea of landscapes. Leopold also goes on to share in the second section his journey to various farms and places throughout the United States, not holding anything back. Leopold addresses the important issues such as declining natural ... Get more on HelpWriting.net ...
  • 20.
    The Roots OfThe Enlightenment Between the years of 1685 1815 the focus of European thought had drastically shifted as a result of what is known as the Age of Reason era, or more commonly known as the Enlightenment. The roots of the enlightenment sprang about during the time of the Renaissance. Enlightenment thinkers such as David Hume, Voltaire, and Jean Jacques Rousseau questioned the traditional ways of authority, and looked to improve mankind with logical changes. The American Revolution, was partially due to members of the enlightened sect, Benjamin Franklin and Thomas Jefferson. The Enlightment roots started in the early 17th century where contributors sought to shed light on human intellect as well as culture after what is known as the dark middle ages. The notion ... Get more on HelpWriting.net ...
  • 21.
    Campbell Soup CompanyAnalysis The name of the company that I am researching is Campbell Soup Company. Campbell Soup Company is a food processing industry that sells a range of high quality canned soups, simple meals, beverages, snacks, and packaged fresh foods. As a part of the company s broad portfolio of brands, Campbell also makes many other products such as SpaghettiOs canned pasta, Pace Picante sauce, V8 beverages, Arnott s biscuits, and Pepperidge Farm baked goods. It is headquartered in Camden, New Jersey. According to the Campbell Soup Company2017 Annual report, Campbell SoupCompany recorded sales of $7,890,000,000. Under the company s Consolidated Balance Sheets, the company recorded $7,726,000 of total assets. Campbell Soup Company has a total of 16,500 employees.... Show more content on Helpwriting.net ... The company is financially not doing well right now and the company has recorded a Net Operating loss for three years now. I think the company is not financially secure because of how unstable US economy can become. During the last American recession in 2007, which did not end for a few years ago. large amounts of jobs were cut worldwide and those individuals remained unemployed for long periods of time. Recession decreases people s purchasing power. If consumers income is down, their demand will decrease which will lead to a decrease in company s profits. Since Campbell cannot control the economy, recession, the global market, worldwide cuts in jobs, a decrease in demand, and people purchasing power are all major threat to profits and net sales. In addition, consumer loyalty and the attraction of new consumers are also threat to the Campbell Brand. From doing previous research, Campbell Soup Company s core consumers are the baby boom generation. This is problematic because the company is doing a poor job at targeting Millennials. According to Forbes s Jenna Goudreau, the company is struggling to maintain relevance with Millennials. Business experts predict that if Campbell Soup Company fails to increase sales with the Millennial group, Campbell s ... Get more on HelpWriting.net ...
  • 22.
    Peer Leadership InRemember The Titans In April of 1971, the United States Supreme Court issued a decision that finished all state forced segregation in government funded schools. This was that year that T. C. Williams High School situated in Alexander Virginia was incorporated. This is the setting for the film Remember the Titans, gazing Denzel Washington who portraits Herman Boonethe head coach of the Titans. Herman Boone is acquired as a colleague coach to join the all white coaching staff. At the point when Herman Boone is named head coach over a wining white mentor he is hesitant to acknowledge because similar things had transpired when a white mentor had been named over him in South Carolina. He at long last acknowledges the head coach position when he sees that the dark occupants consider him to be an image of pride and regard that is inadequate in their group. The motion picture begins with a riot after a white storeowner slaughters a dark young person. This episode underscores the ... Show more content on Helpwriting.net ... They fall into this position due to their physicality, individual feelings, and need to ensure their siblings . Gerry Bertier at last progresses toward becoming group leader by figuring out how to set aside his bias and concentrate on the group paying little mind to shading. The relationship that creates amongst Bertier and Campbell lead the path for the clear majority of the group to meet up. Peer Leadership . Sometimes a manager asks a subordinate to share in performing certain leadership function and sometimes subordinates perform these functions on their own initiative. Furthermore, in the film Remember the Titans I could find the purpose of this assignment to demonstrate my knowledge and applying some leadership theories such as Peer Leadership, Participative Leadership, and Initiating Structure leadership. With this leadership styles, I show how are they used in the movies and how they were ... Get more on HelpWriting.net ...
  • 23.
    The Character AnalysisOf Rihanna s Music Video Music videos bring songs to life through its storylines and captivating visuals. They illustrate the song`s lyrics and can sometimes introduce a new perception to the meaning of the song. In this short film like music video, the storyline overpowers the song and intensifies its theme and tone. The suspense and bold images made it impossible to look away from the screen. Its characters demonstrated that people seek revenge for the things they find valuable to maintain or gain power. The title and the most repeated phrase in the song does not directly correspond to the song`s message. Rihanna used the scenario of someone owing her money to signify power and revenge. As one can see from all of the insane scenes in the video, that it is about going after what you want no matter what. The main characterwas completely focused on getting her money back so much that everything else was irrelevant. The steps she took including kidnapping and torturing the banker s wife were solely for revenge on the banker, because the wife is not involved in the situation. Her actions were dangerous, however in Rihanna`s character`s perspective, these steps were trivial because taking back what was her was more important. If we take away the actual context of the plot, this music videois about a womantaking control over a difficult situation. Through the entire video, Rihanna is portrayed as someone with power and authority. This boss like persona is shown through her having two sidekicks, and ... Get more on HelpWriting.net ...
  • 24.
    King Arthur Chivalry KingArthur is one of the most famous leaders in our world s history. No one knows whether or not King Arthur ever existed. Either way, he still was very impactful on our world and continues to influence our world today. Nick Bettis states, That future generations turned him into legend... That is the real significance of King Arthur. We invented him because we have an inherent need for what he represents. He symbolizes our ideals, which makes the most authentic part of us invested in his legacy. King Arthur invented the idea of chivalry. Chivalry was a code used by the Knights of the Roundtable that included various qualities that were to be expected in an ideal knight such as wisdom, courage, temperance, and justice. All of the knights lived and died by this code. Many different texts written about King... Show more content on Helpwriting.net ... Within this text, King Arthur and his army fight the army of his son, Sir Mordred. At the end of the battle, King Arthur and Sir Mordred are tasked to fight each other. In the end, they kill each other, and Arthur s sword, Excalibur, is returned to the Lady of the Lake. It would be very hard for a man to fight his own son no matter how evil the son was. King Arthur believed it was his duty to face off with his son. Arthur states, No, tide me death, tide me life. Now I see him yonder alone, he shall never escape mine hands. For at a better avail shall I never have him. Arthur was determined to fight Sir Mordred despite the fact that Mordred was his son. Arthur did the right and just thing when he fought his son. Amy Farrell points out, The chivalric virtues of wisdom, faith, charity, and justice were among the many ideals of the Knights Code of Chivalry in the Middle Ages. So Arthur was very chivalrous when he fought his son. King Arthur knew it was he duty to fight his son, but it was also the just thing to do. For this reason, Arthur was very chivalric in this ... Get more on HelpWriting.net ...
  • 25.
