    VEK Adviesgroep was assigned to develop a nursery, together with the client, with the starting point that the nursery should comply
    with the philosophy of the grower. This philosophy is based on a minimum use of energy, a closed water circulation system without
    discharge, growing tomatoes without pesticides in an economical efficient way, good facilities for the staff, a modern shipping building
    with efficient logistics.

    Moreover, the company has to be designed in such a way that phase 2 can be realized without any problems and the water technical
    installation and the hot boiler room are prepared for extension with a minimum of effort.




2
Sustainability and economy
    Today, tomatoes are grown more and more without the use of any chemical pesticides. Moreover, research showed that within
    the rock wool on which the tomatoes grow, an important biological life prevails. Because the rock wool is reused annually,
    eventually this results in a balance between good and bad fungi. This balance helps to ensure that it is no longer necessary to
    use chemical pesticides.

    Because of these experiences, a total new way of growing tomatoes is developing. Any interference in the greenhouse affects the
    natural system. The plants, fungi, bacteria, the roots, the climate, everything has an influence on each other. The big difference
    with the traditional way of growing is that the system is not broken down when there is a problem. One continues to work within
    the existing and natural system. The interventions are aimed to maintain and strengthen the system. This way, the system will
    eventually have the power to solve the problems itself.

    The objective is to produce the best and most tasteful tomatoes with a minimum of resources and waste.




3
Why choose VEK as your Turnkey Greenhouse Partner?
    Our specialists have over 4 decades of experiences in greenhouse
    design, constructions and installations, both domestically and
    abroad. We are experienced in both glass and poly houses for
    vegetables, flowers, pot plants and bedding plants.

    VEK Adviesgroep offers its customers a greenhouse facility that is
    suitable for the local climate and meets the client’s expectations.
    How we accomplish this, is based on a triangle of knowledge in
    growing and technology, experience and implementation.

    Our approach contains 4 unique steps:

    7) Design
    8) Tender
    9) Construct
    10) Training & Greenhouse Management
                                                                          VEK office




4
Why choose VEK as your Turnkey Greenhouse Partner?
    • Design
    Design plays a crucial role in the success of each greenhouse project. With VEK Adviesgroep the crop is ‘king’. This means that
    the whole concept and design is executed in the interest of the crop. VEK Adviesgroep incorporates information on local climate
    conditions and circumstances, possible energy concept, cooling or heating requirements, availability and quality of water, the
    growing skills of the management and labourers, marketing opportunities for the crop etc.

    Objectives during this process are:  Functionality and efficiency
                                         Sustainability
                                         Economics

    VEK Adviesgroep underlines the importance of this phase of a project. Accordingly, we have a team of engineers and designers
    who are looking for the most functional design to be able to grow the best quality product with the best possible yield in the given
    local circumstances.

    • Tender
    Through our global network of suppliers we are able to provide unbeatable prices through a system of competitive tendering for
    worldwide specialized builders and suppliers. The Design & Construct method of VEK Adviesgroep works with open book
    calculations, so you get access to the budgets and the entire project is transparent .

    13) Construct
    VEK Adviesgroep is experienced in managing the whole process and is responsible for the complete construction period. Our
    goal is to build according to your requirements and to finish our work in time. Through our global network, we are able to select
    the best builders and suppliers for your project with a proven international track record.

    16) Training & Greenhouse Management
    A good design, selecting the right suppliers and a well managed building period do not guarantee high quality products and
    yields as were envisaged. Training and education of employees, staff and management are essential. They have to learn how to
    deal with the new equipment, techniques and grow methods.



5
Design stage
    The objective of the company is to realise a greenhouse complex in two phases of 18 ha in total for the cultivation of snack
    tomatoes. The starting point was a complete new horticultural area for the construction of modern greenhouses.

    Requirements of the client:
       • Site development
       • Realization of utility connections because these large capacities were not available in the area
       • Greenhouse
       • Possibilities in the greenhouse to use the new way of growing according to the philosophy of the client
       • Automatic glass cleaning system
       • Packing building with 2 loading docks
       • Unique screening installation
       • Shielding of the grow light
       • Grow light installation
       • Closed water circulation system, including reuse of the condensation of the CHP system
       • Energy production and supply to the electricity grid
       • Year round water storage by means of a large water basin
       • High tech water technical area with various water silos for daily storage and modern water mixing and irrigation units
       • Possibility to increase the company up to 2 x 9 ha, which means double surface
       • Unique design of the office building




6
Concept idea
    The first step in the process was to
    develop a lay out plus energy concept
    and closed water circulation system.

    For international projects this is usually
    combined with a feasibility report plus
    cost price calculation of the whole
    operation.

    We incorporate local climate and
    circumstances, availability of water,
    availability of energy and growing skills of
    the staff and labourers.

    Our goal is to develop the most efficient
    and economic greenhouse in the given
    circumstances.




7
Detail design and engineering

                          After the conceptual phase has been approved
                          and frozen, we evaluate the project into the next
                          phase of detail design / engineering. In this stage
                          we work out all the technical installations in detail.
                          The whole list of technical installations, including
                          some specifics, is given on the next pages.

                          At the end of this stage we are able to conclude
                          all the information into a supply scope for the
                          hardware.

                          The whole design stage has been finished now
                          and we move towards procurement of all the
                          hardware and delivery to the customers’ building
                          site. Internationally, most components are
                          supplied by containers.




8
General description of the project
    General description of the whole project for 1 phase of 9 ha (22.5 acres) for a master plan of 18 ha (45 acres).

