COMPTON INFOTECH PVT. LTD.
DESIGNING DATA CENTERS & SERVER ROOMS
Compton’s Designing Data Center Services are an enterprise-wide, consultative approach
to help you manage mission critical environments. The services encompass the entire life-
cycle, from assessment, strategy and design, to implementation and operational services.
We give the client a Data Center that is state-of-the art and capable of meeting the most
stringent demands.
Our Data Center Management helps design and manages data centers across heterogene-
ous platforms and supports these with global hosting capabilities. Our solutions optimize
and consolidate the data center and its resources, leading to improved service levels and
reduced cost of ownership.
DATA CENTER DESIGNING FOR CROWNE PLAZA
Our Designing Data Center ser-
vices include-
 Understanding the application, data-
base and content
 Space designing i.e. optimized use of
real estate
 Cooling system analysis as per BTU cal-
culations
 Communication and data cabling
 Selection of equipments-Number and
types of racks, Number of servers and
their configuration, switches, storage
devices, backup equipments.
 Physical security
 Fire detection and suppression
 Designing IT policy
 Testing and follow up
 Documentation
Manageability of Our Data Cen-
tre Solutions
 Mature service and delivery practices
and security standards.
 Powered by TIER 3+ datacenters in
Delhi, Mumbai and Bangalore.
 These Data Centers are ISO 20000-1
& 27001 certified.
 World class infrastructure to co-locate
your business critical IT equipment.
 Various managed services option allow
you to completely outsource to experts
while you also concentrate on your
core lines of business.
 We also specialize in delivery Turnkey
DATA CENTRE build out projects.
Creating Data Center at Crown Plaza hotel at Rohini New Delhi
When we started making this data
centre we had a challenge in front of
us that we had to house about 80
servers securely in a not very condu-
cive environment of a five star hotel
where fire water leakage rodents are a
major threat to the IT operations. As
five star hotels have very small area
for it’s maintenance and within the
same area all services like large laun-
dry unit, HVAC units, Chiller plants,
multiple and large kitchens and a
small place for keeping the servers
safe, up and running 24*7*365 days
without any failure. To achieve this we
were given about 3000 sq.ft. space for
the data centre, about 1000 sq.ft for
UPS room and 2000sq.ft. for the IT
Executive and separate cabin for the
IT Manager.
False Flooring:
We maintained the data center raised flooring at 450mm so
that a proper air flow for PAC is maintained. All the services
which are to be delivered under the floor are at different
heights. The ground zero is painted with two hour fire resistant
paint from viper and then covered with insulation of grade 0
(fire resistant) so that we get adequate coverage against acci-
dental fire due substantial amount of power and data cables.
All the cable trays guiding the flow of electrical cables are
rested directly on insulation of ground zero. The raceways are
put on the stand at the height of 300mm so that adequate dis-
tance between the data and power cables is maintained. The
water leakage detection wire is stick on this insulation so that any kind of water seepage or leakage at
ground zero can be detected. VESDA pipe and capillary are put on the height of 250mm at proper dis-
tance to each other and other services to detect any smoke or fire. Gas flooding nozzles are placed at the
height of 200mm from ground zero at proper distance from each other.
Electrical system of data Centre:
It is a type III data centre so there is not complete redundancy of
resources. One of the major lacking is the redundancy of stable
power source only one source of state power supply. The genera-
tor power source is a stop gap arrangement for the state run
power source. We maintained less than 2 Ώ resistance in the
earth. We got 8 earth strips out of which four were directly from
the earth pit in one of the shafts of hotel, these are called pure
earths. The balance four earths were being shared other equip-
ments in the hotel i.e expensive items in hotel
Precision Air-Conditioning (PAC):
The data centre has a very typical cooling requirement of 17 to 21 degree centigrade. This is difficult to
achieve with traditional window/ split or cassette air conditioners. As there is a lot of heat being gener-
ated by various servers/ firewalls/ routers/ Video servers/ Voice Servers/ Storage systems and switches
this need very special type of cooling from the Precision Air-Conditioners which throw the cool air under
the raised flooring which is discharged through the discharge tiles in the raised floor using air dampers.
Rodent Repellant System:
Rodent Repellant System is mainly provided in areas where false flooring is required in a DATA CENTRE.
The Electronic Rodent System should be used in a manner so as to protect the entire volume of space
under consideration including above false ceiling, below false ceiling and below false floor.
Compton Infotech Pvt. Ltd.
B-35a, 2nd Floor, Kalkaji, New Delhi - 110019
Phone - 01147673200, Email - query@compton.in, www.compton.in
Water Leakage Panel:
For this data center we used Siemen’s water leakage panel connected to about 100 mtrs of sonte water
leakage detection wire which is spread out all across the length and breadth of the data center. This is a
very fine cable with water detection sensors protruding out at regular intervals this wire is spread on the
insulation of the data centre. This wire sense the presence of water on the data centre ground zero below
the false flooring and sends it to the panel which hoots to send alarm it can be configured to send a mo-
bile message of an email also. The panel can be divided into four zones to exactly know which part of the
data centre is affected by the water leakage. The panel comes with minimum 2 Zones, 4 Zones, 16Zones
and unlimited zones capacities depending upon the size of facility.
Panels and their Placement:
We placed all the panel i.e Water leakage, VESDA, Fire alarm, Gas flooding outside the data centre in IT
executive room as they become easy to access and maintain also in case of emergency within data cen-
tre it becomes very easy to operate them and control various services. These are all connected to the UPS
power to allow 24*7*365 days operation. We wanted to place them outside the data center also be-
cause we don’t want anybody entering the data center for maintenance jobs. The temperature within data
center has to be maintained between 19 to 21 degree centigrade.
Fire safety and suppression system:
Fire fighting is a very important service in a data center as it is a facility holding very important informa-
tion and there is a big concentration of wires which are very prone to fire. For this purpose all the walls,
windows and doors are made from fire resistant materials and covered with 2 hour fire resistant paint.
Fire services in data center are divided into two separate parts of fire detection and gas flooding system.
VESDA: We used a Very Early Smoke Detection Apparatus (VESDA) from x-tralis to detect the fire in its
very early stage. The fire services in a data center are very specialized as there is a great danger of fire
starting due to some short circuit or voltage fluctuation.
Gas Flooding Systems: We use FM200 based gas flooding systems. The gas based fire suppression sys-
tems are effective for electronics and computer items and also are environment friendly.
Compton Infotech Pvt. Ltd.
B-35A, 2nd Floor, Kalkaji, New Delhi - 110019 Phone - 01147673200, Email - query@compton.in, Website - www.compton.in

