SlideShare a Scribd company logo
1 of 5
Download to read offline
Danny Duggan 
38 Clonmore, dob: 19/06/80 
Kilteragh, m: 0491758447118 Germany 
Dooradoyle, m: 00353877841826 Ireland 
Co. Limerick e: danny_duggan@hotmail.com 
Personal Profile: 
Hard-working Mechanical Supervisor with 15 years experience in many aspects of my trade 
including Supervision, Test & commissioning, Pipefitting, Fabrication, Instrumentation, 
Welding, Plumbing, Field measurements, Safety, good leadership communication problem 
solving skills, seeking employment in an organisation that values dedicated and committed 
employees. 
Key Skills & Area of work experience 
• Pharmaceutical, HVAC, Oil Refinery, Desalination Plants, Hospital, 
• High Rise Apartment, Office Block, Airport, Hotel, School, Data Centre. 
• Coordination with main contractor, engineers, snaggers, safety. 
• Procurement of materials. 
• Managing a team to construct and complete works. 
• Ability to identify and resolve potential project delays. 
• Identify Scope of work changes or scope discrepancies. 
• Ability to work from drawings, implement changes when and where necessary 
Apprenticeship/Education: 
1997 - 2001: 
Cork Institute of Technology 
• FÁS Apprenticeship (Pipe Fitting); Full Merits 
• ECDL computing course 
• Currently studying for PMP project management Exam 
Courses / Training 
• FÁS Safe Pass Card valid until 11/16 
• Manual Handling, Safety Harness, Scissor Lift, Mobile Scaffold 
• Plastic Fusion Training and Abrasive Wheel Training 
• Highly capable in Gas Welding, Arc Welding and Brazing
Work Experience: 
2014 (November) – To date Mercury Engineering 
Project: Zenium Data Center (Frankfurt - Germany) 
Position: Mechanical & Civil P.M Rory O’Brien 
Coordinator 
Duties: 
• Supervise and Coordinate the Mechanical and Civil Construction works on site 
• Responsible for Subcontractors daily activities 
• Responsible for all subcontractor site safety Inductions 
• Logging & documenting safety folder 
• Procurement of materials 
• Responsible for the preparation of T&C paper works 
2014 (April) – 2014 (October) Mercury Engineering 
Project: Primark Retail (Dusseldorf - Germany) 
Position: Mechanical Supervisor P.M Declan Prunty 
Duties: 
• Responsible for Subcontractors daily activities 
• Logging & documenting safety folder 
• Shutting down and connecting to existing POCs using lock & tag out system. 
• Procurement of materials. 
• Red line the changes that have occurred during construction for official As 
Built plans. 
2013 (March) – 2014 (March) Sepam Qatar 
Project: New Doha International Airport (Qatar) 
Position: Superintendent P.M Michael G Maher 
Duties: 
• Set up a work shop and trained over 135 Plumbers in Swagelok Bending for a 
project in Saudi Arabia. 
• Allocation and supervision of construction team. 
• Ensuring permits and safety were in place as a first priority. 
• Regular meetings with management and client working to program. 
• Installation of domestic plumbing, HVAC, sprinkler, sanitary services. 
2013 (Jan) – 2013 (March): Dornan Engineering 
Project: Santander Data Centre (Leicester UK) 
Position: Supervisor P.M Paul Morley 
Duties: 
• Supervision of pneumatic & hydro testing of large CHW piping services. 
• Ensuring permits and safety were in place as a first priority. 
• Regular meetings with management and client working to program. 
• Strict documentation kept at all times.
2012 (May) – 2012 (Dec) Dornan Engineering 
Project: Abbott Pharmaceutical (Amsterdam) 
Position: Supervisor P.M John Maloney 
Duties: 
• Installation of stainless steel drains service pipe work to clean rooms. 
• Supervision of pneumatic & hydro testing of large CHW piping services. 
• Installation of large AHUs. 
• Shutting down and connecting to existing POCs using lock & tag out system. 
• Rigging large CHW heavy gauge pipes in to position. 
2011 (Jul) – 2012 (Apr): L. Lynch & Co. Engineering 
Project: Mid-Western Regional Hospital (Limerick) 
Position: Supervisor P.M Mark O’Reilly 
Duties: 
• Installation of medical gas pipe work, Domestic, Sanitary & Medical waste. 
• Installation of large AHUs. 
• Supervision of pneumatic & hydro testing of large CHW piping services. 
• Installation of sanitary fittings and fixtures. 
• Insuring all materials especially copper pipe & fittings well secure. 
• Procurement of materials. 
2010 (Jan) – 2011 (Jun): Dornan Engineering 
