SlideShare a Scribd company logo
Engineering Procurement & Project Management
Engineering Procurement & Project
Management
O&M ACTIVITIES
Engineering Procurement & Project Management
 EPC contractor with more than 30 years of
experience
 Certified for an Integrated QHSE Management
System
ISO 9001: 2015 – ISO 14001:2015- ISO
45001:2018
 Registered and active in several MEA
countries
EPPM PROFILE
 Created in Tunis, 1993
 Certified for Security Information
Management System ISO 27001
Engineering Procurement & Project Management
Gathering System,
Pipeline,
Oil & Gas processing
plant,
Storage Facilities,
Oily water Treatment,
Water Injection,
Refinery
Oil & Gas
Desalination
Purification,
Potabilization,
Oil removal,
Remineralization,
Waste Management,
Sludge Treatment
Water
& Environment
Energy
& Renewable Energy
FIELDS OF ACTIVITIES
Industry
Fertilising plants
Cement plants
Manufacturing
Agro and Pharmaceutical
Conventional /
Power plants
Photovoltaic
Bio-Gas
EPPM IN NUMBERS
Offices Worldwide
Years of Experience
Industry Sectors
30
12 04
Turnover Projects
Clients
150M
USD
+250
+50
Engineering Procurement & Project Management
Engineering Procurement & Project Management
PROJECT TYPES
EPPM is involved in several Types of Projects such as:
Engineering Design & Consultancy
PMC Projects : Project Management & Consultancy
EPCC Projects : Engineering, Procurement, Construction &
Commissioning
Commissioning, Operation & Maintenance Projects
Investment Projects :
- BOT “Build Own Transfer”
- BOO “Build Own Operate”
- Leasing projects
EPPM GROUP
Engineering Procurement & Project Management
Complementary
activities
Middle East
Africa Investment
Companies
EPPM SERVICES
COMMUNICATION
MANAGEMENT
HUMAN
RESOURCES
MANAGEMENT
SCHEDULE
MANAGEMENT
STAKEHOLDER
MANAGEMENT
RISK
MANAGEMENT
SCOPE
MANAGEMENT
PROCUREMENT
MANAGEMENT
QUALITY
MANAGEMENT
COST
MANAGEMENT
INTEGRATION
MANAGEMENT
PROJECT MANAGEMENT
Engineering Procurement & Project Management
ENGINEERING CAPABILITIES
Multidisciplinary Engineering Services,
Engineering Annual capacity 400 000 to 500 000 man-hours / year
Using the state of the art software,
Using “Electronic Documents Management System” to digitalize validation
process (internal & External) of all technical documents.
Engineering Procurement & Project Management
EPPM has created the R&D Department as extension to it’s design
capabilities, which aims to provide added value to ongoing projects, to
promote and support technological research, and to develop new fields of
activities for the group, mainly in :
Renewable Energies,
Water treatment,
Agriculture,
Food,
Bio Resources,
New building materials,…
With partnership involving local and foreign
research centers (public and private).
RESEARCH & DEVELOPMENT
Engineering Procurement & Project Management
Suppliers Prequalification and Assessment
Supply Chain Management (Negotiation, Expediting, Project deadlines, Packing &
Transport Survey, Transportation, Custom Clearance, inventory management and
warehousing, Etc.),
Negotiation and Contracts Finalisation,
Production Control,
Project QHSE Requirements,
Quality Control.
To manage procurement services, EPPM opts for updated solutions :
- E-Procurement Suppliers management, Inquiry cycle, Bids, Technical evaluation,
evaluation, Purchasing, PO history.
- 2IPS (Industrial Integrated Procurement System): inquiry process, purchasing process,
Receiving cycle.
PROCUREMENT
Engineering Procurement & Project Management
CONSTRUCTION
Construction Management :
Site Engineering
Elaboration of Method Statement
Coordination and Supervision
Reporting (daily, weekly and monthly)
Quality Assurance / Quality Control
HSE Supervision
Interface Management with local content.
Construction Works :
Mechanical : equipment installation & fitting
Piping Works : welding, erection, tests …
Electrical : equipment installation, cable laying & connections (LV, MV & HV)
Instrumentation Works : Instrument installation, Control System, Installation (SCADA,
PLC).
Engineering Procurement & Project Management
COMMISSIONING & START-UP
Pre-Commissioning procedures, Commissioning
Interface Management with Deign office
Commissioning resources assignment and mobilization
FAT & SAT
Coordination of commissioning tests
Development of the QA / QC of Commissioning
Mobilization of Construction Team and Technicians, Vendors
Preparation of the test and closing reports
Training plan preparation, provide field and classroom training sessions to Clients
After market and liability warranty services management.
Engineering Procurement & Project Management
OPERATION & MAINTENANCE
Elaboration of Operation and Maintenance manuals,
Production operation assistance
Maintenance activities of offshore and onshore plants,
Additional services :
Maintenance build: Asset register, maintenance task lists, maintenance plan,
Preparing maintenance plans in accordance with RCM and SCE analysis.
- Facilites management,
- Logistic , procurement and spare-parts management,
- Preparation, planning and management of major overhauls
Engineering Procurement & Project Management
O & M REFERENCES
Scope of Work
Engineering Procurement & Project Management
Project: Juaymah Terminal
Contenairized Waste Water
Treatment Plant
Objective: Reduce the impact of
waste water on the environment.
Location: Juaymah- Saudi
Arabia
Construct, Operate, and maintain for 3 years of a produced oily
water treatment system to treat the wastewater collected in Juaymah
Tank Farm evaporation pond, for disposal into the marine environment.
Supply of spare parts
Supply of chemicals
Scope of Work
Engineering Procurement & Project Management
Project: Upgrade of Biological
Treatment in IWTP 8
Objective: Improve treated water
quality of IWTP and absorb
excess water flowrate above the
existing plant design capacity.
Location: Jubail Industrial city -
Saudi Arabia