More Related Content

What's hot

Data centre requirements
Data centre requirementsData centre requirements
Data centre requirementsarjun thakur
 
Data Center Tiers Explained
Data Center Tiers ExplainedData Center Tiers Explained
Data Center Tiers ExplainedData Cave
 
Green Data Centre for banks
Green Data Centre for banksGreen Data Centre for banks
Green Data Centre for banksPritam Raha Roy
 
Data center presentation toi -28022013
Data center presentation   toi -28022013Data center presentation   toi -28022013
Data center presentation toi -28022013Sanjay Belulkar
 
Datacenter Strategy, Design, and Build
Datacenter Strategy, Design, and BuildDatacenter Strategy, Design, and Build
Datacenter Strategy, Design, and BuildChristopher Kelley
 
POWER POINT PRESENTATION ON DATA CENTER
POWER POINT PRESENTATION ON DATA CENTERPOWER POINT PRESENTATION ON DATA CENTER
POWER POINT PRESENTATION ON DATA CENTERvivekprajapatiankur
 
Data Center Project Management: Key Components of a Successful System
Data Center Project Management:  Key Components of a Successful SystemData Center Project Management:  Key Components of a Successful System
Data Center Project Management: Key Components of a Successful Systemdpsir
 
Serviced Apartment Compound (case study)
Serviced Apartment Compound (case study)Serviced Apartment Compound (case study)
Serviced Apartment Compound (case study)Marah96
 
HCIA-Data Center Facility V2.0 Training Material.pdf
HCIA-Data Center Facility V2.0 Training Material.pdfHCIA-Data Center Facility V2.0 Training Material.pdf
HCIA-Data Center Facility V2.0 Training Material.pdfGermanVN
 
Data centers
Data centersData centers
Data centerstejaswi25
 
Data Center Floor Design - Your Layout Can Save of Kill Your PUE & Cooling Ef...
Data Center Floor Design - Your Layout Can Save of Kill Your PUE & Cooling Ef...Data Center Floor Design - Your Layout Can Save of Kill Your PUE & Cooling Ef...
Data Center Floor Design - Your Layout Can Save of Kill Your PUE & Cooling Ef...Maria Demitras
 

What's hot (20)

Server room
Server roomServer room
Server room
 
Datacenter
DatacenterDatacenter
Datacenter
 
Best Practices for Planning your Datacenter
Best Practices for Planning your DatacenterBest Practices for Planning your Datacenter
Best Practices for Planning your Datacenter
 
Data centre requirements
Data centre requirementsData centre requirements
Data centre requirements
 
