AS Design Technology
Dan Penn




                                                        Mood Board
Direct point of    Brand        Initial                               Gant Chart     Assembly and
     sales        analysis   Specification   Links FX    Customer
                                                                     Questionnaire     Materials
                                                         Profiling
This is a direct point of sale promoting ‘Tony Ferguson’ which
is a company selling products to allow you to loose weight
easily. I do not think this is a good direct point of sale as it
does not promote what the products do very well. The text on
the side of the cardboard container can not be read and the
product isn’t stacked neatly. It does have some good
feautures such as a substantial amount of space and the
companys name is placed in large letters across the top at eye
level, which makes it easier and more appealing to the
customer.                                                          Next
This is a direct point of sale advertising the
company Hovis. Hovis is a big brand company
which sells different varieties of bread. I feel this
is a good direct point of display as it stands out. It
stands out by using big bold vibrant colors such as
yellow. It also advertises the latest offer the
company is selling in big bold writing, covering all
angles of sight for the customer. The bread is set
out neatly on each one and the company's logo is
easily visible. I feel this would attract/catch the
eye of any customer despite their age.




 My last and final point of display is a very well recognised one.
 Walls ice cream is one of the largest ice cream manufactures across
 the country and is well known for selling certain varieties of ice
 creams and ice lollies. This type of storage display is good because
 it meets the aims of the ice cream by keeping them cool and frozen
 but also advertises its company on the sides and top, making it
 easily visible for the customer. This type of point of display can be
 found in many different places such as supermarkets, off licences
 and news agents.


                                                                         Home
This is a very good direct point of
sale as it contain many features
that would appeal to the target
audience. One of the good selling
points it has is its color. It uses
bright color to attract its target
market and draw them to their
products. It also has an interactive
side, where the customer can try
out the pen/pencil before they buy
the product. The direct point of
sale separates the products neatly
and makes it look well
representable.




                                       Next
The company lynx aims its products at the teenage market.
                                                              My opinion of old spice is that it aims at   I think that like Lynx, Fish Soho is also
The adverts broadcasted on the TV are a big selling point
                                                              older males aged 21+. It has a classical     aimed at the target audience of teenagers as
for the product, inspiring the teenagers of today to be the
                                                              edge to the branding of the product. the     it gives off a more funky style by using funny
male on the advertisement. Lynx is owned by Unilever and
                                                              aim of the brand is to eliminate body        names and bright colours on the packaging.
sells male grooming products such as aftershave,deodrant
                                                              odours and stop males from severe            Fish started as a hairdressers, cutting
and shower gel. Although Lynx’s lead product is
                                                              sweat. The company uses well known           everyday peoples hair across Central London.
the fragranced aerosol deodorant body
                                                              celebrity faces to promote the branding      Fish decided to release their own
spray, other formats of the brand exist.
                                                              of the company and to attract the target
Within underarm care the following are
                                                              audience towards their products.
available: deodorant aerosol body spray,
deodorant stick, deodorant roll-on, anti-
perspirant aerosol spray (called Lynx Dry),
and anti-perspirant stick (also called Lynx
Dry).




                                                                                                                                          Next
I believe that L'Oreal men
       expert is targeting the older
       male due to the use of
       certain well known celebrities
       and the aims of the product.
       The product aims to reduce
       wrinkles and make your skin
       look less tired and more
       fresh and healthy.




Back                                    Next
Lynx is a brand selling male grooming
                                              products, owned by the British/Dutch
                                              company Unilever. I feel this brand is
                                              targeting the young males/ teenagers due
                                              to the advertising and packaging of the
                                              product.


Although Lynx’s lead product
is the fragranced aerosol
deodorant body spray, other
formats of the brand exist.
Within underarm care the
following are available:
deodorant aerosol body
spray, deodorant stick,
deodorant roll-on, anti-
perspirant aerosol spray
(called Lynx Dry), and anti-
perspirant stick (also called
Lynx Dry).




Lynx was launched in France in 1983 by Unilever. It was inspired by another of Unilever's brands, Impulse.

Unilever were keen to capitalize on Lynx’s French success and the rest of Europe from 1985 onwards, later introducing the other
products in the range. Unilever were unable to use the name Axe in the United Kingdom and Ireland due to trademark problems so
it was launched as Lynx.

The European launch of the deodorant was followed by success in Latin America and moderate impact in Asia and Africa. In the new
millennium, the brand has launched with great success in the United States and Canada. The company has also widened its portfolio
by overlapping male deodorants into the Lynx brand such as South Africa's Ego brand.
Unilever has now launched its first Lynx product for women in the United Kingdom as part of a global expansion of the previously
men’s-only brand.
                                                                                                                                    Next
Aesthetics
                                                                  Cost
Some of the aspects of my aesthetics for my
                                                                  One main thing I need to take into perspective is the quantity to
point of sale I will be looking at are: brand
                                                                  quality ratio. I also need to think about the cost of my materials
colours, working around and studying what
                                                                  that I could use, whether I use more expensive materials. Also I
colours my brand use. Shapes, the different
                                                                  need to into perspective the cost of manufacturing. Other things I
shapes I can use to attract my target
                                                                  need to look at are the point of sale in the shop and how much it is
audience. Logos, studying the different areas I
                                                                  going to cost if I wanted to place mine on the shop floor.
can place the company's logo. Styles and
patters, looking at all the different styles and   Safety
patterns and which ones will suit my customer                                                               Size
                                                   some of the safety aspects I need to look at are:
and information, the information and text                                                                   Things I need to take
which will be placed onto my direct point of       .Personal health, such as asthma
                                                                                                            into perspective are the
sale.                                              .The person assembling the products
                                                                                                            stability of the point of
                                                   .avoidable instances
             Customer                                                                                       sale. So that it can fit in
                                                   .falling over
             The aspects of my products                                                                     the shop nicely and
                                                   .sharp edges
             should be aimed at my                                                                          neatly. But also the
             customer through targeting
                                                               Materials                                    floor space to cost ratio,
                                                               Some of the materials I am                   allowing me enough
             the right age range, by using
                                                               going to be looking to use are               space to advertise but
             correct colours and shapes.
                                                               alluminium,oak and acrylic. I                not too much so it
             The certain shops it is placed
                                                               am looking to use these                      becomes a waste of
             in, shops my target market
                                                               materials to attract the target              money.
             would visit and also
                                                               audience and to be able to fit
             anthropometrics.
                                                               into its environment.

Environment
When we are looking at the environment we need to look at
the position of the point of sale in the shop and its surroundings.
                                                                            Initial Specification
This is because it needs to be placed in a position with similar
surrounding which would attract the target audience.
                                                                                                                  Next
Task Analysis
.Functionality & Features: Colours, pictures, shapes, design, materials, video, smells, sounds, tasting,
textures.
.Visibility & Position: In it’s own space, no other choice or products in the way/around it, eye-level hanging,
moving.
.Target Markets: Young, teenaged, middle aged, older generation, male or female, unisex.
.Aesthetics/Branding: Shape & colour scheme, name & price of product, lighting, from a distance/up close,
distinctive, eyefall.
.Materials: Plastics, glass, metal, wood, finishes: reflective, matte, smooth, textured, recyclable, sources.
.Safety: No spiky edges, any parts that stick out, brightness, sound level, fire resistant, not
combustible/explosive
.Sustainability: Materials used, uses for other products/designs, recyclable, adaptable, component
replacements
.Environment: What type of shop, which isle/area, positioning, direction of display, consideration of footfall
and eyefall.
.Interactivity: Samples, testers, sensors, theme, method of purchase, use of 5 senses (video, smells, sounds,
tasting, textures)
.Social Networking/Web: Use of QR and barcodes, facebook/ twitter pages, website (layout and
branding).
.Construction: Where will it be made, processes, assembly, source of materials, types of glue/joints.
.Ergonomics: Ease of view/reach, distance from customer to product, level, position/angle.
.Price: Value of the product, reputation of the brand, time it will be used for, type of shop it is in.
.Future: Future products/releases of the brand, trends/fashions, other companies , direction of the
market/technology.



