This document provides a summary of Brian Nicholls' experience and qualifications as a project controls manager. It outlines over 30 years of experience managing project controls for large capital projects in various industries. Some key responsibilities included schedule creation and maintenance using Primavera, cost engineering and tracking, earned value management, and risk analysis. Notable past roles included serving as project controls manager for multi-billion dollar oil and gas and power projects.
7 years of experience in Oil & gas and Petrochemical industries, Renewable Energy project
P l a n n i n g , Scheduler, Control, Real Manager and Field, Leader. I analyses, plan, organize, negotiate, direct, control,
manage and evaluate.
I am also responsible for: the procurement budget, its policy and strategy, its logistics, an organization, a region and, in
particular, to identify opportunities to improve operations.
With developed skills in Primavera P6 and good knowledge of National Electrical Codes.
Having 20+ experience in both Onshore and Offshore Oil & Gas, Petrochemicals, Fertilizer, Power Plants and Shutdown projects to develop the data/package such as Scheduling, Progress Measurements systems, reporting and trending and risk assessment for planning and project control. Also having well exposure in Earned Value Analysis, Costing, Budgeting, Risk Management, Fornesic delay analysis and EOT Claims
http://www.govtalert.com/ukpsc-admit-card/
Applicants who are going to appear for Main examination for filling up Civil Judge post and now looking for UKPSC Admit Card 2016 than you are at correct place.
7 years of experience in Oil & gas and Petrochemical industries, Renewable Energy project
P l a n n i n g , Scheduler, Control, Real Manager and Field, Leader. I analyses, plan, organize, negotiate, direct, control,
manage and evaluate.
I am also responsible for: the procurement budget, its policy and strategy, its logistics, an organization, a region and, in
particular, to identify opportunities to improve operations.
With developed skills in Primavera P6 and good knowledge of National Electrical Codes.
Having 20+ experience in both Onshore and Offshore Oil & Gas, Petrochemicals, Fertilizer, Power Plants and Shutdown projects to develop the data/package such as Scheduling, Progress Measurements systems, reporting and trending and risk assessment for planning and project control. Also having well exposure in Earned Value Analysis, Costing, Budgeting, Risk Management, Fornesic delay analysis and EOT Claims
http://www.govtalert.com/ukpsc-admit-card/
Applicants who are going to appear for Main examination for filling up Civil Judge post and now looking for UKPSC Admit Card 2016 than you are at correct place.
PROFESSIONAL SUMMARY
Program / Project Manager with a successful record of managing full project life-cycle initiatives. Expertise includes a combination of both Application Development and Infrastructure experience. I’ve acted as both developer and then App Dev PM while with the State of Missouri. I rate my SDLC experience as an 8/10 as I personally did VB development and acted as the PM for entire application delivery from development through SQL and into production. An exceptionally strong Program / Project Manager with the following qualifications:
• PM experience covers product planning, scheduling, testing, change management, implementations and ROI analysis
• Successfully managed projects for domestic and international corporations including BP, State of MO-DOR, Salton/Toastmaster
• Recognized for surpassing corporate and customer expectations for quality and focus by configuring, implementing, training, mergers and acquisitions
• Experienced in handling projects in rapidly changing functional, procedural and engineering environments including international offshore (Brazil, Columbia, UK, Trinidad, Argentina, Mexico) testing/development teams
• Provides disciplined, assertive, tactful leadership to resolve challenges in an efficient, cost-effective manner
• Skilled in developing and maintaining strong customer relations and fostering cohesive, consensus-building project team interactions
• Recognized for being a highly-motivated, self-directed, enthusiastic project manager with a positive, creative attitude for balancing schedules, costs and priorities
• Recognized as an “idea leader” with flexibility to handle assignments with analytical test equipment and to develop quality assurance best practices/processes
• Excels in developing and maintaining project plans without being dependent on technical resources for input.
• Successfully transitioned to a portfolio of 65 projects International with a blend of waterfall and agile teams with ~$75 million budget. Overseeing multiple vertical project managers, business analyst, functional analyst, and working with the communications team. All in a ~2 month onboarding to the account.
• Apply communication strategies to engage International-level stakeholders in order to understand product objectives, customer service processes, development teams, and define strategies for opposing developing techniques to timely and with budget constraints. Supports SAFe (Scaled Agile Framework) as the “Release Train Engineer.
• Manage the flow of value through the program and value stream Kanban’s to increase outlook into new work and into the work flow. Establishing connections among the Portfolio, Journey mapping, value stream, and programs levels.
