Ashish Agrawal
12450 NW 15th Place APT 205, Sunrise FL 33323
Home: 954-683-4919
toashishagrawal@gmail.com
SUMMARY
 Nearly 10 years’ experience in leading, guiding and assisting in creating software
solutions to business problems.
 4 years Project Management experience, PMP certified Project Manager.
 5+ years of experience in core application development on .NET platforms.
 Microsoft Certified Technology Specialist in .NET 3.5 Windows Communication
Foundation Applications (MCTS).
 Experience with business analysis and requirements in traditional Waterfall Model and
Agile Methodologies such as SCRUM, Test Driven Data (TDD) Refactoring and
continuous integration Methodologies.
 Ability to relate to people at any level of business and management across the globe and
significant experience working with customers and technical team members for executing
concurrent projects.
 Experienced in Project development, management, cross functional team leadership and
client training and management.
 Highly resourceful in communicating requirements, and designing analysis and
architecture diagrams to the technical team. Skilled in managing a virtual team means
managing the whole spectrum of communication strategies and project management
techniques as well as processes in ways that support the team of nearly 25 members.
 Technical expertise in all aspects of the SDLC involving requirement analysis, design,
development, testing, implementation and enhancement as well as troubleshooting; as
well as maintaining strong relations with the client throughout the project lifecycle.
 Experience in database administration encompassing installation, database design and
creation, database features, disaster recovery planning, archival, restoration and
backups.
 Experience creating multi-tier designs as well as system interface implementation
designs.
 Experienced in creating UML design which includes use cases, activity diagram, process
diagram, sequence diagram, class diagram and ER diagram.
 Excellent problem-solving and communication skills; ability to work with stakeholders and
non-technical teams
 Strong concepts on Designing database.
EDUCATION
Bundelkhand University, Jhansi, India
B.Tech (Computer Science) in 2006
CERTIFICATIONS
 Project Management Professional
 MCTS Microsoft Certified Technology Specialist .NET framework 3.5 Windows
communication Foundation.
 Scrum Fundamental Certified (SFC)
 Certification course on ASP.NET using C# from IIT (Indian Institute of Technology)
Roorkee, India.
KEY COMPETENCIES ACROSS ASSIGNMENTS
TECHNICAL SKILLS
Operating Systems Windows 2000/2003/2007/NT server
Languages C#.NET, ASP.NET 2.0/3.1/3.5/4.0, MVC, MVP, WCF, WPF,
LINQ, Entity Framework, Code First, Jquery, Node.js
Databases Transact-Sql, Mongo DB, My SQL, SQL Server, Oracle, MS
Access
Project Management : Microsoft Project, Microsoft Visio, Enterprise Architect, MS
Office, JIRA, Confluence, Kanban.
Other Tools : Mirth Connect, Health information exchange (HIE),
Microsoft HealthVault, SSRS, Crystal Report Writer.
Source Code Management : TFS, SVN, VSS
MANAGERIAL
 Supervising project planning, design, scope, estimation, resource coordination and
delivery, as per specified timeframes. Implementing project plans within pre-set budgets.
 Lead, guide and assist technical team to create software systems or work flows and
processes that optimize client’s business processes.
 Working on Onsite/offsite model and Interacting with customer over the phone for Project
analysis and updates. Single points of contact for many projects/clients.
 Monitoring project progress as per scheduled deadlines for various tasks and taking
necessary steps to ensure completion within time, cost and effort parameters.
 Managing support/ services for clients and ensuring satisfactory resolution of all issues
(technical and project-related) on priority basis.
 Monitor and manage the development time lines to ensure timely delivery. Create task
lists and / or project plans using tools like MS-Excel, MS-Visio or MS-Project.
 Ensuring compliance with organization’s process guidelines.
 Supervising team activities:
o Mentoring team members. Deploying work based on employee’s skill levels,
monitoring performance and supporting career development.
o Monitoring and supervising team activities and suggesting improvements in their
performance. Determining training needs and conducting training programs.
FUNCTIONAL
Business Analysis
 Devising effective and efficient approaches to achieve the project objectives.
 Studying existing business processes, identifying and resolving issues.
 Discerning and managing risks involved in the projects, as well as planning for
contingencies.
 Interfacing with other project areas to coordinate interdependencies, and with business
units to gather requirements; subsequently resolving issues.
 Working towards improvements in the business processes by suggesting technology-
based solutions.
 Gathering business requirements, mapping processes (existing and future), and
analyzing data.
 Contributing to enterprise architecture development from a business needs point of view
Application Development
 Programming on a need basis using programming languages and methodologies like:
VB.NET, C#, ASP.NET 1.1/2.0/3.0/3.5, JavaScript, SOAP, Web Services, WCF and XML
on Microsoft Windows platforms.