           •    Site development
           •    Greenhouse with 7m (21ft) gutter height and automatic roof cleaning devise
           •    Headhouse for logistics and packing with 2 loading docks
           •    Technical building for irrigation and heat and power.
           •    Irrigation system in a closed loop
           •    Rainwater harvesting pond of 22.440 m3 (approx. 800,000 cu-ft)
           •    Hot water boiler system and heat storage tank
           •    Screening installation
           •    Climate control computer
           •    CHP power generator of approx. 4,4 MW and phase 2 approx. 8,8 MW
           •    CO2 supply system for the plants
           •    Grow light installation.
           •    Cultivation system with hanging gutters
           •    Office building




9
Site development
     From grass to glass:   - Ground works / leveling and filling
                            - GPS land measurements




10
Greenhouse
          Greenhouse with 7 m (21 ft) gutter height and automatic roof cleaning devise
     Technical specifications
     Type of greenhouse: 8,00 m (≈ 24 ft) Venlo-glasshouse (2 x 4,00 m bays ≈ 2 x 12 ft))
     Greenhouse width: 80 bays à 4,00 m / 40 trellis girders à 8,00 m, length 275 m (≈ 900 ft)
                          2 bays à 4,00 m / 1 trellis girder à 8,70 m, length 175 m (≈ 575 ft)
     Trust distance:      5,00 m (≈ 15 ft)
     Gutter height:       7,00 m (≈ 21 ft) (ground level – underside of gutter)
     Corridor:            8 m truss with 4,00 m Venlo bays as a free span
     Technical area:      various trusses with 4,00 m Venlo bays as a free span
     Total surfaces:      90.392,50 m² (≈ 22.5 acres) (distance ctc greenhouse)




11
Greenhouse




12
Greenhouse




13
Greenhouse




                                         Corridor




                  Roof cleaning devise
14
Greenhouse




15
Headhouse
                         Headhouse for logistics and packing with 2 loading docks
     Technical specifications
     Type of headhouse: 28,00 m (≈ 92 ft) A-frame construction
     Headhouse length: 47,00 m (≈ 154 ft)
     Gutter height:        7,00 m (≈ 21 ft) (ground level – underside of gutter)
     Surface:             approx. 1.300 m² (≈ 14,000 sq-ft) packing building




16
Technical building
                             Technical building for irrigation and heat and power
     Technical specifications
     Technical area:      various trusses with 4,00 m (≈ 12 ft) Venlo bays as a free span
     Surface:             2.380 m² (≈ 25,600 sq-ft) (distance ctc technical area)




17
Technical building
     Irrigation system in a closed loop




18
Technical building
                                                       Water technical installation




 Technical specifications for 9 ha (≈ 22.5 acres)

 Fertilizer unit (liquid & solid fertilizer)      90 m3/hr    (≈     24,000 gallons/hr)
 Drip pump unit                                2x 90 m3/hr    (≈ 2 x 24,000 gallons/hr)
 UV-desinfection unit                             15 m3/hr    (≈      4,000 gallons/hr)
 RO unit                                         150 m3/day   (≈     40,000 gallons/day)



19
Technical building
     Lubron condensation water treatment
                              The objective of this installation is to purify approx. 600
                              liter/hour (≈ 160 gallons/hr) condensation water from the
                              CHP system with a natural gas use of 1.100 m3/hour (≈
                              39.000 gallons/hr) + condensation water of the CO2
                              installation of approx. 400 liter/hour. By purifying this
                              water, it can be reused as an addition to the rainwater.

                              Technical specifications
                              Type                  1 x CW 1000
                              Capacity              500-1.000 liter/hour
                                                    (≈ 130-260 gallons/hr)
                              Water temperature 5 - 40°C (≈ 41-104°F)
                              Electrical connection 230 V, 50 Hz
                              Power                 1x 0,5 kW




20
Rain water harvesting pond
     Year round water storage by means of a large rain water harvesting pond

     Technical specifications
     Surface:     12.500 m2   (≈ 3.10 acres)
     Bank height: 2.90 m      (≈ 9 ft)
     Contents:    22.440 m 3
                              (≈ 791,000 cu-ft)




21
Heating system
                                   Hot water boiler system




     Technical specifications
     Capacity: 7 MW ≈ 24 MBTU/hr

22
Heating system
       Pipe heating




23
Heating system
                                                 Heat storage tank




     Technical specifications
     Contents: 7.383 m3      (≈ 260,000 cu-ft)
     Diameter: 28.000 mm (≈ 91 ft)
     Height:    14.729 mm (≈ 48.5 ft)




24
Climate control computer

     Technical specifications
     The climate computer controls all processes in and around the greenhouse:

     Greenhouse Climate Control         Irrigation
     • Meteo station                    • Rain water storage
     • 8 climate zones                  • Steering fertilizer unit
     • Ventilation control              • Drip irrigation system
     • Energy saving screen             • Steering UV disinfection unit
     • Heating control
     • CO2 dosing                       Management information
     • Grow light steering              • Graphical user interface
                                        • Process dashboards
     Energy                             • Historical graphs and tables
     • Boiler room
     • Hot water gas boiler
     • CHP unit
     • Heat storage
     • Distributor with mixing groups




25
Climate control computer




26
CO2 supply system for the plants




27
CHP power generator of approx. 4,4 MW

     Technical specifications

     Engine type (equipment)
     Electrical capacity per engine:   4397     kW
     Thermal capacity per engine:      4589     kW
     Speed:                            50       Hz
     Voltage:                          10.500   V

     The installation includes:
     •    Gas system
     •    Outlet system
     •    Condenser
     •    Oil system
     •    CH system
     •    Electrical installation
     •    Flue gas cleaner
     •    Acoustic housing
     •    CodiNOx Exhaust gas purifier               Acoustic housing




28
CHP power generator of approx. 4,4 MW




29
CHP power generator of approx. 4,4 MW




30
Screening installation

     Unique screening installation (Smartscreen)
     Energy screening installations, light reduction installations and roller side screens

     Technical specifications
     Double screening installation:
                                                                           Screening installation in open position
     - Light reduction (XLS SL 99 W/W Revolux)
       Screening percentage 99,5%
       Energy saving 50%

