SlideShare a Scribd company logo
INDUSTRIALBUILDING
 Client/owner
ASGHAL - QATAR
 Developer
Keppel Seghers Engineering
Singapore PTE LTD
 Contract amount
29.7 million QAR
 Execution time
10 months
 Execution by
CFE Middle East
P.O. Box: 55862 Doha, Qatar, Regency Business Center, 8th Floor, Al Baladiya St.
Tel: +974 4427 0986 Fax: +974 4427 0987 - www.cfe.be
CFE Middle East is a branch office of the CFE Group.
Substation G is part of the landmark
project that will be the largest
greenfield wastewater treatment,
water reuse and sludge treatment
plant in Qatar when completed.
With a peak design capacity to treat
wastewater of up to 439,000m3 per
day, the Doha North Sewage
Treatment Works will serve a
projected population of over
900,000. This modern facility will
feature advanced biological
treatment processes as well as
membrane and ultra-violet
technologies to produce high quality
reclaimed water for reuse in
agriculture. The facility will also be
equipped with thermal drying
processes to treat wastewater
sludge. The dried and pelletized
sludge will be used as soil
conditioners or refuse-derived fuel.
The structure of the building is a
frame one comprising of concrete
columns, beams and slabs casted in
situ. The footings are isolated pads
with a formatting level of about 2m
below natural ground level. Very
good quality finishing works were
chosen for these buildings and
particular care was required during
execution. Since the electrical
infrastructure in Qatar falls under the
authority of KAHRAMAA coordination
with the client for the necessaries
approvals and inspections was
needed.
The scope of works of CFE for this
building included:
- Site preparation
- Leveling and compaction
- Concrete works
- Masonry
- Finishing works
- Carpentry and joinery works, doors
and windows
- Waterproofing works
- Electrical works
Photos:
Doha North Sewege Treatment Works
Substation G
 Building type
Substation 11kV
 Project name
Construction of substations
A,D, E, G and Lime
Dosing Plant at Doha North
Sewerage Treatment Plant

More Related Content

What's hot

Dhanaji suravase resume
Dhanaji suravase resumeDhanaji suravase resume
Dhanaji suravase resume
dhanaji suravase
 
5000 tpd urea mega plants design
5000 tpd urea  mega plants design5000 tpd urea  mega plants design
5000 tpd urea mega plants design
Prem Baboo
 
Plant location and lay out planning
Plant location and lay out planningPlant location and lay out planning
Plant location and lay out planningpragna1510
 
Stop Don't R&R Contractors Flyer
Stop Don't R&R Contractors FlyerStop Don't R&R Contractors Flyer
Stop Don't R&R Contractors FlyerCraig Harrington
 
SAUDI ARABIA : New water treatment plant to be built in Saudi.
SAUDI ARABIA : New water treatment plant to be built in Saudi.SAUDI ARABIA : New water treatment plant to be built in Saudi.
SAUDI ARABIA : New water treatment plant to be built in Saudi.
majesticshuttle73
 
Effect of stone slurry and recycled aggragate on concrete properties
Effect of stone slurry and recycled aggragate on concrete propertiesEffect of stone slurry and recycled aggragate on concrete properties
Effect of stone slurry and recycled aggragate on concrete properties
Dev Sablaniya
 
Shell day case study
Shell day case studyShell day case study
Shell day case studyAtul Gupta
 
Hgd presentation
Hgd presentationHgd presentation
Hgd presentation
Eitan Sharir
 
Kaz M-I for PM local content meeting_2
Kaz M-I for PM local content meeting_2Kaz M-I for PM local content meeting_2
Kaz M-I for PM local content meeting_2Berik Zh
 

What's hot (16)

DNSTW Pump Station 3
DNSTW Pump Station 3DNSTW Pump Station 3
DNSTW Pump Station 3
 
