Offshore Pipelines Emergency
Repair Capability Enhancement
Diverless Services : (2014-17)
Rakesh Kumar
Sr Pipeline Engineer
14” – 4 numbers
30” – 3 numbers
4” – 1 number
Pipeline Inventory in SEIC
Pipeline Failure - Offshore
Leak Rupture
Fix Hydro Clamp Section replacement-connectors
Diving Spread >10mtShallow Barge 1-10mt
No Resources during Ice
Condition – Dec to May
Ice Class Vessel, Work Class
ROV, Diverless Equipments
Current strategy
Currently available OIL States Equipments-Diver assisted
Leak Clamp
Connector
MAF
Emergency pipes stocked
in Kholmsk (fully
refurbished)
Stored in Kholmsk
Offshore Pipeline Emergency Documents
1 5600-Z-90-04-P-0017-00 Rev 02 Pipelines Emergency Response Plan (PA-A to Chaivo)
2 5600-Z-90-04-P-0016-00 Rev 02 Pipelines Emergency Response Plan (PA-B to Chaivo)
3 5600-Z-90-04-P-0018-00 Rev 02 Pipelines Emergency Response Plan (LUN-A to OPF)
4 2000-S-00-N-P-3272-00 Rev 06 PA-A Emergency Response Procedure
5 4000-S-90-04-P-0007-00 Rev 03 Lun-A Emergency Response Procedure
6 3000-S-90-04-P0008-00 Rev 02 PA-B Emergency Response Procedure
7 4000-S-56-43-P-0001-00 Rev 01 MEG Tie-In Spool Contingency Plan - Replacement with
Flexible Pipe
8 5025-S-90-90-P-0004-00 Rev 0 MEG Tie-In Spool Contingency Plan - Diving Workscope
9 5600-S-90-01-T-0019-00 Rev P1 Pipeline Repair Strategy
Ice during
March
near
platforms
With both connectors placed the spoolpiece (flanged section)
replacement is descending.
The connector on the left has been set. The connector on the
right was pulled to the replacement section by the tightening of
the nuts on the replacement flange.
The concrete protective coating has been removed. The
pipeline has been cut in two places and the deteriorated section
is being hoisted away.
The ends of the pipeline have been cleaned more than the
length of the connector.
REPAIR OF PIPELINE SECTION USING MECHANICAL CONNECTOR
Standard Diverless Spread
Diverless Spread-Lowering Frame
Lowering Frame
Diverless Spread
Coating Removal Units
Diverless Spread
Weld Seam Removal
Diverless Spread
1. Oil States equipments (clamps, MAF, connectors and
handling tools) –SEIC
2. Remote Diverless Spread: Hire
H Frames
Excavation tools
Pipeline Cutting and concrete removal tools
ROV special tooling with manipulator
Pipeline retrieval tools
3. Vessel and Logistics – SEIC
-to improve with 100ton

More Related Content

What's hot

ERNEST HODGINS CV
ERNEST HODGINS CVERNEST HODGINS CV
ERNEST HODGINS CV
Ernie Hodgins
 
Vedam Design:- BWTS - Retrofits Services
Vedam Design:-  BWTS - Retrofits Services Vedam Design:-  BWTS - Retrofits Services
Vedam Design:- BWTS - Retrofits Services
Vedam design & Techincal Consultancy Pvt Ltd.
 
Vedam Design: Engineering Solutions - Gas Ships
Vedam Design: Engineering Solutions - Gas ShipsVedam Design: Engineering Solutions - Gas Ships
Vedam Design: Engineering Solutions - Gas Ships
Vedam design & Techincal Consultancy Pvt Ltd.
 
