Australia may need a pipeline repair club to be prepared for underwater pipeline emergencies, like those that exist in other regions. Pipeline repair clubs in the Gulf of Mexico and Mediterranean Sea provide 24/7 emergency response capabilities to repair pipelines up to depths of 10,000 feet. The North Sea pipeline repair system allows fast repairs through a large pool of shared equipment. Without such a system, pipeline failures could result in environmental damage and economic losses from stopped production. Preparing repair capabilities in advance with the right equipment, personnel, and coordination between companies would help ensure Australia is ready to respond effectively to any unexpected pipeline issues.
Skye Residences | Extended Stay Residences Near Toronto Airport
Does Australia really need a pipeline repair club.... or are we the lucky country by Ray Ferrier
1. Does Australia really need a Pipeline Repair
Club
Cl b ... or are we really ”th l k country”?
ll ”the lucky t ”?
Ray Farrier
Business Development Manager
Nemo Offshore Pty Ltd
Nemo
Group
7. Gulf of Mexico
• Response to Underwater Pipeline Emergencies (RUPE) System
• Formed in 1978
• Provides 24 hr emergency capability
• Depth rating of 10.000 ft
• Costs b
C t based on size and l
d i d length of pipelines d di t d t th program
th f i li dedicated to the
• Membership of 31 Oil and Gas Companies
Nemo
Engineering AS
8. Mediterranean Sea
• Diverless Sealine Repair System (DSRS /
ARCOS)
• Built
B il to suit 20” and 26” T
i d Transmed G Export
d Gas E
Pipelines
• Initiated in 1991
• Built and operated by Sonsub / SNAM
• Depth rating of 650 m
• Stored in Venice, It l
St d i V i Italy
• Not used on a planned basis - A formal request
for authorisation of use and agreed rate will be
required t release th t l
i d to l the tools. Telescopic spool with buoyancy elements
- 4 years R&D before shelving
Nemo
Engineering AS
9. North Sea
• Rising concern for pipeline damage in the late
1980’s
• Pipeline owners agreed on a Pipeline Repair
System (PRS) Pool
• A large t l pool of equipment allows a f t repair of
l tool l f i t ll fast i f
the pipelines.
• Statoil has on behalf of the owner group entered
into necessary contracts to ensure the system is
PRS Welding Habitat
operational at all times.
• Th
Through the PRS contract, th equipment is stored,
h th t t the i ti t d
maintained and modified as required. It also
ensures access to well trained personnel,
equipment and suitable vessels.
Nemo
Engineering AS
15. North Sea PRS - Length of Pipelines covered
13000
m
K
12000 12000
11000
10000 10400
9000
8000 7954 8207
7000 7063
6000 Km
5000 4837
4000
3000 2791
2000
1000 948
0
1987 1991 1997 2000 2002 2004 2006 2008
År
Graph courtesy of Statoil Nemo
Engineering AS
16. North Sea PRS – Pipeline Grid
Courtesy of Statoil
Nemo
Engineering AS
17. Response time from incident to resumed operation
Large leakage
Emergency Project organisation (integrated project team)
Preparedness
team 40 – 100 days
Insp
I Decommission Repair
R i Re-commission
48 hours
21 days
- Notify
- Confirm damage
- Secure affected area
-SSecure and prioritise
d i iti
resources
Information from
- Limit discharge
Statoil
Nemo
Engineering AS
18. The backbone of any PRS System
H-Frame used for
picking up the pipeline
Welding Habitat with
Alignment Frame
(to 180 m depth)
Installation Frame (CIF)
Typically used for installation
of Morgrip couplings and
various pipeline plugs
Nemo
Engineering AS
19. H frames
H-frames
60 T 120 T
Nemo
Engineering AS
23. Morgrip Pipeline Connectors
• MORGRIP is a sleeve type pipeline coupling
with integral sealing & pipe gripping system
• Twin S l Integrity
T i Seal I t it
• External Seal Test Capability
• Metal and graphite sealing material –
resistant to all media
• Pipe end is abutted with internal shoulder /
p pe ends pre-loaded t co p ess e
pipe e ds & p e oaded with compressive
forces
• Load path of external loads is through balls
and bolts – seals & abutment are isolated
from these effects
• 1” to 42” pipe
• Clad d Lined Pipe
Cl d and Li d Pi JIP ongoing
i
Nemo
Engineering AS
26. Slimline Repair Clamps
• Custom made clamps to reinforce a pipe with a known defect
• Prepared for post-installation glassfibre wrapping
• Topside or subsea applications
Nemo
Engineering AS
30. Recipe for failure:
• Lack of available equipment
• Lack of planning (environmental,
installation procedures, government
approvals etc.)
etc )
• Uncoordinated / disjointed approach
• Unskilled personnel
p
• Lack of inter-company cooperation
• People don’t plan to fail, but we can
be accused of failing to plan!
Nemo
Engineering AS
34. Recipe for success:
I LOVE
NEMO!!!
• Available equipment
• Processes and systems in place
• pp
Coordinated approach
• Skilled personnel
• Inter-company cooperation
• Pipeline Repair Capability in place
Nemo
Engineering AS
35. It might be a small part to you – but it s a big deal for us!