SlideShare a Scribd company logo
1
DCIM Software
Awareness Workshop
2
The Data CenterThe Data Center
3
Traditional Data Center Operations
Building
Management
System
System
Management
Tool
Facilities IT
Facilities & IT Operating in SilosFacilities & IT Operating in Silos
4
Traditional Data Center Operations
Challenges
BMS solutions designed for critical infrastructure. Not tailor made for
data centers
 Traditional IT Management tools not designed to monitor and
manage critical infrastructure components.
 Both categories do not interface with each other and work on
different network architecture and communication protocols
 Creates lack of visibility on the cascading effect of failure of facility
components on application or service availability
 Results in inability to right-size facility infrastructure capacity in
response to new IT requirements
 Results in complexity in management and data inconsistency due to
multiple tools in the data center environment
5
The Origin of DCIM: Bridging the Gap
DCIM: Single solution for end-to-end data center monitoring &
management
DCIM: Single solution for end-to-end data center monitoring &
management
Data Center
Infrastructure
Management
(DCIM)
Building
Management
System
System
Management
Tool
Facilities IT
6
Role of DCIM
DCIM functions:
• Data collection
• Environmental monitoring and reporting
• Asset, configuration and change management
• Power management
• Data reporting
• Capacity planning, forecasting, simulation and analytics
• Optimization, operational BI, load management
DCIM benefits:
• By delivering right information at the right time DCIM ensures highest level
of availability
• Allows optimized efficiencies by integrating information from IT and facility
assets
• Future-proof architecture based on Capacity Planning and BMS data that
supports design changes
7
How DCIM Helps
Since DCIM Software dynamically captures information related to asset
utilization, power consumption, environmental conditions and other
parameters, it
• Helps Data Center Manager avoid unnecessary over-provisioning
• Helps plan investments and new capacity
• Helps reduce the capital costs
• Helps reduce power use and other operating costs
• Helps reduce risk of failures through critical alerts
• Helps adapting to technical and business change more easily
• Helps improvement plans through real-time metrics & dashboard
8
GFS Crane DCIM
Functional Capabilities &
Business Benefits
9
GFS Crane Functional Capabilities
10
Data Center Operations Priorities
 Control Cost
 Improve Availability
 Improve energy efficiency
 Improve operational efficiency
Operational PrioritiesOperational Priorities
Business GoalsBusiness Goals  Increased profitability (Yield per sq. ft.)
 Meet Business SLA
 Green Data Center
11
GFS Crane: How it helps achieve your business goals?
Helps to run an efficient data center operation
- Increases Revenue
- Reduces Cost
- Proactive Alarms
- Better Impact Analysis
- Change Tracking
- Process Automation
- Better Monitoring
- Tracks Energy & Emissions
- Recommends ways to improve
efficiency
GFS Crane
DCIM
Increase ProfitabilityIncrease Profitability AvailabilityAvailability
Operational EfficiencyOperational Efficiency ‘Green DC’‘Green DC’
12
Increase Profitability: Increase Revenue & Reduce Cost
- Increases Revenue
- Reduces Cost
- Proactive Alarms
- Better Impact Analysis
- Change Tracking
- Process Automation
- Better Monitoring
- Tracks Energy & Emissions
- Recommends ways to improve
efficiency
GFS Crane
DCIM
Increase ProfitabilityIncrease Profitability AvailabilityAvailability
Operational EfficiencyOperational Efficiency ‘Green DC’‘Green DC’
Better visibility helps in discovering hidden power, space, cooling and
compute capacities which in turn helps in maximizing utilization of
existing resources
 Plug revenue leakage through real-time monitoring of capacity used
by customers vis-a-vis contracted capacity
 Ability to bill customers on variable usage above a contracted limit
 Better monitoring & analytics helps to improve efficiency and reduce
operating cost on power
 Automation of processes like Asset Tracking, Provisioning &
Monitoring improves productivity
 Rationalizing asset base helps in lower maintenance overhead like
equipment AMC
Increase RevenueIncrease Revenue
Reducing CostReducing Cost
13
Improved Availability: Predictability, Visibility & Change Tracking
 Advanced Alarm Management helps in failure predictability, faster
turn-around-time and hence improved availability and SLA compliance
 Consolidation of alarms from different facilities helps in centralized
monitoring
Improved visibility of the power chain and the relationships among
critical components of the infrastructure helps in better impact analysis
of device malfunction or failure and doing RCA
 Change Tracking in the data center environment helps in doing
impact analysis of any change and root cause analysis of any outage
occurring due to a change
Proactive AlarmsProactive Alarms
Asset RelationshipAsset Relationship
- Controls CapEx
- Reduces OpEx
- Proactive Alarms
- Better Impact Analysis
- Change Tracking
- Process Automation
- Better Monitoring
- Tracks Energy & Carbon
- Recommends ways to improve
efficiency
GFS Crane
DCIM
Cost ReductionCost Reduction AvailabilityAvailability
Operational EfficiencyOperational Efficiency ‘Green DC’‘Green DC’
Change TrackingChange Tracking
14
Operational Efficiency: Process Automation & Better Monitoring
Automation of critical data center processes like Asset
Management, Capacity Planning and Provisioning improves
efficiency of data center operations
Improved visibility of the power chain and the relationships
among critical components of the infrastructure helps in better
impact analysis of device malfunction or failure and doing RCA
 Change Tracking in the data center environment helps in doing
impact analysis of any change and root cause analysis of any outage
occurring due to a change
Process AutomationProcess Automation
Better MonitoringBetter Monitoring
- Controls CapEx
- Reduces OpEx
- Proactive Alarms
- Better Impact Analysis
- Change Tracking
- Process Automation
- Better Monitoring
- Tracks Energy & Carbon
- Recommends ways to improve
efficiency
GFS Crane
DCIM
Cost ReductionCost Reduction AvailabilityAvailability
Operational EfficiencyOperational Efficiency ‘Green DC’‘Green DC’
15
Green DC: Track Energy & Emissions for Data Center
 Measures real-time power consumption of at device level with
soft-metering and intelligent meters
 Can integrate with existing BMS to capture non-IT power
 Calculates real-time PUE and analyzes PUE trends
 Calculates GHG emission and carbon footprint for the DC
 Recommends ways to reduce IT power by server retirement,
virtualization and replacement
 Identifies power distribution loss in the power chain and helps
in improving infrastructure efficiency
 Recommends ways to improve PUE
Track Energy & CarbonTrack Energy & Carbon
RecommendationsRecommendations
- Controls CapEx
- Reduces OpEx
- Proactive Alarms
- Better Impact Analysis
- Change Tracking
- Process Automation
- Better Monitoring
- Tracks Energy & Emissions
- Recommends ways to improve
efficiency
GFS Crane
DCIM
Cost ReductionCost Reduction AvailabilityAvailability
Operational EfficiencyOperational Efficiency ‘Green DC’‘Green DC’
16
Reports – CIO Dashboard
DCIM Software
Case Study
17
Customer Profile
 Leading integrated infrastructure player in the Finance Sector
 Embarked on an enterprise-wide Energy & Sustainability
Management Program
 Among the first to adopt Data Center Infrastructure Management
(DCIM) software in India
 The primary data center is Uptime Institute Tier III certified
18
What did they want from the system
The ability to monitor real-time large amounts of data from the whole
infrastructure wherever located and not be invasive in the process
 The intelligence to interpret it to provide a range of accurate
addressable information against a wide range of parameters
 The flexibility to report the results at all significant levels of
management, and at all levels of activity within the infrastructure over
any period of time
 The ability to highlight system or performance critical events by alerts
in addition to the normal reporting schedules or on demand
19
Reports – CIO Dashboard
Findings
&
Recommendations
20
Customer found that the
data center computing
resources were heavily
under-utilized and there was
immense scope for
optimization.
Average CPU utilization of
servers in the Data Center
was just above 3%
Customer found that the
data center computing
resources were heavily
under-utilized and there was
immense scope for
optimization.
Average CPU utilization of
servers in the Data Center
was just above 3%
Findings & Recommendations
21
Findings & Recommendations
DCIM identified under-utilized
servers that could be candidates for
retirement resulting in lower power
consumption, lesser emission and
lower power bills for the data
center.
Similarly found candidates for
Virtualization
DCIM identified under-utilized
servers that could be candidates for
retirement resulting in lower power
consumption, lesser emission and
lower power bills for the data
center.
Similarly found candidates for
Virtualization
22
Findings & Recommendations
Customer had not done an
aging analysis of devices in
the data center before
DCIM was implemented.
DCIM enabled –
• Identification of old
servers which had
depreciated and could be
replaced with more energy
efficient devices.
• Replacement options from
within were identified,
saving on capex.
Customer had not done an
aging analysis of devices in
the data center before
DCIM was implemented.
DCIM enabled –
• Identification of old
servers which had
depreciated and could be
replaced with more energy
efficient devices.
• Replacement options from
within were identified,
saving on capex.
23
Maturity Levels
Measurement
Methodology &
Frequency
Basic (Level 1) Intermediate (Level 2) Advanced (Level 3)
Total Facility Power Data center input power
Data center input power less
shared HVAC
Data center input power less
shared HVAC plus building
lighting, security
IT Power UPS PDU Server
Frequency of measurement Monthly/weekly Daily Continuous
PUE Measurement as per Green Grid Recommendation
 Depending on size, scale and tier of a data center, its efficiency program can mainly be at three levels of
maturity namely Basic, Intermediate and Advanced.
 Green Grid recommendeds three levels of PUE calculation corresponding to the maturity levels as
illustrated in the table below.
→ Customer had been measuring weekly PUE from UPS output till now, in line with Basic Maturity Level
→ Customer is now measuring IT power from the BUSBAR output to each rack which is being captured by
DCIM to provide daily PUE report. Hence they comply with the Intermediate Maturity Level now.
→ Customer has started measuring power consumption of individual servers and other IT devices at 95%
accuracy using the ‘soft-metering’ capability of the DCIM. Customer will soon be upgrading the PUE
measurement process to the Advanced Level and monitor the PUE of the data center continuously
through the DCIM.
24
The Financial Savings
• Energy Efficiency: 15% reduction in annual power bills. Their average
growth in power costs was 10% pa;
• Asset Utilization: improvement by 5% through annual savings in
server procurements due to better utilization;
• Operational Efficiency: 10% annual savings due to better capacity
planning in terms of power, cooling, rack and floor space, improved
productivity and higher uptimes & better SLA due to timely
preventive maintenance of devices.
25
Better Information provides greater opportunities
 Save Energy
 Optimize the activity/power use in servers/devices
 Maximize the use of space within racks
 Increase uptime and sustainability
 Delay/reduce the need for more floor space and support devices
 Meet regulatory reporting requirements
26
For more details:
Visit
http://www.greenfieldsoft.com,
Or email
sales@greenfieldsoft.com