Intro to oil well drilling ops pt 2
Intro to oil well drilling ops pt 2 Intro to oil well drilling ops pt 2
Intro to oil well drilling ops pt 2
amrhaggag
 
RV Thuwal - Refit project overview by Maritime Survey Australia
RV Thuwal - Refit project overview by Maritime Survey AustraliaRV Thuwal - Refit project overview by Maritime Survey Australia
RV Thuwal - Refit project overview by Maritime Survey Australia
MichaelUberti
 
Multiphase Desanding for Upstream Oil & Gas Industry
Multiphase Desanding for Upstream Oil & Gas IndustryMultiphase Desanding for Upstream Oil & Gas Industry
Multiphase Desanding for Upstream Oil & Gas Industry
Hank Rawlins
 
Streamlined Newsletter - Panama Canal Requirements
Streamlined Newsletter - Panama Canal RequirementsStreamlined Newsletter - Panama Canal Requirements
Streamlined Newsletter - Panama Canal Requirements
Theodore Papatheodorou
 
Vedam Design: Dredging Solutions
Vedam Design: Dredging Solutions Vedam Design: Dredging Solutions
Vedam Design: Dredging Solutions
Vedam design & Techincal Consultancy Pvt Ltd.
 
Project Management of M&E works at a WwTW
Project Management of M&E works at a WwTWProject Management of M&E works at a WwTW
Project Management of M&E works at a WwTW
ftwg
 
DATA2015-12-06 Ashghal Presentation 2
DATA2015-12-06 Ashghal Presentation 2DATA2015-12-06 Ashghal Presentation 2
DATA2015-12-06 Ashghal Presentation 2
Ian Kelly
 
Viaduct experience
Viaduct experienceViaduct experience
Viaduct experience
Vaimiti RIGAL
 
Think outside the box (culvert): How creativity sells more precast
Think outside the box (culvert): How creativity sells more precastThink outside the box (culvert): How creativity sells more precast
Think outside the box (culvert): How creativity sells more precast
Hamilton_Kent
 
Demolition of a former mine site - Luke Egan and David Wood
Demolition of a former mine site - Luke Egan and David WoodDemolition of a former mine site - Luke Egan and David Wood
Demolition of a former mine site - Luke Egan and David Wood
NSW Environment and Planning
 
Ship dry docking
Ship dry dockingShip dry docking
Ship dry docking
Jishnu Saji
 
Horse Casing Slipstream
Horse Casing SlipstreamHorse Casing Slipstream
Horse Casing Slipstream
mcpiker
 
Emma maersk
Emma  maerskEmma  maersk
Russell bruce cv 2016.
Russell bruce cv 2016.Russell bruce cv 2016.
Russell bruce cv 2016.
Russell Bruce
 
QP_Safety_executive_procedure_final
QP_Safety_executive_procedure_finalQP_Safety_executive_procedure_final
QP_Safety_executive_procedure_final
Ian Kelly
 
Turnkey M&E Installation Ww Tw
Turnkey M&E Installation Ww TwTurnkey M&E Installation Ww Tw
Turnkey M&E Installation Ww Tw
ftwg
 
Tec 2016 services ark la-tx
Tec 2016 services ark la-txTec 2016 services ark la-tx
Tec 2016 services ark la-tx
Bill Beadles
 

What's hot (20)

ERNEST HODGINS CV
ERNEST HODGINS CVERNEST HODGINS CV
ERNEST HODGINS CV
 
Vedam Design:- BWTS - Retrofits Services
Vedam Design:-  BWTS - Retrofits Services Vedam Design:-  BWTS - Retrofits Services
Vedam Design:- BWTS - Retrofits Services
 
Vedam Design: Engineering Solutions - Gas Ships
Vedam Design: Engineering Solutions - Gas ShipsVedam Design: Engineering Solutions - Gas Ships
Vedam Design: Engineering Solutions - Gas Ships
 
Intro to oil well drilling ops pt 2
Intro to oil well drilling ops pt 2 Intro to oil well drilling ops pt 2
Intro to oil well drilling ops pt 2
 
RV Thuwal - Refit project overview by Maritime Survey Australia
RV Thuwal - Refit project overview by Maritime Survey AustraliaRV Thuwal - Refit project overview by Maritime Survey Australia
RV Thuwal - Refit project overview by Maritime Survey Australia
 
Multiphase Desanding for Upstream Oil & Gas Industry
Multiphase Desanding for Upstream Oil & Gas IndustryMultiphase Desanding for Upstream Oil & Gas Industry
Multiphase Desanding for Upstream Oil & Gas Industry
 
Streamlined Newsletter - Panama Canal Requirements
Streamlined Newsletter - Panama Canal RequirementsStreamlined Newsletter - Panama Canal Requirements
Streamlined Newsletter - Panama Canal Requirements
 
