Dragos Bogdan – Reference projects at AEDIFICIA MP
Justice Palace in Bucharest – Rehabilitation project (1998-1999)
 The structure is executed with monumental masonry elements (columns with 2x2 m), reinforced
concrete thin slabs over steel beams and a monumental wood roof. The building is divided in 7
independent wings and inside has some historic protected mural paintings.
Duties:
 Modelling, designing and optimising the strength structure according to Romanian standards and
normative in force and searching and implementing a rehabilitation solution that not affect the mural
paintings;
 The solution agreed by the authorities was to build 7 reinforced concrete cores inside interior courts of
the building connecting them with reinforced concrete flat slabs;
 Development of drawings, technical memorandums and technical specifications;
 Developed and implemented special details for reinforced concrete and steel elements.
Catalytic cracking reactor’s steel strength structure – Rehabilitation project (1998-1999)
 The strength structure is 43 m tall and has 2x1 bays of 6.05 m and is entirely
executed with American wide beams (the structure was raised in year 1965);
 This first rehabilitation project was needed because the beneficiary wanted to
change the existing reactor (at that time) with a new one and the Romanian
seismic standard experienced some improvements toward the one from year
1965;
Duties:
 Modelling the strength structure, designing and optimising the rehabilitation
system according to Romanian standards and normative in force at that time;
 Studied and developed the rehabilitation solution using a tuned mass damper
at the top of the structure;
 Development of drawings, technical memorandums and technical
specifications;
 Developed and implemented special details for mounting the tuned mass
damper on the strength structure.

More Related Content

What's hot

Dominic Holder Portfolio
Dominic Holder PortfolioDominic Holder Portfolio
Dominic Holder PortfolioDominic Holder
 
Emergency Vehicle Operator Course (EVOC)
Emergency Vehicle Operator Course (EVOC)Emergency Vehicle Operator Course (EVOC)
Emergency Vehicle Operator Course (EVOC)PostTensioningInstitute
 
San-Francisco-Oakland Bay Bridge New East Span: Skyway
San-Francisco-Oakland Bay Bridge New East Span: SkywaySan-Francisco-Oakland Bay Bridge New East Span: Skyway
San-Francisco-Oakland Bay Bridge New East Span: SkywayPostTensioningInstitute
 
Metropol Parasol Surface Structure Design Report
Metropol Parasol Surface Structure Design ReportMetropol Parasol Surface Structure Design Report
Metropol Parasol Surface Structure Design ReportKelvin Ng
 
Marquette plaza agresh & snehansu
Marquette plaza agresh & snehansuMarquette plaza agresh & snehansu
Marquette plaza agresh & snehansuKumar Snehansu
 
Item #4 ppt - uiw - 4707 broadway
Item #4   ppt - uiw - 4707 broadwayItem #4   ppt - uiw - 4707 broadway
Item #4 ppt - uiw - 4707 broadwayahcitycouncil
 
Transformation of Warehouse to The King's Centre
Transformation of Warehouse to The King's CentreTransformation of Warehouse to The King's Centre
Transformation of Warehouse to The King's CentreBob Harrison
 
High Rise Structures case study - The Gherkin & Shanghai financial center.
High Rise Structures  case study - The Gherkin & Shanghai financial center.High Rise Structures  case study - The Gherkin & Shanghai financial center.
High Rise Structures case study - The Gherkin & Shanghai financial center.Shabarinath R
 
Marquette Plaza, Minneapolis, Minnesota, United States.
Marquette Plaza, Minneapolis, Minnesota, United States.Marquette Plaza, Minneapolis, Minnesota, United States.
Marquette Plaza, Minneapolis, Minnesota, United States.Mayur Waghulde
 
Cappella Lofts
Cappella LoftsCappella Lofts
Cappella Loftschienjulin
 
Murrayville Heritage Conservation Area
Murrayville Heritage Conservation AreaMurrayville Heritage Conservation Area
Murrayville Heritage Conservation Areajgabateman
 
Kinematics & dynamics assgn
Kinematics & dynamics assgnKinematics & dynamics assgn
Kinematics & dynamics assgnAshfaq Ahmed. A
 
The Glenn Building - Revised_ 051011
The Glenn Building - Revised_ 051011The Glenn Building - Revised_ 051011
The Glenn Building - Revised_ 051011David Peterson
 

What's hot (20)