     - Energy saving (XLS 10 H2No Revolux)
       Screening percentage 13%
       Energy saving 47%




                                                                           Screening installation in closed position




31
Screening installation




32
Screening installation




33
Grow light installation
     Technical specifications
     Light intensity:     ± 15.000 lux ≈ 215 µMol/m².s
     Number of fittings : 11.552 HSE NXT 1000 Watt / 400 Volt electric with Beta reflector
     Light:               11.552 Greenpower lights 1000 Watt El. 400 V.
     Power in kVA:        12.326

     1000 Watt / 400 V    kW – 1,035
                          kVA –               1,067




34
Cultivation system with hanging gutters

     Technical specifications cultivation gutters
     Width gutter           210 mm      (≈ 8.25 inch)
     Height gutter          120 mm      (≈ 4.75 inch)
     Depth water canals      60 mm      (≈ 2.40 inch)
     Width water canals      30 mm      (≈ 1.20 inch)




35
Cultivation system with hanging gutters




36
Post Harvest installation




     With an electric tow truck, the harvesting carts go   Unloading the carts with the filled harvesting crates
     transported automatically from greenhouse to the      and loading the carts with empty crates.
     packing building.




     De-stacking the crates.                               Moving the crates to the stacking unit and
                                                           palletiser for transport.


37
Contact information




              VEK Adviesgroep B.V.
     Jupiter 433, NL-2675 LX Honselersdijk
       P.O. Box, NL-2675 ZW Honselersdijk
             Phone +31 174 389666
                Fax +31 174 389667
               E-mail info@vek.nl
                   www.vek.nl




38

More Related Content

What's hot

Efficient and Affordable: Applying the Passive House Standard to Low-income, ...
Efficient and Affordable: Applying the Passive House Standard to Low-income, ...Efficient and Affordable: Applying the Passive House Standard to Low-income, ...
Efficient and Affordable: Applying the Passive House Standard to Low-income, ...
energytrustor
 
NASA Net Zero Roadmap: Federal Utilities Partnership Working Group, November ...
NASA Net Zero Roadmap: Federal Utilities Partnership Working Group, November ...NASA Net Zero Roadmap: Federal Utilities Partnership Working Group, November ...
NASA Net Zero Roadmap: Federal Utilities Partnership Working Group, November ...
Shanti Pless
 
RMC - Green
RMC - GreenRMC - Green
RMC - Green
allen_griffin
 
Presentation arcadis 2012 eng
Presentation arcadis 2012 engPresentation arcadis 2012 eng
Presentation arcadis 2012 engARCADIS
 
2017 Multifamily Green Building Primer Webinar
2017 Multifamily Green Building Primer Webinar2017 Multifamily Green Building Primer Webinar
2017 Multifamily Green Building Primer Webinar
Dominic Butler
 
Conrad properties sustainability-report-for-2012
Conrad properties sustainability-report-for-2012Conrad properties sustainability-report-for-2012
Conrad properties sustainability-report-for-2012Vedic12
 
Energy Exchange 2015: Track 7 session 5: Energy Performance Based Design Buil...
Energy Exchange 2015: Track 7 session 5: Energy Performance Based Design Buil...Energy Exchange 2015: Track 7 session 5: Energy Performance Based Design Buil...
Energy Exchange 2015: Track 7 session 5: Energy Performance Based Design Buil...
Shanti Pless
 
COH Permitting Center
COH Permitting CenterCOH Permitting Center
COH Permitting Centeraiahouston
 
CULTEC stormwater-management-systems-product-brochure - Culg098
CULTEC stormwater-management-systems-product-brochure - Culg098 CULTEC stormwater-management-systems-product-brochure - Culg098
CULTEC stormwater-management-systems-product-brochure - Culg098
CULTEC, Inc.
 
CARGILLPROJOVERVIEW_rev1
CARGILLPROJOVERVIEW_rev1CARGILLPROJOVERVIEW_rev1
CARGILLPROJOVERVIEW_rev1Dan Caouette
 
AD ENER-G BROCHURE 140313
AD ENER-G BROCHURE 140313AD ENER-G BROCHURE 140313
AD ENER-G BROCHURE 140313Scott Tamplin
 
GSC meeting PM - Final
GSC meeting  PM - FinalGSC meeting  PM - Final
GSC meeting PM - FinalDavid Nderimo
 
Home Quality Mark Cardiff workshop jan 18
Home Quality Mark Cardiff workshop jan 18Home Quality Mark Cardiff workshop jan 18
Home Quality Mark Cardiff workshop jan 18
HomeQualityMark
 
2015 x472 class 02 - generation systems
2015 x472 class 02 - generation systems2015 x472 class 02 - generation systems
2015 x472 class 02 - generation systems
michaeljmack
 
Assignment (1)
Assignment (1)Assignment (1)
Assignment (1)
Lwj Welson
 
JAS Professional Resume092016internal
JAS Professional Resume092016internalJAS Professional Resume092016internal
JAS Professional Resume092016internalJeff Sperlbaum
 
ASHRAE Virtual Design and Construction Conference March 2021- Development of ...
ASHRAE Virtual Design and Construction Conference March 2021- Development of ...ASHRAE Virtual Design and Construction Conference March 2021- Development of ...
ASHRAE Virtual Design and Construction Conference March 2021- Development of ...
Shanti Pless
 
Rainiero leon Auditor EDGE LEED AP
Rainiero leon Auditor EDGE LEED APRainiero leon Auditor EDGE LEED AP
Rainiero leon Auditor EDGE LEED AP
Rainiero Leon
 

What's hot (20)

Efficient and Affordable: Applying the Passive House Standard to Low-income, ...
Efficient and Affordable: Applying the Passive House Standard to Low-income, ...Efficient and Affordable: Applying the Passive House Standard to Low-income, ...
Efficient and Affordable: Applying the Passive House Standard to Low-income, ...
 