More Related Content

What's hot

What is (and is not) DCIM
What is (and is not) DCIMWhat is (and is not) DCIM
What is (and is not) DCIM
CommScope
 
Taming the DCIM Wave with ITIL
Taming the DCIM Wave with ITILTaming the DCIM Wave with ITIL
Taming the DCIM Wave with ITIL
AFCOM
 
Simplifying DCIM with OpManager
Simplifying DCIM with OpManagerSimplifying DCIM with OpManager
Simplifying DCIM with OpManager
ManageEngine, Zoho Corporation
 
NER & Emerson Infrastructure Optimization Capabilties Storyboard
NER & Emerson   Infrastructure Optimization Capabilties StoryboardNER & Emerson   Infrastructure Optimization Capabilties Storyboard
NER & Emerson Infrastructure Optimization Capabilties Storyboard
Greg Stover
 
Panduit DCIM Solution Overview
Panduit DCIM Solution OverviewPanduit DCIM Solution Overview
Panduit DCIM Solution Overview
Panduit
 
Panduit Smartzone™ DCIM Solution Details
Panduit Smartzone™ DCIM Solution DetailsPanduit Smartzone™ DCIM Solution Details
Panduit Smartzone™ DCIM Solution Details
Panduit
 
Five key emerging trends impacting Data Centers in 2016
Five key emerging trends impacting Data Centers in 2016 Five key emerging trends impacting Data Centers in 2016
Five key emerging trends impacting Data Centers in 2016
Greg Stover
 
9 Best Practices for Data Center Maintenance
9 Best Practices for Data Center Maintenance9 Best Practices for Data Center Maintenance
9 Best Practices for Data Center Maintenance
Sunbird DCIM
 
Data Center Trends 2014
Data Center Trends 2014Data Center Trends 2014
Data Center Trends 2014
Belden Inc
 
SCADA of the Future
SCADA of the FutureSCADA of the Future
SCADA of the Future
Schneider Electric
 
Field Data Gathering Services — A Cloud-Based Approach
Field Data Gathering Services — A Cloud-Based ApproachField Data Gathering Services — A Cloud-Based Approach
Field Data Gathering Services — A Cloud-Based Approach
Schneider Electric
 
The Mine Central Control Room: From Concept to Reality
The Mine Central Control Room: From Concept to Reality The Mine Central Control Room: From Concept to Reality
The Mine Central Control Room: From Concept to Reality
Schneider Electric
 
