INDUSTRIALBUILDING
 Client/owner
ASGHAL - QATAR
 Developer
Keppel Seghers Engineering
Singapore PTE LTD
 Contract amount
29.7 million QAR
 Execution time
10 months
 Execution by
CFE Middle East
P.O. Box: 55862 Doha, Qatar, Regency Business Center, 8th Floor, Al Baladiya St.
Tel: +974 4427 0986 Fax: +974 4427 0987 - www.cfe.be
CFE Middle East is a branch office of the CFE Group.
The Lime Dosing Plant is part of the landmark project that will be the
largest greenfield wastewater treatment, water reuse and sludge
treatment plant in Qatar when completed. With a peak design capacity to
treat wastewater of up to 439,000m3 per day, the Doha North Sewage
Treatment Works will serve a projected population of over 900,000. This
modern facility will feature advanced biological treatment processes as
well as membrane and ultra-violet technologies to produce high quality
reclaimed water for reuse in agriculture. The facility will also be equipped
with thermal drying processes to treat wastewater sludge. The dried and
pelletized sludge will be used as soil conditioners or refuse-derived fuel.
The scope of works of CFE for this building included:
- Site preparation
- Leveling and compaction
- Concrete works of the mail building
- Concrete works of the control room
- Masonry of the control room
- Finishing works of the control room
- Doors and windows of the control room
- Waterproofing works of the control room
Photos:
Doha North Sewege Treatment Works
ENTRANCE GATE
 Building type
Industrial building
 Project name
Construction of substations
A,D, E, G and Lime
Dosing Plant at Doha North
Sewerage Treatment Plant

More Related Content

What's hot

Sswi april may-2021_lowres
Sswi april may-2021_lowresSswi april may-2021_lowres
Sswi april may-2021_lowresPrem Baboo
 
5000 tpd urea mega plants design
5000 tpd urea  mega plants design5000 tpd urea  mega plants design
5000 tpd urea mega plants designPrem Baboo
 
SAUDI ARABIA : New water treatment plant to be built in Saudi.
SAUDI ARABIA : New water treatment plant to be built in Saudi.SAUDI ARABIA : New water treatment plant to be built in Saudi.
SAUDI ARABIA : New water treatment plant to be built in Saudi.majesticshuttle73
 
Suez water treatment
Suez water treatmentSuez water treatment
Suez water treatmentRick Nabett
 
Shell day case study
Shell day case studyShell day case study
Shell day case studyAtul Gupta
 
Frac Vap Brochure June 18, 2016
Frac Vap Brochure June 18, 2016Frac Vap Brochure June 18, 2016
Frac Vap Brochure June 18, 2016Garry Bush
 
Shell case study: How should ‘Bion Oil’, an oil & gas giant, expand its busin...
Shell case study: How should ‘Bion Oil’, an oil & gas giant, expand its busin...Shell case study: How should ‘Bion Oil’, an oil & gas giant, expand its busin...
Shell case study: How should ‘Bion Oil’, an oil & gas giant, expand its busin...Akhil Prabhakar
 

What's hot (16)

DNSTW SUBSTATION C
DNSTW SUBSTATION CDNSTW SUBSTATION C
DNSTW SUBSTATION C
 
DNSTW SUBSTATION F
DNSTW SUBSTATION FDNSTW SUBSTATION F
DNSTW SUBSTATION F
 
DNSTW SUBSTATION B
DNSTW SUBSTATION BDNSTW SUBSTATION B
DNSTW SUBSTATION B
 
Organics #2 New Technologies - Harvest Power
Organics #2 New Technologies - Harvest PowerOrganics #2 New Technologies - Harvest Power
Organics #2 New Technologies - Harvest Power
 
Dhanaji suravase resume
Dhanaji suravase resumeDhanaji suravase resume
Dhanaji suravase resume
 
pk
pkpk
pk
 
Sswi april may-2021_lowres
Sswi april may-2021_lowresSswi april may-2021_lowres
Sswi april may-2021_lowres
 
5000 tpd urea mega plants design
5000 tpd urea  mega plants design5000 tpd urea  mega plants design
5000 tpd urea mega plants design
 
HydroGuar
HydroGuarHydroGuar
HydroGuar
 
SAUDI ARABIA : New water treatment plant to be built in Saudi.
SAUDI ARABIA : New water treatment plant to be built in Saudi.SAUDI ARABIA : New water treatment plant to be built in Saudi.
SAUDI ARABIA : New water treatment plant to be built in Saudi.
 