AREAS OF EXPERTISE:
o Contract & Vendor Management
o Earned Value Analysis & Schedule Forensics Specialist
o Progress Reporting, Presentations, Planning & Scheduling
o Project Bonding and Insurance
o Cost and Schedule Risk Analysis
o Estimating & Budgeting, Cost Controls, Cost Analysis.
o Proposal Development
Artificial intelligence (AI) offers new opportunities to radically reinvent the way we do business. This study explores how CEOs and top decision makers around the world are responding to the transformative potential of AI.
The Team Member and Guest Experience - Lead and Take Care of your restaurant team. They are the people closest to and delivering Hospitality to your paying Guests!
Make the call, and we can assist you.
408-784-7371
Foodservice Consulting + Design
Oprah Winfrey: A Leader in Media, Philanthropy, and Empowerment | CIO Women M...CIOWomenMagazine
This person is none other than Oprah Winfrey, a highly influential figure whose impact extends beyond television. This article will delve into the remarkable life and lasting legacy of Oprah. Her story serves as a reminder of the importance of perseverance, compassion, and firm determination.
Modern Database Management 12th Global Edition by Hoffer solution manual.docxssuserf63bd7
https://qidiantiku.com/solution-manual-for-modern-database-management-12th-global-edition-by-hoffer.shtml
name:Solution manual for Modern Database Management 12th Global Edition by Hoffer
Edition:12th Global Edition
author:by Hoffer
ISBN:ISBN 10: 0133544613 / ISBN 13: 9780133544619
type:solution manual
format:word/zip
All chapter include
Focusing on what leading database practitioners say are the most important aspects to database development, Modern Database Management presents sound pedagogy, and topics that are critical for the practical success of database professionals. The 12th Edition further facilitates learning with illustrations that clarify important concepts and new media resources that make some of the more challenging material more engaging. Also included are general updates and expanded material in the areas undergoing rapid change due to improved managerial practices, database design tools and methodologies, and database technology.
Modern Database Management 12th Global Edition by Hoffer solution manual.docx
B Nicholls resume 2016-07-17
1. BRIAN NICHOLLS
PROJECT CONTROLS MANAGER | PRIMAVERA SME | RISK ANALYSIST | EVM & CHANGE MANAGEMENT
Sugar Land, TX | bnicholls44@hotmail.com | (713) 842-0866 – cell | linkedin.com/in/briannichollsconsulting
1 | P a g e
PROFILE
Senior Project Controls Manager who ensures project controls policies/procedures and work products are well developed,
available, adhered to and functioning in accordance with corporate and project standards. Expertise in creating
consistency between the project estimate, cost accounts (COA) and work breakdown structures (WBS), and CPM
schedules. Recognized as Subject Matter Expert (SME) on Primavera software systems. Created, implemented and
managed hundreds of simple schedules of >$1M, as well as multi-million and multi-billion dollar national and global
initiatives. Well-versed in leading project controls departments and mentoring. Experienced in directing earned value
methodologies, cost tracking and metrics reporting, schedule creation and management, critical path methodology,
forecasting, scheduling and cost & risk analytics.
Project Controls & Management
Project Management & Planning
Project Estimation, Coordination & Delivery
Program Management & Execution
Earned Value Management
Schedule Analysis & Control
Risk Analysis & Management
CPM Scheduling
Cost Engineering & Tracking
Change Management
EPC/EPCM Delivery
Project Engineering
EXPERIENCE
NICHOLLS CONSULTING SERVICES Sugar Land, TX
Consultant/Senior Project Controls Manager (1987 to 2015): Provide Consulting Services, Expert Witness Analysis and reporting
regarding all aspects of Project Controls; Cost tracking, EVM and CPM scheduling utilizing Primavera P6 or Microsoft Project and a
variety of Cost Management software systems. Primary function as Owners representative, with clientele including Owners and
EPC/EPCM companies in industrial and commercial sectors such as Oil & Gas - Up-Stream - Mid Stream - Down-Stream; Power
Transmission & Delivery; Power Generation; Industrial Planning Services for Shutdowns and Turnarounds; Vendor Fabrication &
Delivery; Infrastructure, Earthwork, Roadways/Bridges, Utilities; Entertainment Venues and Movie Production Planning/Scheduling.
Additionally, provide proposal re-writes and updates for project controls-related sections of RFQs, PEPs as well as estimate integration
for cost and schedule values.
AECOM / URS White Plains, NY
Senior Project Controls Manager (2015): Designated as seconded Project Controls Manager for the NY Power Authority (NYPA) as
Owner’s rep for 25-year, $729-M systems upgrade program for St. Lawrence District BaRR & T-LEM projects.