DNSTW SUBSTATION C
DNSTW SUBSTATION CDNSTW SUBSTATION C
DNSTW SUBSTATION C
 
DNSTW SUBSTATION B
DNSTW SUBSTATION BDNSTW SUBSTATION B
DNSTW SUBSTATION B
 
DNSTW OCB
DNSTW OCBDNSTW OCB
DNSTW OCB
 
Dhanaji suravase resume
Dhanaji suravase resumeDhanaji suravase resume
Dhanaji suravase resume
 
Organics #2 New Technologies - Harvest Power
Organics #2 New Technologies - Harvest PowerOrganics #2 New Technologies - Harvest Power
Organics #2 New Technologies - Harvest Power
 
5000 tpd urea mega plants design
5000 tpd urea  mega plants design5000 tpd urea  mega plants design
5000 tpd urea mega plants design
 
pk
pkpk
pk
 
Plant location and lay out planning
Plant location and lay out planningPlant location and lay out planning
Plant location and lay out planning
 
Stop Don't R&R Contractors Flyer
Stop Don't R&R Contractors FlyerStop Don't R&R Contractors Flyer
Stop Don't R&R Contractors Flyer
 
SAUDI ARABIA : New water treatment plant to be built in Saudi.
SAUDI ARABIA : New water treatment plant to be built in Saudi.SAUDI ARABIA : New water treatment plant to be built in Saudi.
SAUDI ARABIA : New water treatment plant to be built in Saudi.
 
Effect of stone slurry and recycled aggragate on concrete properties
Effect of stone slurry and recycled aggragate on concrete propertiesEffect of stone slurry and recycled aggragate on concrete properties
Effect of stone slurry and recycled aggragate on concrete properties
 
Shell day case study
Shell day case studyShell day case study
Shell day case study
 
Hgd presentation
Hgd presentationHgd presentation
Hgd presentation
 
Kaz M-I for PM local content meeting_2
Kaz M-I for PM local content meeting_2Kaz M-I for PM local content meeting_2
Kaz M-I for PM local content meeting_2
 
Cv final
Cv finalCv final
Cv final
 

Viewers also liked

Training report of 33/11kv substation Mohamdabad, Tundla
Training report of 33/11kv substation Mohamdabad, TundlaTraining report of 33/11kv substation Mohamdabad, Tundla
Training report of 33/11kv substation Mohamdabad, Tundla
shashanksltor
 
400kv sub-station-final-ppt-by-mohit
400kv sub-station-final-ppt-by-mohit400kv sub-station-final-ppt-by-mohit
400kv sub-station-final-ppt-by-mohitMohit Awasthi
 
Typical layout of a Sub-Station
Typical layout of a Sub-StationTypical layout of a Sub-Station
Typical layout of a Sub-StationTowfiqur Rahman
 
Warehouse
WarehouseWarehouse
Warehouse
BIT
 
Substation overview
Substation overviewSubstation overview
Substation overview
BHAGWAN PRASAD
 

Viewers also liked (6)

Training report of 33/11kv substation Mohamdabad, Tundla
Training report of 33/11kv substation Mohamdabad, TundlaTraining report of 33/11kv substation Mohamdabad, Tundla
Training report of 33/11kv substation Mohamdabad, Tundla
 
400kv sub-station-final-ppt-by-mohit
400kv sub-station-final-ppt-by-mohit400kv sub-station-final-ppt-by-mohit
400kv sub-station-final-ppt-by-mohit
 
Typical layout of a Sub-Station
Typical layout of a Sub-StationTypical layout of a Sub-Station
Typical layout of a Sub-Station
 
Warehouse
WarehouseWarehouse
Warehouse
 
Substation overview
Substation overviewSubstation overview
Substation overview
 
Warehousing
WarehousingWarehousing
Warehousing
 

Similar to DNSTW SUBSTATION G

Ahmed Khalil CV & Resume
Ahmed Khalil CV & ResumeAhmed Khalil CV & Resume
Ahmed Khalil CV & ResumeAhmed Khalil
 