Dominic Holder Portfolio
Dominic Holder PortfolioDominic Holder Portfolio
Dominic Holder Portfolio
 
Emergency Vehicle Operator Course (EVOC)
Emergency Vehicle Operator Course (EVOC)Emergency Vehicle Operator Course (EVOC)
Emergency Vehicle Operator Course (EVOC)
 
Edward Rice House
Edward Rice HouseEdward Rice House
Edward Rice House
 
San-Francisco-Oakland Bay Bridge New East Span: Skyway
San-Francisco-Oakland Bay Bridge New East Span: SkywaySan-Francisco-Oakland Bay Bridge New East Span: Skyway
San-Francisco-Oakland Bay Bridge New East Span: Skyway
 
Metropol Parasol Surface Structure Design Report
Metropol Parasol Surface Structure Design ReportMetropol Parasol Surface Structure Design Report
Metropol Parasol Surface Structure Design Report
 
Marquette plaza agresh & snehansu
Marquette plaza agresh & snehansuMarquette plaza agresh & snehansu
Marquette plaza agresh & snehansu
 
Item #4 ppt - uiw - 4707 broadway
Item #4   ppt - uiw - 4707 broadwayItem #4   ppt - uiw - 4707 broadway
Item #4 ppt - uiw - 4707 broadway
 
Fallingwater Residence
Fallingwater ResidenceFallingwater Residence
Fallingwater Residence
 
Transformation of Warehouse to The King's Centre
Transformation of Warehouse to The King's CentreTransformation of Warehouse to The King's Centre
Transformation of Warehouse to The King's Centre
 
High Rise Structures case study - The Gherkin & Shanghai financial center.
High Rise Structures  case study - The Gherkin & Shanghai financial center.High Rise Structures  case study - The Gherkin & Shanghai financial center.
High Rise Structures case study - The Gherkin & Shanghai financial center.
 
Marquette Plaza, Minneapolis, Minnesota, United States.
Marquette Plaza, Minneapolis, Minnesota, United States.Marquette Plaza, Minneapolis, Minnesota, United States.
Marquette Plaza, Minneapolis, Minnesota, United States.
 
The Gherkin
The GherkinThe Gherkin
The Gherkin
 
Park avenue
Park avenuePark avenue
Park avenue
 
Cappella Lofts
Cappella LoftsCappella Lofts
Cappella Lofts
 
Murrayville Heritage Conservation Area
Murrayville Heritage Conservation AreaMurrayville Heritage Conservation Area
Murrayville Heritage Conservation Area
 
AR Gunnar Birkerts
AR Gunnar BirkertsAR Gunnar Birkerts
AR Gunnar Birkerts
 
Gherkin london
Gherkin londonGherkin london
Gherkin london
 
Bms slides
Bms slidesBms slides
Bms slides
 
Kinematics & dynamics assgn
Kinematics & dynamics assgnKinematics & dynamics assgn
Kinematics & dynamics assgn
 
The Glenn Building - Revised_ 051011
The Glenn Building - Revised_ 051011The Glenn Building - Revised_ 051011
The Glenn Building - Revised_ 051011
 

Viewers also liked

212.учебно методическое пособие по организации и проведению студенческой прак...
212.учебно методическое пособие по организации и проведению студенческой прак...212.учебно методическое пособие по организации и проведению студенческой прак...
212.учебно методическое пособие по организации и проведению студенческой прак...ivanov15666688
 
208.планирование на предприятиях метод указания по выполнению курсовых работ ...
208.планирование на предприятиях метод указания по выполнению курсовых работ ...208.планирование на предприятиях метод указания по выполнению курсовых работ ...
208.планирование на предприятиях метод указания по выполнению курсовых работ ...ivanov15666688
 
662.учитель личность деятельность
662.учитель личность деятельность662.учитель личность деятельность
662.учитель личность деятельностьivanov1566353422
 
JNR Footer - Firas : Chas...
JNR Footer - Firas : Chas...JNR Footer - Firas : Chas...
JNR Footer - Firas : Chas...Richard Ward
 
La radio musical en España - Jornada programación musical HyperTop Madrid 201...
La radio musical en España - Jornada programación musical HyperTop Madrid 201...La radio musical en España - Jornada programación musical HyperTop Madrid 201...
La radio musical en España - Jornada programación musical HyperTop Madrid 201...ACTUONDA
 