 Worked on Service Oriented Architecture SOA for developing application functionality.
 Interfacing with clients for business gathering, conducting system analysis and finalizing
technical / functional specifications and high level design documents for the project.
 Analyzing technologies and suggesting the most viable one, to ensure client’s
requirements are met.
 Contributing to the design, development, testing, troubleshooting of the software.
 Ensuring smooth implementation and testing at client’s location. Providing post-
implementation, application maintenance and enhancement support to the client
Database Administration/ Data Modeling
 Handling various Databases up to DBA to level: MS SQL Server 2000, 2005, My SQL
5.0.
 Writing scripts to monitor and manage multiple databases.
 Evaluating the database features and related products.
 Implementing RDBMS processes like Normalization, Database Fine-tuning, Stored
procedures and Triggers to enhance the performance of Project.
 Devising data modeling strategies and plans. Supporting business information generation
and timely reporting of all crucial data.
Work Experience
 Technical Product Owner, Arrow Consulting & Design, West Palm beach FL- April 2016-
Current
 Technical Project Manager, Chetu Inc. Ltd, Plantation FL – March 12- April 2016
 Technical Manager, Chetu India PVT Ltd, Noida, March 10 – March 2012
 Technical Architect, Chetu India Pvt Ltd, Noida, March 09 – March 2010
 Team Leader, Chetu India Pvt Ltd, Noida, March 08 – Dec 2009
 Software Engineer, Chetu India Pvt Ltd, Noida from Feb 07 – Mar 2008
DETAILS OF PROJECTS EXECUTED
1. Project Name : Workflow BPM (Business Process Management)
Client : PriceWaterhouseCooper (PWC) Dallas, Tx
Employer : Arrow Consulting & Design, West Palm Beach
Duration : 03/7/2016 - Current
Team Size : 5
Technologies Used : Asp.Net MVC, C#, Sql Server 2008R2
Role : Technical Product Owner
Responsibilities : Handling scrum calls, Discussion with Business/client on
requirement, Developed Consultation Module web application
using ASP.NET MVC 2.0/3.0 Razor view
engine Framework andASP.NET Ajax Framework., Database
design on sql server, utilized TFS extensively for regular Code
Review, Create WBS (work break down structure) in TFS and
MS-Project, Create Statement of Work for third party vendors,
Identify Fears, Uncertainties and doubts in project by information
gathering techniques like holding brainstorming with team and
discussion with client.
Project Description : Workflow is a general project management & deliverable
tracking tool (known as Project Plan) that is integrated into other PwC systems. The
Project Plan is the discreet wrapper for work that is being performed for an engagement.
2. Project Name : InfoNET, GlobalNET, SSRS
Client : Hospital Physical Partners, Hollywood, FL
Employer : Chetu Inc, Plantation Florida
Duration : April 2012 – 03/1/2016
Team Size : 9
Technologies Used : Asp.Net, C#, Sql Server 2008R2, Confluence
Role : Technical Project Manager
Responsibilities : Hold daily morning calls with team to communicate client
requirement and define project architecture review source code.
Develop Provider portal and troubleshoot in case team is stuck
or is having problems. Meet clients in person (at least once in
week) for project discussion and to maintain relationship.
Communicate client requirement and define project architecture.
Integration with OpenHIE for healthcare information exchange.
and Implementation of the Healthcare Enterprise (IHE) Cross
Enterprise Document Sharing (XDS.b) and Cross Community
Access (XCA) integration profiles.
Project Description : Helped client in their Health Care related project/initiative. We
helped them to build a .NET/WPF application which allows users
to enter Patient information and also capture their disease/illness
information using specific medical coding systems like ICD9/10,
CPT4 and HCPCS. These patient information and medical codes
(ICD9, CTP4, HCPCS) are used to prepare a claims form (paper
format CMS 1500) or electronically submitted to Insurance
companies in a EDI format (837/835) by or on behalf of
Physician/Doctor using Electronic claim clearing houses.
Insurance companies will verify the information submitted in
these forms and make necessary payments to Physician based
on the Patient’s Insurance plan and their coverage. They are
using WPF Telerik control heavily in their application. We also
helped them in creating reports using SSRS.
3. Project Name : Maverick
Client : Modernizing Medicine, Boca Raton FL
Employer : Chetu Inc, Plantation Florida
Duration : Sep 2012 – Aug 2013
Team Size : 11
Technologies Used : Java 6, Stripes MVC, Apache Cayenne, MySql 5.5, Spring 3.x
Role : Technical Project Manager
Responsibilities : Create High Level design document and specify Language
framework (.NET, Spring, NHiberNET etc.), RAD Components
(Telerik, Infragistics etc.) and architecture diagrams using MS-
Visio. Core Development of Patient and Provider Portal. Created
Stored Procedures to fetch data from the database and web
methods were used to execute this stored procedure in
Electronic Medical Record EMR, Electronic Health Record EHR
and Health Level 7 HL7. Perform Quality Checks through
Offshore Quality Analysis team and assisting them in testing and
final deployment of project. Evaluate team and individual
performance by daily status reports, by tracking work status on
PM Plan, and bi-yearly reviews. Hold regular Client Meetings to
review overall project progress and any positive feedback or
concern for team. Based on discussion identify areas of
improvement.