                                                                                                            Next
Logical



                                                                                                                        Links Fx
Have the brand name clearly displayed on the unit
It is logical to have the product on display, so people can see it
To have it positioned where there is a large footfall
Located near other fragrances
Clear what the product does
To have the products at eye line
Products near the till because they’re already spending money
Have the unit relative in size to the product
To have small samples so consumers can test it

Illogical
For the price to be displayed
Show all products, full focus on one
To be dishonest to the consumer so they have full trust in you
For the unit to look cheap when displaying an expensive product
To sell in non-related stores as you wouldn’t have many sales
To put the point of sale unit in a place of the shop where it is not visible to the passing customers

Need
The product on show so the customers know what they’re purchasing
The unit must stand on its own without any support so it should be freestanding
It needs to be safe to handle when customers want to test it
To inform the customers about what it does if it is a new brand
Accessible to the customer with ease otherwise if it is in a box they probably wont be bothered to ask someone about it
To be easy to use and simple

Keep-
I am going to keep the social media part of it so that it is fun and interactive
I am going to keep the product on display and where there is a heavy footfall because more people will go past it
I am going to keep the theme of the brand with its old heritage look so that customers get a feel for the brand

Scrap
I am going to scrap the demo manikin as I think it cheapens the effect of the unit
I may scrap the barber chair theme as this would be to cost expensive and would be difficult to get hold of

Function vs. Form
The form of the unit so the aesthetics should be more effective than the function as more people will go past it rather than go up to it and test it
The function should be efficient, honest and reflect what the brand does for the customer

X-Factor
The X factor of the unit will be its interactive screen with fun videos about the brand and it will have links to the social media trends and websites
                                                                                                                                                         Home
Gant Chart




             Next
Next
Price: High
 Competitors
 I've placed the fragrance 'Jump’ by Joop!
 In this position as I feel it is very high
 priced,but not very popular due to the
 branding. Joop! Isn't one of the largest,                                                            Ralph Lauren, or otherwise know as
 popular brands but still has expensive                                                               Polo, is one of the most popular
 products.                                                                                            fragrances purchased and used across
                                                                                                      the UK. I have placed it in this position
                                                                                                      because the products are still fairly
                                                                                                      expensive but at the same very popular.




Popularity:                                                                                                             Popularity: High
Low




                                                                    I have placed Lynx in this
                                                                    position as I feel that it is a
                                                                    very cheap brand, which is a
                                                                    good factor as it makes it
                                                                    more accessible to the
                                                                    targeted customer. And I feel
                                                                    that Lynx is a very popular
                                                                    product and appeals to a wide
                        I have placed the Adidas                    target audience.
                        aftershave fragrance in
                        this position as it is dirt
                        cheap compared to other
                        products and is not very
                        popular. Adidas is one of
                        the largest sports brands
                        across the world, and
                        most customers go to
                        their company to buy
                        sports accersiories,not
                        aftershave.
                                                                                                                          Next
                                                       Price: Low
Customer Profiling                                                                                               Lynx aims its products at the older teenagers/young male
                                                                                                                 market. We know this from the packaging of the product,
                                                                                                                 which uses bright primary colours, and the cost of the
                                                                                                                 products, making it easier and more affordable for the
                                                                                                                 customer. Lynx is a brand selling male grooming products,
                                                                                                                 owned by the British/Dutch company Unilever. I myself
                                                                                                                 would personally use Lynx as I feel it is affordable and does
                                                                                                                 what it needs. Lynx stands out to me as it uses bright vibrant
                                                                                                                 colours on dark back grounds, making it jump out of the
                                                                                                                 shelf.
Older teenagers/young males use
Lynx products because they are
attracted to the branding and
advertising of the product. The
company Lynx advertises young men
usually a little older than the age group
wearing the product, allowing them to
attract various girls due to the product.
This the automatically appeals to the
target customer, inspiring them to be
the males presented on the advert .


My stereotypical customer for my
product would be a sports player.
He/she would use Lynx before
and after matches to destroy
odour from things such as sweat
and mud. My customer still
attends school in the higher years
and likes to go out of a weekend
with friends to various places. My
customer likes to constantly smell
good wherever he or she goes. At
school my customer studies                  The main selling point towards the older teenage age range is the advertising
physical education, media and               of the product. TV adverts which represent the brand always show a young
English. My stereotypical                   male aged 21-25 attracting the opposite sex easily. When older teenagers
customer who buys the product               view this advert, they are automatically drawn towards the brand, aspiring to
on a regular basis, comes from a            be the young males represented on the advert. This gives a message across
fairly average background.                  to the target audience of the brand, that if you wear there products you will
He/she had other siblings and               attract the opposite sex, which most older teenagers are constantly looking
parents who work hard. they live            to do.
in a semi detached house in a
fairly goof area. My customer
enjoys his sports and is always
looking to attract the opposite sex.
                                                                             Next
Environmental Snapshot
                         I would place my direct point of
                         sale in a shop like this as it fits the
                         genre of the shop and would be
                         surrounded by products of the
                         same calibre. I would place my
                         direct point of sale in the fragrance
                         area. By doing this means it makes
                         it easier for the customer, allowing
                         the customer to know where our
                         products our stored in the shop. I
                         would also pay extra to have my
                         product placed at eye level. I feel
                         this is a vital element of distributing
                         our product making it more
                         accessible and eye catching towards
                         potential customers. Stores such as
                         Boot and Super Drugs are perfect
                         for my product because they are
                         leading cosmetic stores which sell
                         similar products to mine. I would
                         like to place my direct point of sale
                         in the men's aftershave area, as I
                         feel it would best suit the
                         environment and can be marketed
                         against other brands.
Average price per product: High
Brand Analysis
              I have placed the
              brand Jean Paul
              Gautier in this
              position as I feel
              it is not as big as
              other brands but
              still produces
              high end
              expensive                                                                 I have placed Polo in
              products.                                                                 this position as I feel it is
                                                                                        one of the most popular
                                                                                        if not the most popular
                                                                                        brands out there. It
                                                                                        produces high end
                                                                                        products at a reasonably
                                                                                        high price.
Popularity:                                                                                                             Popularity: High
Low




                                                                             I have placed the brand Lynx in this
                                                                             area as it is one of the largest well
                                                                             known brand aimed at teenagers. It
                                                                             produces low priced products which
                            I Have placed Mr Natty in
                                                                             appeals to the target audience,
                            this position as I feel that it
                                                                             allowing them more sales.
                            is not a very popular
                            product and the prices aren't
                            very high. I feel this is not a
                            popular brand as it only
                            appeal to a thin gap in the
                            market.




                                                                                                        Home
                                                      Average price per product: Low
Questionnaire
1. Does a point of sale influence you towards              By making a questionnaire it allows me
   purchasing the product advertised?                      to design my product around the
    Yes              No            Sometimes               customers needs. The results will allow
                                                           me to assemble and design a direct point
2.What do you think the ideal size of a point of sale...   of sale which will appeal to a wide range
   Chest height, Eye Level, Head Height or Above           of the target audience. By making it
   Head Height                                             appeal more to my target audience, it will
                                                           catch the eye of a potential customer
3.Is it important that the point of sale is interactive    more easily. I asked my questionnaire to
                                                           an age range of 14-23 year old male and
    Yes                 No            Sometimes            females. By doing my questionnaire I
                                                           asked 10 different students who take a
4. How long will you spend at a point of sale              wide range of different subjects within
.1-2minutes                                                the school. By using different styles of
.4-5minutes                                                students gives me a wider range of
.5-10minutes                                               answers. Here are my results...
.10+minutes

5.What do you feel is more important for a direct
   point of sale, form or function?




 Back                                                                                              Next
Questionnaire Results
 1.Does a point of sale influence you towards purchasing the
                                                               2.What do you think the ideal size of a point of sale... Chest
 product advertised?
                                                               height, Eye Level, Head Height or Above Head Height
     Yes               No           Sometimes



                                                                                                                                5.What do you feel is more
                                                                                                                                important for a direct point
                                                                                                                                of sale, form or function?