Construct, Operate, and maintain for 5 years period by installing Biological
process upgrading system to treat 50 000 m3/day of Industrial Waste water
Treatment Plant through HYBAC System:
Hybacs Area: Hybacs, Blower & Piping Installation & MCC & PLC
Installation & Connection, Handrails & Steel Stairs installation, control
room,…
Chemical Injection Skids
Scope of Work
The treated water is characterized as follows:
 Hydrocarbon Elimination (< 10 mg/l),
 Elimination of other materials (20 mg/l),
 Elimination of solid materials,
 Water filtration: 25 microns.
Phase 1: Revamping of all equipment & installations, during 2 years,
including engineering, procurement, installations and commissioning.
Phase 2: 3 years of Operation and Maintenance including :
 Existing equipment Revamping and Maintenance,
 Operation follow-up,
 Quality control of treated water,
 Procurement of the chemical and lubricant products,
 Procurement of the necessary equipment to the maintenance,
 Recommendation of the necessary spare parts,
Engineering Procurement & Project Management
Project : Revamping,
maintenance and operation of 02
Oily Water Treatment plants
(EPCO)
Capacity
• CINA Site : 6000 m3/day
• CIS Site : 8000 m3/day
Objective: Reduce the impact of
oily water on the environment.
Location: Hassi Messaoud -
Algeria
Scope of Work
Client : SONATRACH
Project : Revamping, maintenance
and operation of 03 Oily Water
Treatment plants (EPCO Project)
Capacity
Objective: Reduce the impact of oily
water on the environment
Location: Haoudh Barkaoui – Algeria
• Haoudh Berkaoui Site: 2400
m3/day
• Belkahla Site : 960 m3/day
• Guellala Site : 1440 m3/day
The treated water is characterized as follows :
 Mes < 20 ppm
 HC < 5 ppm
 Sulfato-reducing bacteria < 100 germs
Engineering Procurement & Project Management
Phase 1: Revamping of all equipment & installations, during 1 year,
including engineering, procurement, installations and commissioning.
Phase 2: 4 years of Operation and Maintenance including :
 Existing equipment Revamping and Maintenance,
 Operation follow-up,
 Quality control of treated water,
 Procurement of the chemical and lubricant products,
 Procurement of the necessary equipment to the maintenance,
 Recommendation of the necessary spare parts,
Scope of Work
Client : SOMOIL
Project : Maintenance Services of
FS/FST Associations
Objective: Guarantee continuity of
production platforms and the transfer of
production from offshore and onshore
production (FS / FST) to Block 3
Sonangol.
Location: Soyo - Angola
Preventive, and corrective maintenance, obsolescence equipment study and
replacement, new equipment and packages installation and integration, and
many improvements within the operation field under 4 years maintenance
service agreement (with extension period):
Rotating machines : Generators, gas compressors, electric pumps, air
compressors, …
Static Equipment: Treaters, separator, air and gas vessels, piping,
Repair leaks on piping: Welding, renewing, etc…
Control and measuring instruments : Flow metering, level control, Control
system, etc… (Foxborro, fisher, rosemount etc…) ,
Power Management & Electrical Equipment: all kinds of panels,
Field Safety Equipment
Engineering Procurement & Project Management
Scope of Work
Client : SOMOIL
Project : Offshore Maintenance
Services Bloc 2/05 platforms
Production Capacity : 12 500 BPD
Objective: Maintain all productive
equipment including ; rotating
machinery on all platforms and
satellites in block 2/05 to ensure
continuity of platform production.
Location: Soyo - Angola
Preventive, and corrective maintenance, obsolescence equipment study
and replacement, new equipment and packages installation and
integration, and many improvements within the operation field under 4
years maintenance service agreement (with extension period):
Engineering Procurement & Project Management
Rotative equipment: Pumps, Generators, air & gas compressor, etc.
Static equipment: Theaters, Separators, air & gas vessels, piping,
valves, etc.
Field Process Control Equipment : Valves i.e. SDV, ESDV, BDV,
Pressure and Relief Safety valves, etc.
Control and measuring instruments : Level, pressure, temperature
and flow measurement
Power Management & Electrical Equipment
Field Safety Equipment
Scope of Work :
BOT “Build Own Transfer”
30-years
Client: Ministry of Hydrocarbons
Project: Kivu Lake methane gas
exploitation for electricity production
Objective: Generate electricity from the
extraction of methane gas
Location: Democratic Republic of
Congo
30-years BOT project consists of:
Extract, process, transport and store methane gas from KIVU
Lake,
Build a power station with an installed capacity of 30 MW
operating on fuel oil and methane gas and ensure its operation
and maintenance for a period of 27 years and 03 months,
Build energy transmission lines (high, medium and low-voltage)
and associated stations to interconnect [possibly] with-existing
networks,
Sell all electricity generated at [SNEL]
Engineering Procurement & Project Management
MINISTERE DES HYDROCARBURES
Phase 1 : Realization of a photovoltaic power plant of 10 MW with
string inverters and tracker system, the project consists on :
• Engineering Services,
• Project Management,
• Procurement of all necessary equipment,
• Construction of photovoltaic plant,
• Commissioning & Start-up,
Phase 2 : 20 years of station operation.
Scope of Work
Client: STEG
Project: Production of electricity from
photovoltaic solar energy; Meknassy 10
MW.
Location: Meknassy - Tunisia
Objective: Production of electricity
from photovoltaic solar energy.
BOO “Build Own Operate”
20-years
Engineering Procurement & Project Management
WHO TRUST US
Engineering Procurement & Project Management
Silver Street - Fatma Building - Lake gardens -1053 -Tunis -TUNISIA
Tel. +216 71 16 81 00 Fax. +216 71 19 09 18
www.eppm.com.tn eppm@eppm.com.tn
Engineering Procurement & Project Management