Vif Musique et Marques @ Webinar Radio 2.0 MaMA 2016
Vif Musique et Marques @ Webinar Radio 2.0 MaMA 2016Vif Musique et Marques @ Webinar Radio 2.0 MaMA 2016
Vif Musique et Marques @ Webinar Radio 2.0 MaMA 2016ACTUONDA
 
Carrefour Logistic Management
Carrefour Logistic Management Carrefour Logistic Management
Carrefour Logistic Management Benjamin Perraut
 
DEPRECIACION POR UNIDADES DE PRODUCCIÓN
DEPRECIACION POR UNIDADES DE PRODUCCIÓNDEPRECIACION POR UNIDADES DE PRODUCCIÓN
DEPRECIACION POR UNIDADES DE PRODUCCIÓNCARLOS MASSUH
 
Presentation On Commitment
Presentation On CommitmentPresentation On Commitment
Presentation On CommitmentSujon Sarkar
 

Viewers also liked (11)

212.учебно методическое пособие по организации и проведению студенческой прак...
212.учебно методическое пособие по организации и проведению студенческой прак...212.учебно методическое пособие по организации и проведению студенческой прак...
212.учебно методическое пособие по организации и проведению студенческой прак...
 
MadsKeblovszkiResume
MadsKeblovszkiResumeMadsKeblovszkiResume
MadsKeblovszkiResume
 
Porfolio Cédric Bruzac Abeep
Porfolio Cédric Bruzac  AbeepPorfolio Cédric Bruzac  Abeep
Porfolio Cédric Bruzac Abeep
 
208.планирование на предприятиях метод указания по выполнению курсовых работ ...
208.планирование на предприятиях метод указания по выполнению курсовых работ ...208.планирование на предприятиях метод указания по выполнению курсовых работ ...
208.планирование на предприятиях метод указания по выполнению курсовых работ ...
 
662.учитель личность деятельность
662.учитель личность деятельность662.учитель личность деятельность
662.учитель личность деятельность
 
JNR Footer - Firas : Chas...
JNR Footer - Firas : Chas...JNR Footer - Firas : Chas...
JNR Footer - Firas : Chas...
 
La radio musical en España - Jornada programación musical HyperTop Madrid 201...
La radio musical en España - Jornada programación musical HyperTop Madrid 201...La radio musical en España - Jornada programación musical HyperTop Madrid 201...
La radio musical en España - Jornada programación musical HyperTop Madrid 201...
 
Vif Musique et Marques @ Webinar Radio 2.0 MaMA 2016
Vif Musique et Marques @ Webinar Radio 2.0 MaMA 2016Vif Musique et Marques @ Webinar Radio 2.0 MaMA 2016
Vif Musique et Marques @ Webinar Radio 2.0 MaMA 2016
 
Carrefour Logistic Management
Carrefour Logistic Management Carrefour Logistic Management
Carrefour Logistic Management
 
DEPRECIACION POR UNIDADES DE PRODUCCIÓN
DEPRECIACION POR UNIDADES DE PRODUCCIÓNDEPRECIACION POR UNIDADES DE PRODUCCIÓN
DEPRECIACION POR UNIDADES DE PRODUCCIÓN
 
Presentation On Commitment
Presentation On CommitmentPresentation On Commitment
Presentation On Commitment
 

Similar to Dragos Bogdan ANNEX AEDIFICIA MP

Dragos Bogdan ANNEX P&A
Dragos Bogdan ANNEX P&ADragos Bogdan ANNEX P&A
Dragos Bogdan ANNEX P&ADragos Bogdan
 
Portfolio_DBotelho_2016
Portfolio_DBotelho_2016Portfolio_DBotelho_2016
Portfolio_DBotelho_2016Diogo Botelho
 
A long span structure in Romania Full paper balint karoly
A long span structure in Romania Full paper balint karolyA long span structure in Romania Full paper balint karoly
A long span structure in Romania Full paper balint karolyAnupama Krishnan
 
Case studies for strengthening of existing structures
Case studies for strengthening of existing structuresCase studies for strengthening of existing structures
Case studies for strengthening of existing structuresParamaAthmeka
 
Commission on Chicago Landmarks Meet Agenda - May 13th, 2015
Commission on Chicago Landmarks Meet Agenda - May 13th, 2015Commission on Chicago Landmarks Meet Agenda - May 13th, 2015
Commission on Chicago Landmarks Meet Agenda - May 13th, 2015West Central Association
 