Vedam Design: Dredging Solutions
Vedam Design: Dredging Solutions Vedam Design: Dredging Solutions
Vedam Design: Dredging Solutions
 
Project Management of M&E works at a WwTW
Project Management of M&E works at a WwTWProject Management of M&E works at a WwTW
Project Management of M&E works at a WwTW
 
DATA2015-12-06 Ashghal Presentation 2
DATA2015-12-06 Ashghal Presentation 2DATA2015-12-06 Ashghal Presentation 2
DATA2015-12-06 Ashghal Presentation 2
 
Viaduct experience
Viaduct experienceViaduct experience
Viaduct experience
 
Think outside the box (culvert): How creativity sells more precast
Think outside the box (culvert): How creativity sells more precastThink outside the box (culvert): How creativity sells more precast
Think outside the box (culvert): How creativity sells more precast
 
Demolition of a former mine site - Luke Egan and David Wood
Demolition of a former mine site - Luke Egan and David WoodDemolition of a former mine site - Luke Egan and David Wood
Demolition of a former mine site - Luke Egan and David Wood
 
Ship dry docking
Ship dry dockingShip dry docking
Ship dry docking
 
Horse Casing Slipstream
Horse Casing SlipstreamHorse Casing Slipstream
Horse Casing Slipstream
 
Emma maersk
Emma  maerskEmma  maersk
Emma maersk
 
Russell bruce cv 2016.
Russell bruce cv 2016.Russell bruce cv 2016.
Russell bruce cv 2016.
 
QP_Safety_executive_procedure_final
QP_Safety_executive_procedure_finalQP_Safety_executive_procedure_final
QP_Safety_executive_procedure_final
 
Turnkey M&E Installation Ww Tw
Turnkey M&E Installation Ww TwTurnkey M&E Installation Ww Tw
Turnkey M&E Installation Ww Tw
 
Tec 2016 services ark la-tx
Tec 2016 services ark la-txTec 2016 services ark la-tx
Tec 2016 services ark la-tx
 

Similar to Diverless Services Pipelines

Reparacion y Rehabilitacion Tuberias 01-10.pdf
Reparacion y Rehabilitacion Tuberias 01-10.pdfReparacion y Rehabilitacion Tuberias 01-10.pdf
Reparacion y Rehabilitacion Tuberias 01-10.pdf
gaidipn
 
Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)
Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)
Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)
Nandan Shandilya
 
Long Branch & New Alexandria Pump Station Fuel Tank Replacement
Long Branch & New Alexandria Pump Station Fuel Tank ReplacementLong Branch & New Alexandria Pump Station Fuel Tank Replacement
Long Branch & New Alexandria Pump Station Fuel Tank Replacement
Fairfax County
 
Nelson Perez Jacome - Utility Emergency Response
Nelson Perez Jacome - Utility Emergency ResponseNelson Perez Jacome - Utility Emergency Response
Nelson Perez Jacome - Utility Emergency Response
Nelson Perez-Jacome, P.E.
 
48. ss-esmmp-for-foundationerection-and-stringing-work-may-2015
48. ss-esmmp-for-foundationerection-and-stringing-work-may-201548. ss-esmmp-for-foundationerection-and-stringing-work-may-2015
48. ss-esmmp-for-foundationerection-and-stringing-work-may-2015
Sandeep Bhowmick
 
Cable Installation Plan - SS-109 to 065.pptx
Cable Installation Plan - SS-109 to 065.pptxCable Installation Plan - SS-109 to 065.pptx
Cable Installation Plan - SS-109 to 065.pptx
PrasetiyoHananto1
 
Ghadames project, conveyance pipeline
Ghadames project, conveyance pipelineGhadames project, conveyance pipeline
Ghadames project, conveyance pipeline
Vladimir Popovic
 
Man Made River Project - IV Phase / Ghadames Project - Pipelaying
Man Made River Project - IV Phase / Ghadames Project - PipelayingMan Made River Project - IV Phase / Ghadames Project - Pipelaying
Man Made River Project - IV Phase / Ghadames Project - Pipelaying
Vladimir Popovic
 
Hydraulic Manual (Dec 2014)
Hydraulic Manual (Dec 2014)Hydraulic Manual (Dec 2014)
Hydraulic Manual (Dec 2014)
Kai Li
 
