INDUSTRIALBUILDING
 Client/owner
ASGHAL - QATAR
 Project name
Construction of substations
B, C, Entrance Gate and Odor
Control Facility at Doha North
Sewerage Treatment Plant
 Developer
Keppel Seghers Engineering
Singapore PTE LTD
 Contract amount
32.7 million QAR
 Execution time
10 months
 Execution by
CFE Middle East
P.O. Box: 55862 Doha, Qatar, Regency Business Center, 8th Floor, Al Baladiya St.
Tel: +974 4427 0986 Fax: +974 4427 0987 - www.cfe.be
CFE Middle East is a branch office of the CFE Group.
Substation C is part of the landmark
project that will be the largest
greenfield wastewater treatment,
water reuse and sludge treatment
plant in Qatar when completed.
With a peak design capacity to treat
wastewater of up to 439,000m3 per
day, the Doha North Sewage
Treatment Works will serve a
projected population of over
900,000. This modern facility will
feature advanced biological
treatment processes as well as
membrane and ultra-violet
technologies to produce high quality
reclaimed water for reuse in
agriculture. The facility will also be
equipped with thermal drying
processes to treat wastewater
sludge. The dried and pelletized
sludge will be used as soil
conditioners or refuse-derived fuel.
The structure of the building is a
frame one comprising of concrete
columns, beams and slabs casted in
situ. The footings are isolated pads
with a formatting level of about 2m
below natural ground level. Very
good quality finishing works were
chosen for these buildings and
particular care was required during
execution. Since the electrical
infrastructure in Qatar falls under the
authority of KAHRAMAA coordination
with the client for the necessaries
approvals and inspections was
needed.
The scope of works of CFE for this
building included:
- Site preparation
- Leveling and compaction
- Concrete works
- Masonry
- Finishing works
- Carpentry and joinery works, doors
and windows
- Waterproofing works
- Electrical works
Photos:
Doha North Sewege Treatment Works
Substation C
 Building type
Substation 11kV

More Related Content

What's hot (20)

DNSTW SUBSTATION G
DNSTW SUBSTATION GDNSTW SUBSTATION G
DNSTW SUBSTATION G
 
DNSTW SUBSTATION E
DNSTW SUBSTATION EDNSTW SUBSTATION E
DNSTW SUBSTATION E
 
DNSTW Lagoon1
DNSTW Lagoon1DNSTW Lagoon1
DNSTW Lagoon1
 
DNSTW Pump Station 3
DNSTW Pump Station 3DNSTW Pump Station 3
DNSTW Pump Station 3
 
Mark Clayton, QUBE Renewables
Mark Clayton, QUBE RenewablesMark Clayton, QUBE Renewables
Mark Clayton, QUBE Renewables
 
pk
pkpk
pk
 
Sswi april may-2021_lowres
Sswi april may-2021_lowresSswi april may-2021_lowres
Sswi april may-2021_lowres
 
HydroGuar
HydroGuarHydroGuar
HydroGuar
 
Sewage Treatment Plant Exporter, Manufacturer, Moradabad
Sewage Treatment Plant Exporter, Manufacturer, MoradabadSewage Treatment Plant Exporter, Manufacturer, Moradabad
Sewage Treatment Plant Exporter, Manufacturer, Moradabad
 
Phil Gerrard, Eastern Counties Finance
Phil Gerrard, Eastern Counties FinancePhil Gerrard, Eastern Counties Finance
Phil Gerrard, Eastern Counties Finance
 
Hgd presentation
Hgd presentationHgd presentation
Hgd presentation
 
Bibko ppt presentation 2011 16x9
Bibko ppt presentation 2011 16x9Bibko ppt presentation 2011 16x9
Bibko ppt presentation 2011 16x9
 
MY C.V
MY C.VMY C.V
MY C.V
 
Frac Vap Brochure June 18, 2016
Frac Vap Brochure June 18, 2016Frac Vap Brochure June 18, 2016
Frac Vap Brochure June 18, 2016
 
TIG GROUP | TOTAL SITE SOLUTIONS
TIG GROUP | TOTAL SITE SOLUTIONSTIG GROUP | TOTAL SITE SOLUTIONS
TIG GROUP | TOTAL SITE SOLUTIONS
 