Datacenter Strategy, Design, and Build
Datacenter Strategy, Design, and BuildDatacenter Strategy, Design, and Build
Datacenter Strategy, Design, and Build
Christopher Kelley
 
How green standards are changing data center design and operations
How green standards are changing data center design and operationsHow green standards are changing data center design and operations
How green standards are changing data center design and operations
Schneider Electric
 
The High Availability Mantra - How DCIM Can Help
The High Availability Mantra - How DCIM Can HelpThe High Availability Mantra - How DCIM Can Help
The High Availability Mantra - How DCIM Can Help
GreenField Software Private Limited
 
Best practices for data centers
Best practices for data centersBest practices for data centers
Best practices for data centers
nicholas njoroge
 
Learning simulators
Learning simulators Learning simulators
Learning simulators
Schneider Electric
 

What's hot (20)

What is (and is not) DCIM
What is (and is not) DCIMWhat is (and is not) DCIM
What is (and is not) DCIM
 
Taming the DCIM Wave with ITIL
Taming the DCIM Wave with ITILTaming the DCIM Wave with ITIL
Taming the DCIM Wave with ITIL
 
Simplifying DCIM with OpManager
Simplifying DCIM with OpManagerSimplifying DCIM with OpManager
Simplifying DCIM with OpManager
 
NER & Emerson Infrastructure Optimization Capabilties Storyboard
NER & Emerson   Infrastructure Optimization Capabilties StoryboardNER & Emerson   Infrastructure Optimization Capabilties Storyboard
NER & Emerson Infrastructure Optimization Capabilties Storyboard
 
Panduit DCIM Solution Overview
Panduit DCIM Solution OverviewPanduit DCIM Solution Overview
Panduit DCIM Solution Overview
 
Panduit Smartzone™ DCIM Solution Details
Panduit Smartzone™ DCIM Solution DetailsPanduit Smartzone™ DCIM Solution Details
Panduit Smartzone™ DCIM Solution Details
 
Five key emerging trends impacting Data Centers in 2016
Five key emerging trends impacting Data Centers in 2016 Five key emerging trends impacting Data Centers in 2016
Five key emerging trends impacting Data Centers in 2016
 
9 Best Practices for Data Center Maintenance
9 Best Practices for Data Center Maintenance9 Best Practices for Data Center Maintenance
9 Best Practices for Data Center Maintenance
 
Data Center Trends 2014
Data Center Trends 2014Data Center Trends 2014
Data Center Trends 2014
 
SCADA of the Future
SCADA of the FutureSCADA of the Future
SCADA of the Future
 
Best Practices for Planning your Datacenter
Best Practices for Planning your DatacenterBest Practices for Planning your Datacenter
Best Practices for Planning your Datacenter
 
Field Data Gathering Services — A Cloud-Based Approach
Field Data Gathering Services — A Cloud-Based ApproachField Data Gathering Services — A Cloud-Based Approach
Field Data Gathering Services — A Cloud-Based Approach
 
The Mine Central Control Room: From Concept to Reality
The Mine Central Control Room: From Concept to Reality The Mine Central Control Room: From Concept to Reality
The Mine Central Control Room: From Concept to Reality
 
Datacenter Strategy, Design, and Build
Datacenter Strategy, Design, and BuildDatacenter Strategy, Design, and Build
Datacenter Strategy, Design, and Build
 
How green standards are changing data center design and operations
How green standards are changing data center design and operationsHow green standards are changing data center design and operations
How green standards are changing data center design and operations
 
The High Availability Mantra - How DCIM Can Help
The High Availability Mantra - How DCIM Can HelpThe High Availability Mantra - How DCIM Can Help
The High Availability Mantra - How DCIM Can Help
 
Best practices for data centers
Best practices for data centersBest practices for data centers
Best practices for data centers
 
Learning simulators
Learning simulators Learning simulators
Learning simulators
 
Ensuring your plant is secure
Ensuring your plant is secureEnsuring your plant is secure
Ensuring your plant is secure
 
Apc - 8dec2010
Apc - 8dec2010Apc - 8dec2010
Apc - 8dec2010
 

Viewers also liked

Gauge Maker Pro - Excel Dashboard Add-in
Gauge Maker Pro - Excel Dashboard Add-inGauge Maker Pro - Excel Dashboard Add-in
Gauge Maker Pro - Excel Dashboard Add-in
Excel Dashboard School
 
Week 4 - Data Dashboard
Week 4 -  Data DashboardWeek 4 -  Data Dashboard
Week 4 - Data DashboardRich Parker
 
Resurgence of Captive Data Centers: A Contrarian View
Resurgence of Captive Data Centers: A Contrarian ViewResurgence of Captive Data Centers: A Contrarian View
Resurgence of Captive Data Centers: A Contrarian View
GreenField Software Private Limited
 
Designing for a real-time data dashboard
Designing for a real-time data dashboardDesigning for a real-time data dashboard
Designing for a real-time data dashboard
Neil Wehrle
 
How to create Excel dashboards easily
How to create Excel dashboards easilyHow to create Excel dashboards easily
How to create Excel dashboards easily
Mockup Wireframe
 
DCIM
DCIMDCIM
How to Create an Interactive DASHBOARD in MS Excel
How to Create an Interactive DASHBOARD in MS ExcelHow to Create an Interactive DASHBOARD in MS Excel
How to Create an Interactive DASHBOARD in MS Excel
raman109
 
Top 20 something info path 2010 tips and trips - sps-ozarks12
Top 20 something info path 2010 tips and trips - sps-ozarks12Top 20 something info path 2010 tips and trips - sps-ozarks12
Top 20 something info path 2010 tips and trips - sps-ozarks12Kevin Dostalek
 
Choose a tool for business intelligence in share point 2010
Choose a tool for business intelligence in share point 2010Choose a tool for business intelligence in share point 2010
Choose a tool for business intelligence in share point 2010Ard van Someren
 
Case Study: RagingWire – Improving Service Delivery by Extending DCIM to Mana...
Case Study: RagingWire – Improving Service Delivery by Extending DCIM to Mana...Case Study: RagingWire – Improving Service Delivery by Extending DCIM to Mana...
Case Study: RagingWire – Improving Service Delivery by Extending DCIM to Mana...
CA Technologies
 
Data Visualization and Dashboard Design
Data Visualization and Dashboard DesignData Visualization and Dashboard Design
Data Visualization and Dashboard Design
Jacques Warren
 
Big Data, Small Dashboard
Big Data, Small DashboardBig Data, Small Dashboard
Big Data, Small Dashboard
Andrea Maietta
 
Design Principles of Excel Dashboards & Reports
Design Principles of Excel Dashboards & ReportsDesign Principles of Excel Dashboards & Reports
Design Principles of Excel Dashboards & Reports
Wiley
 