More Related Content

Similar to EPPMPresentationOMOct22 (1).pptx

Interaction sharing my experience
Interaction   sharing my experienceInteraction   sharing my experience
Interaction sharing my experience
Samir Dave
 
Mohammad Rehan Akbar Khan 2- CV
Mohammad Rehan Akbar Khan 2- CVMohammad Rehan Akbar Khan 2- CV
Mohammad Rehan Akbar Khan 2- CVRehan Khan
 
Yahia Eisa- pipeline technical specialist
Yahia Eisa- pipeline technical specialistYahia Eisa- pipeline technical specialist
Yahia Eisa- pipeline technical specialistYahia Ibrahim
 
SCIMEE is a rare-earth magnet-based wastewater treatment company equipped wit...
SCIMEE is a rare-earth magnet-based wastewater treatment company equipped wit...SCIMEE is a rare-earth magnet-based wastewater treatment company equipped wit...
SCIMEE is a rare-earth magnet-based wastewater treatment company equipped wit...
dun yang
 
Resume-Thomas Mathew
Resume-Thomas MathewResume-Thomas Mathew
Resume-Thomas MathewThomas Mathew
 
Pre bid meeting presentation
Pre bid meeting presentationPre bid meeting presentation
Pre bid meeting presentation
Riaz Zalil
 
RESUME - NAJMUL SAQIB MANIAR
RESUME - NAJMUL SAQIB MANIARRESUME - NAJMUL SAQIB MANIAR
RESUME - NAJMUL SAQIB MANIARSAQIB MANIAR
 
R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R S Rajaram
 
R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R S Rajaram
 
My CV, Shahar Ali tuhin
My CV, Shahar Ali tuhinMy CV, Shahar Ali tuhin
My CV, Shahar Ali tuhinMohammed ali
 
RESUME - NAJMUL SAQIB MANIAR
RESUME - NAJMUL SAQIB MANIARRESUME - NAJMUL SAQIB MANIAR
RESUME - NAJMUL SAQIB MANIARSAQIB MANIAR
 
VFDFVFDV
VFDFVFDVVFDFVFDV
VFDFVFDV
dfdfdf7
 

Similar to EPPMPresentationOMOct22 (1).pptx (20)

Rimon forclients 62016
Rimon forclients 62016Rimon forclients 62016
Rimon forclients 62016
 
Resume 2016 nadeem siddiqui
Resume   2016 nadeem siddiquiResume   2016 nadeem siddiqui
Resume 2016 nadeem siddiqui
 
Interaction sharing my experience
Interaction   sharing my experienceInteraction   sharing my experience
Interaction sharing my experience
 