Project Description : Created a new Practice management product called “Maverick”
designed to integrate into MMI's EMA (modernizing medicine’s
EMR) product platform.
4. Project Name : Virco-EHR (AVIGA)
Client : Janssen Diagnostics, Beerse Belgium
Team Size : 2
Employer : Chetu Inc, Plantation Florida
Duration : April 2012 – Dec 2013
Technologies Used : ASP.NET, Oracle, Flex, Mirth Connect, Micro strategy
9.0.2,JIRA with Confluence
Role : Technical Project Manager
Responsibilities : Development on AVIGA’s provider portal. Integrated E-prescription
using DirFirst (third Party system).
Using Microsoft-Project Gantt chart to develop Project Management
Plan along with estimate resources, its allocation and time estimates
for project and Gain formal approval from custom. Ensuring timely
delivery by providing interim releases based on PM Plan’s schedule
and Gain formal acceptance on the release from customer.
construct HL7 messages from Oracle Database and transferred to
Mirth Connect channel to provider portal.
Project Description : Virco Labs (www.vircolab.com) is a division of Johnson & Johnson.
We migrated their existing FoxPro based application to web based
EHR product (AVIGA™) developed using ASP.NET, Flex and
Oracle. They have partnered with us to develop ETL/Migration tool
which can help them to export data from legacy FoxPro database to
CCR based XML file which in turn will be used to import in their new
web based system.
Chetu has created an ETL tool which generates an XML Output file
format which is a standard schema for Client’s product and is
extended from CCR specification
5. Project Name : NationsHealth
Client : NationsHealth, Sunrise FL
Team Size : 2
Employer : Chetu Inc, Plantation Florida
Duration : May 2012 – Aug 2013
Technologies Used : Asp.Net, C#, Sql Server 2008R2, JIRA
Role : Technical Project Manager
Responsibilities : Developed Project Management Plan along with estimate
resources, its allocation and time estimates for project and Gain
formal approval from custom. Take action to control project by
trouble shooting problems, managing reserve in project schedule.
Re-Estimating the remaining components of project. Optimizing the
resources and Update PM Plan and project design documents.
Project Description : Created a web based solution for Agents for Inbound and
outbound calls to give information to members about their medical
plans.
6. Project Name : Sovera
Client : CGI, Fairfax V A
Team Size : 5
Employer : Chetu India PVT. LTD
Duration : Apr 2011 – March 2012
Technologies Used : Asp.Net, C#, Oracle 10g, TFS
Role : Technical Architect
Responsibilities : Project analysis, Application design, Development on
SOVERA’s patient/provider portal. Writing High level design
document, Database design, offshore team management, Code
review & Onsite Coordination from Fairfax, VA. [Business Visit
on US B1 Visa]
Description:
CGI's Sovera solution provides customers with complete digital records Management system,
resulting in increased staff productivity, improved customer service, and enterprise-wide
accessibility. Physicians and their staff - many in multiple locations - require immediate,
simultaneous access to patient charts. Without complete chart accessibility, health systems
face delays in clinical decisions, chart completion, and billing. Sovera HIM provides
Immediate, secure, web-enabled access to all patient medical records. Whether you need
access to lab, clinical, transcription, or radiology records, Sovera HIM delivers them on
demand and integrated through your core clinical information system or other healthcare
applications.
7. Product Name : PALS
Client : Petco
Team Size : 4
Employer : Chetu India PVT. LTD
Duration : Jan 2009- Apr 2011
Technologies Used : Web Services (SOA), Asp.Net, C#, SQL 2005, SSRS, JIRA
Role : Technical Architect
Responsibilities :
Analyze and understand the project’s requirements, business logic from SRS provided for the
project. Designing and implementation of Class Diagram and Business layer logic using
C#,Asp.net Attend daily scrum meeting with the Client (Development Lead, BAs and PM) to
review new requirements, development changes, and bug fixes and analyze progress against
Project Plan. Distribute the task to team; make them understand the functional requirements
Description:
PETCO is a chain of retail stores that offers pet supplies and services such as grooming and
dog training. PETCO runs a natural/holistic food section in its stores referred to as "It's All
Natural". The line contains a variety of brands of natural foods that offer no additives or
preservatives, and includes only pure/natural ingredients. The section has become
increasingly popular and profitable in the last few years, a similar trend in other leading pet
stores. PALS (Petco Animal Lover’s Save), is a loyalty program offered by Petco. PETCO
PALS members enjoy several exclusive benefits. PETCO PALS cards may be used to
receive discounts specifically marked on a variety of products throughout our retail stores.