AME POWER PLANT REFERENCES
AME POWER PLANT REFERENCESAME POWER PLANT REFERENCES
AME POWER PLANT REFERENCES
Carlo Avanzini
 
Crosspointe Pond Retrofit 2014
Crosspointe Pond Retrofit 2014Crosspointe Pond Retrofit 2014
Crosspointe Pond Retrofit 2014
Fairfax County
 
We are TSC-Rev1-small
We are TSC-Rev1-smallWe are TSC-Rev1-small
We are TSC-Rev1-small
Sophia Wang
 
Project Monitoring
Project MonitoringProject Monitoring
Project Monitoring
Norjay Jeruta
 
Trenchless Rehabilitation of Sewer & Water Networks
Trenchless Rehabilitation of Sewer & Water NetworksTrenchless Rehabilitation of Sewer & Water Networks
Trenchless Rehabilitation of Sewer & Water Networks
Loay Ghazaleh MBA, BSc Civil Eng.
 
SISCO - Presentation
SISCO - PresentationSISCO - Presentation
SISCO - Presentation
Talal Bayoumi CCNA, MCSE
 
envinorome.pptx
envinorome.pptxenvinorome.pptx
envinorome.pptx
barunmahato3
 
Nazmy Markos
Nazmy MarkosNazmy Markos
Nazmy Markos
Nazmy Markos
 
Derventa City WW Project
Derventa City WW ProjectDerventa City WW Project
Derventa City WW Project
Vladimir Popovic
 
ASCE San Ramon Canyon Storm Drain 6 4-15
ASCE San Ramon Canyon Storm Drain 6 4-15 ASCE San Ramon Canyon Storm Drain 6 4-15
ASCE San Ramon Canyon Storm Drain 6 4-15
American Society of Civil Engineers, Orange County Branch
 
Gang Strenght Formula.ppt
Gang Strenght Formula.pptGang Strenght Formula.ppt
Gang Strenght Formula.ppt
ssuser9cea3f
 

Similar to Diverless Services Pipelines (20)

Reparacion y Rehabilitacion Tuberias 01-10.pdf
Reparacion y Rehabilitacion Tuberias 01-10.pdfReparacion y Rehabilitacion Tuberias 01-10.pdf
Reparacion y Rehabilitacion Tuberias 01-10.pdf
 
Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)
Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)
Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)
 
Long Branch & New Alexandria Pump Station Fuel Tank Replacement
Long Branch & New Alexandria Pump Station Fuel Tank ReplacementLong Branch & New Alexandria Pump Station Fuel Tank Replacement
Long Branch & New Alexandria Pump Station Fuel Tank Replacement
 
Nelson Perez Jacome - Utility Emergency Response
Nelson Perez Jacome - Utility Emergency ResponseNelson Perez Jacome - Utility Emergency Response
Nelson Perez Jacome - Utility Emergency Response
 
48. ss-esmmp-for-foundationerection-and-stringing-work-may-2015
48. ss-esmmp-for-foundationerection-and-stringing-work-may-201548. ss-esmmp-for-foundationerection-and-stringing-work-may-2015
48. ss-esmmp-for-foundationerection-and-stringing-work-may-2015
 
Cable Installation Plan - SS-109 to 065.pptx
Cable Installation Plan - SS-109 to 065.pptxCable Installation Plan - SS-109 to 065.pptx
Cable Installation Plan - SS-109 to 065.pptx
 
Ghadames project, conveyance pipeline
Ghadames project, conveyance pipelineGhadames project, conveyance pipeline
Ghadames project, conveyance pipeline
 
Man Made River Project - IV Phase / Ghadames Project - Pipelaying
Man Made River Project - IV Phase / Ghadames Project - PipelayingMan Made River Project - IV Phase / Ghadames Project - Pipelaying
Man Made River Project - IV Phase / Ghadames Project - Pipelaying
 
Hydraulic Manual (Dec 2014)
Hydraulic Manual (Dec 2014)Hydraulic Manual (Dec 2014)
Hydraulic Manual (Dec 2014)
 
