DINESH KUMAR YADAV
Mobile: 09167252957 ~ E-Mail: dkpoint@gmail.com
SENIOR LEVEL ASSIGNMENTS
Project Management and Software Development
Location Preference: Mumbai / Overseas
Versatile, high-energy technocrat with the distinction of executing prestigious Information Technology projects of large
magnitude within strict time schedules
Profile Summary
• A result-oriented professional with nearly 9 years of experience in:
Project Management Software Development System Analysis & Design
Requirement Analysis Documentation (High & Low Level) Business Analysis
Team Management Client Relationship Management Liaison & Coordination
• Provided overall leadership to the entire project team including managing deliverables of other functional team leaders
• Followed the project life cycle methodology defined under the process framework; ensured that customer deadlines
were met within project budgets
• Expertise in handling the overall software application development life-cycle involving requirement analysis, system
study, designing, testing, coding, de-bugging, project planning, maintenance & documentation
• Created a software design process to translate business requirements into technical design documents resulting in
improved quality control and output that was ‘right the first time’
• Drove efforts towards maintaining software development practices; adhered to company standards for coding and
unit/functional test coverage
• Bagged Employee of Month Award twice for contributing towards design and implementation phase of software
• Managed iterative application development projects using Agile, Jira and Scrum methodologies
• Performed software rollups and emergency bug fixes, refreshed test servers on a weekly basis, and developed backup and
disaster plans to ensure rapid recovery
• Keen customer centric approach with skills in addressing client priorities & resolving escalation within TAT, thereby
attaining high business & compliance score
• Innovative & creative professional with strong communication, analytical, interpersonal & negotiation skills
Technical Skills
Office Software: MS Office (Word, Visio & Excel)
Operating Systems: DOS, Windows 95/ 98/2000/2007/2008/XP/Linux
Development Tools Microsoft Visual Studio (IDE) 2013/2010/ 2008, TFS, SVN, IIS7
Programming Languages: .Net 4.0(C#), .net 4.5 (C#), ASP.net MVC 4.0, ASP.NET 3.5(C#), WCF, WCFRest, Restful
services using WEB API, JQuery, JSON, LINQ, AJAX, XML & Java Script, Entity Framework
,MSMQ , Windows Service , Web Service, SSIS, SSRS
Database: SQL Server 2000, 2005, 2008R2, 2014 & MYSQL
Developing Methods: Software Design Pattern, SDLC, Object Oriented Programming and Principle, Agile
Development & Jira
Communication: Outlook Express, Go to Meeting, Skype & Telephone
Organizational Experience
Since Dec’14 Sportz Interactive, Mumbai as Associate Manager -Development
Jan’11-Dec’14 FINO, Mumbai as Assistant Manager
Apr’10-Dec’10 Mindgate Solutions, Mumbai as Sr. Software Developer
Jan’07-Mar’10 Reltronics Technologies, Pune as Sr. Software Developer
Key Result Areas:
• Managing the enterprise software development including design, development & troubleshooting of applications;
conducting gap analysis including validation of needs in conjunction with onsite & offsite teams
• Undertaking development & unit testing, defect & issue management for enterprise software applications; conducting
reviews of codes and analyzing change requests / enhancements
• Driving vision / road mapping & lifecycle management for various software / applications development including value
proposition & functionality, strategy elements (domain / business case & build) and training
• Evaluating information gathered from multiple sources, decomposing higher information into details, investigating key
business issues behind numbers and providing clear & concise analysis / recommendation
• Steering the successful rollout of projects with accountability of defining scope, setting timelines, analyzing requirements,
prioritizing tasks, preparing FP Sheet and evaluating risks & issues as per budgets
• Monitoring project progress & outstanding issues and ensuring the quality & timeliness of the deliverables; extending
post-implementation support to the Development Team by defining standard practices
• Handling project delivery as per functional & non-functional needs / Agile Methodology for various releases
• Testing & documenting new or amended programs from supplied specifications as per agreed standards; maintaining
project artefacts as per required approvals
• Providing support in handling escalation from clients to resolve their concerns and addressing their queries (customer