    Understand The ImportanceOf Resilience combine new ideas, data and options enables us to reflect, assimilate, plan and imagine the future. When we do not take this time, we make quick decisions that may not be to our best improvement. These quick decisions can change us and affect our career, our fulfilment, and, ultimately, our resilience. At the same time, the organizational demands are constantly changing based on available resources and global impacts. Today s organizations ask us to define ourselves with a role. We need to understand our skills and figure out what we need to learn to remain current and build for the future. When we graduated from high school, we had a vision of what life would be like. As a leader, I understand the need to be resilient and manage one s career.... Show more content on Helpwriting.net ... What story do we want to be told about us when we are no longer present? This will be our reputation and our legacy, which we leave behind as we depart each company we work for or after we complete a phase of a project. Every individual needs to learn the skills necessary for the next opportunities which are another critical factor for career resilience. Development plans are intended to guide our learning and experiences to enable us all to reach our next opportunities. These opportunities may be internal, a lateral or upward movement, or external to the ... Get more on HelpWriting.net ...
  • 26.
    Essay On IntracranialPial Arteriovenous Fistula INTRODUCTION: Intracranial pial arteriovenous fistula (PAVF) is a rare vascular malformation accounting for 1.6 % of all intracranial vascular malformations [1]. Approximately 170 cases of pial arteriovenous fistulae have been reported since 1970. It consists of one or more arterial feeders and usually a single venous channel [2]. The direct arteriovenous shunt results in high venous blood flow and varix formation with the subsequent risk of haemorrhage. PAVF can be congenital or result from iatrogenic or traumatic injury [2]. However, the exact cause remains elusive. PAVF may present with a wide range of neurologic symptoms including an asymptomatic state, head ache, seizures, focal neurologic deficit to potentially catastrophic ... Show more content on Helpwriting.net ... All patients had a diagnostic angiogram prior to the embolization procedure. Fourteen patients were treated endovascularly. Onyx alone was used in seven patients, coils alone in two patients, coils with onyx in two patients, NBCA alone in one patient, coils with NBCA was used in two patients. Balloon assistance was taken in a case reduce the flow while injecting glue. Onyx 18 in 6 cases onyx 34 was used in one case. We used Marathon microcatheter (ev3) for injection of NBCA and onyx, Echelon microcatheter for coiling. The microcatheter was positioned just proximal to the fistulous site from where the onyx or NBCA was injected. The procedures were performed on Siemens Artis Zee (Siemens, Germany) Biplane digital subtraction angiography machine. Patients were followed up, mRS at 3 months was assessed. After that patients were followed up at one year. Outcome were categorized as neurologically excellent without any symptoms (modified Rankin Scale 0), good (modified Rankin Scale 1 or 2) and poor (modified Rankin Scale score 2). RESULTS Fourteen patients were treated with endovascular means. One patient showed spontaneous obliteration of the fistula just prior to interventional procedure. Of these nine patients (60%) were male patients and six were female. The mean age of the treated patients was 12.5 with a range of 3 to 32 years. The mean age of all the patients was years 14 with a range of 3 to 37 years. In our cohort majority of the patients ... Get more on HelpWriting.net ...
  • 27.
    Quasi Contracts INTRODUCTION ANDRATIONALE OF QUASI CONTRACTS: Under the general heading of the Quasi contract there has been grouped a number of cases which have little or no affinity with contract. A simple illustration is afforded by the action to recover money paid by mistake. If the plaintiff on an erroneous interpretation of the facts, pays to the defendant a sum of money which he does not really owe, law, no less than justice, will require he defendant to restore it. But his obligation is manifestly not based upon the consent, even in the extended meaning borne by the word in the English law, and its description as a quasi contractual liability serves only to emphasize its remoteness from any genuine conception of contract. This shows that there ... Show more content on Helpwriting.net ... But Lord MANSFIELD preferred the latter theory that the bases for quasi contracts are for the purpose of prevention of unjust enrichment. THEORY OF IMPLIED IN FACT CONTRACT: The gist of this kind of action is that the defendant, upon the circumstances of the case, is obliged by the ties of natural justice and equity to refund the money. But apart from this it should be observed that did not use the word equity to denote the jurisdiction of chancery but the synonym for jus naturale . Nor, while he based the obligations of quasi contract upon the duty of restoring benefits unjustly obtained, did he assert that in every such case an action would lie. As he declared in Weston v. Downes, I am a great friend to the action for money had and received, and therefore I am not stretching, lest I should endanger it thus the principle of unjust benefit explained the cases falling within the scope of quasi contracts: it did not automatically invoke the remedy. Subject to these qualifications the rationalization of the quasi contract upon the basis of unjust benefit was accepted for over a hundred years. But when, in the course of the nineteenth century, the form of the action was replaced by the dichotomy of tort and contract, Lord Mansfield s views were challenged. According to Lord SUMNER in Sinclair v. Brougham in 1914 the various actions grouped under the title of quasi contract were clearly not tortious; if the new antithesis of the common law were inevitable ... Get more on HelpWriting.net ...
  • 28.
    Positive And NegativeImpacts Of Daily Moods Hypothesis In their study, Yao Zheng, Robert Plomin, and Sophie von Stumm measured the positive and negative affect, or essentially one s mood over time; the three professors postulated that daily moods can be affected by both nature and nurture, with a degree of separation between positive and negative. To test their hypothesis, they conducted twin studies through a daily, 10 item online questionnaire over the course of one month (30 days). Twins were chosen through an earlier Twins Early Development Study(TEDS) conducted by Plomin and others, who had previously affirmed the status of the twins and had sufficient prior data on the sample subjects. The results, after some correction, were separated based on sex and degree of relation... Show more content on Helpwriting.net ... The official start of the study took place over a 1 week period when participants were instructed to begin daily surveying; any who failed to do so during the time limit was excluded from any data analysis. Those whose first language was any other than English, and those with significant medical conditions preventing reliable reporting were excluded as well. For 40 days twins completed the online survey after school, a time period considered to be from 3 p.m. to 2 a.m., at about the same time each day. As a final precaution against spurious findings, only those who answered the survey for 30+ days with genuine answers were considered in the final analyses. 15,000 total questionnaires were gathered from these efforts (Zheng et al, 2016, 1612 1613). Positive and negative affects results were quarantined for computation, which began with simple mean and standard deviation calculations for the sample. The results were used to create a score for specific means and deviations for each participant. A standard twin model ACE , which decompose[s] the variance of a trait into additive genetic, shared environmental and non shared environmental components, was the basis of most following correlational measurements (Purcell, 2007). The program OpenMx was used to model: structural equations at 95 percent confidence intervals, goodness of fit at negative 2 times the log likelihood, and chi square tests to ... Get more on HelpWriting.net ...
  • 29.