AME POWER PLANT REFERENCES
AME POWER PLANT REFERENCESAME POWER PLANT REFERENCES
AME POWER PLANT REFERENCES
 
Crosspointe Pond Retrofit 2014
Crosspointe Pond Retrofit 2014Crosspointe Pond Retrofit 2014
Crosspointe Pond Retrofit 2014
 
We are TSC-Rev1-small
We are TSC-Rev1-smallWe are TSC-Rev1-small
We are TSC-Rev1-small
 
Project Monitoring
Project MonitoringProject Monitoring
Project Monitoring
 
Trenchless Rehabilitation of Sewer & Water Networks
Trenchless Rehabilitation of Sewer & Water NetworksTrenchless Rehabilitation of Sewer & Water Networks
Trenchless Rehabilitation of Sewer & Water Networks
 
SISCO - Presentation
SISCO - PresentationSISCO - Presentation
SISCO - Presentation
 
envinorome.pptx
envinorome.pptxenvinorome.pptx
envinorome.pptx
 
Nazmy Markos
Nazmy MarkosNazmy Markos
Nazmy Markos
 
Derventa City WW Project
Derventa City WW ProjectDerventa City WW Project
Derventa City WW Project
 
ASCE San Ramon Canyon Storm Drain 6 4-15
ASCE San Ramon Canyon Storm Drain 6 4-15 ASCE San Ramon Canyon Storm Drain 6 4-15
ASCE San Ramon Canyon Storm Drain 6 4-15
 
Gang Strenght Formula.ppt
Gang Strenght Formula.pptGang Strenght Formula.ppt
Gang Strenght Formula.ppt
 

Diverless Services Pipelines

  • 1. Offshore Pipelines Emergency Repair Capability Enhancement Diverless Services : (2014-17) Rakesh Kumar Sr Pipeline Engineer
  • 2. 14” – 4 numbers 30” – 3 numbers 4” – 1 number Pipeline Inventory in SEIC
  • 3. Pipeline Failure - Offshore Leak Rupture Fix Hydro Clamp Section replacement-connectors Diving Spread >10mtShallow Barge 1-10mt No Resources during Ice Condition – Dec to May Ice Class Vessel, Work Class ROV, Diverless Equipments Current strategy
  • 4. Currently available OIL States Equipments-Diver assisted Leak Clamp Connector MAF
  • 5. Emergency pipes stocked in Kholmsk (fully refurbished) Stored in Kholmsk
  • 6. Offshore Pipeline Emergency Documents 1 5600-Z-90-04-P-0017-00 Rev 02 Pipelines Emergency Response Plan (PA-A to Chaivo) 2 5600-Z-90-04-P-0016-00 Rev 02 Pipelines Emergency Response Plan (PA-B to Chaivo) 3 5600-Z-90-04-P-0018-00 Rev 02 Pipelines Emergency Response Plan (LUN-A to OPF) 4 2000-S-00-N-P-3272-00 Rev 06 PA-A Emergency Response Procedure 5 4000-S-90-04-P-0007-00 Rev 03 Lun-A Emergency Response Procedure 6 3000-S-90-04-P0008-00 Rev 02 PA-B Emergency Response Procedure 7 4000-S-56-43-P-0001-00 Rev 01 MEG Tie-In Spool Contingency Plan - Replacement with Flexible Pipe 8 5025-S-90-90-P-0004-00 Rev 0 MEG Tie-In Spool Contingency Plan - Diving Workscope 9 5600-S-90-01-T-0019-00 Rev P1 Pipeline Repair Strategy
  • 8. With both connectors placed the spoolpiece (flanged section) replacement is descending. The connector on the left has been set. The connector on the right was pulled to the replacement section by the tightening of the nuts on the replacement flange. The concrete protective coating has been removed. The pipeline has been cut in two places and the deteriorated section is being hoisted away. The ends of the pipeline have been cleaned more than the length of the connector. REPAIR OF PIPELINE SECTION USING MECHANICAL CONNECTOR
  • 13. Diverless Spread 1. Oil States equipments (clamps, MAF, connectors and handling tools) –SEIC 2. Remote Diverless Spread: Hire H Frames Excavation tools Pipeline Cutting and concrete removal tools ROV special tooling with manipulator Pipeline retrieval tools 3. Vessel and Logistics – SEIC -to improve with 100ton