Mohammad Rehan Akbar Khan 2- CV
Mohammad Rehan Akbar Khan 2- CVMohammad Rehan Akbar Khan 2- CV
Mohammad Rehan Akbar Khan 2- CV
 
RobertKulick_2016
RobertKulick_2016RobertKulick_2016
RobertKulick_2016
 
Yahia Eisa- pipeline technical specialist
Yahia Eisa- pipeline technical specialistYahia Eisa- pipeline technical specialist
Yahia Eisa- pipeline technical specialist
 
SCIMEE is a rare-earth magnet-based wastewater treatment company equipped wit...
SCIMEE is a rare-earth magnet-based wastewater treatment company equipped wit...SCIMEE is a rare-earth magnet-based wastewater treatment company equipped wit...
SCIMEE is a rare-earth magnet-based wastewater treatment company equipped wit...
 
RobertKulick2016
RobertKulick2016RobertKulick2016
RobertKulick2016
 
Resume-Thomas Mathew
Resume-Thomas MathewResume-Thomas Mathew
Resume-Thomas Mathew
 
CV_2016_rev_4_RW
CV_2016_rev_4_RWCV_2016_rev_4_RW
CV_2016_rev_4_RW
 
Pre bid meeting presentation
Pre bid meeting presentationPre bid meeting presentation
Pre bid meeting presentation
 
RESUME - NAJMUL SAQIB MANIAR
RESUME - NAJMUL SAQIB MANIARRESUME - NAJMUL SAQIB MANIAR
RESUME - NAJMUL SAQIB MANIAR
 
R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017
 
R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017
 
JUNDEE MAR TEJEDO
JUNDEE MAR TEJEDOJUNDEE MAR TEJEDO
JUNDEE MAR TEJEDO
 
Moh.Ramadan-CV
Moh.Ramadan-CVMoh.Ramadan-CV
Moh.Ramadan-CV
 
My CV, Shahar Ali tuhin
My CV, Shahar Ali tuhinMy CV, Shahar Ali tuhin
My CV, Shahar Ali tuhin
 
V.GUHAN-CV 01 link
V.GUHAN-CV 01 linkV.GUHAN-CV 01 link
V.GUHAN-CV 01 link
 
RESUME - NAJMUL SAQIB MANIAR
RESUME - NAJMUL SAQIB MANIARRESUME - NAJMUL SAQIB MANIAR
RESUME - NAJMUL SAQIB MANIAR
 
VFDFVFDV
VFDFVFDVVFDFVFDV
VFDFVFDV
 

More from Hedi Ben Mohamed

aida_2024-04-25_34938.arrete francais depot incendie
aida_2024-04-25_34938.arrete francais depot incendieaida_2024-04-25_34938.arrete francais depot incendie
aida_2024-04-25_34938.arrete francais depot incendie
Hedi Ben Mohamed
 
Vol 3_Chapter 22 - Hazard & Risk. LNG.pdf
Vol 3_Chapter 22 - Hazard & Risk. LNG.pdfVol 3_Chapter 22 - Hazard & Risk. LNG.pdf
Vol 3_Chapter 22 - Hazard & Risk. LNG.pdf
Hedi Ben Mohamed
 
Peerless-Dissolved-Gas-Flotation. oil water separator
Peerless-Dissolved-Gas-Flotation. oil water separatorPeerless-Dissolved-Gas-Flotation. oil water separator
Peerless-Dissolved-Gas-Flotation. oil water separator
Hedi Ben Mohamed
 
jsa-grinding-welding-gas-cutting. riskpdf
jsa-grinding-welding-gas-cutting. riskpdfjsa-grinding-welding-gas-cutting. riskpdf
jsa-grinding-welding-gas-cutting. riskpdf
Hedi Ben Mohamed
 
aida_2024-04-25_34938 arrêté du 1 6 2015 dépôt
aida_2024-04-25_34938 arrêté du 1 6 2015 dépôtaida_2024-04-25_34938 arrêté du 1 6 2015 dépôt
aida_2024-04-25_34938 arrêté du 1 6 2015 dépôt
Hedi Ben Mohamed
 
Vol 3_Chapter 22 - Hazard & Risk. LNG.pdf
Vol 3_Chapter 22 - Hazard & Risk. LNG.pdfVol 3_Chapter 22 - Hazard & Risk. LNG.pdf
Vol 3_Chapter 22 - Hazard & Risk. LNG.pdf
Hedi Ben Mohamed
 
uvce gaz dans un dépôt note technique.
uvce  gaz dans un dépôt  note technique.uvce  gaz dans un dépôt  note technique.
uvce gaz dans un dépôt note technique.
Hedi Ben Mohamed
 
SYSTEME DE SECURITE INCENDIE (NF-SSI).pdf
SYSTEME DE SECURITE INCENDIE (NF-SSI).pdfSYSTEME DE SECURITE INCENDIE (NF-SSI).pdf
SYSTEME DE SECURITE INCENDIE (NF-SSI).pdf
Hedi Ben Mohamed
 