8. Project Name : DG-PES
Client : Dollar General
Team Size : 4
Employer : Chetu India PVT. LTD
Duration : Feb 2008- March 2010
Role : Technical Architect
Technologies Used : Web Services (SOA), Asp.Net, C#, SQL 2005, WCF, Kanban
Responsibilities :
Team management, Application architecture, Database Design. Working on High and detail
level design document. Visiting client location for business meeting/requirement capture.
Description:
Dollar General one of the USA’s largest small-box discount retailer. DG-PES is a
Prescreening Employment System. The PES system is responsible for arranging the
candidate test that is coming in store for employment, this application will get candidate
information in terms of demographic data and test interface has functionality to process the
demographic data and questioner given by candidate. Sending and receiving response from
SSC (DG Corporate Web service) and it will be done in two modes one is real time and other
one is queue mode (managed by the windows application). Webservice at DGCorporate
communicates with Kenexa, Kenexa provides all candidates results lookup, precheck, and
test responses.
9. Project Name : Centrum
Client : Centrum Inc.
Team Size : 10
Employer : Chetu India PVT. LTD
Duration : Oct 2008 – Oct 2009
Technologies Used : Asp.Net, C#, SQL 2000/2005, SSIS
Role : Technical Architect
Responsibilities
Application development and support.
Responsible for different Software Development Life Cycle (SDLC) processes included
Analysis, design, Programming, Testing (Unit & System) and Documentation.
Description:
Centrum is the application which provides utility for user (called as camper) for reserving
parks for day use or overnight facilities. Park Setting is made by Park admin, each park have
a different set of attributes, also park admin can schedule different type of events and classes
within their Park, which can also be booked through online application as well as kiosk. Park
Admin uses a complete CMS (content management system) from managing UI for their parks
home page. Centrum is the central host which provides each park admin utility to reserve
their parks online. At the online application, camper reserve sites, while on kiosk park
employees can reserve the tickets as well as manage inventory within parks and manage
check in, check out for the campers
10. Project Name : Getty
Client : Getty
Team Size : 7
Employer : Chetu India PVT. LTD
Duration : March 2008 – Apr 2009
Technologies Used : VB.Net, ASP.net, web services, SQL 2005
Role : Technical Architect
Responsibilities
Extensively used agile methodology standards for building application modules. Client
Interaction and helping the technical team in designing class diagram, technical documents
and code review.
Description:
Getty is US based company which has their museums, throughout all US. Project provides
Getty employees to manage different events within museums, managing rates and
reservation type for reserving any museums. Application uses a tight security using LDAP
manage at Getty central location. The online application uses security from Novel LDAP and
give them permission for manage museums.
11. Project Name : MTN Client Portal
Client : TicketMaster Inc US
Team Size : 8
Employer : Chetu India PVT. LTD
Duration : Apr 2008- Dec 2008
Technologies Used : VB.NET (Win), MS SQL Server 2000
Project Duration : 10 Months
Role : Technical Architect
Responsibilities: Requirement analysis, Designing data model and Business Requirement
specifications.
Description:
We used Agile Software Development in this project. It is a conceptual framework for
software development that promotes development iterations, open collaboration, and
adaptability throughout the life cycle of the project. There are many agile development
methods; most minimize risk by developing software in short amounts of time.
MTN Client Portal will get the information of available inventory from the venues using
replication over VPN. Users login to the http://www.museumtix.com website and try booking
the tickets based on their personal choice. The inventory is checked against the venue
database based on the user’s choice.
If the tickets are available then the users are taken to the payment-processing gateway and
the payment information is validated. If the payment is completed successfully then the
information is submitted to the venue database and the appropriate information is provided to
the user.
12. Project Name : eTranLLC
Client : eTran, FL
Team Size : 7
Employer : Chetu India PVT. LTD.
Duration : Feb 2007 – March 2008
Technologies Used : C#, Asp.Net, MS SQL Server 2000
Role : Software Engineer
Project Duration : 6 Months
Description
eTran is a kiosk machine, which is used as ATM as well as some additional options, like bill
payment, check cashing and money transfer. Using Bill payment user can be able to pay any
bills for any biller for any state in US. Check cashing is a functionality where user can cash
his check and get a prepaid debit card for the same check amount (less some transaction
fee). Money transfer is used to transfer the money from one kiosk to another kiosk. The
application uses multiple financial domains including Master Card RPPS (for bill payment),
Fast Transact (for credit card payment), SPS (for Check Cashing) and Comdata (from
prepaid debit card). Kiosk machine uses a high security module which includes finger print,
palm and DL/ID scan. Each kiosk machine is managed by an admin panel, which is a web
application which is basically used for reporting and advertises management on the kiosk.