advocacy) from other departments for a smooth ride for customer’s diverse issues
• Establishing healthy relations with internal & external stakeholders to provide support for architectural issues; keeping a
close track of developments in the field of IT and updating top management about the same
Notable Accomplishments across Career
• Worked in various capacities such as Offshore Project Manager, Onsite Manager, and Business Analyst for clients like
Reltronics, Standard Chartered Bank, LIC, FINO Paytech, Star Sports and NDTV Sports in delivering projects and programs
for the Indian and US geography
• Recipient of awards such as employee of the month for technical coordination for a large program
• Release Manager for the FINO and Sportz Interactive line of products; owned development, Quality Assurance (QA) and
sustenance (L3)
• Architected a major organizational change to product-line based from matrix over a period of 3 years to impact
development areas; acted as a key stakeholder in the organizational change management process
• Used Sareena tool for assigning engineering manpower which reduced allocation time; improved manpower utilization
and productivity through proper allocation
• Successfully completed delayed projects essential for operational efficiency by identifying and solving complex technical
problems using interdisciplinary teams; restricted the schedule delay
• Collaborated with vendors for successfully developing maximum complex engineering applications while adhering to the
software development process and security procedures
Education
2005 B.Tech. (Electronics Instrumentation) from Hindutan College of Science and Technologies Farah, Mathura, UP
Certification
• Embedded System Design from AICT, Pune University in 2006
Personal Details
Date of Birth: 1-May-1981
Languages Known: English, Hindi and Marathi
Address: Bldg No.137, Moonlight CHSL, R.No. 4750, 4th
Flr., New Tilak Nagar, Chembur, Mumbai-400089
Passport No: H4374138
PAN Card No: ADGPY8642M
Please find the annexure for projects handled
Annexure
Projects Handled
With Sportz Interactive
Title: NDTV Sports
Period: Since Dec’14
Role: Associate Manager -Development
Description: The project involves NDTV Sports that caters to a large audience covering sports all the major sports like
Cricket, Football, Formula 1, Tennis, Hockey, NBA, Golf and many more with Scores and Stats.
Tools &
Technologies: C#, ASP.NET MVC 4.0, ADO.NET, AJAX, Jquery, SQL Server 2014, WebAPI & Windows Server 2008
Team Size: 1 Project Manager and 7 team members
Responsibilities:
• Involved in requirement gathering, scoping, project management, people management, project planning, technical
guidance and development
With FINO
Title: EPTTS (E-Pay Transactions Tracking System)
Period: Jan’12-Dec’14
Role: Assistant Manager
Description: The project involved E-Pay order Transaction Tracking System application which facilitated relevant
employees of FINO to capture and process all ePay Orders, and mainly help in tracking an EPay Order through
its transactions and fund distributions. The system helped in partner institutions like banks in viewing the
status of the ePay Orders. Major features included uploading and distributing transactions to end customers
according to the EPay Order file, Allocation, Validation and disbursement of funds, till the time it reached the
end customer, carded and non-carded transactions, and finally, reconciled transaction and funded data
through their different channels.
Tools &
Technologies: C#, ASP.NET MVC 3.0, ADO.NET, AJAX, Jquery, SQL Server 2008, WCF, SSRS & MSMQ
Server Platform: SQL Server 2008, Windows Server 2008
Team Size: 1 Project Manager and 6 team members
Responsibilities:
• Performed coding/coordinating/designing and implementation & support
• Interfaced with client team and got requirement
Title: D2 App.
Period: Jan’11-Dec’12
Role: Sr. Software Developer
Description: FINO has been working in the field of bringing banking products to the unbanked and the bottom of the pyramid
population in the country. To enable this, FINO worked with Block coordinators who were the point of contact
between FINO and the agents (Bandhu) who were in direct contact with bottom of the pyramid customers. Since
these Block coordinators had to work on field including travelling to various remote areas to meet the agents, it
became very difficult to track the location of the Block coordinators. To make sure that the Block coordinators
are performing their tasks with integrity and keep a track of their tasks/activities, their attendance record and
to manage the cash flow requests between the agents and BCs, the D2 application was developed.