St. Louis Council of Construction Consumers - Best Practices Submission for t...
St. Louis Council of Construction Consumers - Best Practices Submission for t...St. Louis Council of Construction Consumers - Best Practices Submission for t...
St. Louis Council of Construction Consumers - Best Practices Submission for t...wesleyvillhard
 
BUILDING TECHNOLOGY PROJECT 2 REPORT
BUILDING TECHNOLOGY PROJECT 2 REPORTBUILDING TECHNOLOGY PROJECT 2 REPORT
BUILDING TECHNOLOGY PROJECT 2 REPORTJoyeeLee0131
 
Strengthening and Reconstruction of the Hugo Treffner Gymnasium building in T...
Strengthening and Reconstruction of the Hugo Treffner Gymnasium building in T...Strengthening and Reconstruction of the Hugo Treffner Gymnasium building in T...
Strengthening and Reconstruction of the Hugo Treffner Gymnasium building in T...Kari Christer Avellan
 
HEARST PPT.pptx
HEARST PPT.pptxHEARST PPT.pptx
HEARST PPT.pptxKvmRaju
 
Seismic retrofitting of heritage building- case study
Seismic retrofitting of heritage building- case studySeismic retrofitting of heritage building- case study
Seismic retrofitting of heritage building- case studyashlinvilson
 
ICRI - Modern Trends - FRCM Strengthening Technology
ICRI - Modern Trends - FRCM Strengthening TechnologyICRI - Modern Trends - FRCM Strengthening Technology
ICRI - Modern Trends - FRCM Strengthening TechnologyLorella Angelini
 
Consequences and Influences of Active Deflection in the Design of Concrete Fr...
Consequences and Influences of Active Deflection in the Design of Concrete Fr...Consequences and Influences of Active Deflection in the Design of Concrete Fr...
Consequences and Influences of Active Deflection in the Design of Concrete Fr...QUESTJOURNAL
 
MSB01_Architect_s_Guide_2010-08-05.pdf
MSB01_Architect_s_Guide_2010-08-05.pdfMSB01_Architect_s_Guide_2010-08-05.pdf
MSB01_Architect_s_Guide_2010-08-05.pdfSameerSawant61
 
Long Span Structures.pdf
Long Span Structures.pdfLong Span Structures.pdf
Long Span Structures.pdfChitti47
 
STEEL IN ARCHITECTURE-CONTEMPORARY ARCHITECTURE
STEEL IN ARCHITECTURE-CONTEMPORARY ARCHITECTURESTEEL IN ARCHITECTURE-CONTEMPORARY ARCHITECTURE
STEEL IN ARCHITECTURE-CONTEMPORARY ARCHITECTUREMohd Azmatullah
 
5. pre stressed & pre-cast members
5. pre stressed & pre-cast members5. pre stressed & pre-cast members
5. pre stressed & pre-cast membersNoshad Ahmed Wahocho
 

Similar to Dragos Bogdan ANNEX AEDIFICIA MP (20)

Dragos Bogdan ANNEX P&A
Dragos Bogdan ANNEX P&ADragos Bogdan ANNEX P&A
Dragos Bogdan ANNEX P&A
 
Portfolio_DBotelho_2016
Portfolio_DBotelho_2016Portfolio_DBotelho_2016
Portfolio_DBotelho_2016
 
A long span structure in Romania Full paper balint karoly
A long span structure in Romania Full paper balint karolyA long span structure in Romania Full paper balint karoly
A long span structure in Romania Full paper balint karoly
 
Case studies for strengthening of existing structures
Case studies for strengthening of existing structuresCase studies for strengthening of existing structures
Case studies for strengthening of existing structures
 
Commission on Chicago Landmarks Meet Agenda - May 13th, 2015
Commission on Chicago Landmarks Meet Agenda - May 13th, 2015Commission on Chicago Landmarks Meet Agenda - May 13th, 2015
Commission on Chicago Landmarks Meet Agenda - May 13th, 2015
 
St. Louis Council of Construction Consumers - Best Practices Submission for t...
St. Louis Council of Construction Consumers - Best Practices Submission for t...St. Louis Council of Construction Consumers - Best Practices Submission for t...
St. Louis Council of Construction Consumers - Best Practices Submission for t...
 