DSEC Article on ACABIO - Biofuels Nov-Dec_2013
DSEC Article on ACABIO - Biofuels Nov-Dec_2013DSEC Article on ACABIO - Biofuels Nov-Dec_2013
DSEC Article on ACABIO - Biofuels Nov-Dec_2013Pierre Jacquy
 
Er.aad cv new 20151208
Er.aad cv new 20151208Er.aad cv new 20151208
Er.aad cv new 20151208
AADARSH JILKA
 
How to design and construct a 18ha commercial nursery
How to design and construct a 18ha commercial nurseryHow to design and construct a 18ha commercial nursery
How to design and construct a 18ha commercial nursery
vekadviesgroep
 
BE cost appraisal
BE cost appraisalBE cost appraisal
BE cost appraisal
Doreen Yeo
 
Be cost appraisal
Be cost appraisalBe cost appraisal
Be cost appraisal
Lwj Welson
 
PROJECT PROFILE ANNEXURE A2 QAPCO
PROJECT PROFILE ANNEXURE A2 QAPCOPROJECT PROFILE ANNEXURE A2 QAPCO
PROJECT PROFILE ANNEXURE A2 QAPCOHITESH RATHOD
 
New base special 12 february 2014
New base special  12 february 2014New base special  12 february 2014
New base special 12 february 2014
Khaled Al Awadi
 
Jorge luis sousa escandon cv february 2020
Jorge luis sousa escandon cv february 2020Jorge luis sousa escandon cv february 2020
Jorge luis sousa escandon cv february 2020
Jorge Luis Sousa Escandòn
 
Qatargas debottlenecking project
Qatargas debottlenecking projectQatargas debottlenecking project
Qatargas debottlenecking project
John Kingsley
 
Desalination, The Sustainable Alternative
Desalination, The Sustainable AlternativeDesalination, The Sustainable Alternative
Desalination, The Sustainable Alternative
Rick Nabett
 
Desalination the sustainable alternative
Desalination the sustainable alternativeDesalination the sustainable alternative
Desalination the sustainable alternative
Rick Nabett
 
DEGRÉMONT INDUSTRY CORPORATE BROCHURE 2013
DEGRÉMONT INDUSTRY CORPORATE BROCHURE 2013DEGRÉMONT INDUSTRY CORPORATE BROCHURE 2013
DEGRÉMONT INDUSTRY CORPORATE BROCHURE 2013
Rick Nabett
 
Fnb
FnbFnb
Wind Energy by intergen energy ltd.
Wind Energy by intergen energy ltd.Wind Energy by intergen energy ltd.
Wind Energy by intergen energy ltd.
Intergen Energy Ltd.
 
Intergen Energy Limited Construction Management
Intergen Energy Limited Construction ManagementIntergen Energy Limited Construction Management
Intergen Energy Limited Construction Management
Intergen Energy Ltd.
 

Similar to DNSTW SUBSTATION G (20)

Ahmed Khalil CV & Resume
Ahmed Khalil CV & ResumeAhmed Khalil CV & Resume
Ahmed Khalil CV & Resume
 
DSEC Article on ACABIO - Biofuels Nov-Dec_2013
DSEC Article on ACABIO - Biofuels Nov-Dec_2013DSEC Article on ACABIO - Biofuels Nov-Dec_2013
DSEC Article on ACABIO - Biofuels Nov-Dec_2013
 
Ebrayeem cv
Ebrayeem cvEbrayeem cv
Ebrayeem cv
 
Er.aad cv new 20151208
Er.aad cv new 20151208Er.aad cv new 20151208
Er.aad cv new 20151208
 
How to design and construct a 18ha commercial nursery
How to design and construct a 18ha commercial nurseryHow to design and construct a 18ha commercial nursery
How to design and construct a 18ha commercial nursery
 