NASA Net Zero Roadmap: Federal Utilities Partnership Working Group, November ...
NASA Net Zero Roadmap: Federal Utilities Partnership Working Group, November ...NASA Net Zero Roadmap: Federal Utilities Partnership Working Group, November ...
NASA Net Zero Roadmap: Federal Utilities Partnership Working Group, November ...
 
RMC - Green
RMC - GreenRMC - Green
RMC - Green
 
Presentation arcadis 2012 eng
Presentation arcadis 2012 engPresentation arcadis 2012 eng
Presentation arcadis 2012 eng
 
2017 Multifamily Green Building Primer Webinar
2017 Multifamily Green Building Primer Webinar2017 Multifamily Green Building Primer Webinar
2017 Multifamily Green Building Primer Webinar
 
Conrad properties sustainability-report-for-2012
Conrad properties sustainability-report-for-2012Conrad properties sustainability-report-for-2012
Conrad properties sustainability-report-for-2012
 
Energy Exchange 2015: Track 7 session 5: Energy Performance Based Design Buil...
Energy Exchange 2015: Track 7 session 5: Energy Performance Based Design Buil...Energy Exchange 2015: Track 7 session 5: Energy Performance Based Design Buil...
Energy Exchange 2015: Track 7 session 5: Energy Performance Based Design Buil...
 
COH Permitting Center
COH Permitting CenterCOH Permitting Center
COH Permitting Center
 
CULTEC stormwater-management-systems-product-brochure - Culg098
CULTEC stormwater-management-systems-product-brochure - Culg098 CULTEC stormwater-management-systems-product-brochure - Culg098
CULTEC stormwater-management-systems-product-brochure - Culg098
 
CARGILLPROJOVERVIEW_rev1
CARGILLPROJOVERVIEW_rev1CARGILLPROJOVERVIEW_rev1
CARGILLPROJOVERVIEW_rev1
 
AD ENER-G BROCHURE 140313
AD ENER-G BROCHURE 140313AD ENER-G BROCHURE 140313
AD ENER-G BROCHURE 140313
 
Ranjith cv
Ranjith cvRanjith cv
Ranjith cv
 
Final Poster
Final PosterFinal Poster
Final Poster
 
GSC meeting PM - Final
GSC meeting  PM - FinalGSC meeting  PM - Final
GSC meeting PM - Final
 
Home Quality Mark Cardiff workshop jan 18
Home Quality Mark Cardiff workshop jan 18Home Quality Mark Cardiff workshop jan 18
Home Quality Mark Cardiff workshop jan 18
 
2015 x472 class 02 - generation systems
2015 x472 class 02 - generation systems2015 x472 class 02 - generation systems
2015 x472 class 02 - generation systems
 
Assignment (1)
Assignment (1)Assignment (1)
Assignment (1)
 
JAS Professional Resume092016internal
JAS Professional Resume092016internalJAS Professional Resume092016internal
JAS Professional Resume092016internal
 
ASHRAE Virtual Design and Construction Conference March 2021- Development of ...
ASHRAE Virtual Design and Construction Conference March 2021- Development of ...ASHRAE Virtual Design and Construction Conference March 2021- Development of ...
ASHRAE Virtual Design and Construction Conference March 2021- Development of ...
 
Rainiero leon Auditor EDGE LEED AP
Rainiero leon Auditor EDGE LEED APRainiero leon Auditor EDGE LEED AP
Rainiero leon Auditor EDGE LEED AP
 

Similar to How to design and construct a 18ha commercial nursery

Présentation ARCADIS
Présentation ARCADISPrésentation ARCADIS
Présentation ARCADIS
mlvermeire
 
Green building concepts and good building practices
Green building concepts and good building practicesGreen building concepts and good building practices
Green building concepts and good building practices
Manohar Tatwawadi
 
RESUME - NAJMUL SAQIB MANIAR
RESUME - NAJMUL SAQIB MANIARRESUME - NAJMUL SAQIB MANIAR
RESUME - NAJMUL SAQIB MANIARSAQIB MANIAR
 
Barangaroo South District Cooling Plant (DCP) Fact Sheet
Barangaroo South District Cooling Plant (DCP) Fact SheetBarangaroo South District Cooling Plant (DCP) Fact Sheet
Barangaroo South District Cooling Plant (DCP) Fact Sheet
DeanDallwitz
 
CHAPTER 11.pptx
CHAPTER 11.pptxCHAPTER 11.pptx
CHAPTER 11.pptx
jozlap
 
DSEC Article on ACABIO - Biofuels Nov-Dec_2013
DSEC Article on ACABIO - Biofuels Nov-Dec_2013DSEC Article on ACABIO - Biofuels Nov-Dec_2013
DSEC Article on ACABIO - Biofuels Nov-Dec_2013Pierre Jacquy
 
Optimizing Existing Rooftop Unit Energy Efficiency
Optimizing Existing Rooftop Unit Energy EfficiencyOptimizing Existing Rooftop Unit Energy Efficiency
Optimizing Existing Rooftop Unit Energy Efficiency
Center for Energy and Environment
 
Energy Efficient Social Housing for One Manchester
Energy Efficient Social Housing for One ManchesterEnergy Efficient Social Housing for One Manchester
Energy Efficient Social Housing for One Manchester
mark alegbe
 
Osquareteck_GREEN PROJECT
Osquareteck_GREEN PROJECTOsquareteck_GREEN PROJECT
Osquareteck_GREEN PROJECTAnthony Osibajo
 
Ahmed Khalil CV & Resume
Ahmed Khalil CV & ResumeAhmed Khalil CV & Resume
Ahmed Khalil CV & ResumeAhmed Khalil
 
RESUME - NAJMUL SAQIB MANIAR
RESUME - NAJMUL SAQIB MANIARRESUME - NAJMUL SAQIB MANIAR
RESUME - NAJMUL SAQIB MANIARSAQIB MANIAR
 