Project: Vistakon Pharmaceutical (Limerick) 
Position: Chargehand P.M Eoin Rice & John Lyons 
Duties: 
• Installation of stainless steel drains service pipe work to clean rooms 
• Setting and prepping pipe work for orbital welding 
• Supervision of pneumatic & hydro testing of large CHW piping services. 
• Tagging, labelling & installation of valves, sensors, gauge, instruments. 
2009 (Nov) – 2009 (Dec): MSL Engineering Ltd. 
Project: Whitegate Oil Refinery, Cobh (Cork) 
Position: Pipe Fitter P.M: Dave Barry 
Duties: 
• 4 Week Shutdown – Strip-out and re-fit of excising pipe & valves 
• Ensuring permits and safety were in place as a first priority. 
• Coordinating with shut down team to ensure pipe work drained and steam 
cleaned before cutting pipe or unbolting flanges. 
• Completing and signing off punch list. 
• Working off P&IDs and isometric drawings, red lining and documenting 
drawings for as builds
2009 (Mar) – 2009 (Nov): McGrath Engineering 
Project: Kurnell Desalination Plant (Sydney) 
Position: Pipe Fitter P.M Zach Robinson 
Duties: 
• Installation & preparation of stainless steel pipe work. 
• Pneumatic & hydro testing of large piping services. 
2008 (Oct) – 2009 (Feb): Mercury Engineering 
Project: Corrib Gas Terminal (Mayo) 
Position Pipe Fitter P.M Will Tierney 
Duties: 
• Daily task fabrication of pipe work in work shop 
• On site cutting and replacing defected pipe work 
2008 (Apr) – 2008 (Sep): Dornan Engineering 
Project: Mid-Western Regional Hospital (Limerick) 
Position: Chargehand P.M Sara Steele 
Duties: 
• Installation of mechanical services for Oncology Ward Extension 
• Coordinating with other subcontractors to complete works under our scope. 
• Regular meetings with management and client working to program. 
• Installation of sanitary fittings and fixtures. 
• Procurement of materials. 
2006 (Feb) – 2008 (Mar): Dornan Engineering 
Project: Savoy Development Marriott Hotel (Limerick) 
Position: Chargehand P.M John Maloney 
Duties: 
• Installation of all mechanic services to premade bathroom pods. 
• Procurement of material 
2005 (Jan) – 2006 (Jan): Dornan Engineering 
Project Bishop's Quay High Rise Office Block (Limerick) 
Position: Chargehand P.M John Maloney 
Duties: 
• Installation of Victaulic galvanised fire fighting dry riser, potable water & gas. 
• Installation of domestic sanitary piping services, cooling & heating AC units, 
bathroom fit-out, 
2002 (Nov) – 2004 (Dec): Dornan Engineering 
Project: Marine Institute of Technology Oranmore (Galway) 
Position: Chargehand P.M John Maloney 
Duties: 
• Installation of Heating system, gas boilers, expansion vessels, AHUs, A/C 
units, ventilation ducts, chemical waste, deionised water, domestic bathroom 
kitchen, laboratories, & fish tank services.
2001 (Jan) – 2002 (Oct): Dornan Engineering 
Project Power Station, (Shannonbridge) & Lough Ree Power Station, (Longford) 
Position: Chargehand P.M Pat Rea / Gerry Walsh 
Duties: 
• Instrumentation piping bending of small bore stainless steel tube. 
• Fitting Instruments according to tag numbers & drawing number. 
• Installation of swagelok fittings 
• Setting and prepping pipe work for orbital welding 
2001 (Jan) – 2001 (Jun): Dornan Engineering 
Project: Grove Island Leisure Centre, Corbally (Limerick) 
Position: Apprentice P.M Pat Griffin 
2000 (Sep) – 2000 (Dec): Dornan Engineering 
Project: The Square Shopping Centre, Tallaght (Dublin) 
Position: Apprentice P.M Mark Dolan 
1999 (Jan) – 2000 (Aug): Dornan Engineering 
Project: Guidant Pharmaceutical, Clonmel (Tipperary) 
Position: Apprentice P.M Gerry Walsh 
1998 (Oct) – 1999 (Dec): Dornan Engineering 
Project: Apple Computers, Knocknaheeney (Cork) 
Position: Apprentice P.M Pat Rea 
1998 (June) – 1998 (Sep): Dornan Engineering 
Project: Analog Devices, Raheen (Limerick) 
Position: Apprentice P.M Dermot Daly 
1998 (march) – 1998 (may): Dornan Engineering 
Project: Pretty Polly Plant, Killarney (Kerry) 
Position: Apprentice P.M Dan McCarthy 
1997 (Dec) – 1998 (Feb): Dornan Engineering 
Project: Cable & wireless (Shannon) 
Position: Apprentice P.M Pat Griffin 
References: 
• Will Tierney CSU Lead at Shell Oil 
• Paul Flynn Operations Director at Dornan Engineering 
• John Maloney Contracts Manager at Dornan Engineering 
• Michael G Maher Operations Manager at Sepam Qatar 
• Damien Clonan Construction Manager Mercury Engineering 
• Contact details to be furnished upon request.