Javed Sultan
Javed SultanJaved Sultan
Javed Sultan
 
Bibko Presentation 2011
Bibko Presentation 2011Bibko Presentation 2011
Bibko Presentation 2011
 
Introduction to Altiras Recovery
Introduction to Altiras RecoveryIntroduction to Altiras Recovery
Introduction to Altiras Recovery
 
Km.ppt
Km.pptKm.ppt
Km.ppt
 
PROJECTS SUMMARY
PROJECTS SUMMARYPROJECTS SUMMARY
PROJECTS SUMMARY
 

Viewers also liked

Campos de la psicologia
Campos de la psicologiaCampos de la psicologia
Campos de la psicologiamchirinosr
 
Una actividad con "Alma" - cortometraje (5º primaria)
Una actividad con "Alma" - cortometraje (5º primaria)Una actividad con "Alma" - cortometraje (5º primaria)
Una actividad con "Alma" - cortometraje (5º primaria)Pablo Nimo Liboreiro
 
FARMACOS ANTINEOPLASICOS
FARMACOS ANTINEOPLASICOSFARMACOS ANTINEOPLASICOS
FARMACOS ANTINEOPLASICOSpablenq1
 
Regidor contra Reforma al IMIP
Regidor contra Reforma al IMIPRegidor contra Reforma al IMIP
Regidor contra Reforma al IMIPAnibal Santana
 
PreservaçãO Do Ambiente
PreservaçãO Do AmbientePreservaçãO Do Ambiente
PreservaçãO Do Ambienteguestb0f4a46
 
Poesías María José
Poesías María JoséPoesías María José
Poesías María José26197134
 
Presentation1
Presentation1Presentation1
Presentation1jeepman7
 
Agenda sht
Agenda shtAgenda sht
Agenda shtCECY50
 
Social Media - Networking, Marketing und mehr
Social Media - Networking, Marketing und mehrSocial Media - Networking, Marketing und mehr
Social Media - Networking, Marketing und mehrEroLetters
 
Jadual penilaian proses pengajaran januari 2012 fasa ii
Jadual penilaian proses pengajaran januari 2012 fasa iiJadual penilaian proses pengajaran januari 2012 fasa ii
Jadual penilaian proses pengajaran januari 2012 fasa iimusaabusamah
 

Viewers also liked (20)

Peking University
Peking UniversityPeking University
Peking University
 
Campos de la psicologia
Campos de la psicologiaCampos de la psicologia
Campos de la psicologia
 
Una actividad con "Alma" - cortometraje (5º primaria)
Una actividad con "Alma" - cortometraje (5º primaria)Una actividad con "Alma" - cortometraje (5º primaria)
Una actividad con "Alma" - cortometraje (5º primaria)
 
FARMACOS ANTINEOPLASICOS
FARMACOS ANTINEOPLASICOSFARMACOS ANTINEOPLASICOS
FARMACOS ANTINEOPLASICOS
 
test 3
test 3test 3
test 3
 
Script
ScriptScript
Script
 
Regidor contra Reforma al IMIP
Regidor contra Reforma al IMIPRegidor contra Reforma al IMIP
Regidor contra Reforma al IMIP
 
Affiche Motoneiges
Affiche MotoneigesAffiche Motoneiges
Affiche Motoneiges
 
Presentación1
Presentación1Presentación1
Presentación1
 
Listas ingles matutino 6º cuatrimestre 6 c
Listas ingles matutino 6º cuatrimestre 6 cListas ingles matutino 6º cuatrimestre 6 c
Listas ingles matutino 6º cuatrimestre 6 c
 
PreservaçãO Do Ambiente
PreservaçãO Do AmbientePreservaçãO Do Ambiente
PreservaçãO Do Ambiente
 
Poesías María José
Poesías María JoséPoesías María José
Poesías María José
 
perspectivas
perspectivasperspectivas
perspectivas
 
Presentation1
Presentation1Presentation1
Presentation1
 
Agenda sht
Agenda shtAgenda sht
Agenda sht
 
Pg 0247
Pg 0247Pg 0247
Pg 0247
 
Social Media - Networking, Marketing und mehr
Social Media - Networking, Marketing und mehrSocial Media - Networking, Marketing und mehr
Social Media - Networking, Marketing und mehr
 
