Construction Update - February 2015 - VVCCD Dr. Prem Reddy Health Sciences Bu...Justin Gatewood
This is an update regarding the progress of construction on the Dr. Prem Reddy Health Sciences Building Project at the Victor Valley Community College District.
Dr. Prem Reddy Health Sciences Building - Project Construction Update - March...Justin Gatewood
This is a construction project update for March 2015 regarding the status of the Dr. Prem Reddy Health Sciences Building at the Victor Valley Community College District's main Victor Valley College campus.
VVCCD - Dr. Prem Reddy Health Sciences Building - Construction ProgressJustin Gatewood
The Dr. Prem Reddy Health Sciences Building Construction project is underway. This presentation is a collection of photos taken during the early stages of this project so far as of September 2014.
Construction Update - February 2015 - VVCCD Dr. Prem Reddy Health Sciences Bu...Justin Gatewood
This is an update regarding the progress of construction on the Dr. Prem Reddy Health Sciences Building Project at the Victor Valley Community College District.
Dr. Prem Reddy Health Sciences Building - Project Construction Update - March...Justin Gatewood
This is a construction project update for March 2015 regarding the status of the Dr. Prem Reddy Health Sciences Building at the Victor Valley Community College District's main Victor Valley College campus.
VVCCD - Dr. Prem Reddy Health Sciences Building - Construction ProgressJustin Gatewood
The Dr. Prem Reddy Health Sciences Building Construction project is underway. This presentation is a collection of photos taken during the early stages of this project so far as of September 2014.
Victor Valley College Distance Education Academy - November 2014Justin Gatewood
Presentation given at Victor Valley College in November 2015 by Jory Hadsell from the California Community Colleges Chancellor's Office - regarding Distance Education Initiatives from the state level.
Victor Valley College Photovoltaic Solar Technician Program 2014Justin Gatewood
Victor Valley College's Construction Technology - Photovoltaic Solar Technician Program teaches students the knowledge and skills needed to enter this fast-growing industry. This year, California will add over 10,000 solar workers!! Victor Valley College's Construction Technology Department hosts a highly successful Solar Hiring Conference each semester for students achieving a grade of 80% or better.”
Satisfactory Academic Progress presentation provided to students to help them understand the entire process, pass an 8-question quiz, and gain access to the SAP Appeal form to be able to continue with their educational goals and taken more classes at Victor Valley College!
Victor Valley College Distance Education Academy - November 2014Justin Gatewood
Presentation given at Victor Valley College in November 2015 by Jory Hadsell from the California Community Colleges Chancellor's Office - regarding Distance Education Initiatives from the state level.
Victor Valley College Photovoltaic Solar Technician Program 2014Justin Gatewood
Victor Valley College's Construction Technology - Photovoltaic Solar Technician Program teaches students the knowledge and skills needed to enter this fast-growing industry. This year, California will add over 10,000 solar workers!! Victor Valley College's Construction Technology Department hosts a highly successful Solar Hiring Conference each semester for students achieving a grade of 80% or better.”
Satisfactory Academic Progress presentation provided to students to help them understand the entire process, pass an 8-question quiz, and gain access to the SAP Appeal form to be able to continue with their educational goals and taken more classes at Victor Valley College!
This presentation gives a visual overview of the '20 Tips for Teaching an Accessible Online Course' by Sheryl Burghstahler, Ph.D. of the University of Washington. This presentation was given to faculty members at Victor Valley College at our Spring 2018 Distance Education Academy
eduWeb 2017 - S.I.F.T. Through Your Content For Accessibility Justin Gatewood
This presentation demonstrates a proposed method for working through the process of making web content accessible to visitors using assistive technology.
Satisfactory Academic Progress presentation provided to students to help them understand the entire process, pass an 8-question quiz, and gain access to the SAP Appeal form to be able to continue with their educational goals and taken more classes at Victor Valley College!
Introduction to AI for Nonprofits with Tapp NetworkTechSoup
Dive into the world of AI! Experts Jon Hill and Tareq Monaur will guide you through AI's role in enhancing nonprofit websites and basic marketing strategies, making it easy to understand and apply.
Normal Labour/ Stages of Labour/ Mechanism of LabourWasim Ak
Normal labor is also termed spontaneous labor, defined as the natural physiological process through which the fetus, placenta, and membranes are expelled from the uterus through the birth canal at term (37 to 42 weeks
A Strategic Approach: GenAI in EducationPeter Windle
Artificial Intelligence (AI) technologies such as Generative AI, Image Generators and Large Language Models have had a dramatic impact on teaching, learning and assessment over the past 18 months. The most immediate threat AI posed was to Academic Integrity with Higher Education Institutes (HEIs) focusing their efforts on combating the use of GenAI in assessment. Guidelines were developed for staff and students, policies put in place too. Innovative educators have forged paths in the use of Generative AI for teaching, learning and assessments leading to pockets of transformation springing up across HEIs, often with little or no top-down guidance, support or direction.
This Gasta posits a strategic approach to integrating AI into HEIs to prepare staff, students and the curriculum for an evolving world and workplace. We will highlight the advantages of working with these technologies beyond the realm of teaching, learning and assessment by considering prompt engineering skills, industry impact, curriculum changes, and the need for staff upskilling. In contrast, not engaging strategically with Generative AI poses risks, including falling behind peers, missed opportunities and failing to ensure our graduates remain employable. The rapid evolution of AI technologies necessitates a proactive and strategic approach if we are to remain relevant.