Ashish_Agrawal_Techincal Architect

  • 1.
    Ashish Agrawal 12450 NW15th Place APT 205, Sunrise FL 33323 Home: 954-683-4919 toashishagrawal@gmail.com SUMMARY  Nearly 10 years’ experience in leading, guiding and assisting in creating software solutions to business problems.  4 years Project Management experience, PMP certified Project Manager.  5+ years of experience in core application development on .NET platforms.  Microsoft Certified Technology Specialist in .NET 3.5 Windows Communication Foundation Applications (MCTS).  Experience with business analysis and requirements in traditional Waterfall Model and Agile Methodologies such as SCRUM, Test Driven Data (TDD) Refactoring and continuous integration Methodologies.  Ability to relate to people at any level of business and management across the globe and significant experience working with customers and technical team members for executing concurrent projects.  Experienced in Project development, management, cross functional team leadership and client training and management.  Highly resourceful in communicating requirements, and designing analysis and architecture diagrams to the technical team. Skilled in managing a virtual team means managing the whole spectrum of communication strategies and project management techniques as well as processes in ways that support the team of nearly 25 members.  Technical expertise in all aspects of the SDLC involving requirement analysis, design, development, testing, implementation and enhancement as well as troubleshooting; as well as maintaining strong relations with the client throughout the project lifecycle.  Experience in database administration encompassing installation, database design and creation, database features, disaster recovery planning, archival, restoration and backups.  Experience creating multi-tier designs as well as system interface implementation designs.  Experienced in creating UML design which includes use cases, activity diagram, process diagram, sequence diagram, class diagram and ER diagram.  Excellent problem-solving and communication skills; ability to work with stakeholders and non-technical teams  Strong concepts on Designing database. EDUCATION Bundelkhand University, Jhansi, India B.Tech (Computer Science) in 2006
  • 2.
    CERTIFICATIONS  Project ManagementProfessional  MCTS Microsoft Certified Technology Specialist .NET framework 3.5 Windows communication Foundation.  Scrum Fundamental Certified (SFC)  Certification course on ASP.NET using C# from IIT (Indian Institute of Technology) Roorkee, India. KEY COMPETENCIES ACROSS ASSIGNMENTS TECHNICAL SKILLS Operating Systems Windows 2000/2003/2007/NT server Languages C#.NET, ASP.NET 2.0/3.1/3.5/4.0, MVC, MVP, WCF, WPF, LINQ, Entity Framework, Code First, Jquery, Node.js Databases Transact-Sql, Mongo DB, My SQL, SQL Server, Oracle, MS Access Project Management : Microsoft Project, Microsoft Visio, Enterprise Architect, MS Office, JIRA, Confluence, Kanban. Other Tools : Mirth Connect, Health information exchange (HIE), Microsoft HealthVault, SSRS, Crystal Report Writer. Source Code Management : TFS, SVN, VSS MANAGERIAL  Supervising project planning, design, scope, estimation, resource coordination and delivery, as per specified timeframes. Implementing project plans within pre-set budgets.  Lead, guide and assist technical team to create software systems or work flows and processes that optimize client’s business processes.  Working on Onsite/offsite model and Interacting with customer over the phone for Project analysis and updates. Single points of contact for many projects/clients.  Monitoring project progress as per scheduled deadlines for various tasks and taking necessary steps to ensure completion within time, cost and effort parameters.  Managing support/ services for clients and ensuring satisfactory resolution of all issues (technical and project-related) on priority basis.  Monitor and manage the development time lines to ensure timely delivery. Create task lists and / or project plans using tools like MS-Excel, MS-Visio or MS-Project.  Ensuring compliance with organization’s process guidelines.  Supervising team activities: o Mentoring team members. Deploying work based on employee’s skill levels, monitoring performance and supporting career development. o Monitoring and supervising team activities and suggesting improvements in their performance. Determining training needs and conducting training programs.
  • 3.