Blake Lapthorn's green breakfast with guest speaker Keeran Jugdoyal, Faithful...
Blake Lapthorn's green breakfast with guest speaker Keeran Jugdoyal, Faithful...Blake Lapthorn's green breakfast with guest speaker Keeran Jugdoyal, Faithful...
Blake Lapthorn's green breakfast with guest speaker Keeran Jugdoyal, Faithful...
Blake Morgan
 
3 Matrix Docmnt Technology Mfg Housing Pkge
3 Matrix Docmnt Technology Mfg Housing Pkge3 Matrix Docmnt Technology Mfg Housing Pkge
3 Matrix Docmnt Technology Mfg Housing PkgeLiving Modular
 
American Institute of Architects Committee on the Envrinment
American Institute of Architects Committee on the EnvrinmentAmerican Institute of Architects Committee on the Envrinment
American Institute of Architects Committee on the Envrinment
Center for Energy and Environment
 
BREEAM
BREEAMBREEAM
BREEAM
misschand
 
IAED 342-Research Presentation
IAED 342-Research PresentationIAED 342-Research Presentation
IAED 342-Research Presentation
Serra's Art Studio
 
CWG Waste water solutions
CWG Waste water solutionsCWG Waste water solutions
CWG Waste water solutions
Mario Skrapec
 
Controlling capital costs using a performance based design build process
Controlling capital costs using a performance based design build processControlling capital costs using a performance based design build process
Controlling capital costs using a performance based design build process
Shanti Pless
 

Similar to How to design and construct a 18ha commercial nursery (20)

Présentation ARCADIS
Présentation ARCADISPrésentation ARCADIS
Présentation ARCADIS
 
GC - Alder Hey
GC - Alder HeyGC - Alder Hey
GC - Alder Hey
 
Green building concepts and good building practices
Green building concepts and good building practicesGreen building concepts and good building practices
Green building concepts and good building practices
 
RESUME - NAJMUL SAQIB MANIAR
RESUME - NAJMUL SAQIB MANIARRESUME - NAJMUL SAQIB MANIAR
RESUME - NAJMUL SAQIB MANIAR
 
Barangaroo South District Cooling Plant (DCP) Fact Sheet
Barangaroo South District Cooling Plant (DCP) Fact SheetBarangaroo South District Cooling Plant (DCP) Fact Sheet
Barangaroo South District Cooling Plant (DCP) Fact Sheet
 
CHAPTER 11.pptx
CHAPTER 11.pptxCHAPTER 11.pptx
CHAPTER 11.pptx
 
DSEC Article on ACABIO - Biofuels Nov-Dec_2013
DSEC Article on ACABIO - Biofuels Nov-Dec_2013DSEC Article on ACABIO - Biofuels Nov-Dec_2013
DSEC Article on ACABIO - Biofuels Nov-Dec_2013
 
Optimizing Existing Rooftop Unit Energy Efficiency
Optimizing Existing Rooftop Unit Energy EfficiencyOptimizing Existing Rooftop Unit Energy Efficiency
Optimizing Existing Rooftop Unit Energy Efficiency
 
Energy Efficient Social Housing for One Manchester
Energy Efficient Social Housing for One ManchesterEnergy Efficient Social Housing for One Manchester
Energy Efficient Social Housing for One Manchester
 
Osquareteck_GREEN PROJECT
Osquareteck_GREEN PROJECTOsquareteck_GREEN PROJECT
Osquareteck_GREEN PROJECT
 
Ahmed Khalil CV & Resume
Ahmed Khalil CV & ResumeAhmed Khalil CV & Resume
Ahmed Khalil CV & Resume
 
RESUME - NAJMUL SAQIB MANIAR
RESUME - NAJMUL SAQIB MANIARRESUME - NAJMUL SAQIB MANIAR
RESUME - NAJMUL SAQIB MANIAR
 
Blake Lapthorn's green breakfast with guest speaker Keeran Jugdoyal, Faithful...
Blake Lapthorn's green breakfast with guest speaker Keeran Jugdoyal, Faithful...Blake Lapthorn's green breakfast with guest speaker Keeran Jugdoyal, Faithful...
Blake Lapthorn's green breakfast with guest speaker Keeran Jugdoyal, Faithful...
 
3 Matrix Docmnt Technology Mfg Housing Pkge
3 Matrix Docmnt Technology Mfg Housing Pkge3 Matrix Docmnt Technology Mfg Housing Pkge
3 Matrix Docmnt Technology Mfg Housing Pkge
 
American Institute of Architects Committee on the Envrinment
American Institute of Architects Committee on the EnvrinmentAmerican Institute of Architects Committee on the Envrinment
American Institute of Architects Committee on the Envrinment
 
BREEAM
BREEAMBREEAM
BREEAM
 
IAED 342-Research Presentation
IAED 342-Research PresentationIAED 342-Research Presentation
IAED 342-Research Presentation
 
CWG Waste water solutions
CWG Waste water solutionsCWG Waste water solutions
CWG Waste water solutions
 
Erwin Mendoza CV
Erwin Mendoza CVErwin Mendoza CV
Erwin Mendoza CV
 
Controlling capital costs using a performance based design build process
Controlling capital costs using a performance based design build processControlling capital costs using a performance based design build process
Controlling capital costs using a performance based design build process
 

Recently uploaded

Mission to Decommission: Importance of Decommissioning Products to Increase E...
Mission to Decommission: Importance of Decommissioning Products to Increase E...Mission to Decommission: Importance of Decommissioning Products to Increase E...
Mission to Decommission: Importance of Decommissioning Products to Increase E...
Product School
 
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
UiPathCommunity
 
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered QualitySoftware Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
Inflectra
 
Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...
BookNet Canada
 
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
Product School
 
State of ICS and IoT Cyber Threat Landscape Report 2024 preview
State of ICS and IoT Cyber Threat Landscape Report 2024 previewState of ICS and IoT Cyber Threat Landscape Report 2024 preview
State of ICS and IoT Cyber Threat Landscape Report 2024 preview
Prayukth K V
 
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Jeffrey Haguewood
 
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
Product School
 
Neuro-symbolic is not enough, we need neuro-*semantic*
Neuro-symbolic is not enough, we need neuro-*semantic*Neuro-symbolic is not enough, we need neuro-*semantic*
Neuro-symbolic is not enough, we need neuro-*semantic*
Frank van Harmelen
 
Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...
Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...
Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...
Ramesh Iyer
 
When stars align: studies in data quality, knowledge graphs, and machine lear...
When stars align: studies in data quality, knowledge graphs, and machine lear...When stars align: studies in data quality, knowledge graphs, and machine lear...
When stars align: studies in data quality, knowledge graphs, and machine lear...
Elena Simperl
 
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
Product School
 
How world-class product teams are winning in the AI era by CEO and Founder, P...
How world-class product teams are winning in the AI era by CEO and Founder, P...How world-class product teams are winning in the AI era by CEO and Founder, P...
How world-class product teams are winning in the AI era by CEO and Founder, P...
Product School
 
Essentials of Automations: Optimizing FME Workflows with Parameters
Essentials of Automations: Optimizing FME Workflows with ParametersEssentials of Automations: Optimizing FME Workflows with Parameters
Essentials of Automations: Optimizing FME Workflows with Parameters
Safe Software
 
Bits & Pixels using AI for Good.........
Bits & Pixels using AI for Good.........Bits & Pixels using AI for Good.........
Bits & Pixels using AI for Good.........
Alison B. Lowndes
 
Key Trends Shaping the Future of Infrastructure.pdf
Key Trends Shaping the Future of Infrastructure.pdfKey Trends Shaping the Future of Infrastructure.pdf
Key Trends Shaping the Future of Infrastructure.pdf
Cheryl Hung
 
UiPath Test Automation using UiPath Test Suite series, part 4
UiPath Test Automation using UiPath Test Suite series, part 4UiPath Test Automation using UiPath Test Suite series, part 4
UiPath Test Automation using UiPath Test Suite series, part 4
DianaGray10
 
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdfFIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance
 
The Future of Platform Engineering
The Future of Platform EngineeringThe Future of Platform Engineering
The Future of Platform Engineering
Jemma Hussein Allen
 
JMeter webinar - integration with InfluxDB and Grafana
JMeter webinar - integration with InfluxDB and GrafanaJMeter webinar - integration with InfluxDB and Grafana
JMeter webinar - integration with InfluxDB and Grafana
RTTS
 

Recently uploaded (20)

Mission to Decommission: Importance of Decommissioning Products to Increase E...
Mission to Decommission: Importance of Decommissioning Products to Increase E...Mission to Decommission: Importance of Decommissioning Products to Increase E...
Mission to Decommission: Importance of Decommissioning Products to Increase E...
 
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
 
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered QualitySoftware Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
 
Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...
 
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
 
State of ICS and IoT Cyber Threat Landscape Report 2024 preview
State of ICS and IoT Cyber Threat Landscape Report 2024 previewState of ICS and IoT Cyber Threat Landscape Report 2024 preview
State of ICS and IoT Cyber Threat Landscape Report 2024 preview
 
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
 
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
 
Neuro-symbolic is not enough, we need neuro-*semantic*
Neuro-symbolic is not enough, we need neuro-*semantic*Neuro-symbolic is not enough, we need neuro-*semantic*
Neuro-symbolic is not enough, we need neuro-*semantic*
 
Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...
Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...
Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...
 
When stars align: studies in data quality, knowledge graphs, and machine lear...
When stars align: studies in data quality, knowledge graphs, and machine lear...When stars align: studies in data quality, knowledge graphs, and machine lear...
When stars align: studies in data quality, knowledge graphs, and machine lear...
 
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
 
How world-class product teams are winning in the AI era by CEO and Founder, P...
How world-class product teams are winning in the AI era by CEO and Founder, P...How world-class product teams are winning in the AI era by CEO and Founder, P...
How world-class product teams are winning in the AI era by CEO and Founder, P...
 
Essentials of Automations: Optimizing FME Workflows with Parameters
Essentials of Automations: Optimizing FME Workflows with ParametersEssentials of Automations: Optimizing FME Workflows with Parameters
Essentials of Automations: Optimizing FME Workflows with Parameters
 
Bits & Pixels using AI for Good.........
Bits & Pixels using AI for Good.........Bits & Pixels using AI for Good.........
Bits & Pixels using AI for Good.........
 
Key Trends Shaping the Future of Infrastructure.pdf
Key Trends Shaping the Future of Infrastructure.pdfKey Trends Shaping the Future of Infrastructure.pdf
Key Trends Shaping the Future of Infrastructure.pdf
 
UiPath Test Automation using UiPath Test Suite series, part 4
UiPath Test Automation using UiPath Test Suite series, part 4UiPath Test Automation using UiPath Test Suite series, part 4
UiPath Test Automation using UiPath Test Suite series, part 4
 
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdfFIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
 
The Future of Platform Engineering
The Future of Platform EngineeringThe Future of Platform Engineering
The Future of Platform Engineering
 
JMeter webinar - integration with InfluxDB and Grafana
JMeter webinar - integration with InfluxDB and GrafanaJMeter webinar - integration with InfluxDB and Grafana
JMeter webinar - integration with InfluxDB and Grafana
 