 From these results of this question I
 have found out that over half of the 10                       From these sets of results from this shows me how the
 people I asked feel that a direct point                       potential customers feel that no direct point of sale
 of sale does not influence the                                should be above head height, and I should really be
 purchasing of the product and it’s the                        putting my direct point of sale at eye level to increase
 quality and price of the product which                        sales in the product.
 is the main influence.
                                                                                                                                   From this set of results I
 3.Is it important that the point of sale is interactive        4. How long will you spend at a point of sale                      have found that most of
                                                                .1-2minutes                                                        the potential customers
      Yes                No             Sometimes               .4-5minutes                                                        feel that form is more
                                                                .5-10minutes                                                       important than function.
                                                                .10+minutes                                                        This is useful to me as I
                                                                                                                                   can now focus on the
                                                                                                                                   aesthetics of the direct
                                                                                                                                   point of sale rather than
                                                                                                                                   the function of it.

                                                               From these sets of results it indicates to me that
By receiving the results from question 3 I have
                                                               4 out of the 10 target audience I surveyed would
realised that my direct point of sale defiantly
                                                               only spend 1 to 2 minutes at a direct point of
needs to be interactive. The potential customers
                                                               sale. This tells me that on my direct point of sale
feel it needs to be interactive as they feel they
                                                               I need to get my point across quickly and
would spend more time at more product.
                                                                         .
                                                               efficiently
                                      Back                                                                                                       Next
Assembly And Materials

                                                               These are perhaps the most common types of
                   Free standing point of sale units           point of sale units. They are made out of
                   are very risky. They can easily             cardboard and can display multiple items. They
                   can easily be broken or smashed.            are usually delivered in a flat pack. To put the
                   These points of sales are usually           unit up, you’d need to unfold the cardboard. The
                                                               point of sale is cheaper than those of higher
                   fully assembly . once used they
                                                               materials but do not last very long as the material
                   can be re used and different                isnt very strong and hasn’t got long durability.
                   products can be placed within.              The product is easily recyclable.
                   This point of sale is hard to
                   dispose of and would be used
                   more than once.




This is a free standing
acrylic point of sale                        Some point of sales would be in a
unit. They can be used                       display case on a counter.
in portrait and                              Sometimes, the display case would
landscape. They can                          be part of the point of sale. The
also be wall mounted,                        bottom half would be made out of
free standing ,laid flat                     wood, metal or some cheaper ones
or hung from cable                           out of plastics. Can be reused.
systems.
Research Plan
Questionnaire                                                                                                                              Competitors
                                                                                                                                           What I've learnt from carrying out research on my competitors is the different
I feel that my questionnaire was very useful to my research plan as it
                                                                                                                                           styles, prices and colours that my main competitors use. This page was very
gave me a good understanding of what my target audience is attracted
                                                                                                                                           useful to me as it told me all of my main competitors that my brands faces, and
to and what they find good in a direct point of sale. By carrying out a                              Environment
                                                                                                                                           what they do to set their brand out from others.. Carrying out research on my
questionnaire it gave me a clear set of results of what I should base my                             al Snapshot                           competitors taught me how to present my brand in a unique way which will
direct point of sale on.
                                                                                                                                           separate it from others, while also appealing to the target audience.


Environmental Snapshot                                                                                                                                Customer Profiling
An environmental snapshot helped me design my direct                                                                  Competitors                     By researching my stereotypical customer, this has helped me
point of sale to fit the genre and needs of the shop floor.                                                                                           a lot with the design of my direct point of sale, allowing me to
I found this helpful as it tells me the best size for my                           Questionnai
                                                                                                                                                      design it more suitable and attractive towards the potential
direct point of sale and the outline design I should                               re                                                                 customer. Through research on my potential customers it has
choose for the best floor space to cost ratio.                                                                                                        helped me with the design, colours and interaction of my direct
                                                                                                 Customer Profiling                                   point of sale.

Assembly and Materials
Assembly and materials helped me design my direct
point of sale very well. It gave me a good understanding                                                                       Assembly&
of the wide range of varieties the direct point of sales                         Brand                                         Materials
can be assembled. This then also helped me with my                               Analysis
packaging, giving me different options on how to pack
my product and the one which suits my direct point of
sale the best.