Suez water treatment
Suez water treatmentSuez water treatment
Suez water treatment
 
Shell day case study
Shell day case studyShell day case study
Shell day case study
 
Frac Vap Brochure June 18, 2016
Frac Vap Brochure June 18, 2016Frac Vap Brochure June 18, 2016
Frac Vap Brochure June 18, 2016
 
Hgd presentation
Hgd presentationHgd presentation
Hgd presentation
 
Nandan CV (1)
Nandan CV (1)Nandan CV (1)
Nandan CV (1)
 
Shell case study: How should ‘Bion Oil’, an oil & gas giant, expand its busin...
Shell case study: How should ‘Bion Oil’, an oil & gas giant, expand its busin...Shell case study: How should ‘Bion Oil’, an oil & gas giant, expand its busin...
Shell case study: How should ‘Bion Oil’, an oil & gas giant, expand its busin...
 

Viewers also liked

Viewers also liked (10)

ค่าและหน่วยไฟฟ้า ก.พ. 58
ค่าและหน่วยไฟฟ้า ก.พ. 58ค่าและหน่วยไฟฟ้า ก.พ. 58
ค่าและหน่วยไฟฟ้า ก.พ. 58
 
Uol
UolUol
Uol
 
Iss 9
Iss 9Iss 9
Iss 9
 
Tugas mtk 4
Tugas mtk 4Tugas mtk 4
Tugas mtk 4
 
Eşkenar Üçgen-Yıldızlı soru
Eşkenar Üçgen-Yıldızlı soruEşkenar Üçgen-Yıldızlı soru
Eşkenar Üçgen-Yıldızlı soru
 
12_2015 resume
12_2015 resume12_2015 resume
12_2015 resume
 
Citizenship Article
Citizenship ArticleCitizenship Article
Citizenship Article
 
Dss64 2
Dss64 2Dss64 2
Dss64 2
 
Mk0012 retail marketing
Mk0012 retail marketingMk0012 retail marketing
Mk0012 retail marketing
 
How do business organizations manage change, why is it usually resisted
How do business organizations manage change, why is it usually resistedHow do business organizations manage change, why is it usually resisted
How do business organizations manage change, why is it usually resisted
 

Similar to Entrance gate

Ahmed Khalil CV & Resume
Ahmed Khalil CV & ResumeAhmed Khalil CV & Resume
Ahmed Khalil CV & ResumeAhmed Khalil
 
DSEC Article on ACABIO - Biofuels Nov-Dec_2013
DSEC Article on ACABIO - Biofuels Nov-Dec_2013DSEC Article on ACABIO - Biofuels Nov-Dec_2013
DSEC Article on ACABIO - Biofuels Nov-Dec_2013Pierre Jacquy
 
How to design and construct a 18ha commercial nursery
How to design and construct a 18ha commercial nurseryHow to design and construct a 18ha commercial nursery
How to design and construct a 18ha commercial nurseryvekadviesgroep
 
DEGRÉMONT INDUSTRY CORPORATE BROCHURE 2013
DEGRÉMONT INDUSTRY CORPORATE BROCHURE 2013DEGRÉMONT INDUSTRY CORPORATE BROCHURE 2013
DEGRÉMONT INDUSTRY CORPORATE BROCHURE 2013Rick Nabett
 
Qatargas debottlenecking project
Qatargas debottlenecking projectQatargas debottlenecking project
Qatargas debottlenecking projectJohn Kingsley
 
Palm Oil Mill Contractor
Palm Oil Mill ContractorPalm Oil Mill Contractor
Palm Oil Mill ContractorAsumardi67
 
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016Mujahid Ali Akhtar
 
EN - Degremont Industry presentation brochure
EN  - Degremont Industry presentation brochureEN  - Degremont Industry presentation brochure
EN - Degremont Industry presentation brochureDegrémont Industry
 
Er.aad cv new 20151208
Er.aad cv new 20151208Er.aad cv new 20151208
Er.aad cv new 20151208AADARSH JILKA
 
Small Hydro Power intergen energy ltd.
Small Hydro Power intergen energy ltd.Small Hydro Power intergen energy ltd.
Small Hydro Power intergen energy ltd.Intergen Energy Ltd.
 
Intergen Energy Limited Construction Management
Intergen Energy Limited Construction ManagementIntergen Energy Limited Construction Management
Intergen Energy Limited Construction ManagementIntergen Energy Ltd.
 
Yield / Energy Optimization studies
Yield / Energy Optimization studiesYield / Energy Optimization studies
Yield / Energy Optimization studiesIntergen Energy Ltd.
 
Wind Energy by intergen energy ltd.
Wind Energy by intergen energy ltd.Wind Energy by intergen energy ltd.
Wind Energy by intergen energy ltd.Intergen Energy Ltd.
 
intergen energy ltd.Energy Yield analysis
intergen energy ltd.Energy Yield analysisintergen energy ltd.Energy Yield analysis
intergen energy ltd.Energy Yield analysisIntergen Energy Ltd.
 