Revised and updated the integration of Primavera P6 and MS Project detail information into the Program Level 1, 2, 3 and 4
program schedule.
Master Program included interfacing with 4 complete and separate projects with Critical resource assignments in engineering
services and field technician availability.
Advised in-house and outside engineering, procurement services, and direct field contractors in schedule creation and
maintenance on semi-monthly updates for inclusion and update into the master program schedule.
CH2M HILL Houston, TX
Project Controls Manager (2011 to 2015): Impacted projects for OG&C, Power and Water divisions. Guided project planning and
scheduling, estimate resource assessment and integration, cost reporting/tracking, EVM, and CPM implementation. Instrumentally
contributed project controls analysis to management teams leading underperforming projects. Advised corporate and project
management in overcoming operational, financial and organizational challenges.
PCM Lead on NY Power Authority (NYPA) as owner’s rep for 25-year, $729-M systems upgrade program for St. Lawrence
District BaRR & T-LEM projects.
PCM Lead $2.8-B Greenfield Fertilizer program from Pre FEED - FEED - Detail Design to full-on EPC Program.
Produced quantifiable data-driven reports that transformed daily/weekly/monthly SOP business into a sustainable operation
that successfully delivered program and project requirements on time and on budget.
Designated as EPC - PCM & SME for Energy & Chemicals O&G Divisions to train and mentor staff while maintaining department’s
Project Controls Enterprise Wide systems for schedule and cost tracking.
2. BRIAN NICHOLLS
PROJECT CONTROLS MANAGER | PRIMAVERA SME | RISK ANALYSIST | EVM & CHANGE MANAGEMENT
Sugar Land, TX | bnicholls44@hotmail.com | (713) 842-0866 – cell | linkedin.com/in/briannichollsconsulting
2 | P a g e
Insured, implemented and maintaining division policies/procedures and QA/QC requirements. Steered Primavera P6 training
and standardization for schedule development and maintenance.
Guided integration of schedule/cost management procedures, reporting requirements, standardized formats of WBS with COA
and the proper use/training for subsequent projects and program implementation.
THE SHAW GROUP Houston, TX
Senior Project Schedule Lead (2009 to 2011): Directed CPM construction planning and scheduling of $329-M EPC Mobile Source
Air Toxins (MSAT) capital improvement project for Marathon Petroleum Company in Robinson, IL. Maintained overall project
construction schedule, cost tracking integration by developing, utilizing daily, weekly by-weekly and monthly reporting for 9
subcontracts and 1 fully-integrated project file. Coordinated and maintained quality relationships between project teams, owners
representatives and sub-contractors utilizing regularly scheduled project reviews and ad-hoc meetings to discuss the quality and
quantity calculations regarding production values effecting schedule driven critical and near critical path work resulting in ownership
by all participants in the life and health of the schedule and cost tracking information. Project deliveredon and on budget.
MUSTANG ENGINEERING Houston, TX
Senior Project Controls Planner (2007 to 2009): Managed CPM Scheduling, EVM tracking and cost controls on capital
improvements for midstream, downstream and pipeline petrochemical projects. Lead planner/scheduler on several projects for the
capital projects group midstream operations primarily in LNG terminals and Carbon Capture projects.
CB&I The Woodlands, TX
Project Controls Planner (2006 to 2007): Oversaw project controls planning on EPC projects to ensure accurate representation of
all schedule information. Impacted broad base of projects from engineering office as well as the field. Created and managed project
schedules for Mid-Stream LNG and Down-Stream on-site facilities and clients.
Recreated and quantified entire schedule for $3.8-B PERU LNG (PLNG) construction and commissioning requirements, providing
engineering and purchasing schedule target deliverable requirements, to achieve fully-integrated schedule. Included PM’s schedule
template for Engineering & Procurement implementation requirements.
Provided program analytics on delays impacting Gulf Coast projects impacted by Hurricane Katrina. Presented schedule and
cost information to management and owners for incorporation into project recovery.
Served at Valero Refinery in Houston as Project Controls Specialist tracking and reporting on turnover packages and defining
outstanding items delaying system turnover package milestone dates for every package.