  Brand Analysis
  The brand analysis helped me out a lot as it gave me a wide perspective of
  all the other brands and competitors. Through my brand analysis I learnt
  all the different popularities of different styles of company's and also the
  expenses of the company (average price per product). This then gave me
  the best perspective on how popular and expensive my brand is and how I
  should market and present my direct point of sale.
50 Initial Designs
20 Further Designs
Construction: I have studied various        Aesthetics: My development of my                 Components: One of my main
different hinges to place on my point       aesthetics for my direct point of sale is        components of my point of sale unit is
of sale unit to allow the door to open      the colours used. My point of sale unit is       my testers which will be placed inside
and close. After all my research            based around a first aid box/kit                 the direct point of sale unit. The tester
throughout the different joints I           ,continuing with the theme of ‘What              will be a Polaroid picture, containing
decided to do first hand research, by       happened last night?'. Through my                images of ‘the night before’. Each
analysing different joints around the       research on the internet I looked at the         picture will contain the scent of the
school, seeing the durability of the        various colours used on modern and also          fragrance and have information about
joint and the aesthetics of the joint. In   old fashioned first aid boxes. I found out       the company. The pictures will vary
and around my school I found two            that there is various colour first aid boxes     from things such as beer bottles to
main hinges, a casement hinge and a         specific to the medical danger being             kebab shops. To give me a good
door hinge. Both these joints work          carried out. For example an all over red         understanding of images to use on my
really well and carry out the job           box with a white cross symbolises a fire         Polaroid pictures I surveyed 30 males
intended. I decieded to go with a door      hazard. This means the products inside           and 30 females aged 18+ the 5 most
joint as the casement job will not fit my   the box will be specific to fighting fire with   common things they would use on a
direct point of sale and will not work      heatproof blankets and also treatments           night out. This gave me a wide range
with the job needed. This was a good        for fire injuries like burn cream. I also        of ideas to use as images for my
hinge to choose as it fits the              found a plain all green with white cross         pictures. This is a good idea to use as
specification perfectly and also looks      first aid box. This is amore modern first        testers as it is very different from
good on my direct point of sale.            aid box and contains products aimed at           others and makes the brand more
                                            all different injuries. I have chosen to         individual. I know this from my
                                            uses these colours as I feel it will appeal      research of other companies testers
                                            to more of a wider range of audience             and the information/text which is
                                            making it more recognisable, and is also         placed onto them. Most companies
                                            modern appealing to its target audience.         have a small thin white piece of plastic
                                                                                             advertising only the company with the
                                                                                             fragrance placed onto the stick.
Material: For my first aid box,           Construction: Making my first aid box was       Components: Making and assembling
material is key as the box needs          one of the hardest problems I came              the handle onto my direct point of
good stability and durability.            across. Assembling each side of the             sale unit I found very easy, as there
Choosing the right material took a        acrylic plastic walls is tough as it needs to   was a wide range of different handles
long while to work out as the             have good durability and stability for the      to choose from. First I chose the
aesthetic side always interfered, with    first aid box to stay in its intended shape.    material I would use for making my
the boxes designs and colours came        I made a card model to show all the             handle. I decided to choose wood
into consideration. I then tested out     different ways in which the box can be          over acrylic plastic and metal filings.
acrylic plastic. This was a very good     made. Firstly I made each side the              This is because the metal filings I
material to use as it carries out all     correct length as was left with 6 card          found were too heavy and would fall
that is asked. I tested its durability    panels. Firstly I tried the glue gun, in this   off of my direct point of sale unit.
by dropping it from various height        case this would represent araldite as           With the plastic acrylic handle model
until it had been damaged. I then         araldite is a lot stronger and will hold the    was placed onto my unit, I felt that
tested its stability by .This then gave   plastic together more efficiently. This was     there was too much acrylic plastic
me a clear indication that this is a      a good test run for me as it allows me to       and the unit became too colourful.
good material to use for my direct        understand that it is easier to assemble        Wood was then the obvious choice
point of sale as it has good              and will hold the products together nicely.     and also applied to the unit well, with
aesthetics for designs, and can also      The downfall to the glue was the mess it        good aesthetics. I then took some
be purchased in colours saving us         made around the edges. I feel that this is      market research into wooden
colouring it and has a clean block of     a good method to use on my first aid box        handles, taking notes on all the
colour. Acrylic plastic can also be       as it holds each panel in place correctly       various shapes and sizes. I then
bought in large sheets with low           and does the job it entails. Araldite glue is   decide I was going to make a plain
costs, and designs such as the first      a lot cheaper than most other ways of           and simple handle, which is why I
aid cross can be added easily and         connecting each panel. For example if I         chose the round circular knob. This is
efficiently through the use of            was create joints to fit each side, the cost    a good shape to use as it is nice and
coloured sticky plastic, which works      of the machine would be a lot more              smooth and user compatible, being
well with the acrylic plastic.            expensive than a tube of araldite.              able them to wrap their fingers
                                                                                          around it. This is why I chose its 4cm
                                                                                          length, as this is the average size of
                                                                                          the diameter in which your thumb and
                                                                                          index finger grips, making it more
                                                                                          user compatible.
Components: The light on the top of       Usability: Within my first aid box, I      Usability: Alternatively to the wall going
my direct point of sale unit is to        realised that the depth of the box was     through the middle of the box, I could
attract customers which may be in         too deep. Once I had compared my           create a platform at the front of the unit
or around my point of sale display.       first aid box to other displays, I had     for the display products and testers to
This will go off randomly throughout      realised that the product is always at     be neatly stored and accessible. This
the time in which the power is            the centre of the display and stands       is then a good idea as it can be stuck
switched on. The light will be            out. I needed to find a way of bringing    down, and allow the display products
powered by the electrical source.         my product to the front of the display     to placed neatly along with its testers.
The light will consist of two different   when the door was opened. My initial       This can be made out of acrylic plastic
colours, alternatively switching          idea is to add a wall through the centre   to fit the theme of the direct point of
when the light it set off. I              of the box, pushing all the testers and    sale unit and to go nicely with the other
researched into police car lights and     the product display to the front of the    plastic acrylic used on my unit. I can
they released a statement that you        unit. This works very well with my point   be vacuumed formed for round edges.
should be able to see there flashing      of sale unit as it not just pushes my      This will then eliminate any dangers or
blue lights for up to 1 minute if the     products and its testers forward but       possible hazards that could be carried
police car is travelling at 30mph.        allows the testers to be placed in a       out using my point of sale unit. The
This is why I have chosen my light        neat orderly fashion. This the also has    stand can be stuck on using araldite
to consistently flash for 1 minute at     space behind the wall at the back of       glue for good durability and stability. I
random point throughout the day.          my direct point of sale unit to store      think this is a good idea as it makes
This will not only fit with the theme     extra testers and display product in       the display look a lot more neater and
of the direct point of sale unit but      case they run out. This can then           becomes a lot more user compatible to
also attract customers towards my         accessed trough the back of my             the potential customer.
unit. The light will be assembled         display, where it can be then be placed
using small screws, screwed into          neatly round the front through the main
the top of my unit. This means it is      door.
stable and will eliminate any
possible hazards or dangers.
Materials: Wood was another            Materials: Another material which I can           Components: I have various different
possible material which I could of     use is glass. Glass is a good material as         options on which material to use for
