Hard-working Mechanical Supervisor with 15 years experience in many aspects of my trade
including Supervision, Test & commissioning, Pipefitting, Fabrication, Instrumentation,
Welding, Plumbing, Field measurements, Safety, good leadership communication problem
solving skills, seeking employment in an organisation that values dedicated and committed
employees.
Key Skills & Area of work experience
• Pharmaceutical, HVAC, Oil Refinery, Desalination Plants, Hospital,
• High Rise Apartment, Office Block, Airport, Hotel, School, Data Centre.
• Coordination with main contractor, engineers, snaggers, safety.
• Procurement of materials.
• Managing a team to construct and complete works.
• Ability to identify and resolve potential project delays.
• Identify Scope of work changes or scope discrepancies.
• Ability to work from drawings, implement changes when and where necessary
Apprenticeship/Education:
1997 - 2001:
Cork Institute of Technology
• FÁS Apprenticeship (Pipe Fitting); Full Merits
• ECDL computing course
• Currently studying for PMP project management Exam
Courses / Training
• FÁS Safe Pass Card valid until 11/16
• Manual Handling, Safety Harness, Scissor Lift, Mobile Scaffold
• Plastic Fusion Training and Abrasive Wheel Training
• Highly capable in Gas Welding, Arc Welding and Brazing
2. Work Experience:
2014 (November) – To date Mercury Engineering
Project: Zenium Data Center (Frankfurt - Germany)
Position: Mechanical & Civil P.M Rory O’Brien
Coordinator
Duties:
• Supervise and Coordinate the Mechanical and Civil Construction works on site
• Responsible for Subcontractors daily activities
• Responsible for all subcontractor site safety Inductions
• Logging & documenting safety folder
• Procurement of materials
• Responsible for the preparation of T&C paper works
2014 (April) – 2014 (October) Mercury Engineering
Project: Primark Retail (Dusseldorf - Germany)
Position: Mechanical Supervisor P.M Declan Prunty
Duties:
• Responsible for Subcontractors daily activities
• Logging & documenting safety folder
• Shutting down and connecting to existing POCs using lock & tag out system.
• Procurement of materials.
• Red line the changes that have occurred during construction for official As
Built plans.
2013 (March) – 2014 (March) Sepam Qatar
Project: New Doha International Airport (Qatar)
Position: Superintendent P.M Michael G Maher
Duties:
• Set up a work shop and trained over 135 Plumbers in Swagelok Bending for a
project in Saudi Arabia.
• Allocation and supervision of construction team.
• Ensuring permits and safety were in place as a first priority.
• Regular meetings with management and client working to program.
• Installation of domestic plumbing, HVAC, sprinkler, sanitary services.
2013 (Jan) – 2013 (March): Dornan Engineering
Project: Santander Data Centre (Leicester UK)
Position: Supervisor P.M Paul Morley
Duties:
• Supervision of pneumatic & hydro testing of large CHW piping services.
• Ensuring permits and safety were in place as a first priority.
• Regular meetings with management and client working to program.
• Strict documentation kept at all times.
3. 2012 (May) – 2012 (Dec) Dornan Engineering
Project: Abbott Pharmaceutical (Amsterdam)
Position: Supervisor P.M John Maloney
Duties:
• Installation of stainless steel drains service pipe work to clean rooms.
• Supervision of pneumatic & hydro testing of large CHW piping services.
• Installation of large AHUs.
• Shutting down and connecting to existing POCs using lock & tag out system.
• Rigging large CHW heavy gauge pipes in to position.
2011 (Jul) – 2012 (Apr): L. Lynch & Co. Engineering
Project: Mid-Western Regional Hospital (Limerick)
Position: Supervisor P.M Mark O’Reilly
Duties:
• Installation of medical gas pipe work, Domestic, Sanitary & Medical waste.
• Installation of large AHUs.
• Supervision of pneumatic & hydro testing of large CHW piping services.
• Installation of sanitary fittings and fixtures.
• Insuring all materials especially copper pipe & fittings well secure.
• Procurement of materials.
2010 (Jan) – 2011 (Jun): Dornan Engineering
Project: Vistakon Pharmaceutical (Limerick)
Position: Chargehand P.M Eoin Rice & John Lyons
Duties:
• Installation of stainless steel drains service pipe work to clean rooms
• Setting and prepping pipe work for orbital welding
• Supervision of pneumatic & hydro testing of large CHW piping services.
• Tagging, labelling & installation of valves, sensors, gauge, instruments.