Risk & Risk Management
Risk & Risk ManagementRisk & Risk Management
Risk & Risk Managementansula
 
Risk mangement
Risk mangementRisk mangement
Risk mangementcollege
 
Risk management
Risk managementRisk management
Risk management
Abhi Kalyan
 

Viewers also liked (16)

Gauge Maker Pro - Excel Dashboard Add-in
Gauge Maker Pro - Excel Dashboard Add-inGauge Maker Pro - Excel Dashboard Add-in
Gauge Maker Pro - Excel Dashboard Add-in
 
Week 4 - Data Dashboard
Week 4 -  Data DashboardWeek 4 -  Data Dashboard
Week 4 - Data Dashboard
 
Resurgence of Captive Data Centers: A Contrarian View
Resurgence of Captive Data Centers: A Contrarian ViewResurgence of Captive Data Centers: A Contrarian View
Resurgence of Captive Data Centers: A Contrarian View
 
Designing for a real-time data dashboard
Designing for a real-time data dashboardDesigning for a real-time data dashboard
Designing for a real-time data dashboard
 
How to create Excel dashboards easily
How to create Excel dashboards easilyHow to create Excel dashboards easily
How to create Excel dashboards easily
 
DCIM
DCIMDCIM
DCIM
 
How to Create an Interactive DASHBOARD in MS Excel
How to Create an Interactive DASHBOARD in MS ExcelHow to Create an Interactive DASHBOARD in MS Excel
How to Create an Interactive DASHBOARD in MS Excel
 
Top 20 something info path 2010 tips and trips - sps-ozarks12
Top 20 something info path 2010 tips and trips - sps-ozarks12Top 20 something info path 2010 tips and trips - sps-ozarks12
Top 20 something info path 2010 tips and trips - sps-ozarks12
 
Choose a tool for business intelligence in share point 2010
Choose a tool for business intelligence in share point 2010Choose a tool for business intelligence in share point 2010
Choose a tool for business intelligence in share point 2010
 
Case Study: RagingWire – Improving Service Delivery by Extending DCIM to Mana...
Case Study: RagingWire – Improving Service Delivery by Extending DCIM to Mana...Case Study: RagingWire – Improving Service Delivery by Extending DCIM to Mana...
Case Study: RagingWire – Improving Service Delivery by Extending DCIM to Mana...
 
Data Visualization and Dashboard Design
Data Visualization and Dashboard DesignData Visualization and Dashboard Design
Data Visualization and Dashboard Design
 
Big Data, Small Dashboard
Big Data, Small DashboardBig Data, Small Dashboard
Big Data, Small Dashboard
 
Design Principles of Excel Dashboards & Reports
Design Principles of Excel Dashboards & ReportsDesign Principles of Excel Dashboards & Reports
Design Principles of Excel Dashboards & Reports
 
Risk & Risk Management
Risk & Risk ManagementRisk & Risk Management
Risk & Risk Management
 
Risk mangement
Risk mangementRisk mangement
Risk mangement
 
Risk management
Risk managementRisk management
Risk management
 

Similar to DCIM Awareness Workshop

Sleep Better At Night: Eliminate Data Center Failure
Sleep Better At Night: Eliminate Data Center FailureSleep Better At Night: Eliminate Data Center Failure
Sleep Better At Night: Eliminate Data Center Failure
GreenField Software Private Limited
 
DCIM Software: What & Why?
DCIM Software: What & Why?DCIM Software: What & Why?
DCIM Software: What & Why?
GreenField Software Pvt. Ltd.
 
Case Study: Datotel Extended the Power of Infrastructure Management to the Ph...
Case Study: Datotel Extended the Power of Infrastructure Management to the Ph...Case Study: Datotel Extended the Power of Infrastructure Management to the Ph...
Case Study: Datotel Extended the Power of Infrastructure Management to the Ph...
CA Technologies
 
Case study-dcim-implementation-telecom-operator
Case study-dcim-implementation-telecom-operatorCase study-dcim-implementation-telecom-operator
Case study-dcim-implementation-telecom-operator
Swagata Mukherjee
 
Squaring the DCIM circle - Guest Blog by Stephen Bowes-Phipps
Squaring the DCIM circle - Guest Blog by Stephen Bowes-PhippsSquaring the DCIM circle - Guest Blog by Stephen Bowes-Phipps
Squaring the DCIM circle - Guest Blog by Stephen Bowes-Phipps
ConcurrentThinking
 
Knowledge is Power - Richard May, Raritan
Knowledge is Power - Richard May, RaritanKnowledge is Power - Richard May, Raritan
Knowledge is Power - Richard May, Raritan
Mediehuset Ingeniøren Live
 
CA Mainframe Resource Intelligence
CA Mainframe Resource IntelligenceCA Mainframe Resource Intelligence
CA Mainframe Resource Intelligence
CA Technologies
 
Schneider - ASK THE EXPERT - ITNEXT
Schneider - ASK THE EXPERT - ITNEXTSchneider - ASK THE EXPERT - ITNEXT
Schneider - ASK THE EXPERT - ITNEXTAniket Patange
 
What is a DCIM solution?
What is a DCIM solution?What is a DCIM solution?
What is a DCIM solution?
ConcurrentThinking
 
Smart Manufacturing Suite for Power Industry
Smart Manufacturing Suite for Power IndustrySmart Manufacturing Suite for Power Industry
Smart Manufacturing Suite for Power Industry
A.T.E. Private Limited
 
Cisco Energy Management - Short
Cisco Energy Management - ShortCisco Energy Management - Short
Cisco Energy Management - ShortPaul Weight
 
Capacity Optimisation: Use what you have. Buy what you need: Jim Waring, BMC ...
Capacity Optimisation: Use what you have. Buy what you need: Jim Waring, BMC ...Capacity Optimisation: Use what you have. Buy what you need: Jim Waring, BMC ...
Capacity Optimisation: Use what you have. Buy what you need: Jim Waring, BMC ...
BMC Software
 
Manuel cadenas - SIEMENS
Manuel cadenas - SIEMENSManuel cadenas - SIEMENS
Manuel cadenas - SIEMENS
DatAgri1
 
Real-time Data, Site wide Digital Twin, and Proprietary Analytics Cuts into P...
Real-time Data, Site wide Digital Twin, and Proprietary Analytics Cuts into P...Real-time Data, Site wide Digital Twin, and Proprietary Analytics Cuts into P...
Real-time Data, Site wide Digital Twin, and Proprietary Analytics Cuts into P...
Yokogawa1
 
Application driven IT service management for energy efficiency
Application driven IT service management for energy efficiencyApplication driven IT service management for energy efficiency
Application driven IT service management for energy efficiencySI Group - Politecnico di Milano
 