More Related Content

What's hot

Wael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -Cv
Wael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -CvWael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -Cv
Wael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -CvWael El Ahmadi
 
QC Field Engineer 2016
QC Field Engineer 2016QC Field Engineer 2016
QC Field Engineer 2016Michael Nugent
 
QAQC MEP HVAC INSPECTOR
QAQC MEP HVAC INSPECTORQAQC MEP HVAC INSPECTOR
QAQC MEP HVAC INSPECTORMurugan Pillai
 
Peter Holt CV 12-05-2015
Peter Holt CV 12-05-2015Peter Holt CV 12-05-2015
Peter Holt CV 12-05-2015Peter Holt
 
Todd Smith 2016 (Resume))
Todd Smith 2016 (Resume))Todd Smith 2016 (Resume))
Todd Smith 2016 (Resume))Todd Smith
 
Civil QA&QC Inspector Updated Resume
Civil  QA&QC Inspector Updated ResumeCivil  QA&QC Inspector Updated Resume
Civil QA&QC Inspector Updated ResumeMurugan murugan
 
Atiq Amin C.V civil inspector (2)
Atiq Amin C.V civil inspector (2)Atiq Amin C.V civil inspector (2)
Atiq Amin C.V civil inspector (2)atiq amin
 
Makbul Cv
Makbul CvMakbul Cv
Makbul CvMakbul
 
Piping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malikPiping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malikMOHAMAD ANWAR MALIK
 
QA_QC_CIVIL_INSPECTOR_
QA_QC_CIVIL_INSPECTOR_QA_QC_CIVIL_INSPECTOR_
QA_QC_CIVIL_INSPECTOR_seraj ahmad
 
Sr. QA/QC Mechanical Engineer
Sr. QA/QC Mechanical EngineerSr. QA/QC Mechanical Engineer
Sr. QA/QC Mechanical Engineerahmedsgs
 

What's hot (20)

Wael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -Cv
Wael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -CvWael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -Cv
Wael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -Cv
 
QC Field Engineer 2016
QC Field Engineer 2016QC Field Engineer 2016
QC Field Engineer 2016
 
Bannichan Savier CV
Bannichan Savier CVBannichan Savier CV
Bannichan Savier CV
 
QAQC MEP HVAC INSPECTOR
QAQC MEP HVAC INSPECTORQAQC MEP HVAC INSPECTOR
QAQC MEP HVAC INSPECTOR
 
Resume -Amarnath
Resume -AmarnathResume -Amarnath
Resume -Amarnath
 
Resume Khurshid
Resume KhurshidResume Khurshid
Resume Khurshid
 
Peter Holt CV 12-05-2015
Peter Holt CV 12-05-2015Peter Holt CV 12-05-2015
Peter Holt CV 12-05-2015
 
Todd Smith 2016 (Resume))
Todd Smith 2016 (Resume))Todd Smith 2016 (Resume))
Todd Smith 2016 (Resume))
 
Connelly Darren (CV1)
Connelly Darren (CV1)Connelly Darren (CV1)
Connelly Darren (CV1)
 
CV Piping Supervisor
CV Piping SupervisorCV Piping Supervisor
CV Piping Supervisor
 
Civil QA&QC Inspector Updated Resume
Civil  QA&QC Inspector Updated ResumeCivil  QA&QC Inspector Updated Resume
Civil QA&QC Inspector Updated Resume
 
