Structure steel beams
set on columns for
covered walkway
Stainless steel ducting at
South end of cadaver
room.
Cat storage room
Anatomy & Physiology
lab
SIM Center foyer, with
observation & control
rooms.
One of the simulation labs
walls, with headwall
template and backing,
and power conduits
installed
Another shot of
Simulation Center foyer,
from opposite area.
Framed structure of one
shade structure. Outside
Dean’s office
Support steel beams
installed to main covered
walkway columns.
Erected structure of tall
shade structure to the
right.
East facing exterior of
bld, north side.
Electrical room & exit
foyer doors installed.
Masonry columns
for northern covered
walkway
Looking down corridor
127, from faculty offices to
rotunda.
Main shut offs for HVAC
hydronic piping. Inside
Maint. Rm 171
Corridor 127. Storefront
framing for glass installed on
left side wall along corridor.
Womens student
restroom
Men’s student
restooms. Overhead
piping.
Insulation installed at
west wall nursing
fundamentals
Insulation for corridor 127,
other side of wall is nursing
fundamental lab
Insulation installed at
West wall of medical
supplies
Wall between utility room
and beds & equipment
rooms. Washer/dryer
hookups installed
South bldg, west side.
Scaffold for framing of
soffits. Plywood
sheathing installed to
sloped roof.
In wall plumbing for patient
toilet (off Sim Lab)
Janitorial & Maint
supplies room
Trenching for underground
conduits to pilasters for
lighting power.
Overhead duct & wall
insulation installed in
Physical Science
Chemical balance lab, from
exit foyer
Wall insulation, overhead
work in Chemistry Lab
Drywall installed in
corridor 127, north end
Drywall installed around
doorway leading to faculty
offices
Fundamental lab
observation room, with
nursing fundamental lab
ahead
Overhead work & bracing
for operable partition wall
Fundamentals
Observation room
Inside hallway in faculty
office area. Faculty offices
are getting drywall
installed
Ground graded for
concrete to be poured
between bldgs
Plumbing shut off valves
(will have access panel) in
Cat storage
Workroom near Deans
Office
Graded courtyard area,
with shade structure
frame work
Landscapers trenching for
irrigation, adjacent to
existing bldg
Perforated metal panels
for installing at tops of
shade structures.
Electrical equipment
installed inside electrical
room (north)
Overhead work, and wall
insulation at hallway of
faculty offices
Nursing fundmentals.
Some of the faculty
offices. Insulation &
Drywall being installed
Second floor mechanical
area louver, PVC roofing
installed
Hydronic HVAC piping in
mechanical area upstairs
Steel contractor welding
at rotunda – Shields up to
protect others from arc
flash
Ducting ran upstairs,
decking installed above.
Plywood being fastened
to decking on sloped roof,
south side
Looking down at
courtyard from southern
roof top
Concrete curb poured
along north face of bldg
Overhead piping across
front lobby decking
Walls of utility room
insulated and backing
installed
Insulation & drywall on
walls of Beds &
Equipment. Overhead
piping installed
Drywall up on west wall of
nursing fundamental lab
Overhead work & drywall
installed in chemistry lab
Drywall installed in exit
foyer (from chem lab)
Metal decking going up on
top of northen covered
walkway
Irrigation piping installed
in trench.
Set up of forms for
concrete pour in
courtyard.
Drywall along both sides
of corridor 127 (north
end)
Trees delivered for
installing around site
Deans Office
Study area alcove in
corridor 134
Staff restroom
Forms for the color bands
in courtyard concrete
Metal decking installed
over main entry, and
partial rotunda
Exterior bldg. soffits
framed out and lathed for
plaster
Mop sink in Custodian
room
Stub outs for wall
mounted drinking
fountain in vestibule
Second floor mechanical
attic
Looking down on
courtyard from roof.
Concrete poured
Glass installed along
corridor 127
Metal decking installed on
main covered walkway
Finish paint on walls in
faculty office area.

Dr. Prem Reddy Health Sciences Building - Project Construction Update - March 2015