Fire Gas System Specification (1).pdf
Fire  Gas System Specification (1).pdfFire  Gas System Specification (1).pdf
Fire Gas System Specification (1).pdf
Hedi Ben Mohamed
 
foam tank _df_pid01.pdf
foam tank _df_pid01.pdffoam tank _df_pid01.pdf
foam tank _df_pid01.pdf
Hedi Ben Mohamed
 
A_Basics_of_Explosion_Protection_HAZARDO.pdf
A_Basics_of_Explosion_Protection_HAZARDO.pdfA_Basics_of_Explosion_Protection_HAZARDO.pdf
A_Basics_of_Explosion_Protection_HAZARDO.pdf
Hedi Ben Mohamed
 
SI_SK. securite incendie.pdf
SI_SK. securite incendie.pdfSI_SK. securite incendie.pdf
SI_SK. securite incendie.pdf
Hedi Ben Mohamed
 
dokumen.tips_download-wastewater-mng-module-4-powerpoint-file.ppt
dokumen.tips_download-wastewater-mng-module-4-powerpoint-file.pptdokumen.tips_download-wastewater-mng-module-4-powerpoint-file.ppt
dokumen.tips_download-wastewater-mng-module-4-powerpoint-file.ppt
Hedi Ben Mohamed
 
METHANE REGENERATION.pptx
METHANE REGENERATION.pptxMETHANE REGENERATION.pptx
METHANE REGENERATION.pptx
Hedi Ben Mohamed
 
Présentation OSCAR.pptx
Présentation OSCAR.pptxPrésentation OSCAR.pptx
Présentation OSCAR.pptx
Hedi Ben Mohamed
 
topic5 (1).ppt
topic5 (1).ppttopic5 (1).ppt
topic5 (1).ppt
Hedi Ben Mohamed
 
Ei 1540 design_construction_commissionin (2)
Ei 1540 design_construction_commissionin (2)Ei 1540 design_construction_commissionin (2)
Ei 1540 design_construction_commissionin (2)
Hedi Ben Mohamed
 
Hac ei1540 (2)
Hac ei1540 (2)Hac ei1540 (2)
Hac ei1540 (2)
Hedi Ben Mohamed
 
Guide des-travaux-à-proximité-des-installations-de-gaz-naturel-2013
Guide des-travaux-à-proximité-des-installations-de-gaz-naturel-2013Guide des-travaux-à-proximité-des-installations-de-gaz-naturel-2013
Guide des-travaux-à-proximité-des-installations-de-gaz-naturel-2013
Hedi Ben Mohamed
 
Arrete inter mininst_elect_14-07-2011
Arrete inter mininst_elect_14-07-2011Arrete inter mininst_elect_14-07-2011
Arrete inter mininst_elect_14-07-2011
Hedi Ben Mohamed
 

More from Hedi Ben Mohamed (20)

aida_2024-04-25_34938.arrete francais depot incendie
aida_2024-04-25_34938.arrete francais depot incendieaida_2024-04-25_34938.arrete francais depot incendie
aida_2024-04-25_34938.arrete francais depot incendie
 
Vol 3_Chapter 22 - Hazard & Risk. LNG.pdf
Vol 3_Chapter 22 - Hazard & Risk. LNG.pdfVol 3_Chapter 22 - Hazard & Risk. LNG.pdf
Vol 3_Chapter 22 - Hazard & Risk. LNG.pdf
 
Peerless-Dissolved-Gas-Flotation. oil water separator
Peerless-Dissolved-Gas-Flotation. oil water separatorPeerless-Dissolved-Gas-Flotation. oil water separator
Peerless-Dissolved-Gas-Flotation. oil water separator
 
jsa-grinding-welding-gas-cutting. riskpdf
jsa-grinding-welding-gas-cutting. riskpdfjsa-grinding-welding-gas-cutting. riskpdf
jsa-grinding-welding-gas-cutting. riskpdf
 
aida_2024-04-25_34938 arrêté du 1 6 2015 dépôt
aida_2024-04-25_34938 arrêté du 1 6 2015 dépôtaida_2024-04-25_34938 arrêté du 1 6 2015 dépôt
aida_2024-04-25_34938 arrêté du 1 6 2015 dépôt
 
Vol 3_Chapter 22 - Hazard & Risk. LNG.pdf
Vol 3_Chapter 22 - Hazard & Risk. LNG.pdfVol 3_Chapter 22 - Hazard & Risk. LNG.pdf
Vol 3_Chapter 22 - Hazard & Risk. LNG.pdf
 
uvce gaz dans un dépôt note technique.
uvce  gaz dans un dépôt  note technique.uvce  gaz dans un dépôt  note technique.
uvce gaz dans un dépôt note technique.
 