    FUNCTIONAL Business Analysis  Devisingeffective and efficient approaches to achieve the project objectives.  Studying existing business processes, identifying and resolving issues.  Discerning and managing risks involved in the projects, as well as planning for contingencies.  Interfacing with other project areas to coordinate interdependencies, and with business units to gather requirements; subsequently resolving issues.  Working towards improvements in the business processes by suggesting technology- based solutions.  Gathering business requirements, mapping processes (existing and future), and analyzing data.  Contributing to enterprise architecture development from a business needs point of view Application Development  Programming on a need basis using programming languages and methodologies like: VB.NET, C#, ASP.NET 1.1/2.0/3.0/3.5, JavaScript, SOAP, Web Services, WCF and XML on Microsoft Windows platforms.  Worked on Service Oriented Architecture SOA for developing application functionality.  Interfacing with clients for business gathering, conducting system analysis and finalizing technical / functional specifications and high level design documents for the project.  Analyzing technologies and suggesting the most viable one, to ensure client’s requirements are met.  Contributing to the design, development, testing, troubleshooting of the software.  Ensuring smooth implementation and testing at client’s location. Providing post- implementation, application maintenance and enhancement support to the client Database Administration/ Data Modeling  Handling various Databases up to DBA to level: MS SQL Server 2000, 2005, My SQL 5.0.  Writing scripts to monitor and manage multiple databases.  Evaluating the database features and related products.  Implementing RDBMS processes like Normalization, Database Fine-tuning, Stored procedures and Triggers to enhance the performance of Project.  Devising data modeling strategies and plans. Supporting business information generation and timely reporting of all crucial data. Work Experience  Technical Product Owner, Arrow Consulting & Design, West Palm beach FL- April 2016- Current  Technical Project Manager, Chetu Inc. Ltd, Plantation FL – March 12- April 2016  Technical Manager, Chetu India PVT Ltd, Noida, March 10 – March 2012  Technical Architect, Chetu India Pvt Ltd, Noida, March 09 – March 2010  Team Leader, Chetu India Pvt Ltd, Noida, March 08 – Dec 2009  Software Engineer, Chetu India Pvt Ltd, Noida from Feb 07 – Mar 2008
  • 4.
    DETAILS OF PROJECTSEXECUTED 1. Project Name : Workflow BPM (Business Process Management) Client : PriceWaterhouseCooper (PWC) Dallas, Tx Employer : Arrow Consulting & Design, West Palm Beach Duration : 03/7/2016 - Current Team Size : 5 Technologies Used : Asp.Net MVC, C#, Sql Server 2008R2 Role : Technical Product Owner Responsibilities : Handling scrum calls, Discussion with Business/client on requirement, Developed Consultation Module web application using ASP.NET MVC 2.0/3.0 Razor view engine Framework andASP.NET Ajax Framework., Database design on sql server, utilized TFS extensively for regular Code Review, Create WBS (work break down structure) in TFS and MS-Project, Create Statement of Work for third party vendors, Identify Fears, Uncertainties and doubts in project by information gathering techniques like holding brainstorming with team and discussion with client. Project Description : Workflow is a general project management & deliverable tracking tool (known as Project Plan) that is integrated into other PwC systems. The Project Plan is the discreet wrapper for work that is being performed for an engagement. 2. Project Name : InfoNET, GlobalNET, SSRS Client : Hospital Physical Partners, Hollywood, FL Employer : Chetu Inc, Plantation Florida Duration : April 2012 – 03/1/2016 Team Size : 9 Technologies Used : Asp.Net, C#, Sql Server 2008R2, Confluence Role : Technical Project Manager Responsibilities : Hold daily morning calls with team to communicate client requirement and define project architecture review source code. Develop Provider portal and troubleshoot in case team is stuck or is having problems. Meet clients in person (at least once in week) for project discussion and to maintain relationship. Communicate client requirement and define project architecture. Integration with OpenHIE for healthcare information exchange. and Implementation of the Healthcare Enterprise (IHE) Cross Enterprise Document Sharing (XDS.b) and Cross Community Access (XCA) integration profiles. Project Description : Helped client in their Health Care related project/initiative. We helped them to build a .NET/WPF application which allows users to enter Patient information and also capture their disease/illness information using specific medical coding systems like ICD9/10, CPT4 and HCPCS. These patient information and medical codes (ICD9, CTP4, HCPCS) are used to prepare a claims form (paper format CMS 1500) or electronically submitted to Insurance companies in a EDI format (837/835) by or on behalf of Physician/Doctor using Electronic claim clearing houses.
  • 5.