BE cost appraisal
BE cost appraisalBE cost appraisal
BE cost appraisal
 
Be cost appraisal
Be cost appraisalBe cost appraisal
Be cost appraisal
 
PROJECT PROFILE ANNEXURE A2 QAPCO
PROJECT PROFILE ANNEXURE A2 QAPCOPROJECT PROFILE ANNEXURE A2 QAPCO
PROJECT PROFILE ANNEXURE A2 QAPCO
 
New base special 12 february 2014
New base special  12 february 2014New base special  12 february 2014
New base special 12 february 2014
 
samer resume - S
samer resume - Ssamer resume - S
samer resume - S
 
Jorge luis sousa escandon cv february 2020
Jorge luis sousa escandon cv february 2020Jorge luis sousa escandon cv february 2020
Jorge luis sousa escandon cv february 2020
 
MY C.V
MY C.VMY C.V
MY C.V
 
Qatargas debottlenecking project
Qatargas debottlenecking projectQatargas debottlenecking project
Qatargas debottlenecking project
 
Desalination, The Sustainable Alternative
Desalination, The Sustainable AlternativeDesalination, The Sustainable Alternative
Desalination, The Sustainable Alternative
 
Desalination the sustainable alternative
Desalination the sustainable alternativeDesalination the sustainable alternative
Desalination the sustainable alternative
 
DEGRÉMONT INDUSTRY CORPORATE BROCHURE 2013
DEGRÉMONT INDUSTRY CORPORATE BROCHURE 2013DEGRÉMONT INDUSTRY CORPORATE BROCHURE 2013
DEGRÉMONT INDUSTRY CORPORATE BROCHURE 2013
 
Fnb
FnbFnb
Fnb
 
eni_EST_esecutivo
eni_EST_esecutivoeni_EST_esecutivo
eni_EST_esecutivo
 
Wind Energy by intergen energy ltd.
Wind Energy by intergen energy ltd.Wind Energy by intergen energy ltd.
Wind Energy by intergen energy ltd.
 
Intergen Energy Limited Construction Management
Intergen Energy Limited Construction ManagementIntergen Energy Limited Construction Management
Intergen Energy Limited Construction Management
 

DNSTW SUBSTATION G

  • 1. INDUSTRIALBUILDING  Client/owner ASGHAL - QATAR  Developer Keppel Seghers Engineering Singapore PTE LTD  Contract amount 29.7 million QAR  Execution time 10 months  Execution by CFE Middle East P.O. Box: 55862 Doha, Qatar, Regency Business Center, 8th Floor, Al Baladiya St. Tel: +974 4427 0986 Fax: +974 4427 0987 - www.cfe.be CFE Middle East is a branch office of the CFE Group. Substation G is part of the landmark project that will be the largest greenfield wastewater treatment, water reuse and sludge treatment plant in Qatar when completed. With a peak design capacity to treat wastewater of up to 439,000m3 per day, the Doha North Sewage Treatment Works will serve a projected population of over 900,000. This modern facility will feature advanced biological treatment processes as well as membrane and ultra-violet technologies to produce high quality reclaimed water for reuse in agriculture. The facility will also be equipped with thermal drying processes to treat wastewater sludge. The dried and pelletized sludge will be used as soil conditioners or refuse-derived fuel. The structure of the building is a frame one comprising of concrete columns, beams and slabs casted in situ. The footings are isolated pads with a formatting level of about 2m below natural ground level. Very good quality finishing works were chosen for these buildings and particular care was required during execution. Since the electrical infrastructure in Qatar falls under the authority of KAHRAMAA coordination with the client for the necessaries approvals and inspections was needed. The scope of works of CFE for this building included: - Site preparation - Leveling and compaction - Concrete works - Masonry - Finishing works - Carpentry and joinery works, doors and windows - Waterproofing works - Electrical works Photos: Doha North Sewege Treatment Works Substation G  Building type Substation 11kV  Project name Construction of substations A,D, E, G and Lime Dosing Plant at Doha North Sewerage Treatment Plant