    Essay on Womenin the Second Industrial Revolution Women in the Second Industrial Revolution The Second Industrial Revolution had a major impact on women s lives. After being controlled fro so long women were experiencing what it was like to live an independent life. In the late nineteenth century women were participating in a variety of experiences, such as social disabilities confronted by all women, new employment patterns, and working class poverty and prostitution. These experiences will show how women were perceived in the Second Industrial Revolution. Women were confronted by many social obligation in the late nineteenth century. Women were living lives that reflected their social rank. They were expected to be economically dependent and legally inferior. No... Show more content on Helpwriting.net ... Also, women generally socialized with one another, it was unheard of for a woman and a man to socialize unless her husband was with her. The nineteenth century brought about a change in women s education. Common schools were established in the 1820 s, which started to close the educational gap between men and women. Eventually, women were able to take over teaching jobs because it dealt with child nurturing, which was considered to be a female job. On woman who made a difference in women s rights during the nineteenth century was Susan B. Anthony. In 1872, she felt that women perceived the government as having no just powers. The Second Industrial Revolution saw an expansion in the variety of jobs available to women. There was a movement that consisted of women getting jobs as office clerks and administrative positions while the law still saw them as inferior to their husdands and fathers. The League of German Women s Associations, was a group of German women that gave support to all the women in their new careers. The wartime jobs produced lasting careers and life style changes for women. Some of the jobs they did were telephone operators, factory workers, seamstresses, and physicians. Most of the women that were hired for these jobs were young and unmarried because they had fewer obligations to attend. This meant, they could work long hours with little pay since they did not have a family to provide for. It was ... Get more on HelpWriting.net ...
  • 30.
    The Eureka HuntSummary The article, The Eureka Hunt, introduces us with the story of a firefighter,Wag Dodge and his survival during an out of control fire in the Mann Gulch, in Montana. The fire was spreading faster and heading toward the direction of the firefighters. Dodge, in a moment of insight, had an escape plan; he stopped running, igniting the ground in front of him with a match, drenched his hanker chef with water, and laid down on the smoldering embers, as the fire past him. His quick decision is a mere example which psychologist and neuroscientists use to determine the insight experience. Mark Jung Beeman, a cognitive neuroscientist at Northwestern University, has spent fifteen years trying to figure out what happens inside the brain when people have an insight.... Show more content on Helpwriting.net ... In doing so, he conducted experimental word puzzles to see if it could be solved by insight or by analysis. He teamed up with John Kounios, a neuroscientist at Drexel University, who both share the same interest in insight. With both their ideas, they combined EEG and fMRI testings to scan people s brain while they solved the puzzles to see if it can construct a precise map, both in time and space, of the insight process. The resulting studies, published in 2004 and 2006, found that people who solved puzzles with insight were using a portion of the cortical areas. According to Jung Beeman and Kounios, a small fold of tissue on the surface of the right hemisphere, the anterior superior temporal gyrus (aSTG) becomes active first before insight occurs. Once the brain is focused on the problem, the cortex needs to relax, in order for the right hemisphere to provide insight. But as Jung Beeman and Kounios concluded, by trying to force insight can actually prevent insight; the brain must focus on the task but at the same time it has to be accidental. Earl Miller, a neuroscientist at M.I.T., spent years studying the prefrontal ... Get more on HelpWriting.net ...
  • 31.
    Determination Of AnUnknown Amino Acid From Titration Essay Determination of An Unknown Amino Acid From Titration Abstract Experiment 11 used a titration curve to determine the identity of an unknown amino acid. The initial pH of the solution was 1.96, and the pKa s found experimentally were 2.0, 4.0, and 9.85. The accepted pKa values were found to be 2.10, 4.07, and 9.47. The molecular weight was calculated to be 176.3 while the accepted value was found to be 183.5. The identity of the unknown amino acid was established to be glutamic acid, hydrochloride. Introduction Amino acids are simple monomers which are strung together to form polymers (also called proteins). These monomers are characterized by the general structure shown in figure 1. Fig. 1 Although ... Show more content on Helpwriting.net ... This is due to the fact that at the equivalence point the number of moles of titrant equals the number of moles of acid or base originally present (dependent on if the amino acid is in an acidic or basic salt form). Another point of interest on a titration curve is the half equivalence point. The half equivalence point corresponds to the point in which the concentration of weak acid is equal to the concentration of its conjugate base. The region near the half equivalence point also establishes a buffer region (Jicha, et al., 1991). (see figure 4). Fig. 4 The half equivalence point easily allows for the finding of the pKa values of an amino acid. A set pKa values can be extremely helpful in identifying an amino acid. Through a manipulation of the Henderson Hasselbalch equation, the pH at the half equivalence point equals the pKa. This is reasoned because at the half equivalence point the concentration of the conjugate base and the acid are equal. Therefore the pH equals the pKa at the half equivalence point (see figure 5.) Fig. 5 [base] pKa= pH log ... Get more on HelpWriting.net ...
  • 32.
    Essay on ATMO336 Exam 2 Study Guide In this document, I jotted down some notes while putting together the reading material. These notes point out some of the reading content to pay particular attention to. The notes are divided into section headings based on the reading material. This is not meant to be a complete list of everything that you need to know from the reading Water in Atmosphere You should know what is meant by phases of water and phase changes of water. Water vaporis extremely important in the atmosphere for many reasons. A few of those reasons include Water vapor transforms into both liquid and solid cloud particles that grow and fall to Earth as precipitation. When water vapor condenses in the formation of clouds, large amounts of heatcalledlatent heatis... Show more content on Helpwriting.net ... Definition of rate of evaporation. How it changes as temperature changes. Therate of evaporationcan be defined as the number of water molecules that change phase from liquid to gas each second. The rate of evaporation is mainly set by the temperature of the liquid water.The higher the temperature of the liquid water, the faster the rate of evaporation. Definition of rate of condensation. How it changes as vapor pressure (a measure the amount of the gas water vapor above the liquid surface) changes. Therate of condensationcan be defined as the number of water vapor molecules that change phase from gas to liquid each second. The rate of condensation depends mainly on the vapor pressure in the space above the liquid surface. Thus, the higher the concentration of water vapor molecules above the liquid surface, the faster the rate of condensation. What is meant by saturation Why will a closed system like this always move toward saturation with respect to water vapor You may take saturation to mean the capacity or maximum amount of water vapor that will can exist in the air at a particular temperature. It is important to understand that saturation vapor pressure (or the maximum amount of water vapor that can be in the air) increases exponentially as temperature ... Get more on HelpWriting.net ...
  • 33.
    The Business Internet.The Internet Is Constantly Developing. The Business Internet The Internet is constantly developing. From four computers back in the early 70 s to an uncountable number today, the Internet has extreme power and has changed the world. In recent years, Internet growth has been expanding more rapidly than the government can understand. The laws and regulations of a month ago are no longer useful today. The government either has to move quicker in deciding outcomes pertaining to the Internet or has to give up control entirely. Businesses are making large technological advances that involve the Internet and are being held up by government decisions. Commercialization of the Internet brings in new technologies that are essential to growth. The original Internet was not called the ... Show more content on Helpwriting.net ... Their savior was found in the ARPAnet, which now encompassed ALOHAnet and SATnet. The military and the ARPAnet, however, did not agree with what type of protocol to use. Instead of them sitting down and figuring out which protocol to use, the military forced ARPAnet to change and to use the IP protocol (Abbate 133 134). All of these developments in the field of computing continued to grow. As the Personal Computer was born, regular old people started to find the Internet useful to them. Online services such as America Online, Prodigy, and CompuServe started to control Internet services to the home user (Abbate 203). As Internet needs continued to grow, more ISPs, Internet Service Providers, popped up. Currently there are a countless number of ISPs, but people want more (Brown 2). In order to meet these needs, different types of Internet services were born. Some services, called Bulletin Board Services, are not directly connected to the Internet. These servers are just local computers in the area that just require a phone call in order to be used. Ways to use Bulletin Board Services are endless as long as the software on the server supports it. Typically they are just used to transfer small files and to use Internet e mail while the user is not directly connected. Generally, these are free services, but the better ones can ... Get more on HelpWriting.net ...