SYSTEME DE SECURITE INCENDIE (NF-SSI).pdf
SYSTEME DE SECURITE INCENDIE (NF-SSI).pdfSYSTEME DE SECURITE INCENDIE (NF-SSI).pdf
SYSTEME DE SECURITE INCENDIE (NF-SSI).pdf
 
Fire Gas System Specification (1).pdf
Fire  Gas System Specification (1).pdfFire  Gas System Specification (1).pdf
Fire Gas System Specification (1).pdf
 
foam tank _df_pid01.pdf
foam tank _df_pid01.pdffoam tank _df_pid01.pdf
foam tank _df_pid01.pdf
 
A_Basics_of_Explosion_Protection_HAZARDO.pdf
A_Basics_of_Explosion_Protection_HAZARDO.pdfA_Basics_of_Explosion_Protection_HAZARDO.pdf
A_Basics_of_Explosion_Protection_HAZARDO.pdf
 
SI_SK. securite incendie.pdf
SI_SK. securite incendie.pdfSI_SK. securite incendie.pdf
SI_SK. securite incendie.pdf
 
dokumen.tips_download-wastewater-mng-module-4-powerpoint-file.ppt
dokumen.tips_download-wastewater-mng-module-4-powerpoint-file.pptdokumen.tips_download-wastewater-mng-module-4-powerpoint-file.ppt
dokumen.tips_download-wastewater-mng-module-4-powerpoint-file.ppt
 
METHANE REGENERATION.pptx
METHANE REGENERATION.pptxMETHANE REGENERATION.pptx
METHANE REGENERATION.pptx
 
Présentation OSCAR.pptx
Présentation OSCAR.pptxPrésentation OSCAR.pptx
Présentation OSCAR.pptx
 
topic5 (1).ppt
topic5 (1).ppttopic5 (1).ppt
topic5 (1).ppt
 
Ei 1540 design_construction_commissionin (2)
Ei 1540 design_construction_commissionin (2)Ei 1540 design_construction_commissionin (2)
Ei 1540 design_construction_commissionin (2)
 
Hac ei1540 (2)
Hac ei1540 (2)Hac ei1540 (2)
Hac ei1540 (2)
 
Guide des-travaux-à-proximité-des-installations-de-gaz-naturel-2013
Guide des-travaux-à-proximité-des-installations-de-gaz-naturel-2013Guide des-travaux-à-proximité-des-installations-de-gaz-naturel-2013
Guide des-travaux-à-proximité-des-installations-de-gaz-naturel-2013
 
Arrete inter mininst_elect_14-07-2011
Arrete inter mininst_elect_14-07-2011Arrete inter mininst_elect_14-07-2011
Arrete inter mininst_elect_14-07-2011
 

Recently uploaded

Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
manasideore6
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
Investor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptxInvestor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptx
AmarGB2
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
ydteq
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
ClaraZara1
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Christina Lin
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
zwunae
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdfTutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
aqil azizi
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
Aditya Rajan Patra
 
The Role of Electrical and Electronics Engineers in IOT Technology.pdf
The Role of Electrical and Electronics Engineers in IOT Technology.pdfThe Role of Electrical and Electronics Engineers in IOT Technology.pdf
The Role of Electrical and Electronics Engineers in IOT Technology.pdf
Nettur Technical Training Foundation
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 

Recently uploaded (20)

Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
Investor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptxInvestor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptx
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdfTutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
 
The Role of Electrical and Electronics Engineers in IOT Technology.pdf
The Role of Electrical and Electronics Engineers in IOT Technology.pdfThe Role of Electrical and Electronics Engineers in IOT Technology.pdf
The Role of Electrical and Electronics Engineers in IOT Technology.pdf
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 