    Insurance companies willverify the information submitted in these forms and make necessary payments to Physician based on the Patient’s Insurance plan and their coverage. They are using WPF Telerik control heavily in their application. We also helped them in creating reports using SSRS. 3. Project Name : Maverick Client : Modernizing Medicine, Boca Raton FL Employer : Chetu Inc, Plantation Florida Duration : Sep 2012 – Aug 2013 Team Size : 11 Technologies Used : Java 6, Stripes MVC, Apache Cayenne, MySql 5.5, Spring 3.x Role : Technical Project Manager Responsibilities : Create High Level design document and specify Language framework (.NET, Spring, NHiberNET etc.), RAD Components (Telerik, Infragistics etc.) and architecture diagrams using MS- Visio. Core Development of Patient and Provider Portal. Created Stored Procedures to fetch data from the database and web methods were used to execute this stored procedure in Electronic Medical Record EMR, Electronic Health Record EHR and Health Level 7 HL7. Perform Quality Checks through Offshore Quality Analysis team and assisting them in testing and final deployment of project. Evaluate team and individual performance by daily status reports, by tracking work status on PM Plan, and bi-yearly reviews. Hold regular Client Meetings to review overall project progress and any positive feedback or concern for team. Based on discussion identify areas of improvement. Project Description : Created a new Practice management product called “Maverick” designed to integrate into MMI's EMA (modernizing medicine’s EMR) product platform. 4. Project Name : Virco-EHR (AVIGA) Client : Janssen Diagnostics, Beerse Belgium Team Size : 2 Employer : Chetu Inc, Plantation Florida Duration : April 2012 – Dec 2013 Technologies Used : ASP.NET, Oracle, Flex, Mirth Connect, Micro strategy 9.0.2,JIRA with Confluence Role : Technical Project Manager Responsibilities : Development on AVIGA’s provider portal. Integrated E-prescription using DirFirst (third Party system). Using Microsoft-Project Gantt chart to develop Project Management Plan along with estimate resources, its allocation and time estimates for project and Gain formal approval from custom. Ensuring timely delivery by providing interim releases based on PM Plan’s schedule and Gain formal acceptance on the release from customer.
  • 6.
    construct HL7 messagesfrom Oracle Database and transferred to Mirth Connect channel to provider portal. Project Description : Virco Labs (www.vircolab.com) is a division of Johnson & Johnson. We migrated their existing FoxPro based application to web based EHR product (AVIGA™) developed using ASP.NET, Flex and Oracle. They have partnered with us to develop ETL/Migration tool which can help them to export data from legacy FoxPro database to CCR based XML file which in turn will be used to import in their new web based system. Chetu has created an ETL tool which generates an XML Output file format which is a standard schema for Client’s product and is extended from CCR specification 5. Project Name : NationsHealth Client : NationsHealth, Sunrise FL Team Size : 2 Employer : Chetu Inc, Plantation Florida Duration : May 2012 – Aug 2013 Technologies Used : Asp.Net, C#, Sql Server 2008R2, JIRA Role : Technical Project Manager Responsibilities : Developed Project Management Plan along with estimate resources, its allocation and time estimates for project and Gain formal approval from custom. Take action to control project by trouble shooting problems, managing reserve in project schedule. Re-Estimating the remaining components of project. Optimizing the resources and Update PM Plan and project design documents. Project Description : Created a web based solution for Agents for Inbound and outbound calls to give information to members about their medical plans. 6. Project Name : Sovera Client : CGI, Fairfax V A Team Size : 5 Employer : Chetu India PVT. LTD Duration : Apr 2011 – March 2012 Technologies Used : Asp.Net, C#, Oracle 10g, TFS Role : Technical Architect Responsibilities : Project analysis, Application design, Development on SOVERA’s patient/provider portal. Writing High level design document, Database design, offshore team management, Code review & Onsite Coordination from Fairfax, VA. [Business Visit on US B1 Visa] Description: CGI's Sovera solution provides customers with complete digital records Management system, resulting in increased staff productivity, improved customer service, and enterprise-wide accessibility. Physicians and their staff - many in multiple locations - require immediate, simultaneous access to patient charts. Without complete chart accessibility, health systems face delays in clinical decisions, chart completion, and billing. Sovera HIM provides Immediate, secure, web-enabled access to all patient medical records. Whether you need access to lab, clinical, transcription, or radiology records, Sovera HIM delivers them on
  • 7.