Asset Insight Manager Introduction 2014 (2)
Asset Insight Manager Introduction 2014 (2)Asset Insight Manager Introduction 2014 (2)
Asset Insight Manager Introduction 2014 (2)Dean Bishop
 
Smart, Connected Retail Facilities Webinar Deck
Smart, Connected Retail Facilities Webinar DeckSmart, Connected Retail Facilities Webinar Deck
Smart, Connected Retail Facilities Webinar Deck
Switch Automation
 
Green & Beyond: Data Center Actions to Increase Business Responsiveness and R...
Green & Beyond: Data Center Actions to Increase Business Responsiveness and R...Green & Beyond: Data Center Actions to Increase Business Responsiveness and R...
Green & Beyond: Data Center Actions to Increase Business Responsiveness and R...
IBMAsean
 
Advantages of a modern DCS in coal handling
Advantages of a modern DCS in coal handlingAdvantages of a modern DCS in coal handling
Advantages of a modern DCS in coal handling
Schneider Electric
 
VMworld 2013: Create a Key Metrics-based Actionable Roadmap to Deliver IT as ...
VMworld 2013: Create a Key Metrics-based Actionable Roadmap to Deliver IT as ...VMworld 2013: Create a Key Metrics-based Actionable Roadmap to Deliver IT as ...
VMworld 2013: Create a Key Metrics-based Actionable Roadmap to Deliver IT as ...
VMworld
 

Similar to DCIM Awareness Workshop (20)

Sleep Better At Night: Eliminate Data Center Failure
Sleep Better At Night: Eliminate Data Center FailureSleep Better At Night: Eliminate Data Center Failure
Sleep Better At Night: Eliminate Data Center Failure
 
DCIM Software: What & Why?
DCIM Software: What & Why?DCIM Software: What & Why?
DCIM Software: What & Why?
 
Case Study: Datotel Extended the Power of Infrastructure Management to the Ph...
Case Study: Datotel Extended the Power of Infrastructure Management to the Ph...Case Study: Datotel Extended the Power of Infrastructure Management to the Ph...
Case Study: Datotel Extended the Power of Infrastructure Management to the Ph...
 
Case study-dcim-implementation-telecom-operator
Case study-dcim-implementation-telecom-operatorCase study-dcim-implementation-telecom-operator
Case study-dcim-implementation-telecom-operator
 
Squaring the DCIM circle - Guest Blog by Stephen Bowes-Phipps
Squaring the DCIM circle - Guest Blog by Stephen Bowes-PhippsSquaring the DCIM circle - Guest Blog by Stephen Bowes-Phipps
Squaring the DCIM circle - Guest Blog by Stephen Bowes-Phipps
 
Knowledge is Power - Richard May, Raritan
Knowledge is Power - Richard May, RaritanKnowledge is Power - Richard May, Raritan
Knowledge is Power - Richard May, Raritan
 
CA Mainframe Resource Intelligence
CA Mainframe Resource IntelligenceCA Mainframe Resource Intelligence
CA Mainframe Resource Intelligence
 
Schneider - ASK THE EXPERT - ITNEXT
Schneider - ASK THE EXPERT - ITNEXTSchneider - ASK THE EXPERT - ITNEXT
Schneider - ASK THE EXPERT - ITNEXT
 
What is a DCIM solution?
What is a DCIM solution?What is a DCIM solution?
What is a DCIM solution?
 
Smart Manufacturing Suite for Power Industry
Smart Manufacturing Suite for Power IndustrySmart Manufacturing Suite for Power Industry
Smart Manufacturing Suite for Power Industry
 
Cisco Energy Management - Short
Cisco Energy Management - ShortCisco Energy Management - Short
Cisco Energy Management - Short
 
Capacity Optimisation: Use what you have. Buy what you need: Jim Waring, BMC ...
Capacity Optimisation: Use what you have. Buy what you need: Jim Waring, BMC ...Capacity Optimisation: Use what you have. Buy what you need: Jim Waring, BMC ...
Capacity Optimisation: Use what you have. Buy what you need: Jim Waring, BMC ...
 
Manuel cadenas - SIEMENS
Manuel cadenas - SIEMENSManuel cadenas - SIEMENS
Manuel cadenas - SIEMENS
 
Real-time Data, Site wide Digital Twin, and Proprietary Analytics Cuts into P...
Real-time Data, Site wide Digital Twin, and Proprietary Analytics Cuts into P...Real-time Data, Site wide Digital Twin, and Proprietary Analytics Cuts into P...
Real-time Data, Site wide Digital Twin, and Proprietary Analytics Cuts into P...
 
Application driven IT service management for energy efficiency
Application driven IT service management for energy efficiencyApplication driven IT service management for energy efficiency
Application driven IT service management for energy efficiency
 
Asset Insight Manager Introduction 2014 (2)
Asset Insight Manager Introduction 2014 (2)Asset Insight Manager Introduction 2014 (2)
Asset Insight Manager Introduction 2014 (2)
 
Smart, Connected Retail Facilities Webinar Deck
Smart, Connected Retail Facilities Webinar DeckSmart, Connected Retail Facilities Webinar Deck
Smart, Connected Retail Facilities Webinar Deck
 
Green & Beyond: Data Center Actions to Increase Business Responsiveness and R...
Green & Beyond: Data Center Actions to Increase Business Responsiveness and R...Green & Beyond: Data Center Actions to Increase Business Responsiveness and R...
Green & Beyond: Data Center Actions to Increase Business Responsiveness and R...
 
Advantages of a modern DCS in coal handling
Advantages of a modern DCS in coal handlingAdvantages of a modern DCS in coal handling
Advantages of a modern DCS in coal handling
 
VMworld 2013: Create a Key Metrics-based Actionable Roadmap to Deliver IT as ...
VMworld 2013: Create a Key Metrics-based Actionable Roadmap to Deliver IT as ...VMworld 2013: Create a Key Metrics-based Actionable Roadmap to Deliver IT as ...
VMworld 2013: Create a Key Metrics-based Actionable Roadmap to Deliver IT as ...
 