Model Attribute Check Company Auto PropertyCeline George
In Odoo, the multi-company feature allows you to manage multiple companies within a single Odoo database instance. Each company can have its own configurations while still sharing common resources such as products, customers, and suppliers.
How to Make a Field invisible in Odoo 17Celine George
It is possible to hide or invisible some fields in odoo. Commonly using “invisible” attribute in the field definition to invisible the fields. This slide will show how to make a field invisible in odoo 17.
Synthetic Fiber Construction in lab .pptxPavel ( NSTU)
Synthetic fiber production is a fascinating and complex field that blends chemistry, engineering, and environmental science. By understanding these aspects, students can gain a comprehensive view of synthetic fiber production, its impact on society and the environment, and the potential for future innovations. Synthetic fibers play a crucial role in modern society, impacting various aspects of daily life, industry, and the environment. ynthetic fibers are integral to modern life, offering a range of benefits from cost-effectiveness and versatility to innovative applications and performance characteristics. While they pose environmental challenges, ongoing research and development aim to create more sustainable and eco-friendly alternatives. Understanding the importance of synthetic fibers helps in appreciating their role in the economy, industry, and daily life, while also emphasizing the need for sustainable practices and innovation.
Safalta Digital marketing institute in Noida, provide complete applications that encompass a huge range of virtual advertising and marketing additives, which includes search engine optimization, virtual communication advertising, pay-per-click on marketing, content material advertising, internet analytics, and greater. These university courses are designed for students who possess a comprehensive understanding of virtual marketing strategies and attributes.Safalta Digital Marketing Institute in Noida is a first choice for young individuals or students who are looking to start their careers in the field of digital advertising. The institute gives specialized courses designed and certification.
for beginners, providing thorough training in areas such as SEO, digital communication marketing, and PPC training in Noida. After finishing the program, students receive the certifications recognised by top different universitie, setting a strong foundation for a successful career in digital marketing.
Biological screening of herbal drugs: Introduction and Need for
Phyto-Pharmacological Screening, New Strategies for evaluating
Natural Products, In vitro evaluation techniques for Antioxidants, Antimicrobial and Anticancer drugs. In vivo evaluation techniques
for Anti-inflammatory, Antiulcer, Anticancer, Wound healing, Antidiabetic, Hepatoprotective, Cardio protective, Diuretics and
Antifertility, Toxicity studies as per OECD guidelines
2. Construction Technology Class 106 on tour of building.
Balfour Beatty Superintendent has led several different classes on tours through the construction site.
3. First area to receive structural steel. This are is the student restrooms near front entrance.
5. Another shot of the steel sub setting steel at rotunda. This is looking at rotunda from the nursing
fundamentals space. The crane is sitting in the courtyard space between new and existing bldgs.
10. Block wall between the Digital nurse proctor and the SIM lab space. This wall will
frame the south wall up the mechanical attic space above.
11. The rebar cages and block work at columns has started. This is for covered walkway connecting existing bldg. to
the exit foyer for the anatomy labs. A new door will be cut into block wall of existing bldg. during Christmas break.
12. This wall between the student restrooms and medical supplies/utilities rooms will frame the
north end of the mechanical attic space. The large opening seen here is for a ventilation louver.
13. Scaffolding from inside the electrical room/foyer/science labs space has been removed. The two doorways here
are the double door to electric room and the exit foyer door.
14. Space for the science labs. Far corner area will be the chemical balance room. Scaffold has been removed.
16. Facing the bldg., looking to the left. This side of the bldg. will house the
faculty offices, nursing fundamentals lab, chemistry labs, etc
17. Chemistry Lab steel erection has begun. Plumbing stub outs coming from floor are for
fume hood cup sink waste lines
18. Physical Science lab/Electrical room structural steel erection has begun.
Steel curb for mechanical unit sits on top of beams.
19. Completed CMU wall forming north wall of mechanical attic space.
A sloped roof will follow the diagonal steel running up side of CMU.
20. Looking at the courtyard area. To the left side is the meeting room, with the rotunda just to the right. Beyond the
crane, where the scaffolding is, is the exterior wall of corridor 127.
21. Further progress made in the CMU columns for the covered walkway connecting existing bldg. to the new bldg at
anatomy labs & cadaver rooms. New doorway will be cut into the existing bldg.
22. Structural steel has been placed at the anatomy/physiology lab. The piping on the CMU wall is for the casework
installed sinks. The cylinders coming out of slab are for the duct which will run up center of student tables.
23. North wall of simulation center (left) and anatomy lab (right). The opening between them is the corridor 134
opening near the study area.
25. Crane flying in the last circular section of steel at
rotunda.
26. Scaffolding has been removed. This is the south side of the bldg. The opening seen here is for the automatic sliding
doors at door 154A (between sim center and anatomy labs)
27. North wall of simulation center space and upper portion is the south wall is second floor mechanical space.
28. This space will be the air lock area at sliding door 154A. Sloped roof will be installed and follow the slope seen here.
To the left of photo is the space for cadaver & cat storage rooms.
29. Looking on into the anatomy with cadaver lab. Piping on wall is for the casework installed sinks. The door way to
the left is the doorway leading to the covered walkway connection the two bldgs.
30. This is the wall between the digital nursing lab/corridor 134 and the workroom/reception office. The upper portion
of wall is the east wall of the second floor mechanical area. The openings seen in upper wall are for louvers.