BUILDING TECHNOLOGY PROJECT 2 REPORT
BUILDING TECHNOLOGY PROJECT 2 REPORTBUILDING TECHNOLOGY PROJECT 2 REPORT
BUILDING TECHNOLOGY PROJECT 2 REPORT
 
Strengthening and Reconstruction of the Hugo Treffner Gymnasium building in T...
Strengthening and Reconstruction of the Hugo Treffner Gymnasium building in T...Strengthening and Reconstruction of the Hugo Treffner Gymnasium building in T...
Strengthening and Reconstruction of the Hugo Treffner Gymnasium building in T...
 
HEARST PPT.pptx
HEARST PPT.pptxHEARST PPT.pptx
HEARST PPT.pptx
 
Seismic retrofitting of heritage building- case study
Seismic retrofitting of heritage building- case studySeismic retrofitting of heritage building- case study
Seismic retrofitting of heritage building- case study
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concrete
 
ICRI - Modern Trends - FRCM Strengthening Technology
ICRI - Modern Trends - FRCM Strengthening TechnologyICRI - Modern Trends - FRCM Strengthening Technology
ICRI - Modern Trends - FRCM Strengthening Technology
 
Rcs1-chapter1
Rcs1-chapter1Rcs1-chapter1
Rcs1-chapter1
 
PORTFOLIO-DCASSIANO
PORTFOLIO-DCASSIANOPORTFOLIO-DCASSIANO
PORTFOLIO-DCASSIANO
 
Consequences and Influences of Active Deflection in the Design of Concrete Fr...
Consequences and Influences of Active Deflection in the Design of Concrete Fr...Consequences and Influences of Active Deflection in the Design of Concrete Fr...
Consequences and Influences of Active Deflection in the Design of Concrete Fr...
 
PEB.pptx
PEB.pptxPEB.pptx
PEB.pptx
 
MSB01_Architect_s_Guide_2010-08-05.pdf
MSB01_Architect_s_Guide_2010-08-05.pdfMSB01_Architect_s_Guide_2010-08-05.pdf
MSB01_Architect_s_Guide_2010-08-05.pdf
 
Long Span Structures.pdf
Long Span Structures.pdfLong Span Structures.pdf
Long Span Structures.pdf
 
STEEL IN ARCHITECTURE-CONTEMPORARY ARCHITECTURE
STEEL IN ARCHITECTURE-CONTEMPORARY ARCHITECTURESTEEL IN ARCHITECTURE-CONTEMPORARY ARCHITECTURE
STEEL IN ARCHITECTURE-CONTEMPORARY ARCHITECTURE
 
5. pre stressed & pre-cast members
5. pre stressed & pre-cast members5. pre stressed & pre-cast members
5. pre stressed & pre-cast members
 

Dragos Bogdan ANNEX AEDIFICIA MP

  • 1. 1/1 Dragos Bogdan – Reference projects at AEDIFICIA MP Justice Palace in Bucharest – Rehabilitation project (1998-1999)  The structure is executed with monumental masonry elements (columns with 2x2 m), reinforced concrete thin slabs over steel beams and a monumental wood roof. The building is divided in 7 independent wings and inside has some historic protected mural paintings. Duties:  Modelling, designing and optimising the strength structure according to Romanian standards and normative in force and searching and implementing a rehabilitation solution that not affect the mural paintings;  The solution agreed by the authorities was to build 7 reinforced concrete cores inside interior courts of the building connecting them with reinforced concrete flat slabs;  Development of drawings, technical memorandums and technical specifications;  Developed and implemented special details for reinforced concrete and steel elements. Catalytic cracking reactor’s steel strength structure – Rehabilitation project (1998-1999)  The strength structure is 43 m tall and has 2x1 bays of 6.05 m and is entirely executed with American wide beams (the structure was raised in year 1965);  This first rehabilitation project was needed because the beneficiary wanted to change the existing reactor (at that time) with a new one and the Romanian seismic standard experienced some improvements toward the one from year 1965; Duties:  Modelling the strength structure, designing and optimising the rehabilitation system according to Romanian standards and normative in force at that time;  Studied and developed the rehabilitation solution using a tuned mass damper at the top of the structure;  Development of drawings, technical memorandums and technical specifications;  Developed and implemented special details for mounting the tuned mass damper on the strength structure.