  • 34.
    Anime In AmericaResearch Paper Everyone knows each project has a process no matter how long or short it may be, with that said this will be a deep analysis on my project: Anime in America. I chose a topic revolving around anime mainly because I watch it and I wanted to do my project on something I found interesting. Another reason for my choice in topics is because I already knew about some of the things revolving around my thesis, my thesis being how America s encounter resulted in a sanitized, non stereotyped and easily accessible form of media. Even though I had background information on my topic, researching it gave me material I could build upon and use to support the reasons behind my thesis. Now that you know the topic that this project is based on, it would probably be important for you to know where most of my information was derived from. Most the information used in this project came from my own background knowledge and the internet. Background knowledge on this topic was especially useful since it helped with figuring out what to focus on and building ideas. The format I chose for presenting my topic was the performance format due to the well executed examples I ve seen. Another reason for my choice in format was an Animewhere at the end of each episode had a comedic... Show more content on Helpwriting.net ... Plenty of shows today are heavily influenced by anime and have done extremely well. Not only that but with the internet accessing anime is a lot easier, and finding subtitled versions is some peoples preferred way of watching it. Moving away from the act watching anime, there is plenty of merchandise with recognizable characters from anime on it, and are even conventions where people dress as their favorite characters (cosplay) the largest one being Anime Expo. To conclude anime has definitely impacted America and its pop culture ... Get more on HelpWriting.net ...
  • 35.
    Holistic Core ValuesOf Holistic Nursing Holistic Core Values Holistic nursing care involves treating the patient mind and body, as well as providing comfort through prayer. The overall ideal goal of providing holistic care is treating the patient as a whole. There are certain standards and guideline designed by the American Holistic Nursing Association in which establish the core values of holistic nursing (Frisch, 2001, p. 1). This paper will discuss the core value number three: holistic communication, therapeutic environment and cultural diversity. Second, an interview was conducted with two co workers Ms. C.D. and Ms. N.S. and Mrs. T.R., a family member concerning the selected core value. Their opinion concerning the selected core value will be further discussed in this paper. Third, the concept of healing and cure will be discussed, including the difference between the two terms. Fourth, a clinical experience will be discussed in there was no cure but healing demonstrated within the patient. Finally, there will be details of the healing process identified by the patient, family and nurse. The purpose of this paper is to discuss significance of core value number three: holistic communication, therapeutic environment and cultural diversity as it pertains to providing holistic nursing care. Core Value The core value number three: holistic communication, therapeutic environment and cultural diversity considers the patient current health and therapeutic interventions in order to provide holistic nursing care. The ... Get more on HelpWriting.net ...
  • 36.
    Examples Of InstinctiveJudgment Instinctive judgment is the motivation of an action in response to external stimuli based on either behaviour, innateness, or impulsion without involving reason (Encyclopædia Britannica, 2014). Although instinct is often associated with intuition, they are separate concepts because instinct is inherent while intuition is acquired; instinct is the inherent inclination to react to a situation due to an inherited configuration of thought while intuition is the ability to acquire knowledge without thought. Therefore, to make an instinctive judgment is to make a decision based on your instinct. There are as many meanings to check as there are for instinctive judgment , but in this essay check means to verify as to correctness by stopping... Show more content on Helpwriting.net ... Shared knowledge doesn t amplify instinctive judgments as reason checks these judgments. Shared knowledge is public knowledge acquired over time and communicated from various sources. In 2009, a group of researchers under the British government sent about 3000 job applications under false identities, using a mixture of names associated with minority groups and White sounding names, to uncover racial discrimination among employers against potential employees. The results showed that applicants who appeared to be White would only have to send nine applications to receive one positive response while minority applicants would have to send sixteen applications for the same response (Goodley, 2014). A shared piece of knowledge among these employers is the stereotype that minorities don t (or aren t) good at speaking English compared to native English speakers. The stereotype is formed when people associate minorities with bad English due to personal experiences. Through the combination of emotion, perception, and reason, their instinctive judgment is to not hire them. However, if these employers used reason more effectively, they wouldn t base their judgment on the race of the applicant, but the applicant s skills. This means that the best candidate will get the job and the overall company will be better off. In fact, Professor Robin Ely of Harvard Business School argues that the racial diversity of workers does benefit the company (Lagace, 2004). Thus, instinctive judgments aren t amplified by shared knowledge because they are checked by ... Get more on HelpWriting.net ...
  • 37.
    Comparing The CharactersOf Charles Portis Novel True Grit A Journey in Courage: Characters of True Grit Very few people have unyielding courage in the face of hardship or danger (Merriam Webster). Charles Portis uses this concept of grit to create interesting characters that influence events his novel True Grit. Mattie Ross, LaBeouf, and Rooster Cogburn are a few characters that display true courage through their actions and dialogue. Mattie s assertive and stubborn personality contribute to her grit, which creates new challenges she overcomes. In the novel, she discusses debatable ideas with other characters and appears convincing through her confidence and certainty. Mattie s exchange with Stonehill well reveals her unyielding courage despite her opponent s anger and persistence towards her. When the businessman declares Mattie impudent, she replies I do not wish to be, sir, but I will not be pushed about when I am in the right (Portis 32). Mattie s determination to sell her father s ponies brings her to Stonehill even though the businessman was reluctant to pay. Her efforts and courage eventually convinces him to give in to her demands. Throughout True Grit, Mattie was constantly... Show more content on Helpwriting.net ... Rangers like him need to have courage and determination in order to bring lawbreakers to justice. LaBoeuf searched for Chaney for four months and captures him with Mattie s and Rooster s aid. Suddenly I heard a familiar voice, and the words were hard with authority. Hands up, Chelmsford! Move quickly! It is all up with you! Have a care with that pistol! It was LaBoeuf the Texan! (Portis 190). Mattie s injury and capture by Tom Chaney creates difficult conditions for Chaney s justice. Despite this setback, LaBeouf bravely perseveres and recovers her. In the end, Tom Chaney dies and Mattie returns to her mother because of LaBeouf s brave actions. The Texan s continuous courageous acts through dangers and setbacks display his strong ... Get more on HelpWriting.net ...
  • 38.