used for my first aid box. There       it looks very professional and would              my handle. One of the chosen
are various different woods that       advertise the brand in a good light.              materials was iron filings. I think that
can be used on my direct point of      Coloured glass will give my direct point          iron filing is a very good idea as it
sale unit. First I tested oak, as                                                        gives my direct point of sale display
                                       of sale a very unique look, attracting
the material is very durable and                                                         unit a different edge. The
will give my point of sale unit        potential customers towards it. The               advantages of using iron filings is
good stability. But then the           disadvantage of using coloured glass is           that not only does it show the unit in
aesthetics of the oak such as its      the durability of the first aid box. If this is   a different light but is also easy to
grain would ruin its design on the     dropped this then can smash or be                 build. When building my handle it is a
front of the box. Oak is very          severely damaged easily. Another                  lot easier than building one from
durable and can be dropped from        disadvantage of coloured glass is the             plastic. Iron filings are very durable
tall heights without it being          cost. The coloured glass costs a fair bit,        which is good, and have good
damaged. I also tested                 plus the specialist machines which are            stability if attached to the unit in the
chipboard. This has very good          needed to cut them. This is a huge                correct manor. Making the iron filings
aesthetics and colours can be          downfall especially because the material          is fairly cheap as it is mainly made
added to it easily and efficiently.                                                      from left over scrap metal. Iron filings
                                       is so easy to damage. I feel I could use
The disadvantage of using chip                                                           can be applied to the unit through the
                                       this on my direct point of sale unit as it
board is that it is not very durable                                                     use of araldite glue. Iron filings can
and has to be connected very           would show the company and the brand              be shaped and sized in various
well for it to be stable. If I am to   in a professional way.                            different ways. This is good as I can
use, I would choose oak as I feel                                                        make the handle a lot more user
that the stability and durability of                                                     compatible, making it a lot easier for
my direct point of sales more                                                            the potential customer to open the
important than the aesthetics.                                                           door. This comes into play with the
                                                                                         research I have carried out, giving
                                                                                         me information on average sizes and
                                                                                         shapes for small door handles.
Usability: Closing of the door is a key    Aesthetics: For the designs of the        Construction: Another way of
element to part of the users               first aid box I could also use paint as   construction each of the six panels of
compatibility with my direct point of      well as acrylic. Paint is a good          my first aid box could be through a
sale unit. There are various different     appliance to use when adding to the       finger joint. A finger joint is a joint in
ways which I can do this, which links      right material. For example the detail    which each panel is cut into the edges
with the hinges on the door. Once a        on the box would be good to use           in different shapes which is clearly
customer has left my point of sale         paint if my box is going to be made       shown in the image below. If the joint
my research has shown that 3 out of        out of wood. This is a good appliance     is cut accurately the ‘fingers’ should fit
the 10 people randomly chosen              to use as it gives you nice smooth        together without any gaps and then
leave the door open. This then can         layers, which you can apply the right     glue is added which ensures that they
cause potential accidents and makes        amount yourself. It also gives you the    are virtually indestructible. They are
my display look neat and untidy. I         freedom to do whatever you want by        used for a wide range of products
could insert small springs on both of      hand, which allows you to create          including jewellery boxes, cabinets
the two hinges used on my door, to         your own designs using a wide range       and cupboards. I feel this would be a
create automatic close with the door       of colours with your personal             good construction to use on my
staying put. I feel this is a good         judgement of how thick or thin the        display as it becomes very durable
technique to use as it leaves nothing      layer should be. Another advantage        and gives the box a strong stability.
by chance and makes sure that it           for using paint is its wide range of      The disadvantage of using a finger
shuts every time a customer uses it.       colours which can be used. This then      joint is the mount of time it takes to
I feel this is better than leaving it to   allows me to use a wide range of          create and assemble each panel. A lot
chance that the customer does shut         colours onto my direct point of sale      of time lost is bad as this could then
the door as it will then eliminate any     unit in any shape,patter,design I         delay the products release and can
danger hazards which might occur           choose. The disadvantage of using         mess up the whole advertising cycle. It
and stops my display from looking          paint is it can become very messy         would also cost me a bit of money to
untidy. The disadvantage for using         and if applied wrong could ruin the       use the specialist machines in which I
springs within the hinges are the          display. Paint can also be smudged        would need to cut certain materials.
durability. The springs do not last        when wet, and paint can also wear
very long within the hinges and can        down or be scratched off over a
pop out of place. This will then           period of time.
damage my point of display door and
make the brand seem dangerous
and un safety checked.
Components: Another way of           Components: Using a light on top of         Materials: There are various
giving out the scent of the          my direct point of sale is a good idea      different materials which I can
brands smell is automatic spray.     as it draws in a lot of potential           produce the small light which will sit
This will then allow customers to    customers and gives the direct point        on top my material. One of the
test the product using only          of sale unit a edge on other brands.        possible is materials is glass. I feel
motion of themselves. This will      Another way in which this can be            this is a good material as it will
then cause a mechanism to            powered is solar panels. His is a           magnify the light which is produced.
spray a display product which        very good idea as it saves a lot of         The glass can also be coloured to
will spray into the air. This is a   energy and the company paying for           create effect, which will attract
good technique to use as it          electricity. The solar panels are           more customers with bright colours.
saves the company money from         situated on the top of the first aid        Glass is fairly cheap and can be
producing testers and the smell      box, and can be directly linked to the      heat moulded at very high
will also get onto the potential     light situated at the front of the top      temperatures to create any shape
customers clothes, allowing          panel. The disadvantages of using           or size I decide to choose. Glass is
them to remember and link the        solar panels is that if my direct point     what is used on most light bulbs as
smell to the brand making it         of sale is placed onto a shelf, this will   it fulfils the task asked of it. Glass
more recognisable. The               then mean that the amount of light          can also be fairly cheap depending
disadvantage of using this           the panels are receiving are very           on what type you choose to buy.
technique is for people who          limited, which will mean little energy      The disadvantage of using glass is
suffer from asthma. This will        for the light to work off. Another          that it is highly fragile. This means
then cause reaction and creates      disadvantage of using solar panels is       that if dropped from a certain
danger hazards within my direct      the cost. From my research I found          height, this will then smash and will
point of sale unit. This could       the average price for a 10cm by 5cm         not be able to fix. Replacements
also apply to tender parts of the    solar panel costs £… This will cost         are available to buy, but this the
naked body such as eyes and          the company a lot of money just to          costs the company money to keep
mouth. This could then be spray      power one small component.                  replacing what is only a small
and make contact with these                                                      component on my direct point of
areas and cause accidents and                                                    sale unit.
potential injuries.
Usability: I wanted to create a
direct point of sale which was very
interactive. This can be done in
various different ways through the
use of the internet and social
networking sites. One way which
this can be done is a bar code
scanner. From my research over
half of the population living and
working in and around London
own smart phones. This then
allows me to place a bar code
scanner onto my direct point of
sale which my potential customer
will then be able to scan with their
phone, with them receiving free
information abut the brand and
the company. I feel this is a very
good idea to use as the cost is
very cheap and gives the
customer something to remind
them about the company, attract
them towards the Lynx brand. The
disadvantage of using this is the
technical side which could
interfere with the aesthetics of the
display. This means that some bar
code could find it hard to be
printed onto the material used,
which will make the code unscan
able.