EPPMPresentationOMOct22 (1).pptx

  • 1. Engineering Procurement & Project Management Engineering Procurement & Project Management O&M ACTIVITIES
  • 2. Engineering Procurement & Project Management  EPC contractor with more than 30 years of experience  Certified for an Integrated QHSE Management System ISO 9001: 2015 – ISO 14001:2015- ISO 45001:2018  Registered and active in several MEA countries EPPM PROFILE  Created in Tunis, 1993  Certified for Security Information Management System ISO 27001
  • 3. Engineering Procurement & Project Management Gathering System, Pipeline, Oil & Gas processing plant, Storage Facilities, Oily water Treatment, Water Injection, Refinery Oil & Gas Desalination Purification, Potabilization, Oil removal, Remineralization, Waste Management, Sludge Treatment Water & Environment Energy & Renewable Energy FIELDS OF ACTIVITIES Industry Fertilising plants Cement plants Manufacturing Agro and Pharmaceutical Conventional / Power plants Photovoltaic Bio-Gas
  • 4. EPPM IN NUMBERS Offices Worldwide Years of Experience Industry Sectors 30 12 04 Turnover Projects Clients 150M USD +250 +50 Engineering Procurement & Project Management
  • 5. Engineering Procurement & Project Management PROJECT TYPES EPPM is involved in several Types of Projects such as: Engineering Design & Consultancy PMC Projects : Project Management & Consultancy EPCC Projects : Engineering, Procurement, Construction & Commissioning Commissioning, Operation & Maintenance Projects Investment Projects : - BOT “Build Own Transfer” - BOO “Build Own Operate” - Leasing projects
  • 6. EPPM GROUP Engineering Procurement & Project Management Complementary activities Middle East Africa Investment Companies
  • 9. ENGINEERING CAPABILITIES Multidisciplinary Engineering Services, Engineering Annual capacity 400 000 to 500 000 man-hours / year Using the state of the art software, Using “Electronic Documents Management System” to digitalize validation process (internal & External) of all technical documents. Engineering Procurement & Project Management
  • 10. EPPM has created the R&D Department as extension to it’s design capabilities, which aims to provide added value to ongoing projects, to promote and support technological research, and to develop new fields of activities for the group, mainly in : Renewable Energies, Water treatment, Agriculture, Food, Bio Resources, New building materials,… With partnership involving local and foreign research centers (public and private). RESEARCH & DEVELOPMENT Engineering Procurement & Project Management
  • 11. Suppliers Prequalification and Assessment Supply Chain Management (Negotiation, Expediting, Project deadlines, Packing & Transport Survey, Transportation, Custom Clearance, inventory management and warehousing, Etc.), Negotiation and Contracts Finalisation, Production Control, Project QHSE Requirements, Quality Control. To manage procurement services, EPPM opts for updated solutions : - E-Procurement Suppliers management, Inquiry cycle, Bids, Technical evaluation, evaluation, Purchasing, PO history. - 2IPS (Industrial Integrated Procurement System): inquiry process, purchasing process, Receiving cycle. PROCUREMENT Engineering Procurement & Project Management
  • 12. CONSTRUCTION Construction Management : Site Engineering Elaboration of Method Statement Coordination and Supervision Reporting (daily, weekly and monthly) Quality Assurance / Quality Control HSE Supervision Interface Management with local content. Construction Works : Mechanical : equipment installation & fitting Piping Works : welding, erection, tests … Electrical : equipment installation, cable laying & connections (LV, MV & HV) Instrumentation Works : Instrument installation, Control System, Installation (SCADA, PLC). Engineering Procurement & Project Management
  • 13. COMMISSIONING & START-UP Pre-Commissioning procedures, Commissioning Interface Management with Deign office Commissioning resources assignment and mobilization FAT & SAT Coordination of commissioning tests Development of the QA / QC of Commissioning Mobilization of Construction Team and Technicians, Vendors Preparation of the test and closing reports Training plan preparation, provide field and classroom training sessions to Clients After market and liability warranty services management. Engineering Procurement & Project Management
  • 14. OPERATION & MAINTENANCE Elaboration of Operation and Maintenance manuals, Production operation assistance Maintenance activities of offshore and onshore plants, Additional services : Maintenance build: Asset register, maintenance task lists, maintenance plan, Preparing maintenance plans in accordance with RCM and SCE analysis. - Facilites management, - Logistic , procurement and spare-parts management, - Preparation, planning and management of major overhauls Engineering Procurement & Project Management
  • 15. O & M REFERENCES
  • 16. Scope of Work Engineering Procurement & Project Management Project: Juaymah Terminal Contenairized Waste Water Treatment Plant Objective: Reduce the impact of waste water on the environment. Location: Juaymah- Saudi Arabia Construct, Operate, and maintain for 3 years of a produced oily water treatment system to treat the wastewater collected in Juaymah Tank Farm evaporation pond, for disposal into the marine environment. Supply of spare parts Supply of chemicals
  • 17. Scope of Work Engineering Procurement & Project Management Project: Upgrade of Biological Treatment in IWTP 8 Objective: Improve treated water quality of IWTP and absorb excess water flowrate above the existing plant design capacity. Location: Jubail Industrial city - Saudi Arabia Construct, Operate, and maintain for 5 years period by installing Biological process upgrading system to treat 50 000 m3/day of Industrial Waste water Treatment Plant through HYBAC System: Hybacs Area: Hybacs, Blower & Piping Installation & MCC & PLC Installation & Connection, Handrails & Steel Stairs installation, control room,… Chemical Injection Skids