How to design and construct a 18ha commercial nursery

  • 1. Presentatie project Turnkey greenhouse VEK Adviesgroep BV How to design and construct a 18 ha commercial nursery?
  • 2. How to design and construct a 18 ha commercial nursery? VEK Adviesgroep was assigned to develop a nursery, together with the client, with the starting point that the nursery should comply with the philosophy of the grower. This philosophy is based on a minimum use of energy, a closed water circulation system without discharge, growing tomatoes without pesticides in an economical efficient way, good facilities for the staff, a modern shipping building with efficient logistics. Moreover, the company has to be designed in such a way that phase 2 can be realized without any problems and the water technical installation and the hot boiler room are prepared for extension with a minimum of effort. 2
  • 3. Sustainability and economy Today, tomatoes are grown more and more without the use of any chemical pesticides. Moreover, research showed that within the rock wool on which the tomatoes grow, an important biological life prevails. Because the rock wool is reused annually, eventually this results in a balance between good and bad fungi. This balance helps to ensure that it is no longer necessary to use chemical pesticides. Because of these experiences, a total new way of growing tomatoes is developing. Any interference in the greenhouse affects the natural system. The plants, fungi, bacteria, the roots, the climate, everything has an influence on each other. The big difference with the traditional way of growing is that the system is not broken down when there is a problem. One continues to work within the existing and natural system. The interventions are aimed to maintain and strengthen the system. This way, the system will eventually have the power to solve the problems itself. The objective is to produce the best and most tasteful tomatoes with a minimum of resources and waste. 3
  • 4. Why choose VEK as your Turnkey Greenhouse Partner? Our specialists have over 4 decades of experiences in greenhouse design, constructions and installations, both domestically and abroad. We are experienced in both glass and poly houses for vegetables, flowers, pot plants and bedding plants. VEK Adviesgroep offers its customers a greenhouse facility that is suitable for the local climate and meets the client’s expectations. How we accomplish this, is based on a triangle of knowledge in growing and technology, experience and implementation. Our approach contains 4 unique steps: 7) Design 8) Tender 9) Construct 10) Training & Greenhouse Management VEK office 4
  • 5. Why choose VEK as your Turnkey Greenhouse Partner? • Design Design plays a crucial role in the success of each greenhouse project. With VEK Adviesgroep the crop is ‘king’. This means that the whole concept and design is executed in the interest of the crop. VEK Adviesgroep incorporates information on local climate conditions and circumstances, possible energy concept, cooling or heating requirements, availability and quality of water, the growing skills of the management and labourers, marketing opportunities for the crop etc. Objectives during this process are:  Functionality and efficiency  Sustainability  Economics VEK Adviesgroep underlines the importance of this phase of a project. Accordingly, we have a team of engineers and designers who are looking for the most functional design to be able to grow the best quality product with the best possible yield in the given local circumstances. • Tender Through our global network of suppliers we are able to provide unbeatable prices through a system of competitive tendering for worldwide specialized builders and suppliers. The Design & Construct method of VEK Adviesgroep works with open book calculations, so you get access to the budgets and the entire project is transparent . 13) Construct VEK Adviesgroep is experienced in managing the whole process and is responsible for the complete construction period. Our goal is to build according to your requirements and to finish our work in time. Through our global network, we are able to select the best builders and suppliers for your project with a proven international track record. 16) Training & Greenhouse Management A good design, selecting the right suppliers and a well managed building period do not guarantee high quality products and yields as were envisaged. Training and education of employees, staff and management are essential. They have to learn how to deal with the new equipment, techniques and grow methods. 5
  • 6. Design stage The objective of the company is to realise a greenhouse complex in two phases of 18 ha in total for the cultivation of snack tomatoes. The starting point was a complete new horticultural area for the construction of modern greenhouses. Requirements of the client: • Site development • Realization of utility connections because these large capacities were not available in the area • Greenhouse • Possibilities in the greenhouse to use the new way of growing according to the philosophy of the client • Automatic glass cleaning system • Packing building with 2 loading docks • Unique screening installation • Shielding of the grow light • Grow light installation • Closed water circulation system, including reuse of the condensation of the CHP system • Energy production and supply to the electricity grid • Year round water storage by means of a large water basin • High tech water technical area with various water silos for daily storage and modern water mixing and irrigation units • Possibility to increase the company up to 2 x 9 ha, which means double surface • Unique design of the office building 6
  • 7. Concept idea The first step in the process was to develop a lay out plus energy concept and closed water circulation system. For international projects this is usually combined with a feasibility report plus cost price calculation of the whole operation. We incorporate local climate and circumstances, availability of water, availability of energy and growing skills of the staff and labourers. Our goal is to develop the most efficient and economic greenhouse in the given circumstances. 7
  • 8. Detail design and engineering After the conceptual phase has been approved and frozen, we evaluate the project into the next phase of detail design / engineering. In this stage we work out all the technical installations in detail. The whole list of technical installations, including some specifics, is given on the next pages. At the end of this stage we are able to conclude all the information into a supply scope for the hardware. The whole design stage has been finished now and we move towards procurement of all the hardware and delivery to the customers’ building site. Internationally, most components are supplied by containers. 8