Design technology

  • 1.
    AS Design Technology DanPenn Mood Board Direct point of Brand Initial Gant Chart Assembly and sales analysis Specification Links FX Customer Questionnaire Materials Profiling
  • 2.
    This is adirect point of sale promoting ‘Tony Ferguson’ which is a company selling products to allow you to loose weight easily. I do not think this is a good direct point of sale as it does not promote what the products do very well. The text on the side of the cardboard container can not be read and the product isn’t stacked neatly. It does have some good feautures such as a substantial amount of space and the companys name is placed in large letters across the top at eye level, which makes it easier and more appealing to the customer. Next
  • 4.
    This is adirect point of sale advertising the company Hovis. Hovis is a big brand company which sells different varieties of bread. I feel this is a good direct point of display as it stands out. It stands out by using big bold vibrant colors such as yellow. It also advertises the latest offer the company is selling in big bold writing, covering all angles of sight for the customer. The bread is set out neatly on each one and the company's logo is easily visible. I feel this would attract/catch the eye of any customer despite their age. My last and final point of display is a very well recognised one. Walls ice cream is one of the largest ice cream manufactures across the country and is well known for selling certain varieties of ice creams and ice lollies. This type of storage display is good because it meets the aims of the ice cream by keeping them cool and frozen but also advertises its company on the sides and top, making it easily visible for the customer. This type of point of display can be found in many different places such as supermarkets, off licences and news agents. Home
  • 5.
    This is avery good direct point of sale as it contain many features that would appeal to the target audience. One of the good selling points it has is its color. It uses bright color to attract its target market and draw them to their products. It also has an interactive side, where the customer can try out the pen/pencil before they buy the product. The direct point of sale separates the products neatly and makes it look well representable. Next
  • 6.
    The company lynxaims its products at the teenage market. My opinion of old spice is that it aims at I think that like Lynx, Fish Soho is also The adverts broadcasted on the TV are a big selling point older males aged 21+. It has a classical aimed at the target audience of teenagers as for the product, inspiring the teenagers of today to be the edge to the branding of the product. the it gives off a more funky style by using funny male on the advertisement. Lynx is owned by Unilever and aim of the brand is to eliminate body names and bright colours on the packaging. sells male grooming products such as aftershave,deodrant odours and stop males from severe Fish started as a hairdressers, cutting and shower gel. Although Lynx’s lead product is sweat. The company uses well known everyday peoples hair across Central London. the fragranced aerosol deodorant body celebrity faces to promote the branding Fish decided to release their own spray, other formats of the brand exist. of the company and to attract the target Within underarm care the following are audience towards their products. available: deodorant aerosol body spray, deodorant stick, deodorant roll-on, anti- perspirant aerosol spray (called Lynx Dry), and anti-perspirant stick (also called Lynx Dry). Next
  • 7.
    I believe thatL'Oreal men expert is targeting the older male due to the use of certain well known celebrities and the aims of the product. The product aims to reduce wrinkles and make your skin look less tired and more fresh and healthy. Back Next
  • 8.
    Lynx is abrand selling male grooming products, owned by the British/Dutch company Unilever. I feel this brand is targeting the young males/ teenagers due to the advertising and packaging of the product. Although Lynx’s lead product is the fragranced aerosol deodorant body spray, other formats of the brand exist. Within underarm care the following are available: deodorant aerosol body spray, deodorant stick, deodorant roll-on, anti- perspirant aerosol spray (called Lynx Dry), and anti- perspirant stick (also called Lynx Dry). Lynx was launched in France in 1983 by Unilever. It was inspired by another of Unilever's brands, Impulse. Unilever were keen to capitalize on Lynx’s French success and the rest of Europe from 1985 onwards, later introducing the other products in the range. Unilever were unable to use the name Axe in the United Kingdom and Ireland due to trademark problems so it was launched as Lynx. The European launch of the deodorant was followed by success in Latin America and moderate impact in Asia and Africa. In the new millennium, the brand has launched with great success in the United States and Canada. The company has also widened its portfolio by overlapping male deodorants into the Lynx brand such as South Africa's Ego brand. Unilever has now launched its first Lynx product for women in the United Kingdom as part of a global expansion of the previously men’s-only brand. Next
  • 9.
    Aesthetics Cost Some of the aspects of my aesthetics for my One main thing I need to take into perspective is the quantity to point of sale I will be looking at are: brand quality ratio. I also need to think about the cost of my materials colours, working around and studying what that I could use, whether I use more expensive materials. Also I colours my brand use. Shapes, the different need to into perspective the cost of manufacturing. Other things I shapes I can use to attract my target need to look at are the point of sale in the shop and how much it is audience. Logos, studying the different areas I going to cost if I wanted to place mine on the shop floor. can place the company's logo. Styles and patters, looking at all the different styles and Safety patterns and which ones will suit my customer Size some of the safety aspects I need to look at are: and information, the information and text Things I need to take which will be placed onto my direct point of .Personal health, such as asthma into perspective are the sale. .The person assembling the products stability of the point of .avoidable instances Customer sale. So that it can fit in .falling over The aspects of my products the shop nicely and .sharp edges should be aimed at my neatly. But also the customer through targeting Materials floor space to cost ratio, Some of the materials I am allowing me enough the right age range, by using going to be looking to use are space to advertise but correct colours and shapes. alluminium,oak and acrylic. I not too much so it The certain shops it is placed am looking to use these becomes a waste of in, shops my target market materials to attract the target money. would visit and also audience and to be able to fit anthropometrics. into its environment. Environment When we are looking at the environment we need to look at the position of the point of sale in the shop and its surroundings. Initial Specification This is because it needs to be placed in a position with similar surrounding which would attract the target audience. Next
  • 10.
    Task Analysis .Functionality &Features: Colours, pictures, shapes, design, materials, video, smells, sounds, tasting, textures. .Visibility & Position: In it’s own space, no other choice or products in the way/around it, eye-level hanging, moving. .Target Markets: Young, teenaged, middle aged, older generation, male or female, unisex. .Aesthetics/Branding: Shape & colour scheme, name & price of product, lighting, from a distance/up close, distinctive, eyefall. .Materials: Plastics, glass, metal, wood, finishes: reflective, matte, smooth, textured, recyclable, sources. .Safety: No spiky edges, any parts that stick out, brightness, sound level, fire resistant, not combustible/explosive .Sustainability: Materials used, uses for other products/designs, recyclable, adaptable, component replacements .Environment: What type of shop, which isle/area, positioning, direction of display, consideration of footfall and eyefall. .Interactivity: Samples, testers, sensors, theme, method of purchase, use of 5 senses (video, smells, sounds, tasting, textures) .Social Networking/Web: Use of QR and barcodes, facebook/ twitter pages, website (layout and branding). .Construction: Where will it be made, processes, assembly, source of materials, types of glue/joints. .Ergonomics: Ease of view/reach, distance from customer to product, level, position/angle. .Price: Value of the product, reputation of the brand, time it will be used for, type of shop it is in. .Future: Future products/releases of the brand, trends/fashions, other companies , direction of the market/technology. Next
  • 11.
    Logical Links Fx Have the brand name clearly displayed on the unit It is logical to have the product on display, so people can see it To have it positioned where there is a large footfall Located near other fragrances Clear what the product does To have the products at eye line Products near the till because they’re already spending money Have the unit relative in size to the product To have small samples so consumers can test it Illogical For the price to be displayed Show all products, full focus on one To be dishonest to the consumer so they have full trust in you For the unit to look cheap when displaying an expensive product To sell in non-related stores as you wouldn’t have many sales To put the point of sale unit in a place of the shop where it is not visible to the passing customers Need The product on show so the customers know what they’re purchasing The unit must stand on its own without any support so it should be freestanding It needs to be safe to handle when customers want to test it To inform the customers about what it does if it is a new brand Accessible to the customer with ease otherwise if it is in a box they probably wont be bothered to ask someone about it To be easy to use and simple Keep- I am going to keep the social media part of it so that it is fun and interactive I am going to keep the product on display and where there is a heavy footfall because more people will go past it I am going to keep the theme of the brand with its old heritage look so that customers get a feel for the brand Scrap I am going to scrap the demo manikin as I think it cheapens the effect of the unit I may scrap the barber chair theme as this would be to cost expensive and would be difficult to get hold of Function vs. Form The form of the unit so the aesthetics should be more effective than the function as more people will go past it rather than go up to it and test it The function should be efficient, honest and reflect what the brand does for the customer X-Factor The X factor of the unit will be its interactive screen with fun videos about the brand and it will have links to the social media trends and websites Home
  • 12.
  • 13.
  • 14.
    Price: High Competitors I've placed the fragrance 'Jump’ by Joop! In this position as I feel it is very high priced,but not very popular due to the branding. Joop! Isn't one of the largest, Ralph Lauren, or otherwise know as popular brands but still has expensive Polo, is one of the most popular products. fragrances purchased and used across the UK. I have placed it in this position because the products are still fairly expensive but at the same very popular. Popularity: Popularity: High Low I have placed Lynx in this position as I feel that it is a very cheap brand, which is a good factor as it makes it more accessible to the targeted customer. And I feel that Lynx is a very popular product and appeals to a wide I have placed the Adidas target audience. aftershave fragrance in this position as it is dirt cheap compared to other products and is not very popular. Adidas is one of the largest sports brands across the world, and most customers go to their company to buy sports accersiories,not aftershave. Next Price: Low
  • 15.
    Customer Profiling Lynx aims its products at the older teenagers/young male market. We know this from the packaging of the product, which uses bright primary colours, and the cost of the products, making it easier and more affordable for the customer. Lynx is a brand selling male grooming products, owned by the British/Dutch company Unilever. I myself would personally use Lynx as I feel it is affordable and does what it needs. Lynx stands out to me as it uses bright vibrant colours on dark back grounds, making it jump out of the shelf. Older teenagers/young males use Lynx products because they are attracted to the branding and advertising of the product. The company Lynx advertises young men usually a little older than the age group wearing the product, allowing them to attract various girls due to the product. This the automatically appeals to the target customer, inspiring them to be the males presented on the advert . My stereotypical customer for my product would be a sports player. He/she would use Lynx before and after matches to destroy odour from things such as sweat and mud. My customer still attends school in the higher years and likes to go out of a weekend with friends to various places. My customer likes to constantly smell good wherever he or she goes. At school my customer studies The main selling point towards the older teenage age range is the advertising physical education, media and of the product. TV adverts which represent the brand always show a young English. My stereotypical male aged 21-25 attracting the opposite sex easily. When older teenagers customer who buys the product view this advert, they are automatically drawn towards the brand, aspiring to on a regular basis, comes from a be the young males represented on the advert. This gives a message across fairly average background. to the target audience of the brand, that if you wear there products you will He/she had other siblings and attract the opposite sex, which most older teenagers are constantly looking parents who work hard. they live to do. in a semi detached house in a fairly goof area. My customer enjoys his sports and is always looking to attract the opposite sex. Next