  • 18. Scope of Work The treated water is characterized as follows:  Hydrocarbon Elimination (< 10 mg/l),  Elimination of other materials (20 mg/l),  Elimination of solid materials,  Water filtration: 25 microns. Phase 1: Revamping of all equipment & installations, during 2 years, including engineering, procurement, installations and commissioning. Phase 2: 3 years of Operation and Maintenance including :  Existing equipment Revamping and Maintenance,  Operation follow-up,  Quality control of treated water,  Procurement of the chemical and lubricant products,  Procurement of the necessary equipment to the maintenance,  Recommendation of the necessary spare parts, Engineering Procurement & Project Management Project : Revamping, maintenance and operation of 02 Oily Water Treatment plants (EPCO) Capacity • CINA Site : 6000 m3/day • CIS Site : 8000 m3/day Objective: Reduce the impact of oily water on the environment. Location: Hassi Messaoud - Algeria
  • 19. Scope of Work Client : SONATRACH Project : Revamping, maintenance and operation of 03 Oily Water Treatment plants (EPCO Project) Capacity Objective: Reduce the impact of oily water on the environment Location: Haoudh Barkaoui – Algeria • Haoudh Berkaoui Site: 2400 m3/day • Belkahla Site : 960 m3/day • Guellala Site : 1440 m3/day The treated water is characterized as follows :  Mes < 20 ppm  HC < 5 ppm  Sulfato-reducing bacteria < 100 germs Engineering Procurement & Project Management Phase 1: Revamping of all equipment & installations, during 1 year, including engineering, procurement, installations and commissioning. Phase 2: 4 years of Operation and Maintenance including :  Existing equipment Revamping and Maintenance,  Operation follow-up,  Quality control of treated water,  Procurement of the chemical and lubricant products,  Procurement of the necessary equipment to the maintenance,  Recommendation of the necessary spare parts,
  • 20. Scope of Work Client : SOMOIL Project : Maintenance Services of FS/FST Associations Objective: Guarantee continuity of production platforms and the transfer of production from offshore and onshore production (FS / FST) to Block 3 Sonangol. Location: Soyo - Angola Preventive, and corrective maintenance, obsolescence equipment study and replacement, new equipment and packages installation and integration, and many improvements within the operation field under 4 years maintenance service agreement (with extension period): Rotating machines : Generators, gas compressors, electric pumps, air compressors, … Static Equipment: Treaters, separator, air and gas vessels, piping, Repair leaks on piping: Welding, renewing, etc… Control and measuring instruments : Flow metering, level control, Control system, etc… (Foxborro, fisher, rosemount etc…) , Power Management & Electrical Equipment: all kinds of panels, Field Safety Equipment Engineering Procurement & Project Management
  • 21. Scope of Work Client : SOMOIL Project : Offshore Maintenance Services Bloc 2/05 platforms Production Capacity : 12 500 BPD Objective: Maintain all productive equipment including ; rotating machinery on all platforms and satellites in block 2/05 to ensure continuity of platform production. Location: Soyo - Angola Preventive, and corrective maintenance, obsolescence equipment study and replacement, new equipment and packages installation and integration, and many improvements within the operation field under 4 years maintenance service agreement (with extension period): Engineering Procurement & Project Management Rotative equipment: Pumps, Generators, air & gas compressor, etc. Static equipment: Theaters, Separators, air & gas vessels, piping, valves, etc. Field Process Control Equipment : Valves i.e. SDV, ESDV, BDV, Pressure and Relief Safety valves, etc. Control and measuring instruments : Level, pressure, temperature and flow measurement Power Management & Electrical Equipment Field Safety Equipment
  • 22. Scope of Work : BOT “Build Own Transfer” 30-years Client: Ministry of Hydrocarbons Project: Kivu Lake methane gas exploitation for electricity production Objective: Generate electricity from the extraction of methane gas Location: Democratic Republic of Congo 30-years BOT project consists of: Extract, process, transport and store methane gas from KIVU Lake, Build a power station with an installed capacity of 30 MW operating on fuel oil and methane gas and ensure its operation and maintenance for a period of 27 years and 03 months, Build energy transmission lines (high, medium and low-voltage) and associated stations to interconnect [possibly] with-existing networks, Sell all electricity generated at [SNEL] Engineering Procurement & Project Management MINISTERE DES HYDROCARBURES
  • 23. Phase 1 : Realization of a photovoltaic power plant of 10 MW with string inverters and tracker system, the project consists on : • Engineering Services, • Project Management, • Procurement of all necessary equipment, • Construction of photovoltaic plant, • Commissioning & Start-up, Phase 2 : 20 years of station operation. Scope of Work Client: STEG Project: Production of electricity from photovoltaic solar energy; Meknassy 10 MW. Location: Meknassy - Tunisia Objective: Production of electricity from photovoltaic solar energy. BOO “Build Own Operate” 20-years Engineering Procurement & Project Management
  • 24. WHO TRUST US Engineering Procurement & Project Management
  • 25. Silver Street - Fatma Building - Lake gardens -1053 -Tunis -TUNISIA Tel. +216 71 16 81 00 Fax. +216 71 19 09 18 www.eppm.com.tn eppm@eppm.com.tn Engineering Procurement & Project Management