CV17
CV17CV17
CV17
 
Atiq Amin C.V civil inspector (2)
Atiq Amin C.V civil inspector (2)Atiq Amin C.V civil inspector (2)
Atiq Amin C.V civil inspector (2)
 
Makbul Cv
Makbul CvMakbul Cv
Makbul Cv
 
Piping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malikPiping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malik
 
CV Dodo NEW
CV Dodo NEWCV Dodo NEW
CV Dodo NEW
 
QA_QC_CIVIL_INSPECTOR_
QA_QC_CIVIL_INSPECTOR_QA_QC_CIVIL_INSPECTOR_
QA_QC_CIVIL_INSPECTOR_
 
DARIO LOPEZ SAN DIEGO
DARIO LOPEZ SAN DIEGODARIO LOPEZ SAN DIEGO
DARIO LOPEZ SAN DIEGO
 
ENG SAID C.V...
ENG SAID   C.V...ENG SAID   C.V...
ENG SAID C.V...
 
Sr. QA/QC Mechanical Engineer
Sr. QA/QC Mechanical EngineerSr. QA/QC Mechanical Engineer
Sr. QA/QC Mechanical Engineer
 

Similar to Danny Duggan CV

Similar to Danny Duggan CV (20)

Bill Rogers CV 19-01-15
Bill Rogers CV 19-01-15Bill Rogers CV 19-01-15
Bill Rogers CV 19-01-15
 
Resume -Amarnath
Resume -AmarnathResume -Amarnath
Resume -Amarnath
 
Nailesh Patel CV
Nailesh Patel CVNailesh Patel CV
Nailesh Patel CV
 
CV2014
CV2014CV2014
CV2014
 
2015resume1
2015resume12015resume1
2015resume1
 
V. SRINIVASA RAO CV
V. SRINIVASA RAO CVV. SRINIVASA RAO CV
V. SRINIVASA RAO CV
 
Mr Jassadaporn CV apply for UAE
Mr Jassadaporn  CV  apply for UAEMr Jassadaporn  CV  apply for UAE
Mr Jassadaporn CV apply for UAE
 
Josh Resume 11_18_2016
Josh Resume 11_18_2016Josh Resume 11_18_2016
Josh Resume 11_18_2016
 
CV_JIAYI ZHANG
CV_JIAYI ZHANGCV_JIAYI ZHANG
CV_JIAYI ZHANG
 
CV D Schroeder 2016
CV D Schroeder 2016CV D Schroeder 2016
CV D Schroeder 2016
 
CV Darlington
CV DarlingtonCV Darlington
CV Darlington
 
2015 03-17 cv-stefan-grabe_en_e-signed
2015 03-17 cv-stefan-grabe_en_e-signed2015 03-17 cv-stefan-grabe_en_e-signed
2015 03-17 cv-stefan-grabe_en_e-signed
 
RICHARD HEATH-CV3a
RICHARD HEATH-CV3aRICHARD HEATH-CV3a
RICHARD HEATH-CV3a
 
aditi
aditiaditi
aditi
 
Anderson, Perry - PLA E & I Construction Manager CV 2015 - Copy
Anderson, Perry - PLA   E & I Construction Manager CV 2015 - CopyAnderson, Perry - PLA   E & I Construction Manager CV 2015 - Copy
Anderson, Perry - PLA E & I Construction Manager CV 2015 - Copy
 
Jeya CV - updated
Jeya CV - updatedJeya CV - updated
Jeya CV - updated
 
jainco
jaincojainco
jainco
 
Ian_Rowell_Resume_June_2015
Ian_Rowell_Resume_June_2015Ian_Rowell_Resume_June_2015
Ian_Rowell_Resume_June_2015
 
David Pedder_Curriculum Vitae
David Pedder_Curriculum VitaeDavid Pedder_Curriculum Vitae
David Pedder_Curriculum Vitae
 
Cory_Gardiner_Resume_April_2016
Cory_Gardiner_Resume_April_2016Cory_Gardiner_Resume_April_2016
Cory_Gardiner_Resume_April_2016
 