  • 16.
    Environmental Snapshot I would place my direct point of sale in a shop like this as it fits the genre of the shop and would be surrounded by products of the same calibre. I would place my direct point of sale in the fragrance area. By doing this means it makes it easier for the customer, allowing the customer to know where our products our stored in the shop. I would also pay extra to have my product placed at eye level. I feel this is a vital element of distributing our product making it more accessible and eye catching towards potential customers. Stores such as Boot and Super Drugs are perfect for my product because they are leading cosmetic stores which sell similar products to mine. I would like to place my direct point of sale in the men's aftershave area, as I feel it would best suit the environment and can be marketed against other brands.
  • 17.
    Average price perproduct: High Brand Analysis I have placed the brand Jean Paul Gautier in this position as I feel it is not as big as other brands but still produces high end expensive I have placed Polo in products. this position as I feel it is one of the most popular if not the most popular brands out there. It produces high end products at a reasonably high price. Popularity: Popularity: High Low I have placed the brand Lynx in this area as it is one of the largest well known brand aimed at teenagers. It produces low priced products which I Have placed Mr Natty in appeals to the target audience, this position as I feel that it allowing them more sales. is not a very popular product and the prices aren't very high. I feel this is not a popular brand as it only appeal to a thin gap in the market. Home Average price per product: Low
  • 18.
    Questionnaire 1. Does apoint of sale influence you towards By making a questionnaire it allows me purchasing the product advertised? to design my product around the Yes No Sometimes customers needs. The results will allow me to assemble and design a direct point 2.What do you think the ideal size of a point of sale... of sale which will appeal to a wide range Chest height, Eye Level, Head Height or Above of the target audience. By making it Head Height appeal more to my target audience, it will catch the eye of a potential customer 3.Is it important that the point of sale is interactive more easily. I asked my questionnaire to an age range of 14-23 year old male and Yes No Sometimes females. By doing my questionnaire I asked 10 different students who take a 4. How long will you spend at a point of sale wide range of different subjects within .1-2minutes the school. By using different styles of .4-5minutes students gives me a wider range of .5-10minutes answers. Here are my results... .10+minutes 5.What do you feel is more important for a direct point of sale, form or function? Back Next
  • 19.
    Questionnaire Results 1.Doesa point of sale influence you towards purchasing the 2.What do you think the ideal size of a point of sale... Chest product advertised? height, Eye Level, Head Height or Above Head Height Yes No Sometimes 5.What do you feel is more important for a direct point of sale, form or function? From these results of this question I have found out that over half of the 10 From these sets of results from this shows me how the people I asked feel that a direct point potential customers feel that no direct point of sale of sale does not influence the should be above head height, and I should really be purchasing of the product and it’s the putting my direct point of sale at eye level to increase quality and price of the product which sales in the product. is the main influence. From this set of results I 3.Is it important that the point of sale is interactive 4. How long will you spend at a point of sale have found that most of .1-2minutes the potential customers Yes No Sometimes .4-5minutes feel that form is more .5-10minutes important than function. .10+minutes This is useful to me as I can now focus on the aesthetics of the direct point of sale rather than the function of it. From these sets of results it indicates to me that By receiving the results from question 3 I have 4 out of the 10 target audience I surveyed would realised that my direct point of sale defiantly only spend 1 to 2 minutes at a direct point of needs to be interactive. The potential customers sale. This tells me that on my direct point of sale feel it needs to be interactive as they feel they I need to get my point across quickly and would spend more time at more product. . efficiently Back Next
  • 20.
    Assembly And Materials These are perhaps the most common types of Free standing point of sale units point of sale units. They are made out of are very risky. They can easily cardboard and can display multiple items. They can easily be broken or smashed. are usually delivered in a flat pack. To put the These points of sales are usually unit up, you’d need to unfold the cardboard. The point of sale is cheaper than those of higher fully assembly . once used they materials but do not last very long as the material can be re used and different isnt very strong and hasn’t got long durability. products can be placed within. The product is easily recyclable. This point of sale is hard to dispose of and would be used more than once. This is a free standing acrylic point of sale Some point of sales would be in a unit. They can be used display case on a counter. in portrait and Sometimes, the display case would landscape. They can be part of the point of sale. The also be wall mounted, bottom half would be made out of free standing ,laid flat wood, metal or some cheaper ones or hung from cable out of plastics. Can be reused. systems.
  • 21.
    Research Plan Questionnaire Competitors What I've learnt from carrying out research on my competitors is the different I feel that my questionnaire was very useful to my research plan as it styles, prices and colours that my main competitors use. This page was very gave me a good understanding of what my target audience is attracted useful to me as it told me all of my main competitors that my brands faces, and to and what they find good in a direct point of sale. By carrying out a Environment what they do to set their brand out from others.. Carrying out research on my questionnaire it gave me a clear set of results of what I should base my al Snapshot competitors taught me how to present my brand in a unique way which will direct point of sale on. separate it from others, while also appealing to the target audience. Environmental Snapshot Customer Profiling An environmental snapshot helped me design my direct Competitors By researching my stereotypical customer, this has helped me point of sale to fit the genre and needs of the shop floor. a lot with the design of my direct point of sale, allowing me to I found this helpful as it tells me the best size for my Questionnai design it more suitable and attractive towards the potential direct point of sale and the outline design I should re customer. Through research on my potential customers it has choose for the best floor space to cost ratio. helped me with the design, colours and interaction of my direct Customer Profiling point of sale. Assembly and Materials Assembly and materials helped me design my direct point of sale very well. It gave me a good understanding Assembly& of the wide range of varieties the direct point of sales Brand Materials can be assembled. This then also helped me with my Analysis packaging, giving me different options on how to pack my product and the one which suits my direct point of sale the best. Brand Analysis The brand analysis helped me out a lot as it gave me a wide perspective of all the other brands and competitors. Through my brand analysis I learnt all the different popularities of different styles of company's and also the expenses of the company (average price per product). This then gave me the best perspective on how popular and expensive my brand is and how I should market and present my direct point of sale.
  • 22.
  • 24.
  • 30.
    Construction: I havestudied various Aesthetics: My development of my Components: One of my main different hinges to place on my point aesthetics for my direct point of sale is components of my point of sale unit is of sale unit to allow the door to open the colours used. My point of sale unit is my testers which will be placed inside and close. After all my research based around a first aid box/kit the direct point of sale unit. The tester throughout the different joints I ,continuing with the theme of ‘What will be a Polaroid picture, containing decided to do first hand research, by happened last night?'. Through my images of ‘the night before’. Each analysing different joints around the research on the internet I looked at the picture will contain the scent of the school, seeing the durability of the various colours used on modern and also fragrance and have information about joint and the aesthetics of the joint. In old fashioned first aid boxes. I found out the company. The pictures will vary and around my school I found two that there is various colour first aid boxes from things such as beer bottles to main hinges, a casement hinge and a specific to the medical danger being kebab shops. To give me a good door hinge. Both these joints work carried out. For example an all over red understanding of images to use on my really well and carry out the job box with a white cross symbolises a fire Polaroid pictures I surveyed 30 males intended. I decieded to go with a door hazard. This means the products inside and 30 females aged 18+ the 5 most joint as the casement job will not fit my the box will be specific to fighting fire with common things they would use on a direct point of sale and will not work heatproof blankets and also treatments night out. This gave me a wide range with the job needed. This was a good for fire injuries like burn cream. I also of ideas to use as images for my hinge to choose as it fits the found a plain all green with white cross pictures. This is a good idea to use as specification perfectly and also looks first aid box. This is amore modern first testers as it is very different from good on my direct point of sale. aid box and contains products aimed at others and makes the brand more all different injuries. I have chosen to individual. I know this from my uses these colours as I feel it will appeal research of other companies testers to more of a wider range of audience and the information/text which is making it more recognisable, and is also placed onto them. Most companies modern appealing to its target audience. have a small thin white piece of plastic advertising only the company with the fragrance placed onto the stick.
  • 31.
    Material: For myfirst aid box, Construction: Making my first aid box was Components: Making and assembling material is key as the box needs one of the hardest problems I came the handle onto my direct point of good stability and durability. across. Assembling each side of the sale unit I found very easy, as there Choosing the right material took a acrylic plastic walls is tough as it needs to was a wide range of different handles long while to work out as the have good durability and stability for the to choose from. First I chose the aesthetic side always interfered, with first aid box to stay in its intended shape. material I would use for making my the boxes designs and colours came I made a card model to show all the handle. I decided to choose wood into consideration. I then tested out different ways in which the box can be over acrylic plastic and metal filings. acrylic plastic. This was a very good made. Firstly I made each side the This is because the metal filings I material to use as it carries out all correct length as was left with 6 card found were too heavy and would fall that is asked. I tested its durability panels. Firstly I tried the glue gun, in this off of my direct point of sale unit. by dropping it from various height case this would represent araldite as With the plastic acrylic handle model until it had been damaged. I then araldite is a lot stronger and will hold the was placed onto my unit, I felt that tested its stability by .This then gave plastic together more efficiently. This was there was too much acrylic plastic me a clear indication that this is a a good test run for me as it allows me to and the unit became too colourful. good material to use for my direct understand that it is easier to assemble Wood was then the obvious choice point of sale as it has good and will hold the products together nicely. and also applied to the unit well, with aesthetics for designs, and can also The downfall to the glue was the mess it good aesthetics. I then took some be purchased in colours saving us made around the edges. I feel that this is market research into wooden colouring it and has a clean block of a good method to use on my first aid box handles, taking notes on all the colour. Acrylic plastic can also be as it holds each panel in place correctly various shapes and sizes. I then bought in large sheets with low and does the job it entails. Araldite glue is decide I was going to make a plain costs, and designs such as the first a lot cheaper than most other ways of and simple handle, which is why I aid cross can be added easily and connecting each panel. For example if I chose the round circular knob. This is efficiently through the use of was create joints to fit each side, the cost a good shape to use as it is nice and coloured sticky plastic, which works of the machine would be a lot more smooth and user compatible, being well with the acrylic plastic. expensive than a tube of araldite. able them to wrap their fingers around it. This is why I chose its 4cm length, as this is the average size of the diameter in which your thumb and index finger grips, making it more user compatible.