PROJECT PROFILE ANNEXURE A2 QAPCO
PROJECT PROFILE ANNEXURE A2 QAPCOPROJECT PROFILE ANNEXURE A2 QAPCO
PROJECT PROFILE ANNEXURE A2 QAPCOHITESH RATHOD
 

Similar to Entrance gate (20)

Ahmed Khalil CV & Resume
Ahmed Khalil CV & ResumeAhmed Khalil CV & Resume
Ahmed Khalil CV & Resume
 
Ebrayeem cv
Ebrayeem cvEbrayeem cv
Ebrayeem cv
 
DSEC Article on ACABIO - Biofuels Nov-Dec_2013
DSEC Article on ACABIO - Biofuels Nov-Dec_2013DSEC Article on ACABIO - Biofuels Nov-Dec_2013
DSEC Article on ACABIO - Biofuels Nov-Dec_2013
 
How to design and construct a 18ha commercial nursery
How to design and construct a 18ha commercial nurseryHow to design and construct a 18ha commercial nursery
How to design and construct a 18ha commercial nursery
 
DEGRÉMONT INDUSTRY CORPORATE BROCHURE 2013
DEGRÉMONT INDUSTRY CORPORATE BROCHURE 2013DEGRÉMONT INDUSTRY CORPORATE BROCHURE 2013
DEGRÉMONT INDUSTRY CORPORATE BROCHURE 2013
 
Qatargas debottlenecking project
Qatargas debottlenecking projectQatargas debottlenecking project
Qatargas debottlenecking project
 
Palm Oil Mill Contractor
Palm Oil Mill ContractorPalm Oil Mill Contractor
Palm Oil Mill Contractor
 
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
 
MY C.V
MY C.VMY C.V
MY C.V
 
EN - Degremont Industry presentation brochure
EN  - Degremont Industry presentation brochureEN  - Degremont Industry presentation brochure
EN - Degremont Industry presentation brochure
 
Er.aad cv new 20151208
Er.aad cv new 20151208Er.aad cv new 20151208
Er.aad cv new 20151208
 
Intergen Energy Ltd.
Intergen Energy Ltd.Intergen Energy Ltd.
Intergen Energy Ltd.
 
Small Hydro Power intergen energy ltd.
Small Hydro Power intergen energy ltd.Small Hydro Power intergen energy ltd.
Small Hydro Power intergen energy ltd.
 
Intergen Energy Limited Construction Management
Intergen Energy Limited Construction ManagementIntergen Energy Limited Construction Management
Intergen Energy Limited Construction Management
 
Waste to Energy Intergen Energy
Waste to Energy Intergen Energy Waste to Energy Intergen Energy
Waste to Energy Intergen Energy
 
Yield / Energy Optimization studies
Yield / Energy Optimization studiesYield / Energy Optimization studies
Yield / Energy Optimization studies
 
Wind Energy by intergen energy ltd.
Wind Energy by intergen energy ltd.Wind Energy by intergen energy ltd.
Wind Energy by intergen energy ltd.
 
intergen energy ltd.Energy Yield analysis
intergen energy ltd.Energy Yield analysisintergen energy ltd.Energy Yield analysis
intergen energy ltd.Energy Yield analysis
 
PROJECT PROFILE ANNEXURE A2 QAPCO
PROJECT PROFILE ANNEXURE A2 QAPCOPROJECT PROFILE ANNEXURE A2 QAPCO
PROJECT PROFILE ANNEXURE A2 QAPCO
 
eni_EST_esecutivo
eni_EST_esecutivoeni_EST_esecutivo
eni_EST_esecutivo
 

Entrance gate

  • 1. INDUSTRIALBUILDING  Client/owner ASGHAL - QATAR  Developer Keppel Seghers Engineering Singapore PTE LTD  Contract amount 29.7 million QAR  Execution time 10 months  Execution by CFE Middle East P.O. Box: 55862 Doha, Qatar, Regency Business Center, 8th Floor, Al Baladiya St. Tel: +974 4427 0986 Fax: +974 4427 0987 - www.cfe.be CFE Middle East is a branch office of the CFE Group. The Lime Dosing Plant is part of the landmark project that will be the largest greenfield wastewater treatment, water reuse and sludge treatment plant in Qatar when completed. With a peak design capacity to treat wastewater of up to 439,000m3 per day, the Doha North Sewage Treatment Works will serve a projected population of over 900,000. This modern facility will feature advanced biological treatment processes as well as membrane and ultra-violet technologies to produce high quality reclaimed water for reuse in agriculture. The facility will also be equipped with thermal drying processes to treat wastewater sludge. The dried and pelletized sludge will be used as soil conditioners or refuse-derived fuel. The scope of works of CFE for this building included: - Site preparation - Leveling and compaction - Concrete works of the mail building - Concrete works of the control room - Masonry of the control room - Finishing works of the control room - Doors and windows of the control room - Waterproofing works of the control room Photos: Doha North Sewege Treatment Works ENTRANCE GATE  Building type Industrial building  Project name Construction of substations A,D, E, G and Lime Dosing Plant at Doha North Sewerage Treatment Plant