    The Function OfJames And Musculoskeletal System Case Introduction James Walsh, a 55 year old male presented symptoms including weakness inferiorly in his right lower limb and difficulty performing simple tasks such as walking or tying his shoelace. He also had some difficulties swallowing and often experiences unpredictable movements due to lack of control. As a result, he primarily uses a wheelchair and requires careful assistance when performing everyday activities. The function of James musculoskeletal system is primarily to facilitate movement as the contraction of his muscles pull on bone to carry out an action. It also contributes to heat production for enzymes to function, stability by resisting unwanted movement and maintains his posture (Saladin, K S., 2007). This is important ... Show more content on Helpwriting.net ... However, James case of spastic cerebral palsy alters the interaction between the musculoskeletal and nervous system in some areas which are affected. Case Examination James condition of spastic cerebral palsy impacts the regulation of muscle tone due to the effect of spinal reflexes when muscles are slightly contracted (Ballard, F., 2016). Muscle tone is dependent on the release of alpha motor neurons in the spinal cord (Albright, A.L., 1995). This is regulated when there is a balance between excitatory impulses and inhibitory impulses. James condition of cerebral palsy indicates that there is an imbalance between excitatory impulses and inhibitory impulses. The imbalance between these impulses causes a lack in regulation of muscle tone due to the insufficient release of alpha motor neurons in the spinal cord (Albright, A.L., 1995). James excess production of excitatory impulses originates in the golgi tendons of organs and muscle spindle, a specialised sensory receptor in the muscle (Albright, A.L., 1995). The impulse then passes through afferent nerves into the spinal cord and releases excitatory neurotransmitters. In contrast, the lack of ability to generate inhibitory impulses suggest that the regions of the brain responsible for the generation of inhibitory impulses including the basal ganglia, brain stem and cerebellum may be damaged (Albright, A.L., 1995). Consequently, the excess of excitatory impulses may result in ... Get more on HelpWriting.net ...
  • 39.
    The Pros AndCons Of Reproduction Of Art Reproduction Reproduction of art is something that has been done throughout history. As technology advances, so does the way that people reproduce art. From early ages to current times the reproduction of art has had a varying opinion as to whether it should or should not be done. Some groups believe that art should be kept in a small elite community. They are the ones who believe art should not be reproduced and spread throughout the world. On the other hand, there are those who believe art is meant to be seen by everyone. This group believes art should be reproduced so that the masses have an equal opportunity. Time has improved technology, which has aided the ability to reproduce art. Art has been recreated in many ways over the ages. In the past, the main means of recreating would have been to be in front of the original and then to attempt to make an identical copy. The downside is that there would always be some flaw or difference. On the positive side, this would still allow far more people to view it. Overtime as technology advanced we have developed new ways to reproduce art. The next major jump in technology lead us to the invention of the camera. The camera allowed someone to take a picture of the original, which was far more accurate version of reproduction. The camera also allowed people to create multiple prints of the photo, meaning a greater amount of people could to view the image. Berger did not care for what the camera has done for art as he suggests The uniqueness of every painting was once part of the uniqueness of the place where it resided. (Berger,114) Technology has advanced even further since John wrote this literature, but I believe he would be even more disgusted by digital media. With digital media, we are capable of spreading an image across the world in seconds, and anyone can view it. John Berger makes a numerous amount of remarks in Ways of Seeing towards what the reproduction of art has done to the art community. As Berger expresses his opinion in his essay, he states What the modern means of reproduction have done is to destroy the authority of art and to remove it. (Berger, page 126) This makes it clear that Berger is against the reproduction of art. This connects him ... Get more on HelpWriting.net ...
  • 40.
    The Monarch ButterflyAnnual Migration Introduction The monarch butterfly annual migration is a visually spectacular feat, in terms of the number of butterflies flying to their overwintering sites and as well as the masses that congregates at the overwintering sites in Mexico. The idea that monarch butterflies exhibited migratory behavior was once controversial, it was not until Fred Urquhart and his colleagues pioneered a tagging work with the eastern North American population for decades that revealed the long distance of the monarch migration. The tagging efforts that began in 1937 lead to the discovery of their overwintering sites in Mexico in 1975. With its long distance traveled and the nature of the predictable and the repetitive nature of its annual migration. The ... Show more content on Helpwriting.net ... Environmental factors such as the decrease in day length, cooler temperature and aging milkweed trigger the monarch to begin its migration, although the precise environmental trigger that initiates migration is not well understood. When spring arrives, they become reproductively active, mate and leave Mexico to re migrate north. During the remigration northward the females lay fertilized eggs on newly emerged milkweeds in the southern parts of the United States (Reppert and others 2010). Their offspring s will also continue the migration up northward to repopulate the northern section of the monarch habitat range. Even though the monarch migration is repetitive and cyclic in nature, their migration cycle is multigenerational. It takes about two generations of spring and summer butterflies that are following the progressive northward emergence of milkweeds to repopulate the entire range and therefore completing the migration cycle (Reppert and others 2010). Time Compensated Sun Compass (The Navigational process) The Monarch butterfly uses a map and a compass like other long distance migrants. The map sense is needed to determine which direction they are to fly and to stop. The compass sense is utilized so that the migrants can orient in the southern direction throughout the course of their migration. It has been shown that the monarch may not have a true map sense, although the monarch ... Get more on HelpWriting.net ...
  • 41.
    Frederick Research March 16,2014 English 104 Frederick Douglass Article Analysis In the reading by Frederick Douglass, Learning to Read, he talks about how he learned how to read. He grew up in Maryland and he talks about how his mistress, his slave owners wife, taught him the alphabet and how to read. Eventually she stopped, due to him being a slave he wasn t suppose to know how to read, and Douglass had to continue to learn how to read by himself. One thing Frederick Douglass could have done was to put some details about his family. He never mentioned his mom, dad, siblings or if he had any. If he did it would have interesting to know what they did or felt about him learning to read and write. It would have also ... Show more content on Helpwriting.net ... How did he get away with gathering the books and finding the time to copy the words? Douglass could have used some details in describing the scene when he was able to find the time to do such things and how often was he able to do these things? These are just some thoughts that aroused in my head while reading this article. The overall article was well written but if Frederick Douglass would have incorporated some details about his family, like their whereabouts and their feeling or if they were being taught how to read as well, would have made the article a little more interesting. Also if Frederick Douglass would have added more details to his story in certain areas would have made the article fuller and gave the readers a more vivid picture of how he was being taught how to read and when he found the time to sneak books and copy the words to learn how to write. These are just a couple things that could have made the article easier to read and understand because when someone is writing a paper the author needs to make sure that the audience can understand what the message is clearly and be able to create an image of what is being said. WORKS CITED PAGE Douglass, Frederick. Learning to Read Reading the World Ideas that Matter. Ed. Michael Austin. New York ... Get more on HelpWriting.net ...
  • 42.