Team Size: 1 Project Manager and 3 team members
Tools &
Technologies: C#, ASP.NET 4.0, Window Mobile,ADO.NET, AJAX, Java Scripts, SQL Server 2008, WCF, SSIS, SSRS & Google
Map
Server Platform: SQL Server 2008 and Windows Server 2008
Responsibilities:
• Involved in Coding, Module Lead, implementation and support, communicated with client team and collated requirement
With Mindgate Solutions
Title: LIC-AADHAAR
Period: Sep’10-Dec’10
Role: Sr. Software Developer
Description: The project involved Life Insurance Corporation (LIC) which acted as a registrar to Unique Identification
Authority of India (UIDAI) for the delivery of the unique 12-digit identity numbers to customers, making it the
first institution other than State governments to sign up with UIDA. LIC was very keen to build a robust and
secured platform which was integrated with their existing core product KYR. It was also integrated with LIC’s
Website to managing customer queries.
Team Size: 1 Project Manager and 7 team members
Tools &
Technologies: C#, ASP.NET 3.5, Win forms, ADO.NET, AJAX, Java Scripts, SQL Server 2008, WCF, SSIS & SSRS
Server Platform: SQL Server 2008 and Windows Server 2008
Title: ASBA Implementation System
Period: Apr’10-Aug’10
Role: Sr. Software Developer
Description: The project involved the solution which aimed at implementing ASBA (application supported by blocked
amount) for IPO/IDR/NCD for a leading MNC bank (SCB) as per SEBI guidelines. The application integrated the
core payment/banking platform and the offline integration with the exchanges (NSE) and with the registrar.
Team Size: 1 Project Manager and 5 team members
Tools &
Technologies: C#, ASP.NET 3.5, ADO.NET, AJAX, Java Scripts, SQL Server 2005, WCF, SSIS & SSRS
Server platform: SQL Server 2005 and Windows 2003 Server
With Reltronics Technologies
Title: ReALGPS Tracking System
Period: May’09-Mar’10
Role: Sr. Software Developer
Description: The project involved GPS Tracking system which allowed companies and individuals to track their vehicles
anytime anywhere in the world, giving them the ability to view their vehicles current locations in real time an
also the ability to see the past locations of the vehicles as well. GP Last Position, Tracking Map, Tracking
Replay, Fleet Tracking, Estimated Time.
Team Size: 1 Project Manager and 9 team members
Tools &
Technologies: C#, ASP.NET 3.5, ADO.NET, AJAX, Java Scripts, SQL Server 2005, WCF, Silverlight, Virtual Earth, Google Maps &
GPS
Server platform: SQL Server 2005 and Windows-Xp
Title: Crate Management System
Period: Jan’09-Apr’09
Role: Sr. Software Developer
Team Size: 1 Project Manager and 6 team members
Tools &
Technologies: C#, ASP.NET 3.5, ADO.NET, AJAX, SQL Server 2005,WCF,Web Service, MYSQL 5.0,Windows Mobile 5.0
Server Platform: SQL Server 2005 and Windows XP
Title: Salt Level (Snow Plows)
Period: Dec’08-Dec’08
Role: Sr. Software Developer
Team Size: 1 Project Manager and 2 team members
Tools &
Technologies: C#, ASP.NET 3.5, ADO.NET, AJAX, SQL Server 2005
Server Platform: SQL Server 2005 and Windows XP
Title: ReALDVR
Period: Sep’08-Nov’08
Role: Software Developer
Team Size: 1 Project Manager and 3 team members
Tools &
Technologies: C#, ASP.NET 3.5, ADO.NET, AJAX, SQL Server 2005 & Silverlight
Server Platform: SQL Server 2005 and Windows XP
Title: ReALTrack-AMS
Period: Dec’07-Aug’08
Role: Sr. Software Developer
Team Size: 1 Project Manager and 7 team members
Tools &
Technologies: C#, ASP.NET 3.5, ADO.NET, AJAX, SQL Server 2005 & Web Service
Server Platform: SQL Server 2005 and Windows XP
Title: ReALTrack-RMS
Period: Jun’07-Nov’07
Role: Software Developer
Team Size: 1 Project Manager and 4 team members
Tools &
Technologies: C#, ASP.NET 2.0, ADO.NET, AJAX, SQL Server 2005 and Windows Mobile 5.0
Server Platform: SQL Server 2005 and Windows XP
Title: ReALTrack Locator
Period: Mar’07-May’07
Role: Software Developer
Team Size: 1 Project Manager and 3 team members
Tools &
Technologies: C#, ASP.NET 2.0, ADO.NET, AJAX, SQL Server 2005 & Windows Mobile 5.0
Server Platform: SQL Server 2005 and Windows XP
Title: SmartInterpreter
Period: Jan’07-Feb’07
Role: Software Developer
Team Size: 1 Project Manager and 3 team members