  • 9. General description of the project General description of the whole project for 1 phase of 9 ha (22.5 acres) for a master plan of 18 ha (45 acres). • Site development • Greenhouse with 7m (21ft) gutter height and automatic roof cleaning devise • Headhouse for logistics and packing with 2 loading docks • Technical building for irrigation and heat and power. • Irrigation system in a closed loop • Rainwater harvesting pond of 22.440 m3 (approx. 800,000 cu-ft) • Hot water boiler system and heat storage tank • Screening installation • Climate control computer • CHP power generator of approx. 4,4 MW and phase 2 approx. 8,8 MW • CO2 supply system for the plants • Grow light installation. • Cultivation system with hanging gutters • Office building 9
  • 10. Site development From grass to glass: - Ground works / leveling and filling - GPS land measurements 10
  • 11. Greenhouse Greenhouse with 7 m (21 ft) gutter height and automatic roof cleaning devise Technical specifications Type of greenhouse: 8,00 m (≈ 24 ft) Venlo-glasshouse (2 x 4,00 m bays ≈ 2 x 12 ft)) Greenhouse width: 80 bays à 4,00 m / 40 trellis girders à 8,00 m, length 275 m (≈ 900 ft) 2 bays à 4,00 m / 1 trellis girder à 8,70 m, length 175 m (≈ 575 ft) Trust distance: 5,00 m (≈ 15 ft) Gutter height: 7,00 m (≈ 21 ft) (ground level – underside of gutter) Corridor: 8 m truss with 4,00 m Venlo bays as a free span Technical area: various trusses with 4,00 m Venlo bays as a free span Total surfaces: 90.392,50 m² (≈ 22.5 acres) (distance ctc greenhouse) 11
  • 14. Greenhouse Corridor Roof cleaning devise 14
  • 16. Headhouse Headhouse for logistics and packing with 2 loading docks Technical specifications Type of headhouse: 28,00 m (≈ 92 ft) A-frame construction Headhouse length: 47,00 m (≈ 154 ft) Gutter height: 7,00 m (≈ 21 ft) (ground level – underside of gutter) Surface: approx. 1.300 m² (≈ 14,000 sq-ft) packing building 16
  • 17. Technical building Technical building for irrigation and heat and power Technical specifications Technical area: various trusses with 4,00 m (≈ 12 ft) Venlo bays as a free span Surface: 2.380 m² (≈ 25,600 sq-ft) (distance ctc technical area) 17
  • 18. Technical building Irrigation system in a closed loop 18
  • 19. Technical building Water technical installation Technical specifications for 9 ha (≈ 22.5 acres) Fertilizer unit (liquid & solid fertilizer) 90 m3/hr (≈ 24,000 gallons/hr) Drip pump unit 2x 90 m3/hr (≈ 2 x 24,000 gallons/hr) UV-desinfection unit 15 m3/hr (≈ 4,000 gallons/hr) RO unit 150 m3/day (≈ 40,000 gallons/day) 19
  • 20. Technical building Lubron condensation water treatment The objective of this installation is to purify approx. 600 liter/hour (≈ 160 gallons/hr) condensation water from the CHP system with a natural gas use of 1.100 m3/hour (≈ 39.000 gallons/hr) + condensation water of the CO2 installation of approx. 400 liter/hour. By purifying this water, it can be reused as an addition to the rainwater. Technical specifications Type 1 x CW 1000 Capacity 500-1.000 liter/hour (≈ 130-260 gallons/hr) Water temperature 5 - 40°C (≈ 41-104°F) Electrical connection 230 V, 50 Hz Power 1x 0,5 kW 20
  • 21. Rain water harvesting pond Year round water storage by means of a large rain water harvesting pond Technical specifications Surface: 12.500 m2 (≈ 3.10 acres) Bank height: 2.90 m (≈ 9 ft) Contents: 22.440 m 3 (≈ 791,000 cu-ft) 21
  • 22. Heating system Hot water boiler system Technical specifications Capacity: 7 MW ≈ 24 MBTU/hr 22
  • 23. Heating system Pipe heating 23
  • 24. Heating system Heat storage tank Technical specifications Contents: 7.383 m3 (≈ 260,000 cu-ft) Diameter: 28.000 mm (≈ 91 ft) Height: 14.729 mm (≈ 48.5 ft) 24
  • 25. Climate control computer Technical specifications The climate computer controls all processes in and around the greenhouse: Greenhouse Climate Control Irrigation • Meteo station • Rain water storage • 8 climate zones • Steering fertilizer unit • Ventilation control • Drip irrigation system • Energy saving screen • Steering UV disinfection unit • Heating control • CO2 dosing Management information • Grow light steering • Graphical user interface • Process dashboards Energy • Historical graphs and tables • Boiler room • Hot water gas boiler • CHP unit • Heat storage • Distributor with mixing groups 25
  • 27. CO2 supply system for the plants 27
  • 28. CHP power generator of approx. 4,4 MW Technical specifications Engine type (equipment) Electrical capacity per engine: 4397 kW Thermal capacity per engine: 4589 kW Speed: 50 Hz Voltage: 10.500 V The installation includes: • Gas system • Outlet system • Condenser • Oil system • CH system • Electrical installation • Flue gas cleaner • Acoustic housing • CodiNOx Exhaust gas purifier Acoustic housing 28
  • 29. CHP power generator of approx. 4,4 MW 29
  • 30. CHP power generator of approx. 4,4 MW 30
  • 31. Screening installation Unique screening installation (Smartscreen) Energy screening installations, light reduction installations and roller side screens Technical specifications Double screening installation: Screening installation in open position - Light reduction (XLS SL 99 W/W Revolux) Screening percentage 99,5% Energy saving 50% - Energy saving (XLS 10 H2No Revolux) Screening percentage 13% Energy saving 47% Screening installation in closed position 31
  • 34. Grow light installation Technical specifications Light intensity: ± 15.000 lux ≈ 215 µMol/m².s Number of fittings : 11.552 HSE NXT 1000 Watt / 400 Volt electric with Beta reflector Light: 11.552 Greenpower lights 1000 Watt El. 400 V. Power in kVA: 12.326 1000 Watt / 400 V kW – 1,035 kVA – 1,067 34
  • 35. Cultivation system with hanging gutters Technical specifications cultivation gutters Width gutter 210 mm (≈ 8.25 inch) Height gutter 120 mm (≈ 4.75 inch) Depth water canals 60 mm (≈ 2.40 inch) Width water canals 30 mm (≈ 1.20 inch) 35
  • 36. Cultivation system with hanging gutters 36
  • 37. Post Harvest installation With an electric tow truck, the harvesting carts go Unloading the carts with the filled harvesting crates transported automatically from greenhouse to the and loading the carts with empty crates. packing building. De-stacking the crates. Moving the crates to the stacking unit and palletiser for transport. 37