    Rfid Door LockDescription PR25 RFID Door Lock Version 1.0 October 2009 Cytron Technologies Sdn. Bhd. Information contained in this publication regarding device applications and the like is intended through suggestion only and may be superseded by updates. It is your responsibility to ensure that your application meets with your specifications. No representation or warranty is given and no liability is assumed by Cytron Technologies Incorporated with respect to the accuracy or use of such information or infringement of patents or other intellectual property rights arising from such use or otherwise. Use of Cytron Technologies s products as critical components in life support systems is not authorized except with express written approval by Cytron ... Show more content on Helpwriting.net ... Unfortunately, the word is used carelessly and can lead to unnecessary confusion. Here are the basics. Wiegand is: 1. 2. 3. 4. 5. 6. A specific reader to card interface A specific binary reader to controller interface An electronic signal carrying data The standard 26 bitbinary card data format An electromagnetic effect A card technology Figure 4 One I/O pin is needed for one push button as input of PIC microcontroller. The connection of the push button to the I/O pin is shown in Figure 3. The I/O pin should be pull up to 5V using a resistor (with value range 1K10K) and this configuration will result an active low input. When the button is being pressed, reading of I/O pin will be in logic 0, while when the button is not pressed, reading of that I/O pin will be logic 1. For more information on how RFID work, please refer to Cytron s DIY project PR8 at www.cytron.co.my Power supply for the circuit ICSP for microcontroller programming PIC Figure 3 User can choose either AC to DC adaptor (not included in the DIY project set) or 9V 12V battery (not included in the DIY project set) to power up the circuit. Higher input voltage will produce more heat at LM7805 voltage regulator. Typical voltage is 12V. Anyhow, LM7805 will still generate some heat at 12V. There are two type of power
  • 43.
    ... Get moreon HelpWriting.net ...
  • 44.
    Planned Parenthoods October 20th,2015 the U.S House voted to end taxpayer funding of Planned Parenthood due to their harvesting of body parts of aborted babies and fetal tissue, among other parts for scientific research and selling to third party companies to distribute. The companies they sold to used the parts as they wished for research and supposedly for ingredients in cosmetic wear. Center for Medical Progress, an anti abortiongroup, released the videos of them secretly meeting with director of Texas Planned Parenthoods who teaches the methods for abortions for the state, whom explained that they perform abortions to gather intact fetal specimens. Many types of people claim that such an issue is so morally corrupt that the company should be defunded federally,... Show more content on Helpwriting.net ... Even on the patient consent form, patients at Planned Parenthood sign a form that says I agree to give my blood and/or the tissue from the abortion as a gift to be used for education, research or treatment. for scientic research on diabetes, Parkinson s disease, Alzheimer s disease, cancer and AIDS. A professor of University of Wisconsin Madison s law, medicine and public health, explains that it makes sense that money is involved in the procurement of tissue and organs, even if that involves fetal specimen. The professor, R. Alta Charo says, It s been going on for 50 or 60 years; it s ordinary practice, she says. There is good reason for it. We want to help the people who are living or may be living in the future. But according to Eric Ferrero, vice president of communications at Planned Parenthood Federation of America, says the research has advanced vaccines, treatments for life threatening diseases, and goes toward finding cures for specific maternal and infant health conditions. The National Institutes of Health Revitalization Act even allows for reasonable payments associated with transportation, implantation, processing, preservation, quality control, or storage of human fetal issue. This law doesn t define reasonable payments , so violations can be difficut to prove. Most Planned Parenthood facilities and any abortion provider don t have control over how fetal tissue is ultimately used and many women (patients) are uninformed of the possibilities of how their donation is used in the consent forms. Research to develop skin cosmetics and anti aging products has also benefitted from the collecting of fetal tissue (non medical) and there isn t a standing law that prevents ... Get more on HelpWriting.net ...
  • 45.
    Rabbit Proof FenceFilm Techniques The picture Rabbit Proof Fence directed by Phillip Noyce is the true tale about three aboriginal girls called Molly, Daisy and Gracie who get taken from their mother to soon return back over a long journey. This film represents the past of how the aboriginals in the stolen generations were treated and taken from their parent so that they could be purified into a more white generation. During this picture various audio and visual effects are given to display the feelings and emotions of the characters contained in the film. Phillip Noyce positions the audience into a position to feel empathy and sympathy for the girls using various background sounds/music and camera techniques which helps incorporate the message and tragedy about what happened... Show more content on Helpwriting.net ... Sound effects are essential to this film as its sets the scene of the outback desert of Australia. When the main characters Molly, Daisy and Gracie are traveling across Western Australia to get o Moore River there isn t any music but there are many sound effects such as trains going along the tracks and a car traveling across dirt roads. Music has also made you in this movie feel the emotions of Molly, Daisy and Gracie when they are being taken into their dormitory at the Moore River Training Camp. During the girls stay at the Moore River Training Camp there wasn t much background music but it is replaced with a lot of various needed sound effects. Speaking by the host of the Moore River workers/nuns is the most common sound effects throughout this scene. To show the expectations the girls are spoken to many times especially when they are at breakfast as the nuns lead the prairies and the children follow this shows how much the children are being pushed into the British colonist way of life. Thus, Phillip Noyce has effectively used sound and musical elements to transfer his characters emotions to the ... Get more on HelpWriting.net ...
  • 46.
    Summary Of TheSkinny On Salt By Jeremy Likeness Christopher. Hello, Perhaps the reason why salt is not discussed earlier in the chapter is that humans require the nutrient of salt intake. Per author Jeremy Likeness in the article, the The skinny on salt at bodybuiliding.com informs that body needs the nutrient of sodium and chloride that cannot produce in the body. Furthermore, Likeness believes that it is not the sodiumamount that is important rather the sodium in the diet is the ratio of sodium to potassium(Likeness). As sodium potassium effects, fluid balance in the body. As a result, if there is too little sodium it will cause the body to retain water. Unbeknownst to me, I did not realize how important it is to get the right amount of sodium into my diet. Perhaps Bushman wanted all readers to gain a basic understanding of physical activity and diet before... Show more content on Helpwriting.net ... Education is important to keep the body in top conditioning. A person could workout everyday, but if they are not customizing their workout to their body s condition, then their outcome will not be as favorable. Perhaps a high cholesterol awareness week that could offer several fitness classes highlighting exercises that reduce cholesterol levels. Another method to get the message out regarding high cholesterol is print and publication. Thus, a flyer or poster could also include a few great cholesterol factoids, Yet I researched the question and discovered another perspective at webmd.com. Writer Patrick McBride, MD, MPH, director of the preventive cardiology program and the cholesterol clinic at the University of Wisconsin School of Medicine and Public Health enlightens readers. Mr. McBride provides researched based evidence that resistance training has powerful effects on lowering cholesterol. Thus, it is recommended that exercisers mix up their workout to include strength, aerobic and stretch exercises (qtd. in ... Get more on HelpWriting.net ...
  • 47.
    Term Limit Analysis TermLimits Needed The Supreme Court has been left without a majority vote and is dysfunctional. The current fiasco that is happening in Washington with the court being weakened by other branches of the government is an example of the Supreme Court being diminished by political battling. Therefore, term limits are necessary because they would reduce political fighting, younger judges are more in touch and terms will allow more diversity on the court. Term limits can affect political feuding in a positive way minimizing political arguments. Since the Supreme Court job is a lifetime job so when it comes to appointing a new judge the discussions go over the roof debating on whether he or she should be a republican or democrat. Term limits will not only stable power between the political parties but also allow new perspectives. In fact, in 2015 two thirds of Americans supported 10 year... Show more content on Helpwriting.net ... Having variety in women and men with different ethnic backgrounds will help the view cases in a better way. It matters that there s diversity on the court. I think it makes for better lawmaking, because you have people with more diverse range of judgement and who are going to make a better decision on the law ( Rachel Maddow 2014). A woman may relate to a case more than a man which is why diversity is needed. For example, the Roe Vs. Wade trial on abortion that was all decided by men. It is more likely that if the case had a women involved there would have been better understanding of the situation. Term limits will have a major impact on the supreme court because they would decrease political tense, younger judges are more mentally and physically in touch with current society and terms will allow more diversity on the court. A sharper mentality will allow a better understanding as well as diversity on the court. Not only will term limits control the power but will reduce political ... Get more on HelpWriting.net ...