CAPITAL EXCAVATING, INC. Chandler, AZ
Civil Construction Estimator/PM (2004 to 2005): Directed all aspects of estimating process from finding new clients, quantifying
required materials and associated values, defining scope of work, and pricing estimates and negotiating new contracts. Coordinated
startup of new projects, purchased materials and rental equipment, and scheduled design and maintenance. Developed and
implemented new comprehensive spreadsheets for gathering data, as well as subsequent pricing and utilization of owned equipment,
rented equipment, fuel consumption management, material purchases and subcontractor work resulting in an increase of profits by
10% and a reduction of overheads by 15% or better.
EDWARD KRAEMER & SONS Phoenix, AZ
Project Controls Engineer (2003 to 2004): Managed contract schedule via Primavera P3 on $94.9-M+ (TIC) SR51 Design Build 11
mile HOV Lanes project. Ensured accurate distribution of pertinent information to project participants by integrating 3 sub-projects
controlled by 3 Project Managers into 1 master schedule and reporting process. Facilitated change order management and partnered
with ADOT project management team to qualify and quantify resulting impacts, for $8.8-M in total impacts to the project. Project was
delivered on time and on budget.
THE SHAW GROUP Grandbury, TX
Project Controls Planner (2002): A.E.S. Granbury L.L.C., Wolf Hollow Power Plant 750 MW (NG): Instrumentally drove progression
of plant construction project and turnover packages by daily and weekly updating Primavera schedule with information provided from
the field to a “Level 4 & 5,” detail and reported daily progress to management. Overhauled schedule and cost controls programs from
scratch out of Excel and Access, then transferred data to Primavera.
3. BRIAN NICHOLLS
PROJECT CONTROLS MANAGER | PRIMAVERA SME | RISK ANALYSIST | EVM & CHANGE MANAGEMENT
Sugar Land, TX | bnicholls44@hotmail.com | (713) 842-0866 – cell | linkedin.com/in/briannichollsconsulting
3 | P a g e
VILINC SOLUTIONS, INC. (VSI) Grandbury, TX
Project Controls Consultant (2001 to 2002): A.E.S. Granbury L.L.C., Wolf Hollow Power Plant 750 MW (NG): Led weekly schedule
and ad-hoc meetings, loaded data into Primavera P3, and reviewed cost and schedule data with project executives. Revised and
implemented schedule/cost systems impacts and indicated delays to the contract values. Collaborated with 40 project and 20 owner
project team members to define sphere of schedule/cost responsibilities.
VALLEY CREST LANDSCAPING Orlando, FL
Project Engineer & Estimator (1998 to 2000): Implemented and maintained accurate distribution of pertinent cost and schedule
information related to multiple project assignments. Participated in negotiations with owners, subcontractors and vendors to manage
hardscape finished products, rockwork, landscape and irrigation plans from design intent to completed product for multi-million dollar,
high-visibility T&M contracts in Orlando, FL at Universal Studios and Disney sites, TIC value $38+M. Additionally, responsible for
Estimating services and contract buyouts on private commercial, City of Orlando public projects that were Design Build, T&M and
various Fixed Price projects, TIC value $140+M. I served in these capacities in the main and on-site management offices.
BEERS CONSTRUCTION CO./SKANSKA Orlando, FL
Project Scheduler (1997 to 1998): Created and maintained optimize contract schedule via Primavera P3 for $32+M Marvel Superhero
Island (T&M not to exceed) contract at Universal Studios Islands of Adventure. Project encompassed site-wide utilities, 7 multi-use
buildings, roller coaster, and interracial colored hardscape concrete, landscaping and various theme park finishes consistent with
representing Marvel Studios values and visual formats.
JOHNSON BROTHERS CORP. Bartow, FL
Contract/Project Controls Specialist (1994 to 1995): Tracked Combined Cycle (Coal-Gasification) Power Plant via Primavera P3 for
$33+M TECO Polk Power Station Unit 1 Infrastructure project and directly created, oversaw and managed the project schedule CPM
& EVM for $12.4+M Civil/Structural contract. Maintained all information regarding progress and materials delivery. Created weekly
and monthly reports for owners and subcontractors.
Universal Islands of Adventure Infrastructure - Microsoft Network Administrator – (1996 to 1997): Responsibilities included
network system management and the documentation control program called Expedition by Primavera Systems. I set up the system
and assisted in the maintenance and training of appropriate personnel, adjusted the program as needed and recreated the reports
needed to control the flow of all project information and the proper distribution/implementation on all project data.
Universal Islands of Adventure Infrastructure - Project Controls Manager - (1996 to 1997): Original Contract Value $14.65+M plus
T&M change order value $5.35+M involving over 200 T&M Change Orders.
EDUCATION
Fire Science and General Construction Principles for Fire Safety – Pima Community collage – Tucson, AZ