Danny Duggan CV

  • 1. Danny Duggan 38 Clonmore, dob: 19/06/80 Kilteragh, m: 0491758447118 Germany Dooradoyle, m: 00353877841826 Ireland Co. Limerick e: danny_duggan@hotmail.com Personal Profile: Hard-working Mechanical Supervisor with 15 years experience in many aspects of my trade including Supervision, Test & commissioning, Pipefitting, Fabrication, Instrumentation, Welding, Plumbing, Field measurements, Safety, good leadership communication problem solving skills, seeking employment in an organisation that values dedicated and committed employees. Key Skills & Area of work experience • Pharmaceutical, HVAC, Oil Refinery, Desalination Plants, Hospital, • High Rise Apartment, Office Block, Airport, Hotel, School, Data Centre. • Coordination with main contractor, engineers, snaggers, safety. • Procurement of materials. • Managing a team to construct and complete works. • Ability to identify and resolve potential project delays. • Identify Scope of work changes or scope discrepancies. • Ability to work from drawings, implement changes when and where necessary Apprenticeship/Education: 1997 - 2001: Cork Institute of Technology • FÁS Apprenticeship (Pipe Fitting); Full Merits • ECDL computing course • Currently studying for PMP project management Exam Courses / Training • FÁS Safe Pass Card valid until 11/16 • Manual Handling, Safety Harness, Scissor Lift, Mobile Scaffold • Plastic Fusion Training and Abrasive Wheel Training • Highly capable in Gas Welding, Arc Welding and Brazing
  • 2. Work Experience: 2014 (November) – To date Mercury Engineering Project: Zenium Data Center (Frankfurt - Germany) Position: Mechanical & Civil P.M Rory O’Brien Coordinator Duties: • Supervise and Coordinate the Mechanical and Civil Construction works on site • Responsible for Subcontractors daily activities • Responsible for all subcontractor site safety Inductions • Logging & documenting safety folder • Procurement of materials • Responsible for the preparation of T&C paper works 2014 (April) – 2014 (October) Mercury Engineering Project: Primark Retail (Dusseldorf - Germany) Position: Mechanical Supervisor P.M Declan Prunty Duties: • Responsible for Subcontractors daily activities • Logging & documenting safety folder • Shutting down and connecting to existing POCs using lock & tag out system. • Procurement of materials. • Red line the changes that have occurred during construction for official As Built plans. 2013 (March) – 2014 (March) Sepam Qatar Project: New Doha International Airport (Qatar) Position: Superintendent P.M Michael G Maher Duties: • Set up a work shop and trained over 135 Plumbers in Swagelok Bending for a project in Saudi Arabia. • Allocation and supervision of construction team. • Ensuring permits and safety were in place as a first priority. • Regular meetings with management and client working to program. • Installation of domestic plumbing, HVAC, sprinkler, sanitary services. 2013 (Jan) – 2013 (March): Dornan Engineering Project: Santander Data Centre (Leicester UK) Position: Supervisor P.M Paul Morley Duties: • Supervision of pneumatic & hydro testing of large CHW piping services. • Ensuring permits and safety were in place as a first priority. • Regular meetings with management and client working to program. • Strict documentation kept at all times.
  • 3. 2012 (May) – 2012 (Dec) Dornan Engineering Project: Abbott Pharmaceutical (Amsterdam) Position: Supervisor P.M John Maloney Duties: • Installation of stainless steel drains service pipe work to clean rooms. • Supervision of pneumatic & hydro testing of large CHW piping services. • Installation of large AHUs. • Shutting down and connecting to existing POCs using lock & tag out system. • Rigging large CHW heavy gauge pipes in to position. 2011 (Jul) – 2012 (Apr): L. Lynch & Co. Engineering Project: Mid-Western Regional Hospital (Limerick) Position: Supervisor P.M Mark O’Reilly Duties: • Installation of medical gas pipe work, Domestic, Sanitary & Medical waste. • Installation of large AHUs. • Supervision of pneumatic & hydro testing of large CHW piping services. • Installation of sanitary fittings and fixtures. • Insuring all materials especially copper pipe & fittings well secure. • Procurement of materials. 