  • 48.
    The Hallmarks OfA Stem Cell The hallmarks of a stem cell are its ability to self renew as well as its ability to differentiate and assume almost any cell fate if given the appropriate cues known as pluripotency (ref). The differentiation of stem cells requires large and rapid changes in gene expression. miRNAs are well suited to carry out this task through their ability to simultaneously inhibit the translation of several target genes allowing for coordinated control of cellular processes{Bartel:2009fh}. Furthermore, miRNAs have been shown to regulate embryonic development in addition to their role in regulating stem cellfate{Stefani:2008bw}. Evidence for this comes from experimental studies where the overall function of the miRNA biogenesis pathway was evaluated through genetic deletion of the miRNA processing enzymes DICER, DGCR8, Drosha, and AGO2. DICER knockout mice die at early stages of embryogenesis and fail to express the stem cell marker Oct4 and primitive streak marker T (brachyury), which respectively indicate a loss of stem cells and arrested development during gastrulation{Bernstein:2003dp}. Furthermore, DICER deficient mouse ES cells are viable but incapable of differentiation, showing severe proliferation defects{Kanellopoulou:2005kf, Murchison:2005fa}. Similarly, DGCR8 knockout mice arrest early in development{Wang:2007gb}. DGCR8 deficient mouse ES cells also exhibit a proliferation defect and cannot efficiently silence the ES cell program, although these defects are not as ... Get more on HelpWriting.net ...
  • 49.
    Pepsi Vs ColaWars Research Paper PepsiCo and the Coca Cola Company have competed with each other for as long as most people could remember. Pepsi and Coca Cola are the original sodas that the companies have produced. The two products are similar, but there are minuscule differences that are the deal breaker for many individuals. When looking at the popular choice of soft drinks between Pepsi and Coke, Coca Colawould be considered the winner due to its well known enterprise, taste, and nutritional value. Coca Cola is a popular soft drink and one of the top American brands sold across numerous countries. Coca Cola was sold thirteen years before Pepsi Cola. About a million gallons of Coke per year had already been sold by the time Pepsi was introduced to the world (Bahsin, Coke Vs. Pepsi: The Amazing Story Behind the Cola Wars ). Coke has been in the lead of the United States carbonated drinks market with a 42.8 percent of the market share, compared to Pepsi s 31.1 percent. According to Business Insider, most people can easily recognize the brand s logo and the ... Show more content on Helpwriting.net ... A twelve ounce can of Pepsi is one hundred and fifty calories, while a can of Coca Cola is one hundred and forty calories. Pepsi contains forty one grams of sugar and thirty eight milligrams of caffeine. Coca Cola has thirty nine grams of sugar and thirty four milligrams of caffeine. The ingredients that go into the two carbonated drinks are fairly similar. Both drinks are made with carbonated water, high fructose corn syrup, caramel coloring, sugar, phosphoric acid, and natural flavors. The only difference in their ingredients is that Pepsi contains citric acid, which explains its faint citrusy taste, whereas Coke does not ( 12 Fl Oz Official Site for PepsiCo Beverage Information ; Coca Cola Ingredients and Nutritional Information ). Numerous people are quite fond of Coke s flavor, though, and prefer it to the taste of Pepsi ... Get more on HelpWriting.net ...
  • 50.
    Essay about WorkWithin a Legal and Ethical Framework Work within a legal and ethical framework Task A Question 1 Why is important for a worker in the csi to follow their job description? It is important for a worker in the community service industry to follow their job description as it is important that they give a professional standard of the service. It is also due to confidentiality. Community service workers have duty of care to their clients. Also it is important they follow their job description because different services may have different policy and procedures and guidelines that need to be followed accurately so that duty of care is upheld to each client. Question 2 Define the term policy. A policy is a course of action or guidelines to be followed. Question 3 Define the... Show more content on Helpwriting.net ... Ask Julie if she would like to be referred to AA and counselling to help her with her alcohol abuse and the domestic violence she experienced whilst she was with bill 2. At the request of the client act as an advocate and or support for clients accessing referral services and other agencies Call other services to see which services can help Julie with the support and assistance she and her family need. 3. Provide outreach services as required Organize for Julie to call St Vincent de Paul and other organisations that deal with helping people with financial aid so she can get help wit food vouchers, rent, and power bills (etc.) Question 4 As the worker identify and discuss 2 ethical dilemmas in this case study. 1. Heavy drinking: with evidence of heavy drinking it automatically puts the kids at risk of harm especially when Julie is intoxicated who is there to look after the children 2. Domestic violence: Julie has already left bill ounce for domestic violence and she is now planning to take bill back which puts the kids at risk of harm with the fighting and violence that bill brings into the home Question 5 What principles would you need to be aware of when dealing with the ethical dilemmas in this case study? * Be very clear on the guidelines of your particular profession * Be familiar with and guided by all relevant standards which further define how legislation is applied. I am a family ... Get more on HelpWriting.net ...
  • 51.
    Simon Bolivar SIMON BOLIVAR ONECOUNTRY, ONE BROKEN DREAM. Herbert Maduro Columbia Southern University SIMON BOLIVAR ONE COUNTRY, ONE BROKEN DREAM. Herbert Maduro Columbia Southern University Simon Bolivar has been considered by many historians as the liberator of the Americas, he lead an army that liberated Venezuela, Colombia, Peru, Ecuador and Bolivia from the Spanish rule. Bolivar dreamed in having these countries unified as one big country called The Gran Colombia . These countries would have shared a centralized government and would have had the city of Bogota as its capital. In this article I want to explore the reasons why he could not achieve this dream of unifying these countries and if he had what economic and social ... Show more content on Helpwriting.net ... With magnanimous sincerity, San Martin offered to place himself and his soldiers under Bolivar s command if he would send the full Colombian army to drive the Spanish out of Peru. Unfortunately for the patriot cause, Bolivar apparently regarded San Martin as a rival and an antagonist rather than as a comrade in arms, an obstacle to be removed before his own fame and glory were compromised by sharing them with another. Bolivar refused the incredibly selfless offer, saying that his delicacy would not allow him to command San Martin, and that the Colombian Congress would not permit him to leave Colombia to pursue the war in Peru. San Martin also indicated in an interview that he San Martin, a keen reader of men, immediately perceived the arrogance and raw ambition that lay behind the mask of courtly civility and empty excuses. Years later, in 1840, while living in voluntary exile in France, the general confided his candid assessment of Bolivar s character to a visitor, Captain Lafond de Lurcy of the French navy: At first sight his personal appearance prejudiced me against him. He appeared to have much pride, which was in contrast to his habit of never looking in the face of the person he was addressing unless the latter was ... Get more on HelpWriting.net ...