Jadual penilaian proses pengajaran januari 2012 fasa ii
Jadual penilaian proses pengajaran januari 2012 fasa iiJadual penilaian proses pengajaran januari 2012 fasa ii
Jadual penilaian proses pengajaran januari 2012 fasa ii
 
Target pdf
Target pdfTarget pdf
Target pdf
 
conflito cerebral
conflito cerebralconflito cerebral
conflito cerebral
 

Similar to DNSTW SUBSTATION C

Ahmed Khalil CV & Resume
Ahmed Khalil CV & ResumeAhmed Khalil CV & Resume
Ahmed Khalil CV & ResumeAhmed Khalil
 
DSEC Article on ACABIO - Biofuels Nov-Dec_2013
DSEC Article on ACABIO - Biofuels Nov-Dec_2013DSEC Article on ACABIO - Biofuels Nov-Dec_2013
DSEC Article on ACABIO - Biofuels Nov-Dec_2013Pierre Jacquy
 
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016Mujahid Ali Akhtar
 
Co Profile-Comfort Air Systems Fze
Co Profile-Comfort Air Systems FzeCo Profile-Comfort Air Systems Fze
Co Profile-Comfort Air Systems FzeLalit Dhirmalani
 
Er.aad cv new 20151208
Er.aad cv new 20151208Er.aad cv new 20151208
Er.aad cv new 20151208AADARSH JILKA
 
Personal Profile April 2015
Personal Profile April 2015Personal Profile April 2015
Personal Profile April 2015Khaled Elagroudy
 
PROJECT PROFILE ANNEXURE A2 QAPCO
PROJECT PROFILE ANNEXURE A2 QAPCOPROJECT PROFILE ANNEXURE A2 QAPCO
PROJECT PROFILE ANNEXURE A2 QAPCOHITESH RATHOD
 
RHDHV Buildings Architecture 2008-18
RHDHV Buildings Architecture 2008-18RHDHV Buildings Architecture 2008-18
RHDHV Buildings Architecture 2008-18Mauritz Kruger
 
Imran_resume_April 2016
Imran_resume_April 2016Imran_resume_April 2016
Imran_resume_April 2016Mohammed Imran
 
EPPMPresentationOMOct22 (1).pptx
EPPMPresentationOMOct22 (1).pptxEPPMPresentationOMOct22 (1).pptx
EPPMPresentationOMOct22 (1).pptxHedi Ben Mohamed
 
Curriculum vitae_Bhupat Kanani
Curriculum vitae_Bhupat KananiCurriculum vitae_Bhupat Kanani
Curriculum vitae_Bhupat KananiBhupat Kanani
 
Curriculum vitae Bhupat Kanani
Curriculum vitae Bhupat KananiCurriculum vitae Bhupat Kanani
Curriculum vitae Bhupat KananiBhupat Kanani
 
How to design and construct a 18ha commercial nursery
How to design and construct a 18ha commercial nurseryHow to design and construct a 18ha commercial nursery
How to design and construct a 18ha commercial nurseryvekadviesgroep
 
New base special 12 february 2014
New base special  12 february 2014New base special  12 february 2014
New base special 12 february 2014Khaled Al Awadi
 

Similar to DNSTW SUBSTATION C (20)

Ahmed Khalil CV & Resume
Ahmed Khalil CV & ResumeAhmed Khalil CV & Resume
Ahmed Khalil CV & Resume
 
DSEC Article on ACABIO - Biofuels Nov-Dec_2013
DSEC Article on ACABIO - Biofuels Nov-Dec_2013DSEC Article on ACABIO - Biofuels Nov-Dec_2013
DSEC Article on ACABIO - Biofuels Nov-Dec_2013
 
Ebrayeem cv
Ebrayeem cvEbrayeem cv
Ebrayeem cv
 
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
 
Co Profile-Comfort Air Systems Fze
Co Profile-Comfort Air Systems FzeCo Profile-Comfort Air Systems Fze
Co Profile-Comfort Air Systems Fze
 