  • 32.
    Components: The lighton the top of Usability: Within my first aid box, I Usability: Alternatively to the wall going my direct point of sale unit is to realised that the depth of the box was through the middle of the box, I could attract customers which may be in too deep. Once I had compared my create a platform at the front of the unit or around my point of sale display. first aid box to other displays, I had for the display products and testers to This will go off randomly throughout realised that the product is always at be neatly stored and accessible. This the time in which the power is the centre of the display and stands is then a good idea as it can be stuck switched on. The light will be out. I needed to find a way of bringing down, and allow the display products powered by the electrical source. my product to the front of the display to placed neatly along with its testers. The light will consist of two different when the door was opened. My initial This can be made out of acrylic plastic colours, alternatively switching idea is to add a wall through the centre to fit the theme of the direct point of when the light it set off. I of the box, pushing all the testers and sale unit and to go nicely with the other researched into police car lights and the product display to the front of the plastic acrylic used on my unit. I can they released a statement that you unit. This works very well with my point be vacuumed formed for round edges. should be able to see there flashing of sale unit as it not just pushes my This will then eliminate any dangers or blue lights for up to 1 minute if the products and its testers forward but possible hazards that could be carried police car is travelling at 30mph. allows the testers to be placed in a out using my point of sale unit. The This is why I have chosen my light neat orderly fashion. This the also has stand can be stuck on using araldite to consistently flash for 1 minute at space behind the wall at the back of glue for good durability and stability. I random point throughout the day. my direct point of sale unit to store think this is a good idea as it makes This will not only fit with the theme extra testers and display product in the display look a lot more neater and of the direct point of sale unit but case they run out. This can then becomes a lot more user compatible to also attract customers towards my accessed trough the back of my the potential customer. unit. The light will be assembled display, where it can be then be placed using small screws, screwed into neatly round the front through the main the top of my unit. This means it is door. stable and will eliminate any possible hazards or dangers.
  • 33.
    Materials: Wood wasanother Materials: Another material which I can Components: I have various different possible material which I could of use is glass. Glass is a good material as options on which material to use for used for my first aid box. There it looks very professional and would my handle. One of the chosen are various different woods that advertise the brand in a good light. materials was iron filings. I think that can be used on my direct point of Coloured glass will give my direct point iron filing is a very good idea as it sale unit. First I tested oak, as gives my direct point of sale display of sale a very unique look, attracting the material is very durable and unit a different edge. The will give my point of sale unit potential customers towards it. The advantages of using iron filings is good stability. But then the disadvantage of using coloured glass is that not only does it show the unit in aesthetics of the oak such as its the durability of the first aid box. If this is a different light but is also easy to grain would ruin its design on the dropped this then can smash or be build. When building my handle it is a front of the box. Oak is very severely damaged easily. Another lot easier than building one from durable and can be dropped from disadvantage of coloured glass is the plastic. Iron filings are very durable tall heights without it being cost. The coloured glass costs a fair bit, which is good, and have good damaged. I also tested plus the specialist machines which are stability if attached to the unit in the chipboard. This has very good needed to cut them. This is a huge correct manor. Making the iron filings aesthetics and colours can be downfall especially because the material is fairly cheap as it is mainly made added to it easily and efficiently. from left over scrap metal. Iron filings is so easy to damage. I feel I could use The disadvantage of using chip can be applied to the unit through the this on my direct point of sale unit as it board is that it is not very durable use of araldite glue. Iron filings can and has to be connected very would show the company and the brand be shaped and sized in various well for it to be stable. If I am to in a professional way. different ways. This is good as I can use, I would choose oak as I feel make the handle a lot more user that the stability and durability of compatible, making it a lot easier for my direct point of sales more the potential customer to open the important than the aesthetics. door. This comes into play with the research I have carried out, giving me information on average sizes and shapes for small door handles.
  • 34.
    Usability: Closing ofthe door is a key Aesthetics: For the designs of the Construction: Another way of element to part of the users first aid box I could also use paint as construction each of the six panels of compatibility with my direct point of well as acrylic. Paint is a good my first aid box could be through a sale unit. There are various different appliance to use when adding to the finger joint. A finger joint is a joint in ways which I can do this, which links right material. For example the detail which each panel is cut into the edges with the hinges on the door. Once a on the box would be good to use in different shapes which is clearly customer has left my point of sale paint if my box is going to be made shown in the image below. If the joint my research has shown that 3 out of out of wood. This is a good appliance is cut accurately the ‘fingers’ should fit the 10 people randomly chosen to use as it gives you nice smooth together without any gaps and then leave the door open. This then can layers, which you can apply the right glue is added which ensures that they cause potential accidents and makes amount yourself. It also gives you the are virtually indestructible. They are my display look neat and untidy. I freedom to do whatever you want by used for a wide range of products could insert small springs on both of hand, which allows you to create including jewellery boxes, cabinets the two hinges used on my door, to your own designs using a wide range and cupboards. I feel this would be a create automatic close with the door of colours with your personal good construction to use on my staying put. I feel this is a good judgement of how thick or thin the display as it becomes very durable technique to use as it leaves nothing layer should be. Another advantage and gives the box a strong stability. by chance and makes sure that it for using paint is its wide range of The disadvantage of using a finger shuts every time a customer uses it. colours which can be used. This then joint is the mount of time it takes to I feel this is better than leaving it to allows me to use a wide range of create and assemble each panel. A lot chance that the customer does shut colours onto my direct point of sale of time lost is bad as this could then the door as it will then eliminate any unit in any shape,patter,design I delay the products release and can danger hazards which might occur choose. The disadvantage of using mess up the whole advertising cycle. It and stops my display from looking paint is it can become very messy would also cost me a bit of money to untidy. The disadvantage for using and if applied wrong could ruin the use the specialist machines in which I springs within the hinges are the display. Paint can also be smudged would need to cut certain materials. durability. The springs do not last when wet, and paint can also wear very long within the hinges and can down or be scratched off over a pop out of place. This will then period of time. damage my point of display door and make the brand seem dangerous and un safety checked.
  • 35.
    Components: Another wayof Components: Using a light on top of Materials: There are various giving out the scent of the my direct point of sale is a good idea different materials which I can brands smell is automatic spray. as it draws in a lot of potential produce the small light which will sit This will then allow customers to customers and gives the direct point on top my material. One of the test the product using only of sale unit a edge on other brands. possible is materials is glass. I feel motion of themselves. This will Another way in which this can be this is a good material as it will then cause a mechanism to powered is solar panels. His is a magnify the light which is produced. spray a display product which very good idea as it saves a lot of The glass can also be coloured to will spray into the air. This is a energy and the company paying for create effect, which will attract good technique to use as it electricity. The solar panels are more customers with bright colours. saves the company money from situated on the top of the first aid Glass is fairly cheap and can be producing testers and the smell box, and can be directly linked to the heat moulded at very high will also get onto the potential light situated at the front of the top temperatures to create any shape customers clothes, allowing panel. The disadvantages of using or size I decide to choose. Glass is them to remember and link the solar panels is that if my direct point what is used on most light bulbs as smell to the brand making it of sale is placed onto a shelf, this will it fulfils the task asked of it. Glass more recognisable. The then mean that the amount of light can also be fairly cheap depending disadvantage of using this the panels are receiving are very on what type you choose to buy. technique is for people who limited, which will mean little energy The disadvantage of using glass is suffer from asthma. This will for the light to work off. Another that it is highly fragile. This means then cause reaction and creates disadvantage of using solar panels is that if dropped from a certain danger hazards within my direct the cost. From my research I found height, this will then smash and will point of sale unit. This could the average price for a 10cm by 5cm not be able to fix. Replacements also apply to tender parts of the solar panel costs £… This will cost are available to buy, but this the naked body such as eyes and the company a lot of money just to costs the company money to keep mouth. This could then be spray power one small component. replacing what is only a small and make contact with these component on my direct point of areas and cause accidents and sale unit. potential injuries.
  • 36.
    Usability: I wantedto create a direct point of sale which was very interactive. This can be done in various different ways through the use of the internet and social networking sites. One way which this can be done is a bar code scanner. From my research over half of the population living and working in and around London own smart phones. This then allows me to place a bar code scanner onto my direct point of sale which my potential customer will then be able to scan with their phone, with them receiving free information abut the brand and the company. I feel this is a very good idea to use as the cost is very cheap and gives the customer something to remind them about the company, attract them towards the Lynx brand. The disadvantage of using this is the technical side which could interfere with the aesthetics of the display. This means that some bar code could find it hard to be printed onto the material used, which will make the code unscan able.