    demand and integratedthrough your core clinical information system or other healthcare applications. 7. Product Name : PALS Client : Petco Team Size : 4 Employer : Chetu India PVT. LTD Duration : Jan 2009- Apr 2011 Technologies Used : Web Services (SOA), Asp.Net, C#, SQL 2005, SSRS, JIRA Role : Technical Architect Responsibilities : Analyze and understand the project’s requirements, business logic from SRS provided for the project. Designing and implementation of Class Diagram and Business layer logic using C#,Asp.net Attend daily scrum meeting with the Client (Development Lead, BAs and PM) to review new requirements, development changes, and bug fixes and analyze progress against Project Plan. Distribute the task to team; make them understand the functional requirements Description: PETCO is a chain of retail stores that offers pet supplies and services such as grooming and dog training. PETCO runs a natural/holistic food section in its stores referred to as "It's All Natural". The line contains a variety of brands of natural foods that offer no additives or preservatives, and includes only pure/natural ingredients. The section has become increasingly popular and profitable in the last few years, a similar trend in other leading pet stores. PALS (Petco Animal Lover’s Save), is a loyalty program offered by Petco. PETCO PALS members enjoy several exclusive benefits. PETCO PALS cards may be used to receive discounts specifically marked on a variety of products throughout our retail stores. 8. Project Name : DG-PES Client : Dollar General Team Size : 4 Employer : Chetu India PVT. LTD Duration : Feb 2008- March 2010 Role : Technical Architect Technologies Used : Web Services (SOA), Asp.Net, C#, SQL 2005, WCF, Kanban Responsibilities : Team management, Application architecture, Database Design. Working on High and detail level design document. Visiting client location for business meeting/requirement capture. Description: Dollar General one of the USA’s largest small-box discount retailer. DG-PES is a Prescreening Employment System. The PES system is responsible for arranging the candidate test that is coming in store for employment, this application will get candidate information in terms of demographic data and test interface has functionality to process the demographic data and questioner given by candidate. Sending and receiving response from SSC (DG Corporate Web service) and it will be done in two modes one is real time and other one is queue mode (managed by the windows application). Webservice at DGCorporate communicates with Kenexa, Kenexa provides all candidates results lookup, precheck, and test responses. 9. Project Name : Centrum Client : Centrum Inc.
  • 8.
    Team Size :10 Employer : Chetu India PVT. LTD Duration : Oct 2008 – Oct 2009 Technologies Used : Asp.Net, C#, SQL 2000/2005, SSIS Role : Technical Architect Responsibilities Application development and support. Responsible for different Software Development Life Cycle (SDLC) processes included Analysis, design, Programming, Testing (Unit & System) and Documentation. Description: Centrum is the application which provides utility for user (called as camper) for reserving parks for day use or overnight facilities. Park Setting is made by Park admin, each park have a different set of attributes, also park admin can schedule different type of events and classes within their Park, which can also be booked through online application as well as kiosk. Park Admin uses a complete CMS (content management system) from managing UI for their parks home page. Centrum is the central host which provides each park admin utility to reserve their parks online. At the online application, camper reserve sites, while on kiosk park employees can reserve the tickets as well as manage inventory within parks and manage check in, check out for the campers 10. Project Name : Getty Client : Getty Team Size : 7 Employer : Chetu India PVT. LTD Duration : March 2008 – Apr 2009 Technologies Used : VB.Net, ASP.net, web services, SQL 2005 Role : Technical Architect Responsibilities Extensively used agile methodology standards for building application modules. Client Interaction and helping the technical team in designing class diagram, technical documents and code review. Description: Getty is US based company which has their museums, throughout all US. Project provides Getty employees to manage different events within museums, managing rates and reservation type for reserving any museums. Application uses a tight security using LDAP manage at Getty central location. The online application uses security from Novel LDAP and give them permission for manage museums. 11. Project Name : MTN Client Portal Client : TicketMaster Inc US Team Size : 8 Employer : Chetu India PVT. LTD Duration : Apr 2008- Dec 2008 Technologies Used : VB.NET (Win), MS SQL Server 2000 Project Duration : 10 Months Role : Technical Architect Responsibilities: Requirement analysis, Designing data model and Business Requirement specifications. Description:
  • 9.
    We used AgileSoftware Development in this project. It is a conceptual framework for software development that promotes development iterations, open collaboration, and adaptability throughout the life cycle of the project. There are many agile development methods; most minimize risk by developing software in short amounts of time. MTN Client Portal will get the information of available inventory from the venues using replication over VPN. Users login to the http://www.museumtix.com website and try booking the tickets based on their personal choice. The inventory is checked against the venue database based on the user’s choice. If the tickets are available then the users are taken to the payment-processing gateway and the payment information is validated. If the payment is completed successfully then the information is submitted to the venue database and the appropriate information is provided to the user. 12. Project Name : eTranLLC Client : eTran, FL Team Size : 7 Employer : Chetu India PVT. LTD. Duration : Feb 2007 – March 2008 Technologies Used : C#, Asp.Net, MS SQL Server 2000 Role : Software Engineer Project Duration : 6 Months Description eTran is a kiosk machine, which is used as ATM as well as some additional options, like bill payment, check cashing and money transfer. Using Bill payment user can be able to pay any bills for any biller for any state in US. Check cashing is a functionality where user can cash his check and get a prepaid debit card for the same check amount (less some transaction fee). Money transfer is used to transfer the money from one kiosk to another kiosk. The application uses multiple financial domains including Master Card RPPS (for bill payment), Fast Transact (for credit card payment), SPS (for Check Cashing) and Comdata (from prepaid debit card). Kiosk machine uses a high security module which includes finger print, palm and DL/ID scan. Each kiosk machine is managed by an admin panel, which is a web application which is basically used for reporting and advertises management on the kiosk.