  • 52.
    The Iran-Iraq WarEssay The Iran Iraq War While the Iran Iraq War during the 1980 s may have permanently altered the course of progress in Iran and Iraq, the war also altered the resulting permanent involvement of the rest of the world in the middle east. The rich and complicated history in Iraq has established numerous cultural and ethnic traditions that all play a part in where the country is today. The Iran Iraq War brought into focus some of those traditions and how they conflicted, while also bringing Iraq and its economic situation into the spotlight. Being on top of some of the most mineral rich soil in the world makes Iraq a major contributor to the world s economy through petroleum and crude oil exports. This, among other reasons, ties nations ... Show more content on Helpwriting.net ... The Safavids were the first the first to declare Shia Islam the official religion of Iran, and their interest in Iraq lay in the Shia holy places in central Iraq, and also the fact that Baghdad held significant symbolic value as the seat of the ancient Abbasid Empire. The Ottoman Empire on the other hand was afraid that Shia Islam would spread to Asia Minor, and thus looked to control Iraq as a Sunni dominated buffer state. During the Ottoman period, the Sunnis were placed in political positions, while the Shias were then shut out of the political process. This divide between the Sunnis and the Shias continued to be more and more of an important element in the Iraqi social structure, and remains an issue even today. It was also during this time period that the Kurdish Baban Dynasty emerged and began to organize resistance to the Ottoman rule in Northern Iraq. Then came the First World War and with it the defeat of the German army and their allies, including Turkey. As a result in 1919, Iraq, as well as Palestine, came under the control of Great Britain who proceeded to draw out the borders and establish a government that would best suit them. The years which followed were filled with revolutions, jihad, and unrest, as the British sought to maintain control of a nation with which they knew very little about. ... Get more on HelpWriting.net ...
  • 53.
    The Disadvantages Facedby Catholics in Northern Ireland... The Disadvantages Faced by Catholics in Northern Ireland in the Mid 1960 s Since the partition of 1921 the Catholics and Protestants in Northern Ireland had been unable to live on equal terms together. The North became Northern Ireland and the south the Republic of Ireland. It was not really an event, for decades Britain had resisted Home rule but by 1919 the attitudes were altering. A majority of Northern Irelandwere Protestants, the Catholics only made up 33% of the population, and the 66% left were Protestants. The Protestants wanted to remain a part of Britain but the Catholics wanted to become independent and separate form Ireland. This abhorrence between Catholics and Protestants resulted in ... Show more content on Helpwriting.net ... Then possibly the most important election was the Council Election where you could only vote if your property was worth over ВЈ10(most Catholics didn t have that money) or if you were a tenant of a public authority houses you were allowed to vote but 2/3 of Protestants lived in these public authority houses or if you owned a business or a company you were entitled to a second vote but most companies were owned by Protestants. This was important because any Catholic representing party would have some power in the Stormont Election and the General Elections, which would mean Catholics, had some say in the way the area was run. Because the Council Elections were so important the government used a deceiving tactic called Gerrymandering. When there were more Catholics than Protestants in one council election area, the government would move the borders so that the Protestants would be elected because they would then outnumber the Catholics. We can see that this happened in Londonderry (Derry) where there was 36,049 Catholics and only 17,695 Protestants. After the voting regulations had been applied 14,325 Catholics were entitled to a vote against only 9,235 Protestants. From the numbers given it should have been the Catholics who won control but because of the moving borders the Protestants got into power in that area and most other areas. ... Get more on HelpWriting.net ...
  • 54.
    Organizational Systems Task1 Organizational Systems Task 1 Western Governors University Task 1 A. Nursing sensitive indicators By understanding nursing sensitive indicators, the nurses in this case could improve the structure, process, and outcomes of their nursing care. The structure of nursing care is indicated by the supply of nursing staff and the skill level of the nursing staff. By the nurses having increased knowledge of the issues hip fracture patients are prone to having, such as decrease mobility, increase need for surgical intervention, and increase risk of falls, could help improve the quality of patient care. A patient with decrease mobility is at higher risk for pressure sores. The nurses in this case may have prevented the one by proper ... Show more content on Helpwriting.net ... Now, the quality improvement department will need to determine what processes can be modified to improve outcomes. For example, if they see an increase in pressure sores and prevalence of restraints. They could use computerized charting and order entry, along with the evidence based guidelines, to identify specific groups of patients who are vulnerable to developing pressure ulcers or closely monitoring use of restraints. With early identification, automatic orders for preventive interventions can be implemented quickly. With the assistance of the automated consults and orders, the appropriate equipment, the interdisciplinary task force, continuing education, and monitoring, the hospital system would be able to reduce unnecessary use of restraints and hospital acquired pressure ulcer prevalence rate (Cherry amp; Jacob, 2010). Then, they would need to implement core measures and protocols. Continuously track performance and outcomes. Lastly, they can disseminate results to throughout the hospital to increase quality improvement (Cherry amp; Jacob, 2010). By educating staff on nursing sensitive indicators and the issues that need to be addressed, could advance the quality of patient care throughout the hospital. In this case, educating hospital staff on ways to prevent restraint use and pressure sore prevention, the staff could have possible prevented the use of restraints and the pressure sore. Also, by educating staff on how to use restraints would be ... Get more on HelpWriting.net ...
  • 55.
    Physical Science Assignment 1 Energycan be converted from one form into another in three basic ways know as the action of force. The first one is gravitational forces which is when gravity accelerates a falling object, its converts its potential energy to kinetic energy. Likewise, when an object is lifted the gravitational field stores the energy exerted by the lifter as potential energy in the earth object system. The second one is electric and magnetic force fields which is charged particles, upon which electrical fields exert forces, possess potential energy in the presence of an electric field in a way similar to that of an object in a gravitational field. These force fields can accelerate particles, converting a particle s potential energy into ... Show more content on Helpwriting.net ... Several different types of oil and gas traps exist. Natural gas is found throughout the world in reservoirs deep beneath the surface of the earth and floor of the oceans. It forms as pockets of gas over crude oil deposits or is trapped in porous rock formations. Natural gas can be found in oil deposits, as associated natural gas, although non associated natural gas is often found without the presence of oil. Natural gas is considered as a clean fuel because of its environmentally friendly properties such as being practically sulphur free and it produces virtually no sulphur dioxide or SO2. (http://environment.about.com/fossilfuels /Environmental_Issues_Fossil_Fuels_Alternative_Fuels.htm) Two different energy alternatives that came to mind is wind powerand hydropower. Societies have taken advantage of wind power for thousands of years. The first known use was in 5000 BC when people used sails to navigate the Nile River. Persians had already been using windmills for 400 years by 900 AD in order to pump water and grind grain. (www.epa.gov/cleanrgy/energy and you/affect/non hydro.html)Windmills may have even been developed in China before 1 AD, but the earliest written documentation comes from 1219. Cretans were using hundreds of sail rotor windmills to pump water for crops and livestock. Wind power is one of the most promising new energy sources that can serve as ... Get more on HelpWriting.net ...