2010 (Jan) – 2011 (Jun): Dornan Engineering Project: Vistakon Pharmaceutical (Limerick) Position: Chargehand P.M Eoin Rice & John Lyons Duties: • Installation of stainless steel drains service pipe work to clean rooms • Setting and prepping pipe work for orbital welding • Supervision of pneumatic & hydro testing of large CHW piping services. • Tagging, labelling & installation of valves, sensors, gauge, instruments. 2009 (Nov) – 2009 (Dec): MSL Engineering Ltd. Project: Whitegate Oil Refinery, Cobh (Cork) Position: Pipe Fitter P.M: Dave Barry Duties: • 4 Week Shutdown – Strip-out and re-fit of excising pipe & valves • Ensuring permits and safety were in place as a first priority. • Coordinating with shut down team to ensure pipe work drained and steam cleaned before cutting pipe or unbolting flanges. • Completing and signing off punch list. • Working off P&IDs and isometric drawings, red lining and documenting drawings for as builds
  • 4. 2009 (Mar) – 2009 (Nov): McGrath Engineering Project: Kurnell Desalination Plant (Sydney) Position: Pipe Fitter P.M Zach Robinson Duties: • Installation & preparation of stainless steel pipe work. • Pneumatic & hydro testing of large piping services. 2008 (Oct) – 2009 (Feb): Mercury Engineering Project: Corrib Gas Terminal (Mayo) Position Pipe Fitter P.M Will Tierney Duties: • Daily task fabrication of pipe work in work shop • On site cutting and replacing defected pipe work 2008 (Apr) – 2008 (Sep): Dornan Engineering Project: Mid-Western Regional Hospital (Limerick) Position: Chargehand P.M Sara Steele Duties: • Installation of mechanical services for Oncology Ward Extension • Coordinating with other subcontractors to complete works under our scope. • Regular meetings with management and client working to program. • Installation of sanitary fittings and fixtures. • Procurement of materials. 2006 (Feb) – 2008 (Mar): Dornan Engineering Project: Savoy Development Marriott Hotel (Limerick) Position: Chargehand P.M John Maloney Duties: • Installation of all mechanic services to premade bathroom pods. • Procurement of material 2005 (Jan) – 2006 (Jan): Dornan Engineering Project Bishop's Quay High Rise Office Block (Limerick) Position: Chargehand P.M John Maloney Duties: • Installation of Victaulic galvanised fire fighting dry riser, potable water & gas. • Installation of domestic sanitary piping services, cooling & heating AC units, bathroom fit-out, 2002 (Nov) – 2004 (Dec): Dornan Engineering Project: Marine Institute of Technology Oranmore (Galway) Position: Chargehand P.M John Maloney Duties: • Installation of Heating system, gas boilers, expansion vessels, AHUs, A/C units, ventilation ducts, chemical waste, deionised water, domestic bathroom kitchen, laboratories, & fish tank services.
  • 5. 2001 (Jan) – 2002 (Oct): Dornan Engineering Project Power Station, (Shannonbridge) & Lough Ree Power Station, (Longford) Position: Chargehand P.M Pat Rea / Gerry Walsh Duties: • Instrumentation piping bending of small bore stainless steel tube. • Fitting Instruments according to tag numbers & drawing number. • Installation of swagelok fittings • Setting and prepping pipe work for orbital welding 2001 (Jan) – 2001 (Jun): Dornan Engineering Project: Grove Island Leisure Centre, Corbally (Limerick) Position: Apprentice P.M Pat Griffin 2000 (Sep) – 2000 (Dec): Dornan Engineering Project: The Square Shopping Centre, Tallaght (Dublin) Position: Apprentice P.M Mark Dolan 1999 (Jan) – 2000 (Aug): Dornan Engineering Project: Guidant Pharmaceutical, Clonmel (Tipperary) Position: Apprentice P.M Gerry Walsh 1998 (Oct) – 1999 (Dec): Dornan Engineering Project: Apple Computers, Knocknaheeney (Cork) Position: Apprentice P.M Pat Rea 1998 (June) – 1998 (Sep): Dornan Engineering Project: Analog Devices, Raheen (Limerick) Position: Apprentice P.M Dermot Daly 1998 (march) – 1998 (may): Dornan Engineering Project: Pretty Polly Plant, Killarney (Kerry) Position: Apprentice P.M Dan McCarthy 1997 (Dec) – 1998 (Feb): Dornan Engineering Project: Cable & wireless (Shannon) Position: Apprentice P.M Pat Griffin References: • Will Tierney CSU Lead at Shell Oil • Paul Flynn Operations Director at Dornan Engineering • John Maloney Contracts Manager at Dornan Engineering • Michael G Maher Operations Manager at Sepam Qatar • Damien Clonan Construction Manager Mercury Engineering • Contact details to be furnished upon request.