Data center
Data centerData center
Data center
 
Data Center Tiers Explained
Data Center Tiers ExplainedData Center Tiers Explained
Data Center Tiers Explained
 
Data center
Data centerData center
Data center
 
Green Data Centre for banks
Green Data Centre for banksGreen Data Centre for banks
Green Data Centre for banks
 
Data center presentation toi -28022013
Data center presentation   toi -28022013Data center presentation   toi -28022013
Data center presentation toi -28022013
 
Datacenter Strategy, Design, and Build
Datacenter Strategy, Design, and BuildDatacenter Strategy, Design, and Build
Datacenter Strategy, Design, and Build
 
POWER POINT PRESENTATION ON DATA CENTER
POWER POINT PRESENTATION ON DATA CENTERPOWER POINT PRESENTATION ON DATA CENTER
POWER POINT PRESENTATION ON DATA CENTER
 
Data Center Project Management: Key Components of a Successful System
Data Center Project Management:  Key Components of a Successful SystemData Center Project Management:  Key Components of a Successful System
Data Center Project Management: Key Components of a Successful System
 
Modular Data Center Design
Modular Data Center DesignModular Data Center Design
Modular Data Center Design
 
project report on DATACENTER
project report on DATACENTERproject report on DATACENTER
project report on DATACENTER
 
Data-center SDN
Data-center  SDN Data-center  SDN
Data-center SDN
 
DATA CENTER
DATA CENTER DATA CENTER
DATA CENTER
 
Serviced Apartment Compound (case study)
Serviced Apartment Compound (case study)Serviced Apartment Compound (case study)
Serviced Apartment Compound (case study)
 
HCIA-Data Center Facility V2.0 Training Material.pdf
HCIA-Data Center Facility V2.0 Training Material.pdfHCIA-Data Center Facility V2.0 Training Material.pdf
HCIA-Data Center Facility V2.0 Training Material.pdf
 
Data centers
Data centersData centers
Data centers
 
Data Center Floor Design - Your Layout Can Save of Kill Your PUE & Cooling Ef...
Data Center Floor Design - Your Layout Can Save of Kill Your PUE & Cooling Ef...Data Center Floor Design - Your Layout Can Save of Kill Your PUE & Cooling Ef...
Data Center Floor Design - Your Layout Can Save of Kill Your PUE & Cooling Ef...
 

Similar to Data Center Design Case Study

Aruba Data Center - English
Aruba Data Center - EnglishAruba Data Center - English
Aruba Data Center - EnglishAruba S.p.A.
 
DataBOX 2012 EN
DataBOX 2012 ENDataBOX 2012 EN
DataBOX 2012 ENxavi72
 
Edge Data Center Solutions
Edge Data Center SolutionsEdge Data Center Solutions
Edge Data Center SolutionsRittal India
 
Deltalis Factsheet English
Deltalis Factsheet EnglishDeltalis Factsheet English
Deltalis Factsheet EnglishMichaelImfeld
 
Brochure Data Center
Brochure Data CenterBrochure Data Center
Brochure Data Centerbryanpsu
 
Company profile miguns Group
Company profile miguns GroupCompany profile miguns Group
Company profile miguns GroupAkankha Ahmed
 
Cse318,lab report
Cse318,lab reportCse318,lab report
Cse318,lab reportFarhadHimel
 
Corexchange Data Center Tour
Corexchange Data Center TourCorexchange Data Center Tour
Corexchange Data Center Tourtpersky
 
Remote Office 2010
Remote Office 2010Remote Office 2010
Remote Office 2010myazhome
 
EADC Brochure - Kenya Tier III Datacentre
EADC Brochure - Kenya Tier III DatacentreEADC Brochure - Kenya Tier III Datacentre
EADC Brochure - Kenya Tier III Datacentrestevenpaterson
 
Roxtec data centers
Roxtec data centersRoxtec data centers
Roxtec data centersRADOME-IT
 
In the Data Center: Five Keys to Achieving Ultra-Low PUEs
In the Data Center: Five Keys to Achieving Ultra-Low PUEsIn the Data Center: Five Keys to Achieving Ultra-Low PUEs
In the Data Center: Five Keys to Achieving Ultra-Low PUEsVantage Data Centers
 
Elitery Building Facilities in Bogor
Elitery Building Facilities in BogorElitery Building Facilities in Bogor
Elitery Building Facilities in BogorHendra Suryakusuma
 

Similar to Data Center Design Case Study (20)

Aruba Data Center - English
Aruba Data Center - EnglishAruba Data Center - English
Aruba Data Center - English
 