2009 (Nov) – 2009 (Dec): MSL Engineering Ltd.
Project: Whitegate Oil Refinery, Cobh (Cork)
Position: Pipe Fitter P.M: Dave Barry
Duties:
• 4 Week Shutdown – Strip-out and re-fit of excising pipe & valves
• Ensuring permits and safety were in place as a first priority.
• Coordinating with shut down team to ensure pipe work drained and steam
cleaned before cutting pipe or unbolting flanges.
• Completing and signing off punch list.
• Working off P&IDs and isometric drawings, red lining and documenting
drawings for as builds
4. 2009 (Mar) – 2009 (Nov): McGrath Engineering
Project: Kurnell Desalination Plant (Sydney)
Position: Pipe Fitter P.M Zach Robinson
Duties:
• Installation & preparation of stainless steel pipe work.
• Pneumatic & hydro testing of large piping services.
2008 (Oct) – 2009 (Feb): Mercury Engineering
Project: Corrib Gas Terminal (Mayo)
Position Pipe Fitter P.M Will Tierney
Duties:
• Daily task fabrication of pipe work in work shop
• On site cutting and replacing defected pipe work
2008 (Apr) – 2008 (Sep): Dornan Engineering
Project: Mid-Western Regional Hospital (Limerick)
Position: Chargehand P.M Sara Steele
Duties:
• Installation of mechanical services for Oncology Ward Extension
• Coordinating with other subcontractors to complete works under our scope.
• Regular meetings with management and client working to program.
• Installation of sanitary fittings and fixtures.
• Procurement of materials.
2006 (Feb) – 2008 (Mar): Dornan Engineering
Project: Savoy Development Marriott Hotel (Limerick)
Position: Chargehand P.M John Maloney
Duties:
• Installation of all mechanic services to premade bathroom pods.
• Procurement of material
2005 (Jan) – 2006 (Jan): Dornan Engineering
Project Bishop's Quay High Rise Office Block (Limerick)
Position: Chargehand P.M John Maloney
Duties:
• Installation of Victaulic galvanised fire fighting dry riser, potable water & gas.
• Installation of domestic sanitary piping services, cooling & heating AC units,
bathroom fit-out,
2002 (Nov) – 2004 (Dec): Dornan Engineering
Project: Marine Institute of Technology Oranmore (Galway)
Position: Chargehand P.M John Maloney
Duties:
• Installation of Heating system, gas boilers, expansion vessels, AHUs, A/C
units, ventilation ducts, chemical waste, deionised water, domestic bathroom
kitchen, laboratories, & fish tank services.
5. 2001 (Jan) – 2002 (Oct): Dornan Engineering
Project Power Station, (Shannonbridge) & Lough Ree Power Station, (Longford)
Position: Chargehand P.M Pat Rea / Gerry Walsh
Duties:
• Instrumentation piping bending of small bore stainless steel tube.
• Fitting Instruments according to tag numbers & drawing number.
• Installation of swagelok fittings
• Setting and prepping pipe work for orbital welding
2001 (Jan) – 2001 (Jun): Dornan Engineering
Project: Grove Island Leisure Centre, Corbally (Limerick)
Position: Apprentice P.M Pat Griffin
2000 (Sep) – 2000 (Dec): Dornan Engineering
Project: The Square Shopping Centre, Tallaght (Dublin)
Position: Apprentice P.M Mark Dolan
1999 (Jan) – 2000 (Aug): Dornan Engineering
Project: Guidant Pharmaceutical, Clonmel (Tipperary)
Position: Apprentice P.M Gerry Walsh
1998 (Oct) – 1999 (Dec): Dornan Engineering
Project: Apple Computers, Knocknaheeney (Cork)
Position: Apprentice P.M Pat Rea
1998 (June) – 1998 (Sep): Dornan Engineering
Project: Analog Devices, Raheen (Limerick)
Position: Apprentice P.M Dermot Daly
1998 (march) – 1998 (may): Dornan Engineering
Project: Pretty Polly Plant, Killarney (Kerry)
Position: Apprentice P.M Dan McCarthy
1997 (Dec) – 1998 (Feb): Dornan Engineering
Project: Cable & wireless (Shannon)
Position: Apprentice P.M Pat Griffin
References:
• Will Tierney CSU Lead at Shell Oil
• Paul Flynn Operations Director at Dornan Engineering
• John Maloney Contracts Manager at Dornan Engineering
• Michael G Maher Operations Manager at Sepam Qatar
• Damien Clonan Construction Manager Mercury Engineering
• Contact details to be furnished upon request.