Tools &
Technologies: C# .net 2.0, ADO.NET, SQL Server 2000, Python and Windows XP
Title: ReALTrack-AMS
Period: Dec’07-Aug’08
Role: Sr. Software Developer
Team Size: 1 Project Manager and 7 team members
Tools &
Technologies: C#, ASP.NET 3.5, ADO.NET, AJAX, SQL Server 2005 & Web Service
Server Platform: SQL Server 2005 and Windows XP
Title: ReALTrack-RMS
Period: Jun’07-Nov’07
Role: Software Developer
Team Size: 1 Project Manager and 4 team members
Tools &
Technologies: C#, ASP.NET 2.0, ADO.NET, AJAX, SQL Server 2005 and Windows Mobile 5.0
Server Platform: SQL Server 2005 and Windows XP
Title: ReALTrack Locator
Period: Mar’07-May’07
Role: Software Developer
Team Size: 1 Project Manager and 3 team members
Tools &
Technologies: C#, ASP.NET 2.0, ADO.NET, AJAX, SQL Server 2005 & Windows Mobile 5.0
Server Platform: SQL Server 2005 and Windows XP
Title: SmartInterpreter
Period: Jan’07-Feb’07
Role: Software Developer
Team Size: 1 Project Manager and 3 team members
Tools &
Technologies: C# .net 2.0, ADO.NET, SQL Server 2000, Python and Windows XP

DineshYadav(dotNet)

  • 1.
    DINESH KUMAR YADAV Mobile:09167252957 ~ E-Mail: dkpoint@gmail.com SENIOR LEVEL ASSIGNMENTS Project Management and Software Development Location Preference: Mumbai / Overseas Versatile, high-energy technocrat with the distinction of executing prestigious Information Technology projects of large magnitude within strict time schedules Profile Summary • A result-oriented professional with nearly 9 years of experience in: Project Management Software Development System Analysis & Design Requirement Analysis Documentation (High & Low Level) Business Analysis Team Management Client Relationship Management Liaison & Coordination • Provided overall leadership to the entire project team including managing deliverables of other functional team leaders • Followed the project life cycle methodology defined under the process framework; ensured that customer deadlines were met within project budgets • Expertise in handling the overall software application development life-cycle involving requirement analysis, system study, designing, testing, coding, de-bugging, project planning, maintenance & documentation • Created a software design process to translate business requirements into technical design documents resulting in improved quality control and output that was ‘right the first time’ • Drove efforts towards maintaining software development practices; adhered to company standards for coding and unit/functional test coverage • Bagged Employee of Month Award twice for contributing towards design and implementation phase of software • Managed iterative application development projects using Agile, Jira and Scrum methodologies • Performed software rollups and emergency bug fixes, refreshed test servers on a weekly basis, and developed backup and disaster plans to ensure rapid recovery • Keen customer centric approach with skills in addressing client priorities & resolving escalation within TAT, thereby attaining high business & compliance score • Innovative & creative professional with strong communication, analytical, interpersonal & negotiation skills Technical Skills Office Software: MS Office (Word, Visio & Excel) Operating Systems: DOS, Windows 95/ 98/2000/2007/2008/XP/Linux Development Tools Microsoft Visual Studio (IDE) 2013/2010/ 2008, TFS, SVN, IIS7 Programming Languages: .Net 4.0(C#), .net 4.5 (C#), ASP.net MVC 4.0, ASP.NET 3.5(C#), WCF, WCFRest, Restful services using WEB API, JQuery, JSON, LINQ, AJAX, XML & Java Script, Entity Framework ,MSMQ , Windows Service , Web Service, SSIS, SSRS Database: SQL Server 2000, 2005, 2008R2, 2014 & MYSQL Developing Methods: Software Design Pattern, SDLC, Object Oriented Programming and Principle, Agile Development & Jira Communication: Outlook Express, Go to Meeting, Skype & Telephone Organizational Experience Since Dec’14 Sportz Interactive, Mumbai as Associate Manager -Development Jan’11-Dec’14 FINO, Mumbai as Assistant Manager Apr’10-Dec’10 Mindgate Solutions, Mumbai as Sr. Software Developer Jan’07-Mar’10 Reltronics Technologies, Pune as Sr. Software Developer Key Result Areas:
  • 2.