Recently uploaded

Webinar: Salesforce Document Management 2.0 - Smarter, Faster, Better
Webinar: Salesforce Document Management 2.0 - Smarter, Faster, BetterWebinar: Salesforce Document Management 2.0 - Smarter, Faster, Better
Webinar: Salesforce Document Management 2.0 - Smarter, Faster, Better
XfilesPro
 
Prosigns: Transforming Business with Tailored Technology Solutions
Prosigns: Transforming Business with Tailored Technology SolutionsProsigns: Transforming Business with Tailored Technology Solutions
Prosigns: Transforming Business with Tailored Technology Solutions
Prosigns
 
Explore Modern SharePoint Templates for 2024
Explore Modern SharePoint Templates for 2024Explore Modern SharePoint Templates for 2024
Explore Modern SharePoint Templates for 2024
Sharepoint Designs
 
Using IESVE for Room Loads Analysis - Australia & New Zealand
Using IESVE for Room Loads Analysis - Australia & New ZealandUsing IESVE for Room Loads Analysis - Australia & New Zealand
Using IESVE for Room Loads Analysis - Australia & New Zealand
IES VE
 
BoxLang: Review our Visionary Licenses of 2024
BoxLang: Review our Visionary Licenses of 2024BoxLang: Review our Visionary Licenses of 2024
BoxLang: Review our Visionary Licenses of 2024
Ortus Solutions, Corp
 
Developing Distributed High-performance Computing Capabilities of an Open Sci...
Developing Distributed High-performance Computing Capabilities of an Open Sci...Developing Distributed High-performance Computing Capabilities of an Open Sci...
Developing Distributed High-performance Computing Capabilities of an Open Sci...
Globus
 
Globus Compute Introduction - GlobusWorld 2024
Globus Compute Introduction - GlobusWorld 2024Globus Compute Introduction - GlobusWorld 2024
Globus Compute Introduction - GlobusWorld 2024
Globus
 
Accelerate Enterprise Software Engineering with Platformless
Accelerate Enterprise Software Engineering with PlatformlessAccelerate Enterprise Software Engineering with Platformless
Accelerate Enterprise Software Engineering with Platformless
WSO2
 
Software Testing Exam imp Ques Notes.pdf
Software Testing Exam imp Ques Notes.pdfSoftware Testing Exam imp Ques Notes.pdf
Software Testing Exam imp Ques Notes.pdf
MayankTawar1
 
How to Position Your Globus Data Portal for Success Ten Good Practices
How to Position Your Globus Data Portal for Success Ten Good PracticesHow to Position Your Globus Data Portal for Success Ten Good Practices
How to Position Your Globus Data Portal for Success Ten Good Practices
Globus
 
Large Language Models and the End of Programming
Large Language Models and the End of ProgrammingLarge Language Models and the End of Programming
Large Language Models and the End of Programming
Matt Welsh
 
Why React Native as a Strategic Advantage for Startup Innovation.pdf
Why React Native as a Strategic Advantage for Startup Innovation.pdfWhy React Native as a Strategic Advantage for Startup Innovation.pdf
Why React Native as a Strategic Advantage for Startup Innovation.pdf
ayushiqss
 
Corporate Management | Session 3 of 3 | Tendenci AMS
Corporate Management | Session 3 of 3 | Tendenci AMSCorporate Management | Session 3 of 3 | Tendenci AMS
Corporate Management | Session 3 of 3 | Tendenci AMS
Tendenci - The Open Source AMS (Association Management Software)
 
Paketo Buildpacks : la meilleure façon de construire des images OCI? DevopsDa...
Paketo Buildpacks : la meilleure façon de construire des images OCI? DevopsDa...Paketo Buildpacks : la meilleure façon de construire des images OCI? DevopsDa...
Paketo Buildpacks : la meilleure façon de construire des images OCI? DevopsDa...
Anthony Dahanne
 
Lecture 1 Introduction to games development
Lecture 1 Introduction to games developmentLecture 1 Introduction to games development
Lecture 1 Introduction to games development
abdulrafaychaudhry
 
GlobusWorld 2024 Opening Keynote session
GlobusWorld 2024 Opening Keynote sessionGlobusWorld 2024 Opening Keynote session
GlobusWorld 2024 Opening Keynote session
Globus
 
Multiple Your Crypto Portfolio with the Innovative Features of Advanced Crypt...
Multiple Your Crypto Portfolio with the Innovative Features of Advanced Crypt...Multiple Your Crypto Portfolio with the Innovative Features of Advanced Crypt...
Multiple Your Crypto Portfolio with the Innovative Features of Advanced Crypt...
Hivelance Technology
 
Understanding Globus Data Transfers with NetSage
Understanding Globus Data Transfers with NetSageUnderstanding Globus Data Transfers with NetSage
Understanding Globus Data Transfers with NetSage
Globus
 
In 2015, I used to write extensions for Joomla, WordPress, phpBB3, etc and I ...
In 2015, I used to write extensions for Joomla, WordPress, phpBB3, etc and I ...In 2015, I used to write extensions for Joomla, WordPress, phpBB3, etc and I ...
In 2015, I used to write extensions for Joomla, WordPress, phpBB3, etc and I ...
Juraj Vysvader
 
How Recreation Management Software Can Streamline Your Operations.pptx
How Recreation Management Software Can Streamline Your Operations.pptxHow Recreation Management Software Can Streamline Your Operations.pptx
How Recreation Management Software Can Streamline Your Operations.pptx
wottaspaceseo
 

Recently uploaded (20)

Webinar: Salesforce Document Management 2.0 - Smarter, Faster, Better
Webinar: Salesforce Document Management 2.0 - Smarter, Faster, BetterWebinar: Salesforce Document Management 2.0 - Smarter, Faster, Better
Webinar: Salesforce Document Management 2.0 - Smarter, Faster, Better
 
Prosigns: Transforming Business with Tailored Technology Solutions
Prosigns: Transforming Business with Tailored Technology SolutionsProsigns: Transforming Business with Tailored Technology Solutions
Prosigns: Transforming Business with Tailored Technology Solutions
 
Explore Modern SharePoint Templates for 2024
Explore Modern SharePoint Templates for 2024Explore Modern SharePoint Templates for 2024
Explore Modern SharePoint Templates for 2024
 
Using IESVE for Room Loads Analysis - Australia & New Zealand
Using IESVE for Room Loads Analysis - Australia & New ZealandUsing IESVE for Room Loads Analysis - Australia & New Zealand
Using IESVE for Room Loads Analysis - Australia & New Zealand
 
BoxLang: Review our Visionary Licenses of 2024
BoxLang: Review our Visionary Licenses of 2024BoxLang: Review our Visionary Licenses of 2024
BoxLang: Review our Visionary Licenses of 2024
 
Developing Distributed High-performance Computing Capabilities of an Open Sci...
Developing Distributed High-performance Computing Capabilities of an Open Sci...Developing Distributed High-performance Computing Capabilities of an Open Sci...
Developing Distributed High-performance Computing Capabilities of an Open Sci...
 