Er.aad cv new 20151208
Er.aad cv new 20151208Er.aad cv new 20151208
Er.aad cv new 20151208
 
CV- Project Control Manager PMP
CV- Project Control Manager PMPCV- Project Control Manager PMP
CV- Project Control Manager PMP
 
Instrumentation design engineer
Instrumentation design engineerInstrumentation design engineer
Instrumentation design engineer
 
Personal Profile April 2015
Personal Profile April 2015Personal Profile April 2015
Personal Profile April 2015
 
Jorge luis sousa escandon cv february 2020
Jorge luis sousa escandon cv february 2020Jorge luis sousa escandon cv february 2020
Jorge luis sousa escandon cv february 2020
 
PROJECT PROFILE ANNEXURE A2 QAPCO
PROJECT PROFILE ANNEXURE A2 QAPCOPROJECT PROFILE ANNEXURE A2 QAPCO
PROJECT PROFILE ANNEXURE A2 QAPCO
 
01_HVAC-R5_Tecni
01_HVAC-R5_Tecni01_HVAC-R5_Tecni
01_HVAC-R5_Tecni
 
RHDHV Buildings Architecture 2008-18
RHDHV Buildings Architecture 2008-18RHDHV Buildings Architecture 2008-18
RHDHV Buildings Architecture 2008-18
 
Imran_resume_April 2016
Imran_resume_April 2016Imran_resume_April 2016
Imran_resume_April 2016
 
EPPMPresentationOMOct22 (1).pptx
EPPMPresentationOMOct22 (1).pptxEPPMPresentationOMOct22 (1).pptx
EPPMPresentationOMOct22 (1).pptx
 
Curriculum vitae_Bhupat Kanani
Curriculum vitae_Bhupat KananiCurriculum vitae_Bhupat Kanani
Curriculum vitae_Bhupat Kanani
 
Curriculum vitae Bhupat Kanani
Curriculum vitae Bhupat KananiCurriculum vitae Bhupat Kanani
Curriculum vitae Bhupat Kanani
 
How to design and construct a 18ha commercial nursery
How to design and construct a 18ha commercial nurseryHow to design and construct a 18ha commercial nursery
How to design and construct a 18ha commercial nursery
 
CV PMG
CV PMGCV PMG
CV PMG
 
New base special 12 february 2014
New base special  12 february 2014New base special  12 february 2014
New base special 12 february 2014
 

DNSTW SUBSTATION C

  • 1. INDUSTRIALBUILDING  Client/owner ASGHAL - QATAR  Project name Construction of substations B, C, Entrance Gate and Odor Control Facility at Doha North Sewerage Treatment Plant  Developer Keppel Seghers Engineering Singapore PTE LTD  Contract amount 32.7 million QAR  Execution time 10 months  Execution by CFE Middle East P.O. Box: 55862 Doha, Qatar, Regency Business Center, 8th Floor, Al Baladiya St. Tel: +974 4427 0986 Fax: +974 4427 0987 - www.cfe.be CFE Middle East is a branch office of the CFE Group. Substation C is part of the landmark project that will be the largest greenfield wastewater treatment, water reuse and sludge treatment plant in Qatar when completed. With a peak design capacity to treat wastewater of up to 439,000m3 per day, the Doha North Sewage Treatment Works will serve a projected population of over 900,000. This modern facility will feature advanced biological treatment processes as well as membrane and ultra-violet technologies to produce high quality reclaimed water for reuse in agriculture. The facility will also be equipped with thermal drying processes to treat wastewater sludge. The dried and pelletized sludge will be used as soil conditioners or refuse-derived fuel. The structure of the building is a frame one comprising of concrete columns, beams and slabs casted in situ. The footings are isolated pads with a formatting level of about 2m below natural ground level. Very good quality finishing works were chosen for these buildings and particular care was required during execution. Since the electrical infrastructure in Qatar falls under the authority of KAHRAMAA coordination with the client for the necessaries approvals and inspections was needed. The scope of works of CFE for this building included: - Site preparation - Leveling and compaction - Concrete works - Masonry - Finishing works - Carpentry and joinery works, doors and windows - Waterproofing works - Electrical works Photos: Doha North Sewege Treatment Works Substation C  Building type Substation 11kV