    • Managing theenterprise software development including design, development & troubleshooting of applications; conducting gap analysis including validation of needs in conjunction with onsite & offsite teams • Undertaking development & unit testing, defect & issue management for enterprise software applications; conducting reviews of codes and analyzing change requests / enhancements • Driving vision / road mapping & lifecycle management for various software / applications development including value proposition & functionality, strategy elements (domain / business case & build) and training • Evaluating information gathered from multiple sources, decomposing higher information into details, investigating key business issues behind numbers and providing clear & concise analysis / recommendation • Steering the successful rollout of projects with accountability of defining scope, setting timelines, analyzing requirements, prioritizing tasks, preparing FP Sheet and evaluating risks & issues as per budgets • Monitoring project progress & outstanding issues and ensuring the quality & timeliness of the deliverables; extending post-implementation support to the Development Team by defining standard practices • Handling project delivery as per functional & non-functional needs / Agile Methodology for various releases • Testing & documenting new or amended programs from supplied specifications as per agreed standards; maintaining project artefacts as per required approvals • Providing support in handling escalation from clients to resolve their concerns and addressing their queries (customer advocacy) from other departments for a smooth ride for customer’s diverse issues • Establishing healthy relations with internal & external stakeholders to provide support for architectural issues; keeping a close track of developments in the field of IT and updating top management about the same Notable Accomplishments across Career • Worked in various capacities such as Offshore Project Manager, Onsite Manager, and Business Analyst for clients like Reltronics, Standard Chartered Bank, LIC, FINO Paytech, Star Sports and NDTV Sports in delivering projects and programs for the Indian and US geography • Recipient of awards such as employee of the month for technical coordination for a large program • Release Manager for the FINO and Sportz Interactive line of products; owned development, Quality Assurance (QA) and sustenance (L3) • Architected a major organizational change to product-line based from matrix over a period of 3 years to impact development areas; acted as a key stakeholder in the organizational change management process • Used Sareena tool for assigning engineering manpower which reduced allocation time; improved manpower utilization and productivity through proper allocation • Successfully completed delayed projects essential for operational efficiency by identifying and solving complex technical problems using interdisciplinary teams; restricted the schedule delay • Collaborated with vendors for successfully developing maximum complex engineering applications while adhering to the software development process and security procedures Education 2005 B.Tech. (Electronics Instrumentation) from Hindutan College of Science and Technologies Farah, Mathura, UP Certification • Embedded System Design from AICT, Pune University in 2006 Personal Details Date of Birth: 1-May-1981 Languages Known: English, Hindi and Marathi Address: Bldg No.137, Moonlight CHSL, R.No. 4750, 4th Flr., New Tilak Nagar, Chembur, Mumbai-400089 Passport No: H4374138 PAN Card No: ADGPY8642M
  • 3.