Globus Compute Introduction - GlobusWorld 2024
Globus Compute Introduction - GlobusWorld 2024Globus Compute Introduction - GlobusWorld 2024
Globus Compute Introduction - GlobusWorld 2024
 
Accelerate Enterprise Software Engineering with Platformless
Accelerate Enterprise Software Engineering with PlatformlessAccelerate Enterprise Software Engineering with Platformless
Accelerate Enterprise Software Engineering with Platformless
 
Software Testing Exam imp Ques Notes.pdf
Software Testing Exam imp Ques Notes.pdfSoftware Testing Exam imp Ques Notes.pdf
Software Testing Exam imp Ques Notes.pdf
 
How to Position Your Globus Data Portal for Success Ten Good Practices
How to Position Your Globus Data Portal for Success Ten Good PracticesHow to Position Your Globus Data Portal for Success Ten Good Practices
How to Position Your Globus Data Portal for Success Ten Good Practices
 
Large Language Models and the End of Programming
Large Language Models and the End of ProgrammingLarge Language Models and the End of Programming
Large Language Models and the End of Programming
 
Why React Native as a Strategic Advantage for Startup Innovation.pdf
Why React Native as a Strategic Advantage for Startup Innovation.pdfWhy React Native as a Strategic Advantage for Startup Innovation.pdf
Why React Native as a Strategic Advantage for Startup Innovation.pdf
 
Corporate Management | Session 3 of 3 | Tendenci AMS
Corporate Management | Session 3 of 3 | Tendenci AMSCorporate Management | Session 3 of 3 | Tendenci AMS
Corporate Management | Session 3 of 3 | Tendenci AMS
 
Paketo Buildpacks : la meilleure façon de construire des images OCI? DevopsDa...
Paketo Buildpacks : la meilleure façon de construire des images OCI? DevopsDa...Paketo Buildpacks : la meilleure façon de construire des images OCI? DevopsDa...
Paketo Buildpacks : la meilleure façon de construire des images OCI? DevopsDa...
 
Lecture 1 Introduction to games development
Lecture 1 Introduction to games developmentLecture 1 Introduction to games development
Lecture 1 Introduction to games development
 
GlobusWorld 2024 Opening Keynote session
GlobusWorld 2024 Opening Keynote sessionGlobusWorld 2024 Opening Keynote session
GlobusWorld 2024 Opening Keynote session
 
Multiple Your Crypto Portfolio with the Innovative Features of Advanced Crypt...
Multiple Your Crypto Portfolio with the Innovative Features of Advanced Crypt...Multiple Your Crypto Portfolio with the Innovative Features of Advanced Crypt...
Multiple Your Crypto Portfolio with the Innovative Features of Advanced Crypt...
 
Understanding Globus Data Transfers with NetSage
Understanding Globus Data Transfers with NetSageUnderstanding Globus Data Transfers with NetSage
Understanding Globus Data Transfers with NetSage
 
In 2015, I used to write extensions for Joomla, WordPress, phpBB3, etc and I ...
In 2015, I used to write extensions for Joomla, WordPress, phpBB3, etc and I ...In 2015, I used to write extensions for Joomla, WordPress, phpBB3, etc and I ...
In 2015, I used to write extensions for Joomla, WordPress, phpBB3, etc and I ...
 
How Recreation Management Software Can Streamline Your Operations.pptx
How Recreation Management Software Can Streamline Your Operations.pptxHow Recreation Management Software Can Streamline Your Operations.pptx
How Recreation Management Software Can Streamline Your Operations.pptx
 