DataBOX 2012 EN
DataBOX 2012 ENDataBOX 2012 EN
DataBOX 2012 EN
 
DataBOX by Adam - EN
DataBOX by Adam - ENDataBOX by Adam - EN
DataBOX by Adam - EN
 
Data center m&e
Data center  m&eData center  m&e
Data center m&e
 
DC english
DC englishDC english
DC english
 
Edge Data Center Solutions
Edge Data Center SolutionsEdge Data Center Solutions
Edge Data Center Solutions
 
Deltalis Factsheet English
Deltalis Factsheet EnglishDeltalis Factsheet English
Deltalis Factsheet English
 
Brochure Data Center
Brochure Data CenterBrochure Data Center
Brochure Data Center
 
Company profile miguns Group
Company profile miguns GroupCompany profile miguns Group
Company profile miguns Group
 
TFS Brochure 5_Redetec
TFS Brochure 5_RedetecTFS Brochure 5_Redetec
TFS Brochure 5_Redetec
 
GCSS COMPANY PROFILE
GCSS COMPANY PROFILEGCSS COMPANY PROFILE
GCSS COMPANY PROFILE
 
Data Center Monitoring Systems
Data Center Monitoring SystemsData Center Monitoring Systems
Data Center Monitoring Systems
 
Cse318,lab report
Cse318,lab reportCse318,lab report
Cse318,lab report
 
Corexchange Data Center Tour
Corexchange Data Center TourCorexchange Data Center Tour
Corexchange Data Center Tour
 
Remote Office 2010
Remote Office 2010Remote Office 2010
Remote Office 2010
 
EADC Brochure - Kenya Tier III Datacentre
EADC Brochure - Kenya Tier III DatacentreEADC Brochure - Kenya Tier III Datacentre
EADC Brochure - Kenya Tier III Datacentre
 
Roxtec data centers
Roxtec data centersRoxtec data centers
Roxtec data centers
 
In the Data Center: Five Keys to Achieving Ultra-Low PUEs
In the Data Center: Five Keys to Achieving Ultra-Low PUEsIn the Data Center: Five Keys to Achieving Ultra-Low PUEs
In the Data Center: Five Keys to Achieving Ultra-Low PUEs
 
Elitery Building Facilities in Bogor
Elitery Building Facilities in BogorElitery Building Facilities in Bogor
Elitery Building Facilities in Bogor
 
Dc
DcDc
Dc
 

Recently uploaded

Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Igalia
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024The Digital Insurer
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Paola De la Torre
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024The Digital Insurer
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreternaman860154
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slidevu2urc
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking MenDelhi Call girls
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfEnterprise Knowledge
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonAnna Loughnan Colquhoun
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...apidays
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024Rafal Los
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking MenDelhi Call girls
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxMalak Abu Hammad
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024Results
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Enterprise Knowledge
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...Neo4j
 

Recently uploaded (20)

Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 

Data Center Design Case Study

  • 1. COMPTON INFOTECH PVT. LTD. DESIGNING DATA CENTERS & SERVER ROOMS Compton’s Designing Data Center Services are an enterprise-wide, consultative approach to help you manage mission critical environments. The services encompass the entire life- cycle, from assessment, strategy and design, to implementation and operational services. We give the client a Data Center that is state-of-the art and capable of meeting the most stringent demands. Our Data Center Management helps design and manages data centers across heterogene- ous platforms and supports these with global hosting capabilities. Our solutions optimize and consolidate the data center and its resources, leading to improved service levels and reduced cost of ownership. DATA CENTER DESIGNING FOR CROWNE PLAZA
  • 2. Our Designing Data Center ser- vices include-  Understanding the application, data- base and content  Space designing i.e. optimized use of real estate  Cooling system analysis as per BTU cal- culations  Communication and data cabling  Selection of equipments-Number and types of racks, Number of servers and their configuration, switches, storage devices, backup equipments.  Physical security  Fire detection and suppression  Designing IT policy  Testing and follow up  Documentation Manageability of Our Data Cen- tre Solutions  Mature service and delivery practices and security standards.  Powered by TIER 3+ datacenters in Delhi, Mumbai and Bangalore.  These Data Centers are ISO 20000-1 & 27001 certified.  World class infrastructure to co-locate your business critical IT equipment.  Various managed services option allow you to completely outsource to experts while you also concentrate on your core lines of business.  We also specialize in delivery Turnkey DATA CENTRE build out projects. Creating Data Center at Crown Plaza hotel at Rohini New Delhi When we started making this data centre we had a challenge in front of us that we had to house about 80 servers securely in a not very condu- cive environment of a five star hotel where fire water leakage rodents are a major threat to the IT operations. As five star hotels have very small area for it’s maintenance and within the same area all services like large laun- dry unit, HVAC units, Chiller plants, multiple and large kitchens and a small place for keeping the servers safe, up and running 24*7*365 days without any failure. To achieve this we were given about 3000 sq.ft. space for the data centre, about 1000 sq.ft for UPS room and 2000sq.ft. for the IT Executive and separate cabin for the IT Manager.
  • 3. False Flooring: We maintained the data center raised flooring at 450mm so that a proper air flow for PAC is maintained. All the services which are to be delivered under the floor are at different heights. The ground zero is painted with two hour fire resistant paint from viper and then covered with insulation of grade 0 (fire resistant) so that we get adequate coverage against acci- dental fire due substantial amount of power and data cables. All the cable trays guiding the flow of electrical cables are rested directly on insulation of ground zero. The raceways are put on the stand at the height of 300mm so that adequate dis- tance between the data and power cables is maintained. The water leakage detection wire is stick on this insulation so that any kind of water seepage or leakage at ground zero can be detected. VESDA pipe and capillary are put on the height of 250mm at proper dis- tance to each other and other services to detect any smoke or fire. Gas flooding nozzles are placed at the height of 200mm from ground zero at proper distance from each other. Electrical system of data Centre: It is a type III data centre so there is not complete redundancy of resources. One of the major lacking is the redundancy of stable power source only one source of state power supply. The genera- tor power source is a stop gap arrangement for the state run power source. We maintained less than 2 Ώ resistance in the earth. We got 8 earth strips out of which four were directly from the earth pit in one of the shafts of hotel, these are called pure earths. The balance four earths were being shared other equip- ments in the hotel i.e expensive items in hotel Precision Air-Conditioning (PAC): The data centre has a very typical cooling requirement of 17 to 21 degree centigrade. This is difficult to achieve with traditional window/ split or cassette air conditioners. As there is a lot of heat being gener- ated by various servers/ firewalls/ routers/ Video servers/ Voice Servers/ Storage systems and switches this need very special type of cooling from the Precision Air-Conditioners which throw the cool air under the raised flooring which is discharged through the discharge tiles in the raised floor using air dampers. Rodent Repellant System: Rodent Repellant System is mainly provided in areas where false flooring is required in a DATA CENTRE. The Electronic Rodent System should be used in a manner so as to protect the entire volume of space under consideration including above false ceiling, below false ceiling and below false floor.
  • 4. Compton Infotech Pvt. Ltd. B-35a, 2nd Floor, Kalkaji, New Delhi - 110019 Phone - 01147673200, Email - query@compton.in, www.compton.in Water Leakage Panel: For this data center we used Siemen’s water leakage panel connected to about 100 mtrs of sonte water leakage detection wire which is spread out all across the length and breadth of the data center. This is a very fine cable with water detection sensors protruding out at regular intervals this wire is spread on the insulation of the data centre. This wire sense the presence of water on the data centre ground zero below the false flooring and sends it to the panel which hoots to send alarm it can be configured to send a mo- bile message of an email also. The panel can be divided into four zones to exactly know which part of the data centre is affected by the water leakage. The panel comes with minimum 2 Zones, 4 Zones, 16Zones and unlimited zones capacities depending upon the size of facility. Panels and their Placement: We placed all the panel i.e Water leakage, VESDA, Fire alarm, Gas flooding outside the data centre in IT executive room as they become easy to access and maintain also in case of emergency within data cen- tre it becomes very easy to operate them and control various services. These are all connected to the UPS power to allow 24*7*365 days operation. We wanted to place them outside the data center also be- cause we don’t want anybody entering the data center for maintenance jobs. The temperature within data center has to be maintained between 19 to 21 degree centigrade. Fire safety and suppression system: Fire fighting is a very important service in a data center as it is a facility holding very important informa- tion and there is a big concentration of wires which are very prone to fire. For this purpose all the walls, windows and doors are made from fire resistant materials and covered with 2 hour fire resistant paint. Fire services in data center are divided into two separate parts of fire detection and gas flooding system. VESDA: We used a Very Early Smoke Detection Apparatus (VESDA) from x-tralis to detect the fire in its very early stage. The fire services in a data center are very specialized as there is a great danger of fire starting due to some short circuit or voltage fluctuation. Gas Flooding Systems: We use FM200 based gas flooding systems. The gas based fire suppression sys- tems are effective for electronics and computer items and also are environment friendly. Compton Infotech Pvt. Ltd. B-35A, 2nd Floor, Kalkaji, New Delhi - 110019 Phone - 01147673200, Email - query@compton.in, Website - www.compton.in