    Please find theannexure for projects handled Annexure Projects Handled With Sportz Interactive Title: NDTV Sports Period: Since Dec’14 Role: Associate Manager -Development Description: The project involves NDTV Sports that caters to a large audience covering sports all the major sports like Cricket, Football, Formula 1, Tennis, Hockey, NBA, Golf and many more with Scores and Stats. Tools & Technologies: C#, ASP.NET MVC 4.0, ADO.NET, AJAX, Jquery, SQL Server 2014, WebAPI & Windows Server 2008 Team Size: 1 Project Manager and 7 team members Responsibilities: • Involved in requirement gathering, scoping, project management, people management, project planning, technical guidance and development With FINO Title: EPTTS (E-Pay Transactions Tracking System) Period: Jan’12-Dec’14 Role: Assistant Manager Description: The project involved E-Pay order Transaction Tracking System application which facilitated relevant employees of FINO to capture and process all ePay Orders, and mainly help in tracking an EPay Order through its transactions and fund distributions. The system helped in partner institutions like banks in viewing the status of the ePay Orders. Major features included uploading and distributing transactions to end customers according to the EPay Order file, Allocation, Validation and disbursement of funds, till the time it reached the end customer, carded and non-carded transactions, and finally, reconciled transaction and funded data through their different channels. Tools & Technologies: C#, ASP.NET MVC 3.0, ADO.NET, AJAX, Jquery, SQL Server 2008, WCF, SSRS & MSMQ Server Platform: SQL Server 2008, Windows Server 2008 Team Size: 1 Project Manager and 6 team members Responsibilities: • Performed coding/coordinating/designing and implementation & support • Interfaced with client team and got requirement Title: D2 App. Period: Jan’11-Dec’12 Role: Sr. Software Developer Description: FINO has been working in the field of bringing banking products to the unbanked and the bottom of the pyramid population in the country. To enable this, FINO worked with Block coordinators who were the point of contact between FINO and the agents (Bandhu) who were in direct contact with bottom of the pyramid customers. Since these Block coordinators had to work on field including travelling to various remote areas to meet the agents, it became very difficult to track the location of the Block coordinators. To make sure that the Block coordinators are performing their tasks with integrity and keep a track of their tasks/activities, their attendance record and to manage the cash flow requests between the agents and BCs, the D2 application was developed. Team Size: 1 Project Manager and 3 team members Tools & Technologies: C#, ASP.NET 4.0, Window Mobile,ADO.NET, AJAX, Java Scripts, SQL Server 2008, WCF, SSIS, SSRS & Google Map Server Platform: SQL Server 2008 and Windows Server 2008 Responsibilities: • Involved in Coding, Module Lead, implementation and support, communicated with client team and collated requirement With Mindgate Solutions
  • 4.
    Title: LIC-AADHAAR Period: Sep’10-Dec’10 Role:Sr. Software Developer Description: The project involved Life Insurance Corporation (LIC) which acted as a registrar to Unique Identification Authority of India (UIDAI) for the delivery of the unique 12-digit identity numbers to customers, making it the first institution other than State governments to sign up with UIDA. LIC was very keen to build a robust and secured platform which was integrated with their existing core product KYR. It was also integrated with LIC’s Website to managing customer queries. Team Size: 1 Project Manager and 7 team members Tools & Technologies: C#, ASP.NET 3.5, Win forms, ADO.NET, AJAX, Java Scripts, SQL Server 2008, WCF, SSIS & SSRS Server Platform: SQL Server 2008 and Windows Server 2008 Title: ASBA Implementation System Period: Apr’10-Aug’10 Role: Sr. Software Developer Description: The project