DCIM Awareness Workshop

  • 2. 2 The Data CenterThe Data Center
  • 3. 3 Traditional Data Center Operations Building Management System System Management Tool Facilities IT Facilities & IT Operating in SilosFacilities & IT Operating in Silos
  • 4. 4 Traditional Data Center Operations Challenges BMS solutions designed for critical infrastructure. Not tailor made for data centers  Traditional IT Management tools not designed to monitor and manage critical infrastructure components.  Both categories do not interface with each other and work on different network architecture and communication protocols  Creates lack of visibility on the cascading effect of failure of facility components on application or service availability  Results in inability to right-size facility infrastructure capacity in response to new IT requirements  Results in complexity in management and data inconsistency due to multiple tools in the data center environment
  • 5. 5 The Origin of DCIM: Bridging the Gap DCIM: Single solution for end-to-end data center monitoring & management DCIM: Single solution for end-to-end data center monitoring & management Data Center Infrastructure Management (DCIM) Building Management System System Management Tool Facilities IT
  • 6. 6 Role of DCIM DCIM functions: • Data collection • Environmental monitoring and reporting • Asset, configuration and change management • Power management • Data reporting • Capacity planning, forecasting, simulation and analytics • Optimization, operational BI, load management DCIM benefits: • By delivering right information at the right time DCIM ensures highest level of availability • Allows optimized efficiencies by integrating information from IT and facility assets • Future-proof architecture based on Capacity Planning and BMS data that supports design changes
  • 7. 7 How DCIM Helps Since DCIM Software dynamically captures information related to asset utilization, power consumption, environmental conditions and other parameters, it • Helps Data Center Manager avoid unnecessary over-provisioning • Helps plan investments and new capacity • Helps reduce the capital costs • Helps reduce power use and other operating costs • Helps reduce risk of failures through critical alerts • Helps adapting to technical and business change more easily • Helps improvement plans through real-time metrics & dashboard
  • 8. 8 GFS Crane DCIM Functional Capabilities & Business Benefits
  • 9. 9 GFS Crane Functional Capabilities
  • 10. 10 Data Center Operations Priorities  Control Cost  Improve Availability  Improve energy efficiency  Improve operational efficiency Operational PrioritiesOperational Priorities Business GoalsBusiness Goals  Increased profitability (Yield per sq. ft.)  Meet Business SLA  Green Data Center
  • 11. 11 GFS Crane: How it helps achieve your business goals? Helps to run an efficient data center operation - Increases Revenue - Reduces Cost - Proactive Alarms - Better Impact Analysis - Change Tracking - Process Automation - Better Monitoring - Tracks Energy & Emissions - Recommends ways to improve efficiency GFS Crane DCIM Increase ProfitabilityIncrease Profitability AvailabilityAvailability Operational EfficiencyOperational Efficiency ‘Green DC’‘Green DC’
  • 12. 12 Increase Profitability: Increase Revenue & Reduce Cost - Increases Revenue - Reduces Cost - Proactive Alarms - Better Impact Analysis - Change Tracking - Process Automation - Better Monitoring - Tracks Energy & Emissions - Recommends ways to improve efficiency GFS Crane DCIM Increase ProfitabilityIncrease Profitability AvailabilityAvailability Operational EfficiencyOperational Efficiency ‘Green DC’‘Green DC’ Better visibility helps in discovering hidden power, space, cooling and compute capacities which in turn helps in maximizing utilization of existing resources  Plug revenue leakage through real-time monitoring of capacity used by customers vis-a-vis contracted capacity  Ability to bill customers on variable usage above a contracted limit  Better monitoring & analytics helps to improve efficiency and reduce operating cost on power  Automation of processes like Asset Tracking, Provisioning & Monitoring improves productivity  Rationalizing asset base helps in lower maintenance overhead like equipment AMC Increase RevenueIncrease Revenue Reducing CostReducing Cost
  • 13. 13 Improved Availability: Predictability, Visibility & Change Tracking  Advanced Alarm Management helps in failure predictability, faster turn-around-time and hence improved availability and SLA compliance  Consolidation of alarms from different facilities helps in centralized monitoring Improved visibility of the power chain and the relationships among critical components of the infrastructure helps in better impact analysis of device malfunction or failure and doing RCA  Change Tracking in the data center environment helps in doing impact analysis of any change and root cause analysis of any outage occurring due to a change Proactive AlarmsProactive Alarms Asset RelationshipAsset Relationship - Controls CapEx - Reduces OpEx - Proactive Alarms - Better Impact Analysis - Change Tracking - Process Automation - Better Monitoring - Tracks Energy & Carbon - Recommends ways to improve efficiency GFS Crane DCIM Cost ReductionCost Reduction AvailabilityAvailability Operational EfficiencyOperational Efficiency ‘Green DC’‘Green DC’ Change TrackingChange Tracking
  • 14. 14 Operational Efficiency: Process Automation & Better Monitoring Automation of critical data center processes like Asset Management, Capacity Planning and Provisioning improves efficiency of data center operations Improved visibility of the power chain and the relationships among critical components of the infrastructure helps in better impact analysis of device malfunction or failure and doing RCA  Change Tracking in the data center environment helps in doing impact analysis of any change and root cause analysis of any outage occurring due to a change Process AutomationProcess Automation Better MonitoringBetter Monitoring - Controls CapEx - Reduces OpEx - Proactive Alarms - Better Impact Analysis - Change Tracking - Process Automation - Better Monitoring - Tracks Energy & Carbon - Recommends ways to improve efficiency GFS Crane DCIM Cost ReductionCost Reduction AvailabilityAvailability Operational EfficiencyOperational Efficiency ‘Green DC’‘Green DC’
  • 15. 15 Green DC: Track Energy & Emissions for Data Center  Measures real-time power consumption of at device level with soft-metering and intelligent meters  Can integrate with existing BMS to capture non-IT power  Calculates real-time PUE and analyzes PUE trends  Calculates GHG emission and carbon footprint for the DC  Recommends ways to reduce IT power by server retirement, virtualization and replacement  Identifies power distribution loss in the power chain and helps in improving infrastructure efficiency  Recommends ways to improve PUE Track Energy & CarbonTrack Energy & Carbon RecommendationsRecommendations - Controls CapEx - Reduces OpEx - Proactive Alarms - Better Impact Analysis - Change Tracking - Process Automation - Better Monitoring - Tracks Energy & Emissions - Recommends ways to improve efficiency GFS Crane DCIM Cost ReductionCost Reduction AvailabilityAvailability Operational EfficiencyOperational Efficiency ‘Green DC’‘Green DC’
  • 16. 16 Reports – CIO Dashboard DCIM Software Case Study
  • 17. 17 Customer Profile  Leading integrated infrastructure player in the Finance Sector  Embarked on an enterprise-wide Energy & Sustainability Management Program  Among the first to adopt Data Center Infrastructure Management (DCIM) software in India  The primary data center is Uptime Institute Tier III certified
  • 18. 18 What did they want from the system The ability to monitor real-time large amounts of data from the whole infrastructure wherever located and not be invasive in the process  The intelligence to interpret it to provide a range of accurate addressable information against a wide range of parameters  The flexibility to report the results at all significant levels of management, and at all levels of activity within the infrastructure over any period of time  The ability to highlight system or performance critical events by alerts in addition to the normal reporting schedules or on demand
  • 19. 19 Reports – CIO Dashboard Findings & Recommendations
  • 20. 20 Customer found that the data center computing resources were heavily under-utilized and there was immense scope for optimization. Average CPU utilization of servers in the Data Center was just above 3% Customer found that the data center computing resources were heavily under-utilized and there was immense scope for optimization. Average CPU utilization of servers in the Data Center was just above 3% Findings & Recommendations
  • 21. 21 Findings & Recommendations DCIM identified under-utilized servers that could be candidates for retirement resulting in lower power consumption, lesser emission and lower power bills for the data center. Similarly found candidates for Virtualization DCIM identified under-utilized servers that could be candidates for retirement resulting in lower power consumption, lesser emission and lower power bills for the data center. Similarly found candidates for Virtualization
  • 22. 22 Findings & Recommendations Customer had not done an aging analysis of devices in the data center before DCIM was implemented. DCIM enabled – • Identification of old servers which had depreciated and could be replaced with more energy efficient devices. • Replacement options from within were identified, saving on capex. Customer had not done an aging analysis of devices in the data center before DCIM was implemented. DCIM enabled – • Identification of old servers which had depreciated and could be replaced with more energy efficient devices. • Replacement options from within were identified, saving on capex.
  • 23. 23 Maturity Levels Measurement Methodology & Frequency Basic (Level 1) Intermediate (Level 2) Advanced (Level 3) Total Facility Power Data center input power Data center input power less shared HVAC Data center input power less shared HVAC plus building lighting, security IT Power UPS PDU Server Frequency of measurement Monthly/weekly Daily Continuous PUE Measurement as per Green Grid Recommendation  Depending on size, scale and tier of a data center, its efficiency program can mainly be at three levels of maturity namely Basic, Intermediate and Advanced.  Green Grid recommendeds three levels of PUE calculation corresponding to the maturity levels as illustrated in the table below. → Customer had been measuring weekly PUE from UPS output till now, in line with Basic Maturity Level → Customer is now measuring IT power from the BUSBAR output to each rack which is being captured by DCIM to provide daily PUE report. Hence they comply with the Intermediate Maturity Level now. → Customer has started measuring power consumption of individual servers and other IT devices at 95% accuracy using the ‘soft-metering’ capability of the DCIM. Customer will soon be upgrading the PUE measurement process to the Advanced Level and monitor the PUE of the data center continuously through the DCIM.
  • 24. 24 The Financial Savings • Energy Efficiency: 15% reduction in annual power bills. Their average growth in power costs was 10% pa; • Asset Utilization: improvement by 5% through annual savings in server procurements due to better utilization; • Operational Efficiency: 10% annual savings due to better capacity planning in terms of power, cooling, rack and floor space, improved productivity and higher uptimes & better SLA due to timely preventive maintenance of devices.
  • 25. 25 Better Information provides greater opportunities  Save Energy  Optimize the activity/power use in servers/devices  Maximize the use of space within racks  Increase uptime and sustainability  Delay/reduce the need for more floor space and support devices  Meet regulatory reporting requirements