involved the solution which aimed at implementing ASBA (application supported by blocked amount) for IPO/IDR/NCD for a leading MNC bank (SCB) as per SEBI guidelines. The application integrated the core payment/banking platform and the offline integration with the exchanges (NSE) and with the registrar. Team Size: 1 Project Manager and 5 team members Tools & Technologies: C#, ASP.NET 3.5, ADO.NET, AJAX, Java Scripts, SQL Server 2005, WCF, SSIS & SSRS Server platform: SQL Server 2005 and Windows 2003 Server With Reltronics Technologies Title: ReALGPS Tracking System Period: May’09-Mar’10 Role: Sr. Software Developer Description: The project involved GPS Tracking system which allowed companies and individuals to track their vehicles anytime anywhere in the world, giving them the ability to view their vehicles current locations in real time an also the ability to see the past locations of the vehicles as well. GP Last Position, Tracking Map, Tracking Replay, Fleet Tracking, Estimated Time. Team Size: 1 Project Manager and 9 team members Tools & Technologies: C#, ASP.NET 3.5, ADO.NET, AJAX, Java Scripts, SQL Server 2005, WCF, Silverlight, Virtual Earth, Google Maps & GPS Server platform: SQL Server 2005 and Windows-Xp Title: Crate Management System Period: Jan’09-Apr’09 Role: Sr. Software Developer Team Size: 1 Project Manager and 6 team members Tools & Technologies: C#, ASP.NET 3.5, ADO.NET, AJAX, SQL Server 2005,WCF,Web Service, MYSQL 5.0,Windows Mobile 5.0 Server Platform: SQL Server 2005 and Windows XP Title: Salt Level (Snow Plows) Period: Dec’08-Dec’08 Role: Sr. Software Developer Team Size: 1 Project Manager and 2 team members Tools & Technologies: C#, ASP.NET 3.5, ADO.NET, AJAX, SQL Server 2005 Server Platform: SQL Server 2005 and Windows XP Title: ReALDVR Period: Sep’08-Nov’08 Role: Software Developer Team Size: 1 Project Manager and 3 team members Tools & Technologies: C#, ASP.NET 3.5, ADO.NET, AJAX, SQL Server 2005 & Silverlight Server Platform: SQL Server 2005 and Windows XP
  • 5.
    Title: ReALTrack-AMS Period: Dec’07-Aug’08 Role:Sr. Software Developer Team Size: 1 Project Manager and 7 team members Tools & Technologies: C#, ASP.NET 3.5, ADO.NET, AJAX, SQL Server 2005 & Web Service Server Platform: SQL Server 2005 and Windows XP Title: ReALTrack-RMS Period: Jun’07-Nov’07 Role: Software Developer Team Size: 1 Project Manager and 4 team members Tools & Technologies: C#, ASP.NET 2.0, ADO.NET, AJAX, SQL Server 2005 and Windows Mobile 5.0 Server Platform: SQL Server 2005 and Windows XP Title: ReALTrack Locator Period: Mar’07-May’07 Role: Software Developer Team Size: 1 Project Manager and 3 team members Tools & Technologies: C#, ASP.NET 2.0, ADO.NET, AJAX, SQL Server 2005 & Windows Mobile 5.0 Server Platform: SQL Server 2005 and Windows XP Title: SmartInterpreter Period: Jan’07-Feb’07 Role: Software Developer Team Size: 1 Project Manager and 3 team members Tools & Technologies: C# .net 2.0, ADO.NET, SQL Server 2000, Python and Windows XP
  • 6.
    Title: ReALTrack-AMS Period: Dec’07-Aug’08 Role:Sr. Software Developer Team Size: 1 Project Manager and 7 team members Tools & Technologies: C#, ASP.NET 3.5, ADO.NET, AJAX, SQL Server 2005 & Web Service Server Platform: SQL Server 2005 and Windows XP Title: ReALTrack-RMS Period: Jun’07-Nov’07 Role: Software Developer Team Size: 1 Project Manager and 4 team members Tools & Technologies: C#, ASP.NET 2.0, ADO.NET, AJAX, SQL Server 2005 and Windows Mobile 5.0 Server Platform: SQL Server 2005 and Windows XP Title: ReALTrack Locator Period: Mar’07-May’07 Role: Software Developer Team Size: 1 Project Manager and 3 team members Tools & Technologies: C#, ASP.NET 2.0, ADO.NET, AJAX, SQL Server 2005 & Windows Mobile 5.0 Server Platform: SQL Server 2005 and Windows XP Title: SmartInterpreter Period: Jan’07-Feb’07 Role: Software Developer Team Size: 1 Project Manager and 3 team members Tools & Technologies: C# .net 2.0, ADO.NET, SQL Server 2000, Python and Windows XP